S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
Reference: PE/ICM/APP/0255 Version: 01.04/EN Date of issue: 16/06/99
This confidential document is the property of NORTEL MATRA CELLULAR and may not be copied or circulated without permission
7/27/2019 Low Noise Dacs
2/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 2
CONTENTS
1. INTRODUCTION ......................................................................................................................4
1.1. OBJECT............................................................................................................................................4
1.2. SCOPE..............................................................................................................................................4
2. RELATED DOCUMENTS........................................................................................................4
2.1. REFERENCE DOCUMENTS..........................................................................................................4
2.2. APPLICABLE DOCUMENTS ........................................................................................................4
3. ABBREVIATIONS AND TERMS............................................................................................5
3.1. ABBREVIATIONS..........................................................................................................................5
3.2. TERMS.............................................................................................................................................5
4. PREREQUISITES......................................................................................................................6
5. RESOURCES..............................................................................................................................6
5.1. HUMAN RESOURCES ...................................................................................................................6
5.2. HARDWARE TOOLS .....................................................................................................................6
5.3. SOFTWARE TOOLS.......................................................................................................................6
5.4. INSTALLATION SUPPLIES ..........................................................................................................6
6. SAFETY.......................................................................................................................................7
6.1. STAFF SAFETY ..............................................................................................................................76.2. EQUIPMENT SAFETY ...................................................................................................................7
7. STRATEGY OF INSTALLATION..........................................................................................8
8. IMPACTS ON THE NETWORK .............................................................................................8
9. QUALITY CONTROL ..............................................................................................................8
10. SEQUENCE OF OPERATIONS...............................................................................................8
Z END OF DOCUMENTY ..........................................................................................................33
7/27/2019 Low Noise Dacs
3/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 3
SHEETS
SHEET S1 Hardware checks .........................................................................................9
SHEET S2 Site status checks ......................................................................................10
SHEET S3 Site shutdown............................................................................................11
SHEET S4 Cabinet power off......................................................................................13
SHEET S5 Equipment removing.................................................................................14
SHEET S6 Ambient air thermistor installation ...........................................................15
SHEET S7 New equipments installation.....................................................................16
SHEET S8 Cabinet power up ......................................................................................18
SHEET S9 Site return in service .................................................................................19SHEET S10 Final checks...............................................................................................20
APPENDICES
Appendix 1 Kit components .....................................................................................................21
Appendix 2 Font view of the cabinet ........................................................................................22
Appendix 3 AC box general view.............................................................................................23
Appendix 4 Battery cabinet.......................................................................................................26
Appendix 5 Thermistor installation ..........................................................................................27
Appendix 6 Control board ........................................................................................................29
Appendix 7 View of the ambient thermistor final installation .................................................30
Appendix 8 Report sheet...........................................................................................................31
7/27/2019 Low Noise Dacs
4/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 4
1. INTRODUCTION
1.1. OBJECT
This document describes the acoustic noise reduction kit installation on a S8000
outdoor BTS.
1.2. SCOPE
This operation may be performed only on any S8000 outdoor BTS equipped with the
climatic system DACS. The BTS is equipped with BCF or CBCF.
2. RELATED DOCUMENTS
2.1. REFERENCE DOCUMENTS
None
2.2. APPLICABLE DOCUMENTS
All PE/ICM documents listed below are Core I&C Methods product documents.
These documents must be available on site at the latest version (refer to the project
documentation status list). On a given project some of those documents may be replaced by other project
specific ones (refer to the report sheet that indicates for each document which
reference is applicable).
For the document phased with the system release, refer to the report sheet thatindicates for each document which reference is applicable.
All applicable documents are referenced in the report sheet.
