34333RD STREET
F O R L E A S E
I N D I A B A S I N
TOUCHSTONE COMMERCIAL PARTNERS, INC. // Corp. Lic. 01112906 // www.tcpre.com // www.zm-tcpre.com
TOUCHSTONE COMMERCIAL PARTNERS | 2
Feeding off of Mission Bay’s recent development frenzy, San Francisco’s India Basin is positioning itself as the next hotbedfor commercial, laboratory, office and mixed-use development in the Bay Area. 3433 3rd Street is a proposed 46,507 square footcommercial/laboratory/office/flex development, which includes a large public assembly hall, ground floor retail, outdoor parking, andmore. San Francisco’s Carpenter Union (Local Union No. 22) is committed to occupy the entire second floor of the development and will play a pivotal role in the construction of the building. The site is located at the intersection of 3rd Street and Cargo Way and boasts environmentally sustainable design with state-of-the-art features from David Baker and Partners.
3433 3RD STREET
EXECUTIVE SUMMARY
TOUCHSTONE COMMERCIAL PARTNERS | 3
ADDRESS 3433 3rd StreetSan Francisco, CA 94124
APN # 5203-083
RENTABLE AREA +/- 41,434 Square Feet
NO. OF STORIES 5
FLOOR PLATE SIZE 10,891 (Floors 3-5)
USE Legal Office Approved
PROPERTY SUMMARY
DEVELOPMENT DETAILS
3433 3RD STREET
The proposed development will also offer approximately 1,717 square feet of corner retail space and shared use of an assembly/meeting hall.
PLANNING
Fully Entitled For Office
RETAIL
Ground Floor Corner Space
DESIGN
David Baker and Partners
SUSTAINABILITY
Lead Gold
PARKING
34 SpacesDELIVERY
Spring 2019
TOUCHSTONE COMMERCIAL PARTNERS | 4
SITE PLAN 3433 3RD STREET
A Bioswale to Treat RunoffB PlantingC Concrete SidewalkD Cut [E] Sidewalk for 4’-0” Wide Planting Strip and 6’-0” Wide SidewalkE [E] Street Trees to RemainF Specimen Tree in PlazaG Cafe Table and ChairsH Custom Sculptural Wood Seating Elements
I Bike ParkingJ [E] Brick Sidewalk BandK DG with Grove of Shade TreesL Chainlink Fence at PLM Parking Area (34 Spaces)N Steel Grate Over Sunken/Infiltration Bed with TreesO Multi-Modal PathP Auto Entry with Gate
Designed by David Baker and Partners, the building’s state-of-the-art and innovative architecture integrates the latest in environmentally sustainable design and sets the standard for upcoming development projects in the neighborhood.
Cargo Way
Cargo Way
Cargo Way
C
TOUCHSTONE COMMERCIAL PARTNERS | 5
3433 3RD STREET
SECOND FLOOR
Office Space235
elev
ator
mec
h24
4
service245
stair #1218
e219
e223
Vestibule250
w221
m222
lobby248
lobby249
stair #2246
open to below 1/16" = 1'-0"
2Level 2- Site Permit
Office Space139
stair #1239
e213
e237
Vestibule251
w216
m238
Lobby224
stair #2227
common236
data243
1/16" = 1'-0"
3Level 3- Site Permit
Office Space125
stair #1194
e195
e261
Vestibule262
263
m265
Lobby266
Stair #2267
data260
common259
1/16" = 1'-0"
4Level 4- Site Permit
Office Space138
stair #1206
e207
e211
Vestibule270
209
wc210
Lobby226
Stair #2268
common269
data208
1/16" = 1'-0"
5Level 5- Site Permit
mech penthouse252
e254
stair #1253
solar DHWpanels
pv array
pv array
pv array
pv array
1/16" = 1'-0"
6Roof- Site Permit
Office Space
Office Space
Office Space
Office Space
Retail
Meeting Hall
Office Space
Office Space
Office Space
mech penthouse
common
common
common
restrooms
restrooms
restrooms
restrooms
restrooms
elev
ator
sha
ft
elev
ator
lobb
ies
FLOOR PLANS
Office Space235
elev
ator
mec
h24
4
service245
stair #1218
e219
e223
Vestibule250
w221
m222
lobby248
lobby249
stair #2246
open to below 1/16" = 1'-0"
2Level 2- Site Permit
Office Space139
stair #1239
e213
e237
Vestibule251
w216
m238
Lobby224
stair #2227
common236
data243
1/16" = 1'-0"
3Level 3- Site Permit
Office Space125
stair #1194
e195
e261
Vestibule262
263
m265
Lobby266
Stair #2267
data260
