paul testa architecture longley hub, sheffield Client: LOCAL Appointment: June 2004 Planning: March 2005 On site: December 2006 Completion: July 2007 Value: £750,000 Consultants: M & E: Ove Arup, Sheffield Structural: Ove Arup, Sheffield Cost Consultants: Bernard William Associates, Barnsley Construction Company: Clay Construction (Huddersfield) Ltd Materials used: Polychromatic brick skin, glulam timber roof structure, green roof, ground source heat pump-fed underfloor heating. Involvement: Paul was the project Architect for this project whilst working for Allen Tod Architecture. Longley is one of a series of local ‘hubs’, neighbourhood centres with community spaces. This community-led regeneration scheme has expanded the existing facilities with a multi- purpose community space and provids a much improved area for the existing, thriving community café. Environmentally friendly features include renewable materials, a passive solar and ventilation strategy and a green roof to control rainwater run-off and moderate extremes of temperature. Developed with community consultation, the brick façade creates a striking, and robust exterior. The design was developed using the following principles: Response to wider context Response to the local context Efficiency of design Consultation. This ranged from a fun day with local people and youths to regular CABE review days. Participation Sustainability (economic and environmental) top left: glulam roof structure / top right: ground source heating coils / above: the opening event / right: timber and brickwork
Transcript
Page 1: longley hub, sheffield · model view / right: good environmental principles Leeds leeds@allentod.co.uk The Studio, 32 The Calls ... COMMUNITY 1 COMMUNITY 2 STORE STORE FFL +94.500

p a u l t e s t a a r c h i t e c t u r e

l o n g l e y h u b ,s h e f f i e l d

Client: LOCAL

Appointment: June 2004

Planning: March 2005

On site: December 2006

Completion: July 2007

Value: £750,000

Consultants:

M & E: Ove Arup, Sheffield

Structural: Ove Arup, Sheffield

Cost Consultants: Bernard Wil l iam Associates, Barnsley

Construction Company: Clay Construction (Huddersfield) Ltd

Materials used: Polychromatic brick skin, glulam timber roof structure, green roof, ground source heat pump-fed underfloor heating.

Involvement: Paul was the project Architect for this project whilst working for Allen Tod Architecture.

Longley is one of a series of local ‘hubs’, neighbourhood centres with community spaces. This community-led regeneration scheme has expanded the existing facil it ies with a multi-purpose community space and provids a much improved area for the existing, thriving community café.

Environmentally friendly features include renewable materials, a passive solar and venti lation strategy and a green roof to control rainwater run-off and moderate extremes of temperature.

Developed with community consultation, the brick façade creates a striking, and robust exterior.

The design was developed using the fol lowing principles:

Response to wider contextResponse to the local contextEfficiency of designConsultation. This ranged from a fun day with local people and youths to regular CABE review days.ParticipationSustainabil ity (economic and environmental)

top left: glulam roof structure / top right: ground source heating coils / above: the opening event / right: timber and brickwork

Page 2: longley hub, sheffield · model view / right: good environmental principles Leeds leeds@allentod.co.uk The Studio, 32 The Calls ... COMMUNITY 1 COMMUNITY 2 STORE STORE FFL +94.500

p a u l t e s t a a r c h i t e c t u r e

l o n g l e y h u b ,s h e f f i e l d

The location of the new building across the street from the existing facil it ies creates the opportunity for a new public space that physically and visually l inks the buildings. Closure or downgrading of the existing road to vehicular traffic creates a space that is safe and allows for spil l out from the new and existing buildings. The space becomes the centre of the community, a venue for events, festivals etc. We tested this idea out at a public consultation event where the road was temporari ly closed to vehicles. A uniform surface material was used between the buildings. The design of this space includes improved l ighting and seating provision. In conjunction, parking around the green has been reconfigured. Parking spaces are marked out with parking encouraged along the central Southey Avenue to ease pressure adjacent to the buildings.

The layout of the building is designed to make maximum use of the enclosed space and of the materials used. The sloping roof and ceil ing of the building allows for a distribution of spaces that is informed by height requirements. Multi-use community rooms are situated under the highest point al lowing for sports use whilst toi lets and offices sit under the lowest part. Circulation is kept to a minimum within the building. The only dedicated circulation space is the entrance area which also acts as a reception and waiting area. The café is be the heart of the building and much of the circulation between rooms happens here. Plant space and bin stores are accessed externally.

top: patterned brickwork facade design elevation / above left: the building plan / above right: computer model view / right: good environmental principles

Leeds [email protected] Studio, 32 The CallsLeeds LS2 7EWtel: 0113 244 9973 fax: 0113 242 3687

www.allentod.co.uk

This drawing to be read in conjunction with structural, mechanical and electrical drawings and otherrelevant information and any discrepancies are to be reported to the Architect.Work and materials to be in accordance with the Building Regulations and to comply with relevantBritish Standards.This drawing is the copyright of Allen Tod Architecture Limited and should not be reproduced inwhole or in part without their written permission.