[A1] Site preparation and installation document : Project document
[A2] Packing list : Project document
[A3] V8 OMC-R operations called by I&C procedures : PE/ICM/APP/0071
Or V9 OMC-R operations called by I&C procedures : PE/ICM/APP/0144
Or V10 OMC-R operations called by I&C procedures : PE/ICM/APP/0188
Or V11 OMC-R operations called by I&C procedures : PE/ICM/APP/0218
7/27/2019 Low Noise Dacs
5/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 5
3. ABBREVIATIONS AND TERMS
3.1. ABBREVIATIONS
BCF : Base Common Function
BTS : Base Transceiver Station
CSWM : Control and switching matrix
DACS : Direct Ambient Climatic System
DRX : Low RF-power Driver and Receiver
DSC : Data signaling concentrator
GND : GrouND
GTW : Gateway
LED : Light emitting diode
OMC : Operation & Maintenance center
PA : Power Amplifier
PCMI : Pulse code modulation interface
PCU : Power Control Unit
PSCMD : Power supply command
SYNC : synchronization unit
TX : Transmitter
3.2. TERMS
Installer Person in charge of the installation
Coordinator Person in charge of coordinating the project installation
Supervisor Person in charge to supervising a site installation
7/27/2019 Low Noise Dacs
6/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 6
4. PREREQUISITES
The use of this procedure requires the availability on site of :
- The filled-out report sheet (See Appendix at the end of this document) which
gives all required input data to apply the procedure.
- All the applicable documents listed in paragraph 2.2.
5. RESOURCES
5.1. HUMAN RESOURCES
- One OMC Technician on the OMC site.
- One Installer on the BTS site ( two installers required for safety reasons if this is a
roof-top or a site remotely located).
5.2. HARDWARE TOOLS
Description Comments
Drilling machine wireless type
Drills for metal Size : 3.5 mm - 6.5 mm
Standard centre punch
Screwdriver for phillips heads extra long blade (N 2, 250 mm)
Hand riveters for 3 mm
Five-tread stepladders
Crimping pliers for insulated
terminals
Vacuum cleaner small type with batteries
5.3. SOFTWARE TOOLSNone.
5.4. INSTALLATION SUPPLIES
Acoustic noise reduction kit : NTQA 97 AB.
Adhesives rules to catch the cutting of metal.
7/27/2019 Low Noise Dacs
7/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 7
6. SAFETY
6.1. STAFF SAFETY
Any operation on an outside site is forbidden in case of thunder storm, heavyrain or high wind.
You must switch off the circuit-breaker at the operator AC interface, and disactivate
the batteries before manipulating the power supply wiring of the AC box and of the
rectifier shelf.
The AC switch-off provokes the batteries discharge (the BTS remains powered with
- 48V DC).
If the batteries are internal, turn off the battery disconnect switch located above the
rectifier shelf of the BTS cabinet to disactivate them.
If there is a separate battery cabinet, turn off the DC circuit-breaker located at the
bottom-left of the battery cabinet to disactivate them.
6.2. EQUIPMENT SAFETY
In case of rainy / snowy weather, do not open a cabinet without a tent set up
beforehand. A tent specific to the S8000 Outdoor BTS cabinet is available.
Never leave wet equipment inside the cabinet (tent, etc...).
Initially powered, the S8000 BTS cabinet is operational during 3 hours door open at a
temperature of -10C (~ 14F). Once this time is passed the door opening of the
powered-up BTS cabinet is only possible with the use of an external heated shelter
(use a tent and heaters).
Be careful with the cutting of metal. Clean the DACS after the operation of drilling.
WARNING:
When the blowers are switched off, it is mandatory to wait a complete stop before
attempting to restart. In practice this means ensuring a period od least 30 second after
switch off before switching back on.
7/27/2019 Low Noise Dacs
8/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 8
7. STRATEGY OF INSTALLATION
The installation of the noise reduction kit may be performed on a DACS in a
warehouse. The working condition is better. In this case only the replacement of the
DACS is achieved on site.
8. IMPACTS ON THE NETWORK
During the installation of the kit on site, the cabinet is not operational.
These operations must be performed at the appropriate time, to limit call attempt
failures from the network subscribers.
Duration of site unavailability is estimated at 1.5 hours in the worst case.
9. QUALITY CONTROL- All cases of non-compliance must be recorded as they are observed and
recapitulated clearly on the report sheet.
- For any corrective action refer to the coordinator.
10. SEQUENCE OF OPERATIONS
The sequence of operations is given by the report sheet.
7/27/2019 Low Noise Dacs
9/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 9
SHEET S1 Hardware checks
INITIAL STATUS:
The site is operational.
ACTIONS:
The installers inspect the premises in order to check that they comply with [A1] Site
preparation and installation document.
The following operations have to be performed:
1. Upon arrival, read the safety guidelines specific to the site.
2. Check that the number of units for each kind of items corresponds to the operation to beperformed (refer to [A2] Packing listand Appendix 1 for the kit).
3. Unpack each item.
4. Fill in the report sheet.
FINAL STATUS:
The hardware equipment delivered complies with the operations.
