+ All Categories
Home > Documents > Logistics Infrastructure and Economic Growth

Logistics Infrastructure and Economic Growth

Date post: 06-Feb-2016
Category:
Upload: terah
View: 23 times
Download: 0 times
Share this document with a friend
Description:
ECON 705Spring 2012. Logistics Infrastructure and Economic Growth. Omor Sharif Jaime Ketten Qun Wang. Attractions of this research. Should countries invest on infrastructure? Could we get money from invest on infrastructure? Does it help economic growth?. - PowerPoint PPT Presentation
Popular Tags:
31
Logistics Infrastructure and Economic Growth Omor Sharif Jaime Ketten Qun Wang ECON 705 Spring 2012 1
Transcript
Page 1: Logistics Infrastructure and Economic Growth

1

Logistics Infrastructure and Economic Growth

Omor SharifJaime Ketten

Qun Wang

ECON 705 Spring 2012

Page 2: Logistics Infrastructure and Economic Growth

Attractions of this research

• Should countries invest on infrastructure?• Could we get money from invest on

infrastructure?• Does it help economic growth?

Page 3: Logistics Infrastructure and Economic Growth

Empirical studies on Infrastructure and economic growth

• Positive relationship results• Easterly and Rebelo (1993) • World Bank (1994) • Yoshino and Nakahigashi (2000) • Yoshida (2000) • Negative relationship results • Deverajan, Swaroop and Zou (1996) • Mosley (1985) • Kocherlakota and Yi (1996)

Page 4: Logistics Infrastructure and Economic Growth

Purpose for this research

• To determine whether countries invest in infrastructure

• To examine the relationship between infrastructure and economic growth in different areas

• Data source– World Bank– GDP in 2006 and 2009– 139 countries

Page 5: Logistics Infrastructure and Economic Growth

5

Infrastructure Data

• LPI index published by World Bank as a measure of a country's logistics performance (2006 and 2009)

• The ranking is on a continuous scale between 1- worst to 5- best.

• The factors considered in building LPI index are- Quality of infrastructure Competence of private and public logistics service providers Performance of customs and other borders agency Corruption and transparency Reliability of trading and supply chain.• LPI Based on a world-wide survey of global freight forwarders

and express carriers.

Page 6: Logistics Infrastructure and Economic Growth

6

International LPI: ranking

Page 7: Logistics Infrastructure and Economic Growth

7

Variables

• GDP (RGDPL)• Quality of Trade and Transport Infrastructure• Logistics Performance Index (LPI)• Cell Phone Use per 100 People• Population Density• Urban Population• Life Expectancy• South Asia, Europe, Middle East, Africa, Latin America, • Income Groups: Low, Lowmid, Upmid, OECD

Page 8: Logistics Infrastructure and Economic Growth

8

Variable DF Estimate Error t Value Pr > |t| Intercept 1 0.079184 0.011574 6.84 <.0001 inf06 1 -0.02156 0.004314 -5.00 <.0001

R-Square 0.15424

Variable DF Estimate Error t Value Pr > |t| Intercept 1 0.047034 0.030662 1.53 0.1274inf06 1 -0.02229 0.004361 -5.11 <.0001pop06 1 0.002092 0.001848 1.13 0.2595

R-Square 0.16190

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE

Page 9: Logistics Infrastructure and Economic Growth

9

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -0.13343 0.111782 -1.19 0.2347inf06 1 -0.02936 0.007459 -3.94 0.0001pop06 1 0.005063 0.007857 0.64 0.5204urb06 1 -0.00252 0.008014 -0.31 0.7533life06 1 0.045055 0.026708 1.69 0.0939

R-Square 0.17625

Variable DF Estimate Error t Value Pr > |t|Intercept 1 0.047090 0.032157 1.46 0.1454inf06 1 -0.02231 0.006150 -3.63 0.0004

pop06 1 0.002048 0.007614 0.27 0.7884urb06 1 0.000047 0.007830 0.01 0.9952

R-Square 0.16189

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE

Page 10: Logistics Infrastructure and Economic Growth

10

Variable DF Estimate Error t Value Pr > |t|

Intercept 1 0.088963 0.144387 0.62 0.5389Inf06 1 -0.04174 0.017179 -2.43 0.0165Pop06 1 -0.00207 0.009822 -0.21 0.8335Urb06 1 0.005389 0.010439 0.52 0.6066Life06 1 0.002069 0.035558 0.06 0.9537Sasia 1 -0.01556 0.018042 -0.86 0.3899Eur 1 -0.00489 0.021609 -0.23 0.8213Mideast 1 -0.03283 0.016991 -1.93 0.0555Afr 1 -0.03444 0.016778 -2.05 0.0421Latam 1 -0.01824 0.016691 -1.09 0.2766Pac 1 -0.00282 0.011531 -0.24 0.8075