common259
1/16" = 1'-0"
4Level 4- Site Permit
Office Space138
stair #1206
e207
e211
Vestibule270
209
wc210
Lobby226
Stair #2268
common269
data208
1/16" = 1'-0"
5Level 5- Site Permit
mech penthouse252
e254
stair #1253
solar DHWpanels
pv array
pv array
pv array
pv array
1/16" = 1'-0"
6Roof- Site Permit
Office Space
Office Space
Office Space
Office Space
Retail
Meeting Hall
Office Space
Office Space
Office Space
mech penthouse
common
common
common
restrooms
restrooms
restrooms
restrooms
restrooms
elev
ator
sha
ft
elev
ator
lobb
ies
TOUCHSTONE COMMERCIAL PARTNERS | 6
3433 3RD STREETFLOOR PLANS
THIRD FLOOR
Office Space235
elev
ator
mec
h24
4
service245
stair #1218
e219
e223
Vestibule250
w221
m222
lobby248
lobby249
stair #2246
open to below 1/16" = 1'-0"
2Level 2- Site Permit
Office Space139
stair #1239
e213
e237
Vestibule251
w216
m238
Lobby224
stair #2227
common236
data243
1/16" = 1'-0"
3Level 3- Site Permit
Office Space125
stair #1194
e195
e261
Vestibule262
263
m265
Lobby266
Stair #2267
data260
common259
1/16" = 1'-0"
4Level 4- Site Permit
Office Space138
stair #1206
e207
e211
Vestibule270
209
wc210
Lobby226
Stair #2268
common269
data208
1/16" = 1'-0"
5Level 5- Site Permit
mech penthouse252
e254
stair #1253
solar DHWpanels
pv array
pv array
pv array
pv array
1/16" = 1'-0"
6Roof- Site Permit
Office Space
Office Space
Office Space
Office Space
Retail
Meeting Hall
Office Space
Office Space
Office Space
mech penthouse
common
common
common
restrooms
restrooms
restrooms
restrooms
restrooms
elev
ator
sha
ft
elev
ator
lobb
ies
FOURTH FLOOR
Office Space235
elev
ator
mec
h24
4
service245
stair #1218
e219
e223
Vestibule250
w221
m222
lobby248
lobby249
stair #2246
open to below 1/16" = 1'-0"
2Level 2- Site Permit
Office Space139
stair #1239
e213
e237
Vestibule251
w216
m238
Lobby224
stair #2227
common236
data243
1/16" = 1'-0"
3Level 3- Site Permit
Office Space125
stair #1194
e195
e261
Vestibule262
263
m265
Lobby266
Stair #2267
data260
common259
1/16" = 1'-0"
4Level 4- Site Permit
Office Space138
stair #1206
e207
e211
Vestibule270
209
wc210
Lobby226
Stair #2268
common269
data208
1/16" = 1'-0"
5Level 5- Site Permit
mech penthouse252
e254
stair #1253
solar DHWpanels
pv array
pv array
pv array
pv array
1/16" = 1'-0"
6Roof- Site Permit
Office Space
Office Space
Office Space
Office Space
Retail
Meeting Hall
Office Space
Office Space
Office Space
mech penthouse
common
common
common
restrooms
restrooms
restrooms
restrooms
restrooms
elev
ator
sha
ft
elev
ator
lobb
ies
TOUCHSTONE COMMERCIAL PARTNERS | 7
3433 3RD STREETFLOOR PLANS
SIXTH FLOOR
Office Space235
elev
ator
mec
h24
4
service245
stair #1218
e219
e223
Vestibule250
w221
m222
lobby248
lobby249
stair #2246
open to below 1/16" = 1'-0"
2Level 2- Site Permit
Office Space139
stair #1239
e213
e237
Vestibule251
w216
m238
Lobby224
stair #2227
common236
data243
1/16" = 1'-0"
3Level 3- Site Permit
Office Space125
stair #1194
e195
e261
Vestibule262
263
m265
Lobby266
Stair #2267
data260
common259
1/16" = 1'-0"
4Level 4- Site Permit
Office Space138
stair #1206
e207
e211
Vestibule270
209
wc210
Lobby226
Stair #2268
common269
data208
1/16" = 1'-0"
5Level 5- Site Permit
mech penthouse252
e254
stair #1253
solar DHWpanels
pv array
pv array
pv array
pv array
1/16" = 1'-0"
6Roof- Site Permit
Office Space
Office Space
Office Space
Office Space
Retail
Meeting Hall
Office Space
Office Space
Office Space
mech penthouse
common
common
common
restrooms
restrooms
restrooms
restrooms
restrooms
elev
ator
sha
ft
elev
ator
lobb
ies
FIFTH FLOOR
Office Space235
elev
ator
mec
h24
4
service245
stair #1218
e219
e223
Vestibule250
w221
m222
lobby248
lobby249
stair #2246
open to below 1/16" = 1'-0"
2Level 2- Site Permit
Office Space139
stair #1239
e213
e237
Vestibule251
