Page-1 Lockheed Martin Lifetime Support Operations
Transcript
Page 1: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-1

Lockheed MartinLifetime Support Operations

Page 2: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-2

�Primarily Performance Based Logistics ContractsToday to Support LM Weapon Systems andCommercial

�Includes Command and Control Systems for LogisticsProcesses

�Moving Towards Total Sustainment of Systems thatComprise Both LM and other OEM Components,Involving Automated Supply Chain Management,Maintenance Free Operating Period Design, DistanceSupport and Total Asset Visibility

Enterprise Logistics

Page 3: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-3

ConditionBased Maintenance

Process

Prognostics &Health Mgmt

Sensor Algorithms

“O” LevelMaint. Action

Creates demand

Intelligent Supply Chain Management ~ SCM Command Center1. Electronically accept requisition (MILSTRIP, EDI, …)2. Query CM data base to validate correct part is being ordered3. Validate software compatibility4. Determine Safe Stocking Level5. Contact 3PL for shipment and TAV6. Validate delivery and carcass return

Update Real-TimeDemand Forecast &

Adjust inventory buys& Schedules

Failure Analysis ~ SILC• trending• training related• engineering related• process related

10

CEE is the Backbone of the D2DCEE is the Backbone of the D2D System DescriptionOperational ConceptSpecification and Data ManagementFunctional DescriptionSoftware Requirements SpecificationsDesign Descriptions for HW & SWAs DesignedProduct Hierarchy for System InstanceAs BuiltAs TestedAs InstalledAs MaintainedSupport ProductsIETMTrainingMAMsOBRPsConfiguration ManagementBaseline ControlRelease Control

Life CycleGroundrulesPlatform Lifetime

Schedule / EffectivelyProgram Baseline PhasingTechnology Refreshment

Technology InsertionKits (Parts/SW/Documents)

Supply Support

ModelsPerformance Models

Resource ModelsReliability Models

Cost Models

Decision SupportCommon Requirements SetPOM Planning RequirementsBOM Generated from DevelopmentCAIV/DTA Trades (Acq vs Life Cycle)Fixed Period Cost ProjectionsFactory Cost Per SystemMapping to Total Ownership CostReliability ReportsModel Year PrescriptionKit DefinitionProduct CatalogPlatform Profile TrackingCommonality AssessmentCost Partitioning to Fleet, Acq Mgrs

The CollaborativeEngineering Environment:•Integrated Product Data Environment. Single,Integrated Database System for EngineeringDesign. Represents the Product, All of ItsAttributes, and All of Its Constructs. HierarchicalViews for Both Functional & Physical Structure .Coordinated Work Efforts Latest Views ofProduct to All Users. Management of Work Flowand Scheduling. Implements Effective BusinessProcesses. Manages System Baseline, Bills ofMaterial, and Support Products. AutomatedConfiguration Management of Documents andParts, Etc. Imbedded Change Management FleetSupport . Data Readily Available Interfaces MRPfor Production. Serves As Full DesignAuthentication System

Create Once,Update Once,Use Many !!!

Optimization ofSupport Elements& Supply Chain

ConsistentSystem Viewto Designers,Op Support,

& Fleet

CEEInstalled Asset Base

Op SupportCustomers

Suppliers

Engineering

CAIV

DTA

OPERATIONAL

PHYSICAL

SCHEDULE

INFRASTRUCTURE

FUNCTIONAL

e-Business Portal

•Single problem or trend•Root cause analysis•Correct IETM•Hardware/Software ECP•Process Change

Maintenance Assist•Web-enabled distance support ~ NavalSupport.com•Field rep maint. Ass’t application ~ eLert•Distance training ~ IETM

Autonomous & Intelligent Design to Disposal Management & Control ofMaintenance, Engineering, CM, Training, Field & Distance Support, Supplier/Repair,

Warehouse, Inventory, Transportation, PHM, Government Interfaces & Portals

Design to Disposal™™ Intelligent Logistics Architecture

Page 4: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-4

Lifetime Support Command Center (LSCC)Lifetime Support Command Center (LSCC)