R-Square 0.22252

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE

Page 11: Logistics Infrastructure and Economic Growth

11

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -0.05672 0.115236 -0.49 0.6234Inf06 1 -0.02153 0.010927 -1.97 0.0509Pop06 1 0.014199 0.008984 1.58 0.1164Urb06 1 -0.01223 0.009467 -1.29 0.1986Life06 1 0.021142 0.028870 0.73 0.4653Low 1 -0.00069 0.009306 -0.07 0.9410Lowmid 1 0.006006 0.009691 0.62 0.5365Upmid 1 0.024165 0.010778 2.24 0.0267High 1 0.008690 0.010379 0.84 0.4040

R-Square 0.22314

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE

Page 12: Logistics Infrastructure and Economic Growth

12

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP2009

Variable DF Estimate Error t Value Pr > |t| Intercept 1 3.445936 0.363617 9.48 <.0001Inf06 1 2.035044 0.136241 14.94 <.0001

R-Square 0.61957

Variable DF Estimate Error t Value Pr > |t| Intercept 1 6.184289 0.870364 7.11 <.0001Inf06 1 2.111755 0.136616 15.46 <.0001Pop06 1 -0.18063 0.052277 -3.46 0.0007

R-Square 0.63816

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP 2009

Page 13: Logistics Infrastructure and Economic Growth

13

Variable DF Estimate Error t Value Pr > |t| Intercept 1 6.639336 0.854975 7.77 <.0001Inf06 1 1.889878 0.199025 9.50 <.0001Pop06 1 -0.48564 0.218660 -2.22 0.0280Urb06 1 0.326180 0.228213 1.43 0.1552

R-Square 0.68282

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -1.68302 2.429834 -0.69 0.4897Inf06 1 1.348620 0.215298 6.26 <.0001Pop06 1 -0.50418 0.167388 -3.01 0.0031Urb06 1 0.382722 0.175339 2.18 0.0308Life06 1 2.171434 0.610573 3.56 0.0005

R-Square 0.79162

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP 2009

Page 14: Logistics Infrastructure and Economic Growth

14

Variable DF Estimate Error t Value Pr > |t| Intercept 1 0.421419 2.028337 0.21 0.8357Inf06 1 0.622163 0.241328 2.58 0.0111Pop06 1 -0.72212 0.137974 -5.23 <.0001Urb06 1 0.656572 0.146644 4.48 <.0001Life06 1 2.055050 0.499519 4.11 <.0001Sasia 1 -0.29453 0.253456 -1.16 0.2474Eur 1 -0.27386 0.303565 -0.90 0.3687Latam 1 -0.51601 0.234471 -2.20 0.0295Mideast 1 -0.50936 0.238687 -2.13 0.0347Pac 1 -0.67019 0.161988 -4.14 <.0001Afr 1 -0.90382 0.235702 -3.83 0.0002

R-Square 0.88437

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP 2009

Page 15: Logistics Infrastructure and Economic Growth

15

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -1.66727 2.110936 -0.79 0.4311Inf06 1 1.346779 0.200171 6.73 <.0001Pop06 1 -0.31267 0.164575 -1.90 0.0597Urb06 1 0.185938 0.173426 1.07 0.2856Life06 1 2.085674 0.528844 3.94 0.0001Low 1 0.074968 0.170479 0.44 0.6609Lowmid 1 0.530402 0.177533 2.99 0.0034Upmid 1 0.748831 0.197443 3.79 0.0002High 1 0.238451 0.190124 1.25 0.2120

