Los Angeles Unified School District Facilities Services Division
E X I S T I N G F A C I L I T I E S
Design Proposal for Multipurpose Room and Lunch Shelter Multnomah Elementary School
Monthly Program Status Report
December 2007 - Final Prepared for: Bond Oversight Committee Meeting December 2007
TABLE OF CONTENTS Program Overview ........................................................................................................... 2 State Matching Effort ....................................................................................................... 8 Construction Starts and Completes ............................................................................ 10 Change Order Rates...................................................................................................... 12 Board Member and Local District Discretionary Funds............................................ 14 Allocation of Funds ........................................................................................................ 16 Program Highlights......................................................................................................... 18 Community Events ......................................................................................................... 29
1
December 2007 Monthly Program Status Report
PROGRAM OVERVIEW
2
Data Source: 01-November-2007
4
Data Source: 01-November-2007
5
Data Source: 01-November-2007
6
Data Source: 01-November-2007
7
December 2007 Monthly Program Status Report
STATE MATCHING EFFORT
8
Data Source 01-November-2007
9
December 2007 Monthly Program Status Report
CONSTRUCTION STARTS AND COMPLETES
10
Data Source 01-November-2007
11
December 2007 Monthly Program Status Report
CHANGE ORDER RATES
12
13
December 2007 Monthly Program Status Report
BOARD MEMBER AND LOCAL DISTRICT DISCRETIONARY FUNDS
14
Data Source: 01-November-2007
15
December 2007 Monthly Program Status Report
ALLOCATION OF UNALLOCATED BOND DOLLARS
16
17
December 2007 Monthly Program Status Report
PROGRAM HIGHLIGHTS
18
Plumbing/IrrigationBoard Member: Marlene Canter – District 4 Region: 1
Underground gas and water pipes were in a state of deteriorationLeaks were forming throughout the campus
Data Date: 05 November 2007
Planning/Design $ 106,860Bid/Award $ 500Construction $ 413,900TOTAL $ 521,260 3/1/2003 2/01/08
10/26/05 1/17/07 6/15/07 10/5/2007
All underground water and gas pipes were replaced throughout the campusOld galvanized piping was replaced with copper for extended life and reduced maintenance
To replace all underground utility piping
3/1/03Design/Planning
1/17/07Bid/Award
6/28/07 - 10/3/07Construction
10/5/07Close Out
19
Plumbing/IrrigationBoard Member: Tamar Galatzan – District 3Region: 1
Planning/Design $ 12,938Bid/Award $ 0Construction $ 92,917TOTAL $ 105,855
Data Date: 06 November 2007
2/6/06 10/26/0710/30/2006 10/15/07
6/21/07 - 10/12/07Construction
2/6/06Design/Planning
Replacement Sprinkler System Installation
Old system provided insufficient volume and coverage.Plants were dieing or in poor condition
10/15/07Close-Out
A new automatic irrigation system was installed including: I-20 Hunter heads with stainless steal risers and Rainbird Series remote valvesCampus grounds showing drastic improvement in plant health and appearance
4/2/07Bid/Award
4/2/07Bid/Award
20
Sheet Metal/FencingBoard Member: Marlene Canter – District 4Region: 1
Planning/Design $ 27,980Bid/Award $ 0Construction $ 439,355TOTAL $ 467,335
Data Date: 05 November 2007
6/22/06 2/12/0810/18/06 1/9/07 7/27/07 10/15/07
Installation of replacement fencing throughout campus
Existing fencing was rusted, bent and misaligned, resulting in reduced security and unsafe conditions for students
Over 4,600 linear feet of fencing, perimeter and campus interior, was replaced with galvanized steel chain link fencingBroken, bent, and rusted posts were replaced
7/30/07 - 10/12/07Construction
10/15/07Close-Out
6/22/06Design/Planning
6/6/07Bid/Award
21
Obsolete LightingBoard Member: Julie Korenstein – District 6Region: 2
Planning/Design $ 0Bid/Award $ 0Construction $ 38,057TOTAL $ 38,057
Data Date: 06 November 2007
5/22/2006 1/31/20081/1/07 10/4/07
9/17/07 - 10/3/07Construction
5/22/06Design/Planning
Provide energy efficient lighting fixtures throughout exterior hallways
Existing fixtures were deteriorating and became increasingly difficult to locate necessary replacement parts forExisting fixtures were not energy efficient and did not provided adequate illumination
10/4/07Close-Out
Newly installed energy efficient light fixtures produce more illumination using less energyFixture types were reduced and standardized, allowing for the maintenance of a more efficient and economical parts inventory
4/23/07Bid/Award
22
Obsolete LightingBoard Member: Julie Korenstein – District 6 Region: 2
