p a u l t e s t a a r c h i t e c t u r e
l o n g l e y h u b ,s h e f f i e l d
Client: LOCAL
Appointment: June 2004
Planning: March 2005
On site: December 2006
Completion: July 2007
Value: £750,000
Consultants:
M & E: Ove Arup, Sheffield
Structural: Ove Arup, Sheffield
Cost Consultants: Bernard Wil l iam Associates, Barnsley
Construction Company: Clay Construction (Huddersfield) Ltd
Materials used: Polychromatic brick skin, glulam timber roof structure, green roof, ground source heat pump-fed underfloor heating.
Involvement: Paul was the project Architect for this project whilst working for Allen Tod Architecture.
Longley is one of a series of local ‘hubs’, neighbourhood centres with community spaces. This community-led regeneration scheme has expanded the existing facil it ies with a multi-purpose community space and provids a much improved area for the existing, thriving community café.
Environmentally friendly features include renewable materials, a passive solar and venti lation strategy and a green roof to control rainwater run-off and moderate extremes of temperature.
Developed with community consultation, the brick façade creates a striking, and robust exterior.
The design was developed using the fol lowing principles:
Response to wider contextResponse to the local contextEfficiency of designConsultation. This ranged from a fun day with local people and youths to regular CABE review days.ParticipationSustainabil ity (economic and environmental)
top left: glulam roof structure / top right: ground source heating coils / above: the opening event / right: timber and brickwork
p a u l t e s t a a r c h i t e c t u r e
l o n g l e y h u b ,s h e f f i e l d
The location of the new building across the street from the existing facil it ies creates the opportunity for a new public space that physically and visually l inks the buildings. Closure or downgrading of the existing road to vehicular traffic creates a space that is safe and allows for spil l out from the new and existing buildings. The space becomes the centre of the community, a venue for events, festivals etc. We tested this idea out at a public consultation event where the road was temporari ly closed to vehicles. A uniform surface material was used between the buildings. The design of this space includes improved l ighting and seating provision. In conjunction, parking around the green has been reconfigured. Parking spaces are marked out with parking encouraged along the central Southey Avenue to ease pressure adjacent to the buildings.
The layout of the building is designed to make maximum use of the enclosed space and of the materials used. The sloping roof and ceil ing of the building allows for a distribution of spaces that is informed by height requirements. Multi-use community rooms are situated under the highest point al lowing for sports use whilst toi lets and offices sit under the lowest part. Circulation is kept to a minimum within the building. The only dedicated circulation space is the entrance area which also acts as a reception and waiting area. The café is be the heart of the building and much of the circulation between rooms happens here. Plant space and bin stores are accessed externally.
top: patterned brickwork facade design elevation / above left: the building plan / above right: computer model view / right: good environmental principles
Leeds [email protected] Studio, 32 The CallsLeeds LS2 7EWtel: 0113 244 9973 fax: 0113 242 3687
www.allentod.co.uk
This drawing to be read in conjunction with structural, mechanical and electrical drawings and otherrelevant information and any discrepancies are to be reported to the Architect.Work and materials to be in accordance with the Building Regulations and to comply with relevantBritish Standards.This drawing is the copyright of Allen Tod Architecture Limited and should not be reproduced inwhole or in part without their written permission.
Do not scale from this DrawingIt is the Contractor's responsibility to check all governing dimensions and verify all dimensions on sitebefore commencing any work or making any shop drawings.
NOTES
revision:
job no:
issue status:
date:rev: notes:
drawing title:
scale @ A1: date:
drawn: checked:
client:
project:
drawing no:
allen tod architecture
by:
The Studio, 11th Floor, St James House,Vtel: 0114 241 3440 fax: 0114 241 3441
LONGLEY LOCAL HUB
LOCAL
200509
BB
BB
AA
AA
AA
AA
BB
BB
3,735.03,977.5 3,915.0
5,13
6.3
5,13
6.3
1,800.0
3,99
2.5
4,30
0.0
1,50
0.0
200.
0
632.5
100.
01,
698.
71,
200.
0
7,39
0.0
650
500.