R-Square 0.82865

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP 2009

Page 16: Logistics Infrastructure and Economic Growth

16

Variable DF Estimate Error t Value Pr > |t|

Intercept 1 0.075925 0.008270 9.18 <.0001Inf 1 -0.02005 0.003043 -6.59 <.0001

R-Square 0.13588

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE (278 Samples)

Variable DF Estimate Error t Value Pr > |t|

Intercept 1 0.040119 0.021758 1.84 0.0663Inf 1 -0.02099 0.003080 -6.81 <.0001Pop 1 0.002351 0.001322 1.78 0.0765

R-Square 0.14546

Page 17: Logistics Infrastructure and Economic Growth

17

Variable DF Estimate Error t Value Pr > |t| Intercept 1 0.040833 0.022749 1.79 0.0738Inf 1 -0.02327 0.004727 -4.92 <.0001Pop 1 0.001907 0.005625 0.34 0.7349Popdens 1 4.47E-6 2.601E-6 1.72 0.0869

Urbpop 1 0.000740 0.005852 0.13 0.8995R-Square 0.15388

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -0.14245 0.083282 -1.71 0.0883Inf 1 -0.02844 0.005647 -5.04 <.0001Pop 1 0.004905 0.005702 0.86 0.3904Urbpop 1 -0.00197 0.005872 -0.34 0.7374Life 1 0.045331 0.019947 2.27 0.0238

R-Square 0.15844

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE (278 Samples)

Page 18: Logistics Infrastructure and Economic Growth

18

PANEL STUDY RESULTS Dependent Variable: Growth Rate

Variable DF Estimate Error t Value Pr > |t|

Intercept 1 0.088116 0.102019 0.86 0.3885Inf 1 -0.03683 0.012165 -3.03 0.0027Pop 1 -0.00155 0.007075 -0.22 0.8266Urbpop 1 0.005111 0.007646 0.67 0.5044Life 1 -0.00231 0.025214 -0.09 0.9272Sasia 1 -0.00874 0.011953 -0.73 0.4653Eur 1 0.004750 0.013975 0.34 0.7342Mideast 1 -0.02836 0.011586 -2.45 0.0150Afr 1 -0.03220 0.012030 -2.68 0.0079Latam 1 -0.01293 0.011370 -1.14 0.2565Pac 1 -0.00196 0.007934 -0.25 0.8055

R-Square 0.21727

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE (278 Samples)

Page 19: Logistics Infrastructure and Economic Growth

19

PANEL STUDY RESULTS Dependent Variable: Growth Rate

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -0.03139 0.087912 -0.36 0.7214Inf 1 -0.01520 0.008741 -1.74 0.0832Pop 1 0.016682 0.006715 2.48 0.0136Urbpop 1 -0.01502 0.007236 -2.08 0.0389Life 1 0.011648 0.022310 0.52 0.6020Low 1 0.001844 0.006686 0.28 0.7829Lowmid 1 0.009333 0.007128 1.31 0.1915Upmid 1 0.027541 0.007925 3.48 0.0006High 1 0.006879 0.007229 0.95 0.3422

R-Square 0.20970

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GROWTH RATE (278 Samples)

Page 20: Logistics Infrastructure and Economic Growth

20

PANEL STUDY RESULTS Dependent Variable: GDP

Variable DF Estimate Error t Value Pr > |t| Intercept 1 3.970727 0.209457 18.96 <.0001Inf 1 1.796615 0.077067 23.31 <.0001

R-Square 0.66320

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP (278 Samples)

Variable DF Estimate Error t Value Pr > |t| Intercept 1 6.856595 0.532143 12.88 <.0001Inf 1 1.872628 0.075337 24.86 <.0001Pop 1 -0.18945 0.032327 -5.86 <.0001

R-Square 0.69289

Page 21: Logistics Infrastructure and Economic Growth

21

Variable DF Estimate Error t Value Pr > |t| Intercept 1 7.519486 0.488020 15.41 <.0001Inf 1 1.612807 0.101404 15.90 <.0001Pop 1 -0.74957 0.120675 -6.21 <.0001Popdens 1 -0.00017 0.000056 -3.01 0.0029Urbpop 1 0.587837 0.125550 4.68 <.0001

