LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg
Transcript
Page 1: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

LOGOPROJECT

Regensburg’s Implementation Plan(Part VI of the Management Plan)Barbara Bühler, City of Regensburg

Page 2: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 2

I. INTRODUCTION

II. IDENTIFYING ISSUES1. Understanding the historic urban area2. Stakeholders and Structure III. APPRAISAL1. Overall vision and objective for the historic urban area2. Field of actions, their principles, objectives and actions3. Organisational and operational structures

IV. IMPLEMENTATION1. Action Plan 2. Continuous monitoring and review

Objective of the Local Implementation Plan

Str

uctu

re M

anag

emen

t P

lan

LOCAL IMPLEMENTATION PLAN “LIP”

Part IV of the “CHIMP” is the “Local Implementation Plan” (LIP) which points out concrete actions and projects in support of the sustainable development and management of the historic urban area including costs, time frame, responsibilities, etc.

In order to facilitate funding for concrete measures on local level, the LIP should be elaborated in close co-operation with the associated Managing Authority.

Nils Scheffler
Describe what you want to achieve with your CHIMP.
Page 3: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 3

During the elaboration process of the ManagementPlan, the LSG conjointly identified 6 “Fields of Action”:

1. Built Cultural Heritage

2. Culture and Tourism

3. Economic Development

4. Urban Development and Urban Planning

5. Environmental Issues and Recreation

6. Awareness Raising and Science

Structure and Content of the LIP

Nils Scheffler
Describe with which issues you will deal with in the CHIMP. Name the field of actions and the structures and procedures you want to tackle or develop to secure to reach the objectives of the CHIMP.Lay down the table of content of your CHIMP.
Page 4: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 4

Structure and Content of the LIP

Done so far:

For each of the six „Fields of Action“ we defined principles and objectives

Next step:

Identification of concrete measures to support these objectives

Nils Scheffler
Describe with which issues you will deal with in the CHIMP. Name the field of actions and the structures and procedures you want to tackle or develop to secure to reach the objectives of the CHIMP.Lay down the table of content of your CHIMP.
Page 5: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 5

Field of Action

Objective Number Measure Priority Responsibleestimated

costs

Financing secured

(Investment Plan)

Funding by / Funding Programme

ScheduleLink to another

objective / measure

1. iv. 10Restoration of the

Stone Bridgehigh Department for … 1.000.000 € x Investitionspaket II: 80% 2010 ….

Field of Action the measure related to

Objective the measure supports

Number

What is it about? (keyword)

Priority

Responsible department / institution

Structure and Content of the LIP

Estimated costs

Financing Secured?

Funded by (Institution/Programme)

Time schedule

Link to another objective / measure

Nils Scheffler
Describe what you want to achieve with your CHIMP.
Page 6: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 6

Additional to the LIP table:

Extra sheet for high priority measures (1-2 pages) with further information such as

- Objective

- Brief description

- Steps for implementation / Time schedule

- expected output

- stakeholders to be involved

- if required: break down of costs

Structure and Content of the LIP

Nils Scheffler
Describe what you want to achieve with your CHIMP.
Page 7: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 7

The next two meetings are dedicated to the elaboration of the LIP:

- Analysis / collecting measures

- Check: still relevant?

- Responsibility

- Requirements for implementation

- Filling in the table

- Check: Is funding secured?

Elaboration Process of the LIP

LOCAL SUPPORT GROUP

Nils Scheffler
Describe what you want to achieve with your CHIMP.
Page 8: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 8

December 2009:

- Information evening

- Information desk

- PR

January 2010:

Civic Participation Process

Discussion of LIP with the public

Participation of all stakeholder groups

Elaboration Process of the LIP

CIVIC PARTICIPATION

Nils Scheffler
Describe what you want to achieve with your CHIMP.
Page 9: LOGO PROJECT Regensburg’s Implementation Plan (Part VI of the Management Plan) Barbara Bühler, City of Regensburg.

HerO Midterm-Conference in Valletta | 8th-10th November 2009 I Page 9

Recommendations / Lessons learnt

Regular information of the political level (City Council) / Approval of important steps and funding for concrete measures

Involvement of the public through Civic Participation Process

PR activities:

- Information during the elaboration process

- Presentation of the results to the public

Nils Scheffler
Describe what you want to achieve with your CHIMP.