Our Command Center is in use TODAYOur Command Center is in use TODAY

Page 5: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-5

PBL Performance in OEF/OIF

100.0 100.0

95.7

88.3

100.0 99.0

93.492.1

86.6

100.098.2

100.0

75

80

85

90

95

100

F-04 M-04 A-04 M-04 J-04 J-04 A-04 S-04 O-04 N-04 D-04 J-05

SMA

Cum

99.01%98.61%

99.30%

98.21%

99.81%

97.83%

98.82%

97.18%

98.94%99.48%

97.43%

99.61%

90.00%

91.00%

92.00%

93.00%

94.00%

95.00%

96.00%

97.00%

98.00%

99.00%

100.00%

Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05

PE

RCE

NT

OF

RE

QU

ISIT

ION

S

45,109 casings for45,109 casings forretreading sinceretreading since

start upstart up

Call 1Call 1--866866--686686--00600060

From anywhere in theFrom anywhere in theWORLDWORLD

ReverseReverse LogisticsLogistics

Page 6: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-8

Combining the Best Commercial and DODCombining the Best Commercial and DODProcessesProcesses

General Aviation

Space shuttle

CommercialRegional

Military

Page 7: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-9

Total System Support ResponsibilityFrom Systems to “Systems of Systems”

Base of In-Place System Level Lifetime Support& Performance Based Logistics Contracts

------------------------------------------------Surface Combat System Related• AEGIS Lifetime Support ~ MS2

Moorestown• MK-41 VLS ~ MS2 Baltimore• MK-92 FCS ~ LMIS Huntsville/Moorestown• USQ-70 ~ MS2-Eagan-------------------------------------------------Naval Aviation Related• S-3 PVS ~ Aero Marietta• CASS ~ LMSTS Orlando• LANTIRN PBL ~ M&FC, Orlando• Navy Aircraft Tires ~ MS2

Moorestown• H-60 ~ LMSI / Sikorsky JV--------------------------------------------------Submarine Related• BSY2 POSS ~ MS2 Syracuse• ARCI PBL ~ MS2 Manassas--------------------------------------------------Army• JAVELIN ~ M&FC• HIMARS ~ M&FC

Total SystemSupport Responsibility

Ultimate Goal:Maintenance Free

Operating Design &Autonomous

Support

System of SystemsTotal Platform

Support

• F-117 TSPR ~ Aero• F-35 TSPIR ~ JSF• Deepwater ~ MS2• THAAD ~ Space

New Major SystemProgram Pursuits• Littoral Command Ship

~ MS2• MUOS ~ Space• SBR ~ Space

D2D/ALISfor Autonomic Logistics

Page 8: Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 PERCENT OF REQUISITIONS 45,109casingsfor retreadingsince

Page-10

Cumulative Life-Cycle CostsIncurred by the Program/System

$

Conceptual/Preliminary

Design

DetailDesign/

Development

Production/Construction

System Use/Support/Phase-out

Maintenance Free Operating Period (MFOP)Maintenance Free Operating Period (MFOP) --Wedge of OpportunityWedge of Opportunity

Traditional source ofthe lion’s share ofsystem cost

Traditional source ofthe lion’s share ofsystem cost

Impact of COTS• Less Design• Less Schedule• Modularity &

Scalability

Impact of COTS• Less Design• Less Schedule• Modularity &

Scalability

MFOPSavings Opportunity

MFOPSavings Opportunity

LogisticsLogisticsSavingsSavings

• Tech Refresh• Training• Maintenance• Supply Support

20-35 Years

••MFOPMFOP -- Eliminates maintenance and the need for associated support whilEliminates maintenance and the need for associated support while aligninge aligninglogistics actions with preplanned COTS Technology Refresh and Inlogistics actions with preplanned COTS Technology Refresh and Insertion for improvedsertion for improvedOperational Availability.Operational Availability.