R-Square 0.75457

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -3.86567 1.371228 -2.82 0.0052Inf 1 1.031105 0.092984 11.09 <.0001Pop 1 -0.65341 0.093877 -6.96 <.0001Urbpop 1 0.542646 0.096679 5.61 <.0001Life 1 2.847646 0.328421 8.67 <.0001

R-Square 0.84344

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP (278 Samples)

Page 22: Logistics Infrastructure and Economic Growth

22

PANEL STUDY RESULTS Dependent Variable: GDP

Variable DF Estimate Error t Value Pr > |t| Intercept 1 -0.33207 1.388229 -0.24 0.8111Inf 1 0.482878 0.165530 2.92 0.0038Pop 1 -0.77472 0.096268 -8.05 <.0001Urbpop 1 0.711850 0.104043 6.84 <.0001Life 1 2.324046 0.343100 6.77 <.0001Sasia 1 -0.47846 0.162654 -2.94 0.0036Eur 1 -0.53801 0.190163 -2.83 0.0050Mideast 1 -0.61039 0.157653 -3.87 0.0001Afr 1 -0.97833 0.163700 -5.98 <.0001Latam 1 -0.67231 0.154714 -4.35 <.0001Pac 1 -0.70815 0.107961 -6.56 <.0001

R-Square 0.89413

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP (278 Samples)

Page 23: Logistics Infrastructure and Economic Growth

23

PANEL STUDY RESULTS Dependent Variable: GDP

Variable DF Estimate Error t Value Pr > |t| Intercept 1 0.308366 1.719194 0.18 0.8578Inf 1 1.633647 0.170932 9.56 <.0001Pop 1 -0.18536 0.131315 -1.41 0.1592Urbpop 1 0.013264 0.141502 0.09 0.9254Life 1 1.546110 0.436299 3.54 0.0005Low 1 0.171979 0.130747 1.32 0.1895Lowmid 1 0.656368 0.139390 4.71 <.0001Upmid 1 0.870375 0.154987 5.62 <.0001High 1 0.234528 0.141373 1.66 0.0983

R-Square 0.81272

SYSLIN procedure / 2 Stage Least Squares EstimationDependent Variable: GDP (278 Samples)

Page 24: Logistics Infrastructure and Economic Growth

24

Variable DF Estimate Error t Value Pr > |t| CS1 1 -3.76505 0.1109 -33.94 <.0001CS138 1 -3.19366 0.1014 -31.50 <.0001 Intercept 1 10.41614 0.1366 76.26 <.0001Inf 1 0.032526 0.0313 1.04 0.3000Year 1 0.066734 0.00921 7.25 <.0001

R-Square 0.9985

PANEL Procedure / Fixed One Way EstimatesDependent Var: GDP (Cross Section = 139, Time Series = 2)

Variable DF Estimate Error t Value Pr > |t| CS1 1 -3.10206 0.3313 -9.36 <.0001 CS138 1 -2.24647 0.4577 -4.91 <.0001 Intercept 1 4.678208 2.7091 1.73 0.0865 Inf 1 0.03285 0.0309 1.06 0.2892Pop 1 0.294917 0.1391 2.12 0.0358Year 1 0.051621 0.0116 4.47 <.0001

R-Square 0.9985

Page 25: Logistics Infrastructure and Economic Growth

25

Variable DF Estimate Error t Value Pr > |t| CS1 1 -1.772 0.5441 -3.26 0.0014 CS138 1 -1.38726 0.5272 -2.63 0.0095 Intercept 1 5.471969 2.6440 2.07 0.0404Inf 1 0.048481 0.0304 1.59 0.1134Pop 1 -0.83954 0.3979 -2.11 0.0367Urbpop 1 1.103951 0.3642 3.03 0.0029Year 1 0.026932 0.0139 1.94 0.0542

R-Square 0.9986

PANEL Procedure / Fixed One Way EstimatesDependent Var: GDP (Cross Section = 139, Time Series = 2)

Page 26: Logistics Infrastructure and Economic Growth

26

PANEL PROCEDURE RESULTSFIXED ONE WAY ESTIMATES

Dependent Variable: GDP

Variable DF Estimate Error t Value Pr > |t| CS1 1 -1.66941 0.5907 -2.83 0.0054 CS138 1 -1.25496 0.6039 -2.08 0.0396 Intercept 1 3.79932 4.5417 0.84 0.4043Inf 1 0.048505 0.0305 1.59 0.1143Pop 1 -0.77466 0.4239 -1.83 0.0699Urbpop 1 1.033243 0.3971 2.60 0.0103Life 1 0.4083 0.9000 0.45 0.6508