7/27/2019 Low Noise Dacs
10/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 10
SHEET S2 Site status checks
INITIAL STATUS:
The S8000 outdoor BTS is on line.
ACTIONS:
1. Set up a phone link with the OMC technician and inform him that alarms will appearwhen opening the base radio cabinet front doors.
2. Open the base radio cabinets front doors.
3. Visually check the operating status of the site (see Appendix 2).
LEDs on BCF front face:
active CSWM: "RDY" and "ON" green LEDs on,
passive CSWM: "RDY" green LED on but "ON" LED off,
active GTW: "ON" green LED is on,
active SYNC: "MASTER" green LED is on,
no alarm on any SYNC or PCMI (if a PCMI card is connected to only one externalPCM, a NOS alarm will illuminate a red LED on its front face).
LEDs on CBCF front face:
both CMCF : "+5V", "RDY" and "RUN" green LEDs on,
active CMCF: "ABIS" and "ON" green LEDs on,
no alarm on any CPCMI (if a CPCMI card is connected to only one external PCM, aNOS alarm will illuminate a red LED on its front face).
LEDs on radio module front face:
each DRX has the "+5V" and "DRX" green LEDs on.
each PA has the "ALARM" LED green.
FINAL STATUS:
The OMC technician and the commissioner have performed the initial checks.
7/27/2019 Low Noise Dacs
11/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 11
SHEET S3 Site shutdown
INITIAL STATUS:
The site is in service
ACTIONS:
There are three possible network configurations. See Figure 1:
BTS
DTI0
TEI 0
DTI1
BSC BTS
DTI0
TEI 1
DTI1
BTS
DTI0
TEI 2
DTI1
BTS
DTI0
TEI 3
DTI1
chained BTS
BTS
DTI0
TEI 0
DTI1
BSC BTS
DTI0
TEI 1
DTI1
BTS
DTI0
TEI 2
DTI1
BTS
DTI0
TEI 3
DTI1
looped BTS
BTS
DTI0
TEI 0
DTI1
BSC star BTS
Figure 1: Network configurations
1. Ask the OMC-R technician to interrupt the BTS traffic by performing a soft shutdown,see SheetLO2
If the BTS is chainedor looped :
2. Ask the OMC-R technician to interrupt the traffic of each dropped BTS by performing asoft shutdown, see SheetLO2.
3. Remove the blue straps on the PCMI or CPCMI board and make a short circuit as shownbelow.
7/27/2019 Low Noise Dacs
12/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 12
XL
LP
RL
XL
LP
RL
4. Ask the OMC-R technician to make the formerly shutdown BTSs return to service, seeSheetUN2.
FINAL STATUS:
The site is interrupted to traffic and the initial cabinets are still powered on.
7/27/2019 Low Noise Dacs
13/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 13
SHEET S4 Cabinet power off
INITIAL STATUS:
The site is shutdown
ACTIONS:
1. If necessary, open the cabinet doors.
2. Only for the base cabinet, turn off the PSCMD to power off the BCF ( see Appendix 2).
3. Turn off each power amplifier and each F-type converter, ( see Appendix 2).
4. With internal batteries : turn off the battery disconnect switch above the rectifiers, ( seeAppendix 2).
With battery cabinet : open the doors, turn off the DC breaker, Appendix 4.
5. On the AC box turn off the following circuit breaker, see Appendix 3 :
- Main circuit,
- Climatic system,
- Rectifier
6. Turn off the site breaker dedicated in the AC distribution customer box.
FINAL STATUS:
The cabinet is powered off.
7/27/2019 Low Noise Dacs
14/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 14
SHEET S5 Equipment removing
INITIAL STATUS:
The cabinet is powered off
ACTIONS:
1. Unlock the cabinet hood and open the hood to its vertical position.
2. Remove filter cover plate and lid of the DACS.
3. Disconnect the yellow/green cable on the lid of the DACS.
4. Remove the transparent cover over the board.
5. Remove the lid from the cable way at rear of the blower.
6. Cut the cable ties.
7. Unplug the blower cables from the control board ( connectors P4A and P4B)
8. Undo the four screws around the flange of the blower A and remove the blower.
9. Undo the four screws around the flange of the blower B and remove the blower.
10. Disconnect all other plugs to the control board (connectors P1, P2, P3, P5 and P6).
11. Sequentially release the plastics standoffs supporting the control board ( by depressing thetop end of the standoffs) and remove the board.