0
equal equal
High LevelClerestoryWindow WithObscuredGlazing
Steel louvreddoors to plantroom
Steel louvreddoors to plantroom
Grasscrete perimeter strip
Timber decking adjacentto cafe
New hedge tomatch existing,forming return
Entrance canopy
Sloped area toaccommodate changeof levels
Sloped area toaccommodate changeof levels
Sliding screen NBS L20/545
Extent of roofoverhang
+94.000+94.250+94.500
+94.500
+94.750+95.000
+94.500
+94.500
SOUTHEY AVENUE
+94.500
2
A B C D
2
A B C D
PLANTROOM
RECEPTION /OFFICE
MALEWC
KITCHENSTORE
BINSTORE
KITCHEN
FEMALEWC
CLEANER'SSTORE ENTRANCE
CAFE
COMMUNITY 1
COMMUNITY 2
STORE
STORE
FFL+94.500
Existing pavement
Existing grassedarea
Existing pavement
Existing grassedarea
+94.500
UNI.WC
aa
aa
D01 D02
D04D06
D08
D09
W09
D03
D05
D07
W01 W02 W03
W04W05
W07
W08
D11
W10
W06
W11
D21
D22 D23
D13
D17
D16
D20
D19
D18
D12
tarmacentranceway
grassed area
grassed area
tarmac surface tonew pedestrianway
timber decking
RWP
RWP
RWP
5 4 3 2
1
E
Ebbcc
cc bb
33
1 1
H02
F
F
D14
D10
H01
D15
Level of existingresin bound gravel:94.500
Checkdimension:approx 27,000to back ofkerb.
123
3,075.0 3,075.0 3,690.03,767.5
1,74
0.0
335.
081
0.0
335.
01,
740.
0
910.
0
750.
0
179.2910.0 700.0 1,010.0330.0
910.0 300.0 2,000.0
2,55
2.0
3,31
0.0
2,54
4.0
3,507.5
1,025.0 2,642.5
250.
0
1,92
7.0
118.
0
1,23
7.5
8,20
2.5
1,23
7.5
1,660.07,180.8
3,20
6.3
181.
018
1.0
112.5
770.0832.1
1,53
0
1,497.1
3,767.5
2,167.5
1,20
6.5
1,202.5
1,602.52,232.5
52.5
3,82
9.5
112.
591
0.0
2,97
0.0
877.
5
1,02
5.0
2,22
5.0
1,01
0.0
100.
02,
460.
01,
176.
31,
176.
22,
460.
010
0.0
1,01
0.0
250.
0
6,595.86,922.5
4,377.5 1,135.0 4,725.0 2,915.0 4,285.0 1,790.0 4,285.0 2,127.5 1,800.0
800.
0
3,027.5 910.0 1,790.0 910.0 1,790.0 2,935.0 1,790.0 4,285.0 1,790.0 4,285.0 2,127.5 1,800.0
552.
51,
810.
01,
115.
01,
810.
01,
340.
02,
259.
81,
790.
2
FOR MARKED DETAILS REFER TO ATA DRAWING NUMBERS200460/401-403
PT
202
GROUND FLOOR GA PLAN
CONSTRUCTION
A PT
PTB
17/05/06
09/05/2006
18/05/06
DETAILS ADDED - DIMS CHANGED TOBLOCKWORK WHERE APPROPRIATE
H01 ADDED AND W07 AMENDED TO SUITECUBICLE PARTITIONS
PTH02 ADDED AND W06 EXTENDED TO INCLUDEAIR INTAKE GRILLE
C 02/06/06
PTD 01/09/06GRID EXTENDED & ADJUSTED. STEELWORKAMENDED. LEVELS AMENDED. PLANADJUSTED FOR NEW KITCHEN/CAFE LAYOUT.W13 OMITTED.
1:50
PTHIGHLIGHTED AMENDMENTS. ISSUED FORCONSTRUCTION.
C1 22/11/06
PTC2 SETTING OUT INFORMATION ADDED -HIGHLIGHTED.
27/11/06
PT09/01/06C3 W03 & 04 REDUCED TO MATCH W02 & 05
PTC4STEPS ADDED, FENCES REMOVED, DECKINGLIMITS ADJUSTED. 05/06/07
PTFINAL CONSTRUCTION ISSUE. 03/08/07
C5
C5