+ All Categories
Home > Documents > LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal...

LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal...

Date post: 17-Jul-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
22
LOR-US 20-22.19 PROJECT MATCHMAKER
Transcript
Page 1: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

LOR-US 20-22.19 PROJECT MATCHMAKER

Page 2: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

2 |

WELCOME

PROJECT REVIEW

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

QUESTIONS

MATCHMAKER EVENT

AGENDA

LOR US 20-22.19 MATCHMAKER

Page 3: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

3 |

PROJECT

OVERVIEW

LOR US 20-22.19 MATCHMAKER

Page 4: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

4 |

PROJECT OVERSITE

LOR US 20-22.19 MATCHMAKER

BRIAN RAWLINGS: PROJECT ENGINEER

LUKE WYSOCKI: CONSTRUCTION AREA ENGINEER

Page 5: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

5 |

PROJECT OVERSITE

LOR US 20-22.19 MATCHMAKER

MIKE FAIR: DISTRICT CONSTRUCTION ADMINISTRATOR

MICHAEL WEILER: PROJECT MANAGER, DESIGN

Page 6: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

6 |

PROJECT LOCATION

LOR US 20-22.19 MATCHMAKER

Project No. 170566

LOR-US 20-22.19

PID 82632

Stoney RidgeLear Nagle

Page 7: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

7 |

PROJECT LOCATION

LOR US 20-22.19 MATCHMAKER

Project No. 170566

LOR-US 20-22.19

PID 82632

Page 8: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

8 |

PROJECT OVERVIEW

LOR US 20-22.19 MATCHMAKER

PROJECT DESCRIPTION:

WIDENING TO 5 LANES FROM STONEY RIDGE ROAD TO

LEAR NAGLE IN THE CITY OF NORTH RIDGEVILLE,

LORAIN COUNTY; REPLACING 2 STRUCTURES;

CONSTRUCTION OF NEW TRAFFIC SIGNALS AND

RELATED WORK

ESTIMATED COST:

$26.5 MILLION

Page 9: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

9 |

PROJECT LOCATION

LOR US 20-22.19 MATCHMAKER

Project No. 170566

LOR-US 20-22.19

PID 82632

Structure 1

Structure 2

Page 10: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

10 |

PROJECT DESCRIPTION

LOR US 20-22.19 MATCHMAKER

THE PROJECT IMPROVES 2.32 MILES OF US 20/CENTER RIDGE

ROAD IN NORTH RIDGEVILLE BY WIDENING THE ROADWAY

FROM 3 LANES TO 5 LANES; CONSTRUCTING ALL NEW:

PAVEMENT

CURB AND GUTTER

SIDEWALK

SHARED-USE PATH

STORM SEWER

NEW TRAFFIC SIGNALS

Page 11: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

11 |

PROJECT DESCRIPTION

LOR US 20-22.19 MATCHMAKER

THE PROJECT WILL RE-ALIGN ROOT ROAD

& RIDGEVIEW BOULEVARD AND REPLACE

THE TWO STRUCTURES CARRYING US 20 &

ROOT ROAD OVER FRENCH CREEK

Page 12: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

12 |

PROJECT DESCRIPTION

LOR US 20-22.19 MATCHMAKER

THE PROJECT INCLUDES

IMPROVEMENTS TO SIDE

ROADS,

RECONSTRUCTION OF

GARDEN STREET, AND

CONSTRUCTION OF A

NEW STREET NAMED

SINTA RUN AND NEW

TRAFFIC SIGNALS

SINTA RUN

Page 13: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

13 |

PROJECT SCHEDULE

LOR US 20-22.19 MATCHMAKER

SALE DATE: NOVEMBER 30, 2017

AWARD DATE: DECEMBER 11, 2017

CONSTRUCTION START: APRIL 2, 2018

CONSTRUCTION END: OCTOBER 11, 2019

Page 14: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

14 |

EXPECTED CONSTRUCTION WORK TYPES

LOR US 20-22.19 MATCHMAKER

ROADWAY

EROSION CONTROL

DRAINAGE

PAVEMENT

WATER WORK

Page 15: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

15 |

EXPECTED CONSTRUCTION WORK TYPES

LOR US 20-22.19 MATCHMAKER

SANITARY SEWER, MINOR WORK

LIGHTING

TRAFFIC CONTROL

TRAFFIC SIGNALS & ALTERNATES

Page 16: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

16 |

EXPECTED CONSTRUCTION WORK TYPES

LOR US 20-22.19 MATCHMAKER

MAINTENANCE OF TRAFFIC

RETAINING WALLS

STRUCTURE OVER 20 FOOT SPAN

ROOT ROAD – SINGLE SPAN REINFORCED CONCRETE SLAB ON REINFORCED CONCRETE ABUTMENTS

STRUCTURE 20 FOOT SPAN AND UNDER

US 20 - 16’ X 8’ 4 SIDED PRECAST AND C-I-P CONCRETE BOX CULVERT

INCIDENTALS

Page 17: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

17 |

UTILITY WORK

LOR US 20-22.19 MATCHMAKER

MOST UTILITIES HAVE OR ARE RELOCATED

SANITARY SEWER REALIGNMENT IS ALREADY

COMPLETED

MOST COMMERCIAL/RESIDENTIAL

STRUCTURES ALREADY REMOVED

Page 18: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

18 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

LOR US 20-22.19 MATCHMAKER

DBE GOAL 10%

CONTAINS THE PROPOSAL NOTE 013-DISADVANTAGED BUSINESS

ENTERPRISE (DBE) UTILIZATION PLAN AND GOOD FAITH EFFORTS

UPDATED 07/21/2017

ALL BIDDERS SHALL SUBMIT A DBE UTILIZATION PLAN AT THE TIME

OF BID, SETTING FORTH SPECIFIC INFORMATION DEMONSTRATING

HOW THE BIDDER WILL ACHIEVE THE DBE GOAL

Page 19: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

19 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

LOR US 20-22.19 MATCHMAKER

DBE CERTIFIED FIRMS:

http://www.dot.state.oh.us/Divisions/ODI/SDBE/Pages

/DBE-Directory.aspx

Page 20: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

20 |

WHERE TO FIND US

LOR US 20-22.19 MATCHMAKER

ODOT DISTRICT 3

906 CLARK STREET

ASHLAND, OHIO 44805

419-281-0513

HOWARD (BUTCH) HUEBNER

DISTRICT DEPUTY DIRECTOR

Page 21: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

21 |

QUESTIONS

LOR US 20-22.19 MATCHMAKER

?

Page 22: LOR-US 20-22.19 PROJECT MATCHMAKER...lor us 20-22.19 matchmaker dbe goal 10% contains the proposal note 013-disadvantaged business enterprise (dbe) utilization plan and good faith

22 |

MATCHMAKER

IMMEDIATELY

FOLLOWING

LOR US 20-22.19 MATCHMAKER


Recommended