FINAL STATUS:
The control board and the blowers are removed.
7/27/2019 Low Noise Dacs
15/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 15
SHEET S6 Ambient air thermistor installation
INITIAL STATUS:
The control board and the blowers are removed.
ACTIONS:
See the Appendix 5 and Appendix 7.
1. Remove the filter DACS.
2. Place the hole template in position.
3. Mark the four holes through plate ( 3 on horizontal, 1 on vertical).
4. Remove the hole template.
5. Drill holes to diameters shown.
6. Remove the cutting of metal.
7. Fit grommets supplied to 6.5 DIA holes ( quantity 2).
8. Push the thermistor through grommet A.
9. Push the thermistor through grommet B.
10. Do not attach plug to connector P7 at this time.
11. Allow sufficient lead under fin block plate to attach thermistor to bracket.
12. Push the thermistor probe into grommet on bracket.
13. Push the wire into the clip on bracket.
14. Position the bracket under the front top channel and rivet it ( two rivets).
15. Pull excess thermistor cable back through grommet A and B.
FINAL STATUS:
The ambient thermistor is installed in the DACS.
7/27/2019 Low Noise Dacs
16/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 16
SHEET S7 New equipments installation
INITIAL STATUS:
The ambient thermistor is installed in the DACS.
ACTIONS:
1. Screw the replacement blowers into place using the eight screws.
2. Mount the new board onto the plastic standoffs, ensuring that the LEDs are towards thetop of the DACS.
3. Check the position of the micro-switch [SW1] on the board is in compliance with thephoto below.
First board version
SW1
Strap
Second board version
SW1
OFF
ON
Position of the
switch top
7/27/2019 Low Noise Dacs
17/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 17
4. Insert plugs P1, P2, P3, P5, P6 and P7, see Appendix 6.
WARNING: take care the correct way of the connecteurs.
5. Plug blower A (left hand from front of unit) into P4A and blower B into P4B.
6. Push all wire harnesses into the cable trunking in a tidy fashion.
7. Clamp the cable in the cable trunking.
8. Replace trunking cover.
9. Replace the plastic cover over the board.
10. Replace the filter.
11. Replace the DACS lid and filter cover plate.
12. Connect the yellow/green cable on the lid of the DACS.
13. Check the DACS is tidy and clean.
FINAL STATUS:
The new equipments are installed.
7/27/2019 Low Noise Dacs
18/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 18
SHEET S8 Cabinet power up
INITIAL STATUS:
The new equipments are installed.
ACTIONS:
1. For the cabinet, turn on :
the site breaker dedicated.
the climatic system breaker on the AC box.
the rectifier breaker on the AC box (if necessary, check that the new rectifiers arepowered).
2. If battery backup used, turn on :
the internal battery switch above the rectifiers, if internal batteries used
the DC breaker (left), if battery cabinet used
3. Turn on :
each F-type converter
the PSCMD to power on the BCF only for the base cabinet.
FINAL STATUS
The cabinet is powered up.
7/27/2019 Low Noise Dacs
19/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 19
SHEET S9 Site return in service
INITIAL STATUS:
The cabinet (s) is powered up.
ACTIONS:
1. Ask the OMC-R technician to interrupt the traffic of each dropped BTS by performing asoft shutdown, refer to SheetLO2.
2. Remove the short circuit on the PCMI or CPCMI board and put the blue straps in theirs
initial location.3. Ask the OMC technician to set all the site back to service, refer to Sheet UN2.
4. Ask the OMC technician to unbar the Cells , and to enable the incomingHandover, seeSheet UN7.
FINAL STATUS:
The site is in service.
7/27/2019 Low Noise Dacs
20/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 20
SHEET S10 Final checks
INITIAL STATUS:
The site is unlocked and enabled.
ACTIONS:
1. Stick the completed label on the DACS adjacent to the standard DACS identificationlabel.
2. Close and lock the hood of each cabinet.
3. Close and lock the doors of each cabinet.
4. Ask the OMC technician to check no alarms are remaining.
5. Fill up the Report Sheet (Appendix 8). Let one copy on site and send one copy to theCoordinator.
6. All non compliance have to be physically spotted on site and recapitulated on the ReportSheet.
7. For any corrective action refer to the Coordinator.
8. Release the phone link with the OMC-R technician.
9. Leave the premises clean and tidy.
FINAL STATUS:
The acoustic noise reduction kit is installed.