Data Date: 05 November 2007
Planning/Design $ 17,740Bid/Award $ 0Construction $ 277,930TOTAL $ 295,670 7/25/2006 1/10/08
2/2/07 6/15/07 6/27/07 10/13/07
Provide energy efficient lighting fixtures with higher lumen output at designated locations
Newly installed energy efficient light fixtures produce more illumination using less energyFixture types were reduced and standardized, allowing for the maintenance of a more efficient and economical parts inventory
7/25/06Design/Planning
6/15/07Bid/Award
6/27/07 - 10/13/07Construction
10/13/07Close-Out
Existing fixtures were deteriorating and became increasingly difficult to locate necessary replacement parts forExisting fixtures were not energy efficient and did not provided adequate illumination
23
Upgrade ElectricalBoard Member: Marlene Canter – District 4Region: 4
Planning/Design $ 9,948Bid/Award $ 0Construction $ 80,251TOTAL $ 90,199
Data Date: 06 November 2007
7/4/2006 2/28/20081/1/07 10/16/07
5/11/07 - 10/15/07Construction
7/4/06Design/Planning
Upgrade of electrical fuse panels
Deteriorating electrical fuse panels could not provide sufficient electrical capacity for necessary lighting in administrative and instructional areas
10/16/07Close-Out
Upgraded the electrical panels by removing existing outdated fuse panels and installed new circuit breaker panelsUpgrade allowed full use of all campus lighting fixtures
24
Electrical / M&O Fire AlarmBoard Member: Yolie Flores Aguilar – District 5Region: 4
Planning/Design $ 11,698Bid/Award $ 0Construction $ 83,454TOTAL $ 95,132
Data Date: 06 November 2007
7/3/2006 2/28/20081/30/07 1/1/08
6/5/07 - 10/4/07Construction
7/3/06Design/Planning
Replacement of emergency generator and control panel
Emergency generator at the site was deteriorating and prone to malfunction, resulting in potential safety and security hazards
10/5/07Close-Out
Removed deteriorating generatorReplaced with newer model emergency generatorEnhanced the safety and security of students and school staff
25
Lighting RetrofitBoard Member: Marguerite Poindexter La Motte – District 1Region: 7
Existing screw-in incandescent bulbs were not providing sufficient lightingPoor lighting conditions made hallways unsafe and made the campus more susceptible to vandalismExisting fixtures were not energy efficient
Data Date: 05 November 2007
Planning/Design $ 0Bid/Award $ 0Construction $ 353,635TOTAL $ 353,635
6/1/06 2/28/084/24/07 12/4/06 6/15/07 10/19/07
337 fixtures were replaced 332 fixtures were retrofittedFluorescent fixtures use half the energy and emit more light, providing added safety and security to students and staff
Replacement of exterior lighting fixtures
6/18/07 - 10/18/07Construction
10/19/07Close-Out
4/24/07Bid/Award
6/1/06Design/Planning
26
Window ReplacementBoard Member: Marguerite Poindexter LaMotte – District 1 Region: 7
Planning/Design $ 0Bid/Award $ 0Construction $ 233,427TOTAL $ 233,427
Data Date: 05 November 2007
8/30/05 2/28/086/16/2006 1/12/2007 3/05/07 10/17/07
Replace windows in various buildings throughout the campus
Deteriorating wood sashes and panels required excessive maintenance
10/18/07Close-Out
118 wooden sashes and panels were replaced with aluminum frames and claddingAluminum frames minimize maintenance and future repairDouble glazed glass was used in a windowsLimiter blocks were included for increased safety
8/30/05Design/Planning
6/18/07 - 10/18/07Construction
1/12/07Bid/Award
27
Replacement of Obsolete LightingBoard Member: Marguerite Poindexter LaMotte – District 1Region: 1
Planning/Design $ 0Bid/Award $ 0Construction $ 462,414TOTAL $ 462,414
Data Date: 06 November 2007
7/25/2006 1/29/20081/1/07 10/11/07
4/9/07 - 10/5/07Construction
7/25/06Design/Planning
Replacement and retrofitting of lighting fixtures throughout campus
Throughout campus, interior and exterior lighting was poor and energy inefficient
Upgraded lighting improve the learning environment and enhance campus securityNew and retrofitted light fixtures meet or exceed current standards for light levels
10/16/06Bid/Award
10/11/07Close-Out
28
December 2007 Monthly Program Status Report
COMMUNITY EVENTS
29
S. MARK TAPERMIDDLE SCHOOL
LIBRARY GRANT PROGRAM
• Fall of 2006 - The S. Mark Taper Foundation contributed a 1-time donation of $200,000 toward upgrade of 8 middle school libraries– 1 middle school per LAUSD Local
District was selected to receive $25,000 from the Taper plus a $25,000 program match from the general fund
• The completion and awards ceremony for the program was held in the LAUSD Board Room on Oct. 18, 2007
• The learning environment is known to be a strong factor in the enthusiasm level of our students.
• The program demonstrates the impact which partnerships between LAUSD and the greater LA community can have on this learning environment.
30