Do not scale from this DrawingIt is the Contractor's responsibility to check all governing dimensions and verify all dimensions on sitebefore commencing any work or making any shop drawings.

NOTES

revision:

job no:

issue status:

date:rev: notes:

drawing title:

scale @ A1: date:

drawn: checked:

client:

project:

drawing no:

allen tod architecture

by:

The Studio, 11th Floor, St James House,Vtel: 0114 241 3440 fax: 0114 241 3441

LONGLEY LOCAL HUB

LOCAL

200509

BB

BB

AA

AA

AA

AA

BB

BB

3,735.03,977.5 3,915.0

5,13

6.3

5,13

6.3

1,800.0

3,99

2.5

4,30

0.0

1,50

0.0

200.

0

632.5

100.

01,

698.

71,

200.

0

7,39

0.0

650

500.

0

equal equal

High LevelClerestoryWindow WithObscuredGlazing

Steel louvreddoors to plantroom

Steel louvreddoors to plantroom

Grasscrete perimeter strip

Timber decking adjacentto cafe

New hedge tomatch existing,forming return

Entrance canopy

Sloped area toaccommodate changeof levels

Sloped area toaccommodate changeof levels

Sliding screen NBS L20/545

Extent of roofoverhang

+94.000+94.250+94.500

+94.500

+94.750+95.000

+94.500

+94.500

SOUTHEY AVENUE

+94.500

2

A B C D

2

A B C D

PLANTROOM

RECEPTION /OFFICE

MALEWC

KITCHENSTORE

BINSTORE

KITCHEN

FEMALEWC

CLEANER'SSTORE ENTRANCE

CAFE

COMMUNITY 1

COMMUNITY 2

STORE

STORE

FFL+94.500

Existing pavement

Existing grassedarea

Existing pavement

Existing grassedarea

+94.500

UNI.WC

aa

aa

D01 D02

D04D06

D08

D09

W09

D03

D05

D07

W01 W02 W03

W04W05

W07

W08

D11

W10

W06

W11

D21

D22 D23

D13

D17

D16

D20

D19

D18

D12

tarmacentranceway

grassed area

grassed area

tarmac surface tonew pedestrianway

timber decking

RWP

RWP

RWP

5 4 3 2

1

E

Ebbcc

cc bb

33

1 1

H02

F

F

D14

D10

H01

D15

Level of existingresin bound gravel:94.500

Checkdimension:approx 27,000to back ofkerb.

123

3,075.0 3,075.0 3,690.03,767.5

1,74

0.0

335.

081

0.0

335.

01,

740.

0

910.

0

750.

0

179.2910.0 700.0 1,010.0330.0

910.0 300.0 2,000.0

2,55

2.0

3,31

0.0

2,54

4.0

3,507.5

1,025.0 2,642.5

250.

0

1,92

7.0

118.

0

1,23

7.5

8,20

2.5

1,23

7.5

1,660.07,180.8

3,20

6.3

181.

018

1.0

112.5

770.0832.1

1,53

0

1,497.1

3,767.5

2,167.5

1,20

6.5

1,202.5

1,602.52,232.5

52.5

3,82

9.5

112.

591

0.0

2,97

0.0

877.

5

1,02

5.0

2,22

5.0

1,01

0.0

100.

02,

460.

01,

176.

31,

176.

22,

460.

010

0.0

1,01

0.0

250.

0

6,595.86,922.5

4,377.5 1,135.0 4,725.0 2,915.0 4,285.0 1,790.0 4,285.0 2,127.5 1,800.0

800.

0

3,027.5 910.0 1,790.0 910.0 1,790.0 2,935.0 1,790.0 4,285.0 1,790.0 4,285.0 2,127.5 1,800.0

552.

51,

810.

01,

115.

01,

810.

01,

340.

02,

259.

81,

790.

2

FOR MARKED DETAILS REFER TO ATA DRAWING NUMBERS200460/401-403

PT

202

GROUND FLOOR GA PLAN

CONSTRUCTION

A PT

PTB

17/05/06

09/05/2006

18/05/06

DETAILS ADDED - DIMS CHANGED TOBLOCKWORK WHERE APPROPRIATE

H01 ADDED AND W07 AMENDED TO SUITECUBICLE PARTITIONS

PTH02 ADDED AND W06 EXTENDED TO INCLUDEAIR INTAKE GRILLE

C 02/06/06

PTD 01/09/06GRID EXTENDED & ADJUSTED. STEELWORKAMENDED. LEVELS AMENDED. PLANADJUSTED FOR NEW KITCHEN/CAFE LAYOUT.W13 OMITTED.

1:50

PTHIGHLIGHTED AMENDMENTS. ISSUED FORCONSTRUCTION.

C1 22/11/06

PTC2 SETTING OUT INFORMATION ADDED -HIGHLIGHTED.

27/11/06

PT09/01/06C3 W03 & 04 REDUCED TO MATCH W02 & 05

PTC4STEPS ADDED, FENCES REMOVED, DECKINGLIMITS ADJUSTED. 05/06/07

PTFINAL CONSTRUCTION ISSUE. 03/08/07