Year 1 0.022866 0.0165 1.38 0.1692R-Square 0.9986

PANEL Procedure / Fixed One Way EstimatesDependent Var: GDP (Cross Section = 139, Time Series = 2)

Page 27: Logistics Infrastructure and Economic Growth

27

Parameter Estimate Error t Value Pr > |t| Intercept 0.0730293 0.01176605 6.21 <.0001Inf06 -0.0192010 0.00386650 -4.97 <.0001

R-square 0.1569

SURVEYREG Procedure / Clusters = 139, DOF = 138Dependent Var: Growth Rate

Parameter Estimate Error t Value Pr > |t| Intercept 0.0429448 0.03412800 1.26 0.2104Inf06 -0.0197224 0.00395885 -4.98 <.0001Pop06 0.0019330 0.00207526 0.93 0.3533

R-square 0.1637

Page 28: Logistics Infrastructure and Economic Growth

28

Parameter Estimate Error t Value Pr > |t| Intercept 0.0392951 0.03541769 1.11 0.2692inf06 -0.0181495 0.00473182 -3.84 0.0002pop06 0.0054289 0.00766120 0.71 0.4798urb06 -0.0036768 0.00745685 -0.49 0.6227

R-square 0.1654

SURVEYREG Procedure / Clusters = 139, DOF = 138Dependent Var: Growth Rate

Parameter Estimate Error t Value Pr > |t| Intercept -0.0767370 0.10747903 -0.71 0.4765inf06 -0.0209545 0.00483316 -4.34 <.0001pop06 0.0086201 0.00787032 1.10 0.2753urb06 -0.0067225 0.00777550 -0.86 0.3888life06 0.0282100 0.02556836 1.10 0.2718

R-square 0.1735

Page 29: Logistics Infrastructure and Economic Growth

29

Parameter Estimate Error t Value Pr > |t| Intercept 4.97606535 0.22423336 22.19 <.0001Inf06 1.44786498 0.07111614 20.36 <.0001

R-square 0.6227

SURVEYREG Procedure / Clusters = 139, DOF = 138Dependent Var: GDP 2009

Parameter Estimate Error t Value Pr > |t| Intercept 7.1818017 0.78916487 9.10 <.0001Inf06 1.4860911 0.07035441 21.12 <.0001Pop06 -0.1417202 0.04740760 -2.99 0.0033

R-square 0.6481

Page 30: Logistics Infrastructure and Economic Growth

30

SURVEYREG PROCEDURE REGRESSION RESULTSDependent Variable: GDP2009

Parameter Estimate Error t Value Pr > |t| Intercept 8.2868366 0.68904769 12.03 <.0001Inf06 1.0098468 0.09053863 11.15 <.0001Pop06 -1.2002088 0.16394209 -7.32 <.0001Urb06 1.1132604 0.16460550 6.76 <.0001

R-square 0.7550

SURVEYREG Procedure / Clusters = 139, DOF = 138Dependent Var: GDP 2009

Parameter Estimate Error t Value Pr > |t| Intercept -6.3570985 2.09044902 -3.04 0.0028Inf06 0.6558352 0.07860621 8.34 <.0001Pop06 -0.7974655 0.14381317 -5.55 <.0001Urb06 0.7288757 0.14096802 5.17 <.0001Life06 3.5602720 0.47437483 7.51 <.0001

R-square 0.8458

Page 31: Logistics Infrastructure and Economic Growth

CONCLUSION

31

Both LPI and Trade and Transport Infrastructure seem to positively affect Log(RGDPL). LPI is always significant, while Infrastructure loses significance when each country is accounted for, LPI remains significant.

Upper-middle, Lower-middle, and Low income countries are significantly different from OECD countries. High income (non-OECD) countries are not.

All regions developing countries are significantly different from developed countries.

Change in LPI and change in Infrastructure are not significant, but may positively affect change in Log(RGDPL).

LPI and Infrastructure negatively affect change in Log(RGDPL).


Recommended