+ All Categories
Home > Education > Login methodology for Primavera V8.3 (EPPM)

Login methodology for Primavera V8.3 (EPPM)

Date post: 06-May-2015
Category:
Upload: cadd-centre-software-solutions-private-limited
View: 447 times
Download: 0 times
Share this document with a friend
Description:
Describes about the logging in methodology for Primavera EPPM V8.3
Popular Tags:
18
“Log in to Primavera P6 EPPM 8.3 Version” Exercise Section 1: Purpose This exercise takes you through the process of logging in to the P6 EPPM v8.3 software. Section 2: Log in to Primavera Unifier Open Internet Explorer. Navigate to the URL provided with your registration. Enter your Username and password.
Transcript
Page 1: Login methodology for Primavera V8.3 (EPPM)

“Log in to Primavera P6 EPPM 8.3 Version” Exercise

Section 1: Purpose This exercise takes you through the process of logging in to the P6 EPPM v8.3

software.

Section 2: Log in to Primavera Unifier Open Internet Explorer.

Navigate to the URL provided with your registration.

Enter your Username and password.

Page 2: Login methodology for Primavera V8.3 (EPPM)

Section 3: Check that you have 5 Main Tabs

Navigate in to the tool and see that you have 5 main tabs in the application as it is

shown below.

Page 3: Login methodology for Primavera V8.3 (EPPM)

“Customize your own Dashboard” Exercise

Section 1: Purpose This exercise will show you how you can manage your Dashboards and how to in this

case customize your own dashboard.

Section 2: Go to the Dashboard tab

Go to the dashboard tab and hit the Manage Dashboard option.

Page 4: Login methodology for Primavera V8.3 (EPPM)

Section 3: Customize your Own Dashboard

Expand the available Dashboards and check the “Personal Workspace” box.”

Page 5: Login methodology for Primavera V8.3 (EPPM)

Press the “Personal Workspace Dashboard” option and you will see the content of the

Personal Workspace Dashboard , which you will now customize.

Check the needed boxes as shown in the above screenshot

Page 6: Login methodology for Primavera V8.3 (EPPM)

Go to the Layout and design the position of the portlets chosen by you.

Go to the access tab and release this Dashboard either to all the users or only to the

current user.

Page 7: Login methodology for Primavera V8.3 (EPPM)

Section 4: View your new created Dashboard

As shown in the above screenshot you can now view the new and customized Dashboard for your future usage.

Page 8: Login methodology for Primavera V8.3 (EPPM)

“Create a new Portfolio” Exercise

Section 1: Purpose This exercise will show you how you can create a new Portfolio using the filter option.

Section 2: Navigate to the Portfolio tab

Go and hit the Portfolio tab and following this hit the “Manage Portfolios” option.

Section 3: Create a new Project Portfolio As shown below please go to the “create Project Portfolio” option and try to create your

own Portfolio.

Page 9: Login methodology for Primavera V8.3 (EPPM)
Page 10: Login methodology for Primavera V8.3 (EPPM)

As shown in the above screenshot, please chose;

-By Filter,

-Current user,

-As the filter criteria;

“Budget at completion” is greater than 10000 $

Project Status equals to “active”.

-Then hit the save button.

Go back to the Portfolio Analysis subtab and view the new created Portfolio.

Page 11: Login methodology for Primavera V8.3 (EPPM)

“Create a new Project using the template

concept”

Exercise

Section 1: Purpose This exercise will show you how you can create a new Project using a template which is

already existing in the system.

Section 2: Navigate to the EPS tab and add a new Project

-Please go to the EPS tab and go to the actions button

-Go to add >> add Project

Page 12: Login methodology for Primavera V8.3 (EPPM)

-Add Project window opens

-Enter Project ID and Project name and select the IT template as shown in the above

screeshot.

-After this you will see the new created “Redfish” project. Under the EPS

tab. Section 3: Open the new created Project and add 3 new activities

to the Redfish Project

Page 13: Login methodology for Primavera V8.3 (EPPM)

-Open the Redfish Project with right click.

-Under the Projects tab go to the “activities” sub tab and see the WBS o created Project

Redfish. -Go to the Testing Phase >> Test system and hit the “Insert” button on your keyboard.

This enables you to add new activities into the existing WBS structure.

-Finally click all the new created 3 activites and link them using the “Link selected

Activities” option.

f

Page 14: Login methodology for Primavera V8.3 (EPPM)
Page 15: Login methodology for Primavera V8.3 (EPPM)

“Check the Resource Overallocation” Exercise

Section 1: Purpose This exercise will show you where the Resource meta data is centrally defined

and stored in the system and will also show you how you can view the overallocation of

a specific Resource.

Section 2: Navigate to the Resource Tab

Navigate to the Resources tab and see the Resources and Roles tab as shown in the

above screenshot. This is where Resources and Roles can be defined and

stored centrally.

Section 3: Navigate to the Resource Tab >> Analysis >> Resource

usage sub tab In this section we want to show you that you can check the loading status of the

Resouce called “Gary Marshall” using the Resource usage option of P6. The red bars

below indicate the overallocated time period of this specific resource.

Page 16: Login methodology for Primavera V8.3 (EPPM)

Section 4: Navigate to the Resource Tab >> Analysis >> Resource

Analysis sub tab

Now that we have understood the overallocation status of this resource we can

now view the load distribution of Gary Marshall based on what projects he is working or

he is planned to work on in the future. Please see the legend as shown in the

below screenshot.

Page 17: Login methodology for Primavera V8.3 (EPPM)

“Run a user-defined Report” Exercise

Section 1: Purpose This exercise shows you how you can run & schedule the reports that are

already existing in the system.

Section 2: Navigate to the Reports tab of P6 EPPM Navigate to the Reports tab of P6 EPPM and hit the “Project status report” under P6

Reports >> Project folder.

-Right click the Project status report and click “Run the report” option.

Section 3: Run and schedule a predefined User-defined

Report

Page 18: Login methodology for Primavera V8.3 (EPPM)

-Now you have to define the format, delivery type and also set the Report parameters

(Project ID & Project Status) which are pre-defined and can fully be configured using BI

Publisher.

-Finally you can set a frequency for the report to be created and distributed to

the defined stakeholders via mail as it is shown in the above screenshot.


Recommended