w216
m238
Lobby224
stair #2227
common236
data243
1/16" = 1'-0"
3Level 3- Site Permit
Office Space125
stair #1194
e195
e261
Vestibule262
263
m265
Lobby266
Stair #2267
data260
common259
1/16" = 1'-0"
4Level 4- Site Permit
Office Space138
stair #1206
e207
e211
Vestibule270
209
wc210
Lobby226
Stair #2268
common269
data208
1/16" = 1'-0"
5Level 5- Site Permit
mech penthouse252
e254
stair #1253
solar DHWpanels
pv array
pv array
pv array
pv array
1/16" = 1'-0"
6Roof- Site Permit
Office Space
Office Space
Office Space
Office Space
Retail
Meeting Hall
Office Space
Office Space
Office Space
mech penthouse
common
common
common
restrooms
restrooms
restrooms
restrooms
restrooms
elev
ator
sha
ft
elev
ator
lobb
ies
ON-SITE MEETING HALL
[REPRESENTATIVE PHOTOS]
The 3,791 square foot on-site meeting hall at 3433 3rd Street will provide an open and flexible space for tenants to leverage at their hosting convenience. Imagine a Biotech group using the space to promote the launch of a new drug, or a tech group using the hall to host a networking event — the possibilities are endless and the ability to use the hall comes at no charge to building occupants. In addition, the Carpenter’s Union will use the hall to host monthly gatherings and will play an important role in establishing a home base for all those San Franciscans who work in construction related trades.
TOUCHSTONE COMMERCIAL PARTNERS | 8
3433 3RD STREET
ISLAIS CREEK
INDIA BASIN
MISSION BAY
DOGPATCH
POTRERO HILL
3433 3RD STREET
LOCATION OVERVIEW
TOUCHSTONE COMMERCIAL PARTNERS | 9
TOUCHSTONE COMMERCIAL PARTNERS | 10
INDIA BASIN SHORELINE PARK
The India Basin, once a defunct section of the city, is completely reinventing itself. In fact, the City is in the process of redeveloping the India Basin Shoreline Park, dubbed “San Francisco’s Next Frontier of Development”. The redevelopment of India Basin will be a legacy waterfront park for the City of San Francisco and greater Bay Area.
In 2014, the City acquired the 900 Innes property, which is adjacent to the existing India Basin Shoreline Park and India Basin Shoreline Open Space. The city plans to design and build a new, world class 8-acre park will provide local residents with direct access to parks, open space, and new recreational opportunities. The Trust for Public Land conducted a “Designs Ideas Competition” for the future of the combined 900 Innes and India Basin Shoreline Park Sites. Five talented landscape architecture teams submitted design ideas, and were reviewed by a jury. The competition was guided by the technical information contained in the India Basin Waterfront Study. The winning firm was Seattle-based Gustafson Guthrie Nichol.
The current park is 5.6-acres and will be redesigned to better serve the surrounding community and enhance citywide programs. Hunters Point Boulevard and the adjacent new park at 900 Innes Street will be connected via new biking and walking paths. Closer to the shoreline, a new wetland habitat, an enhanced playground and recreational facilities will be developed.
3433 3RD STREET
TOUCHSTONE COMMERCIAL PARTNERS | 11
*The information presented has been secured from sources we believe to be reliable but we make no representations or warranties, expressed or implied, as to the accuracy of the information. Lessee must verify the information and bears all risk for any inaccuracies.
TOUCHSTONE COMMERCIAL PARTNERS, INC. // Corp. Lic. 01112906 // www.tcpre.com // www.zm-tcpre.com
ZACHHAUPERT
direct (415) 539-1121 // cell (415) [email protected] // BRE # 01822907
MICHAELSANBERG
TREVORGUDIM
direct (415) 539-1103 // cell (415) [email protected] // BRE # 01930041
direct (415) 539-1122 // cell (858) [email protected] // BRE # 01979980
3433 3RD STREET