Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Long-Term Plan UpdateLong-Term Plan Update
Options for Accelerating Recovery of Phosphorus Impacted Areas in the
Florida Everglades
February 28, 2006Long-Term Plan Annual Update
Jamie L. SerinoDirector, Everglades Division
SFWMD
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Options for Options for Accelerating RecoveryAccelerating Recovery
Problems:
Phosphorus (P) enriched discharges into the EPA Human-mediated changes to hydrologic patterns BMP and STAs address the source of P However, sediments in the impacted areas of the
Everglades are enriched in P Monotypic stands of cattail have resulted which are
dependent on the high levels of P This sediment will continue to be is a source of P for
cattail for decades
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Options for Options for Accelerating RecoveryAccelerating Recovery
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Options for Options for Accelerating RecoveryAccelerating Recovery
Approach:
Conduct research to answer questions related to accelerating the recovery of cattail impacted areas
SFWMD scientists developed research projects to address the issue: Fire Project The Cattail Habitat Improvement Project (CHIP)
These projects were presented at an “Options for Accelerating Recovery” Scientific and Public Workshop
The projects were then reviewed by an external panel of expert scientists
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Options for Options for Accelerating RecoveryAccelerating Recovery
Outcome:
A detailed Research Plan
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Options for Options for Accelerating RecoveryAccelerating Recovery
Projects Personnel:
Everglades Division Director (Jamie L. Serino) Project Manager for Accelerated Recovery (Thomas W. Dreschel)
Fire Project Scientists (PI: ShiLi Miao)
Cattail Habitat Improvement Project Scientists (PIs: Susan Newman, Scot Hagerthey, Mark Cook)
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Long Term Plan UpdateLong Term Plan Update
Ecological effects of fire and natural recovery in a phosphorus (P)-enriched
Everglades wetland (Fire Project)
ShiLi Miao
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Fire ProjectFire Project
Objectives:
To assess whether repeated fire can be used as an effective management tool to manage cattail expansion
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Fire ProjectFire Project
Project design: Six 300 m X 300 m plots within WCA2A
300 m300 m
300
m30
0 m
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Fire ProjectFire Project
Project Status:Completed Tasks
Site selection Walkway construction Coordination with
outside labs and agencies
Methods testing for sampling procedures
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Fire ProjectFire Project
Water
qualityBiomass
harvest
Plant
growthSoil
study
Studies Initiated:
Seed bank
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Fire ProjectFire Project
Upcoming events in 2006:
Continued pre-burn sampling and studies First burn implementation Post-burn sampling Initiation of decomposition study Initiation of native vegetation recruitment study Public outreach
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Long Term Plan UpdateLong Term Plan Update
The Cattail Habitat Improvement Project
Sue Newman, Scot Hagerthey, and Mark Cook
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Cattail Habitat Cattail Habitat Improvement ProjectImprovement Project
Objectives:
To determine the effects of large scale cattail removal on ecosystem structure (plants and animals) and function (e.g., nutrient cycling)
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Cattail Habitat Cattail Habitat Improvement ProjectImprovement Project
Project design: Created fifteen 250 m X 250
m plots within WCA2A Six plots in an enriched
area; three open plots and three control plots
Six plots in a transitional area; three open plots and three control plots
Three plots in an unenriched area; all control plots
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Cattail Habitat Cattail Habitat Improvement ProjectImprovement Project
250
m
Airboat Maintained Buffer (in open plots only)
Grab & Tube Samples
Autosampler
Hydrolab
Met Station
Designated Paths
Fish Sampling
Predefined Sampling Area
N
Staging Platform
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Cattail Habitat Cattail Habitat Improvement ProjectImprovement Project
Project Status: Pre-burn construction:
Fifteen wooden platforms (4X4 m) Nine wooden walkways (100 m) Six control plot metal sampling
platforms Six open plot metal sampling
platforms Completion of firebreaks around
open plots
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Cattail Habitat Cattail Habitat Improvement ProjectImprovement Project
Project status Completed tasks:
Protocol selection for each attribute
Pre/post burn water quality and herbicide monitoring design complete
Everglades Research Database Production attributes assigned
Coordinated with analytical labs and state agencies for sample analysis
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Cattail Habitat Cattail Habitat Improvement ProjectImprovement Project
Upcoming events in 2006: Continued maintenance of fire
breaks Herbicide application in open
plots in May Controlled back burn of open
plots in June Water quality and herbicide
monitoring begins in May Protocol verification and
refinement (inverts and fish) Construction of last six walkways
in open plots after the burn Public outreach
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Long-Term Plan UpdateLong-Term Plan Update
Accelerate Recovery of Impacted Areas
Tracey Piccone, P.E.
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Alternatives Analysis & Plan Alternatives Analysis & Plan FormulationFormulation
Project Manager: TBD
Project Description: Conduct a full alternatives analysis and develop a plan
formulation of management scenarios for accelerating recovery of impacted areas of the Everglades Protection Area.
Prepare report summarizing risks and benefits associated with different management scenarios
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Alternatives Analysis & Plan Alternatives Analysis & Plan FormulationFormulation
Status
Work not scheduled to start until FY08 Plan includes recommended funding of $400,000
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Hydropattern RestorationHydropattern Restoration
Project Manager: Tracey Piccone
Project Description: Restore a sheet flow approximation to various areas
along the northerly boundary of the Everglades Protection Area
Structural modifications and components to allow delivery of STA discharges to WCA-2A, East WCA-3A and West WCA-3A via a sheet flow approximation
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Hydropattern RestorationHydropattern Restoration
Status
Work not scheduled to start until FY2009 Construction complete by end of FY2012
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Implement Steps to Accelerate Recovery Implement Steps to Accelerate Recovery of Impacted Areasof Impacted Areas
Project Manager: Tracey Piccone
Project Description: Implement the most promising techniques to
accelerate recovery of the impacted areas in the EPA
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Implement Steps to Accelerate Implement Steps to Accelerate Recovery of Impacted AreasRecovery of Impacted Areas
Status
Work not scheduled to start until FY2010 Construction complete by end of FY2014
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Adaptive ImplementationAdaptive Implementation
Project Manager: Tracey Piccone
Project Description: To implement additional enhancements and
modifications resulting from the PDE process that can be implemented within the existing footprints of the ECP STAs, or added to CERP projects as a locally preferred option to enhance their water quality performance
Plan includes recommended funding of $36 million
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Adaptive ImplementationAdaptive Implementation
Status
Plan recommended funding of $9 million per year starting in FY2007 and ending in FY2010 Unused FY04 funds from other Long-Term Plan
projects were transferred to this project to assist with the surveying phase of the Bolles and Cross Canal Improvements Project (first minor revision to the Plan)
In FY05, funds were budgeted and used for the EAA Regional Feasibility Study
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
As part of proposed revision to LTP, FY06 funds not needed for two projects will be used for Adaptive Implementation activities
Real Time TP monitoring at STAs Vegetation Management Strategies BMPs in District Canals STA-1W Cell 5 drawdown/enhancements
Adaptive ImplementationAdaptive Implementation
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Long-Term Plan UpdateLong-Term Plan Update
Public Comment