The site is fully operational
7/27/2019 Low Noise Dacs
21/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 21
Appendix 1 Kit components
Item Quantity by kit
Blower DDC 0-10V Input 2
Thermistor assy 1
Thermistor bracket 1
Clamp plastic 1
Control assy 1
Grommet PVC 6.4mm 2
Standoff PCB 4
Rivet pop steel 4
Hole template 1
Support plate 1
Yellow insulated terminal 3
7/27/2019 Low Noise Dacs
22/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 22
Appendix 2 Font view of the cabinet
User
PA location DRX location
Battery box
GND bar
Hood
Gas spring
1 2 AC Box
Compartment
6U
Open-hood EM sensor
DACS
BCF location
Type F converters
Battery disconnectionswitch
7/27/2019 Low Noise Dacs
23/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 23
Appendix 3 AC box general view
Climatic system circuit breaker(blue)
Fuse for indicator light
Main AC power indicator light
Main circuit breaker
Alarm return to ALCO board
Fuse for mains plugs
Two mains plugs
Rectifier circuit breaker
AC power to rectifiers
Ground
Cover
AC voltage to climatic systemand heaters
AC lightning protector
(green)
(red)
(blue)
Figure A : Single-phased AC box
7/27/2019 Low Noise Dacs
24/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 24
Two mains plugs
Fuse for mains plugs
AC voltage to climatic systemand heaters
Climatic system circuit breaker(blue)
Fuse for indicator light
main AC power indicator light
Main circuit breaker
Alarm return to ALCO board
Rectifier circuit breaker
AC power to rectifiers
Ground
AC lightning protector
(blue)
(red)
(green)
Figure B : Split single-phased AC box
7/27/2019 Low Noise Dacs
25/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 25
Alarm return to ALCO board
ACU0 circuit breaker
ACU1 circuit breaker(not used)
General stop button
Mains plugs circuit breaker
Rectifier circuit breaker
Ground
AC lightning protector
AC voltage to rectifiers
AC voltage to climatic systemand heaters
Cover
Two mains plugs
Figure C : Tri-phased AC box
7/27/2019 Low Noise Dacs
26/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 26
Appendix 4 Battery cabinet
+
+
-- +
- + -
+
+
-- +
- + -
+
+
-- +
- + -
+
+
--
- + -
+
Bleu
Battery compartment
Battery compartment
Battery compartment
Battery compartment
DCpanel
Heating and
ventilation unit
ACpanel
Black
Groundterminal block
DCbreaker
HVUbreaker
Blue
-48Vterminal block
Plinth
ACbreaker
7/27/2019 Low Noise Dacs
27/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 27
Appendix 5 Thermistor installation
m : location of the hole with the template
Control board
Front of the DACS
3.5 dia
6.5 dia
Hole template
6.5 dia
6.5 dia
Top view
To handrail for
the hole template
7/27/2019 Low Noise Dacs
28/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 28
n Installation of the thermistor in the DACS
Control board
Front of the DACS
Thermistor
Top view
Gromet "A" Gromet "B"
o Lateral view of the installation of the thermistor on its support
Grommet
Thermistor
7/27/2019 Low Noise Dacs
29/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 29
Appendix 6 Control board
Control board
P3
P2
P1 P7
P6
P5
P4B
P4A
P1 : Cabinet air temperatureP2 : AC supplies
P3 : DC supplies
P4A : Blower A
P4B : Blower BP5 : Damper motor drive
P6 : Alarms and filter clog switch
P7 : Ambient air thermistor
7/27/2019 Low Noise Dacs
30/33
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 30
Appendix 7 View of the ambient thermistor final installation
Hole with 6.5 dia.
Ambient thermistor
Rivets
7/27/2019 Low Noise Dacs
31/33
PROJECT:............................
SITE NAME:.......................
FOLIO /.....
RECORD:...................
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 31
Appendix 8 Report sheet
The following parts MUST be filled by the coordinator before the site operation.
Applicable documents: (new documents may be added) Reference
Project documentation plan : ..............................
[A1] Site preparation and installation : Project document
[A2] Packing list : Project document
[A3] V_ OMC-R operations called by I&C procedures : PE/ICM/APP/00__
:
:
....................................................... : ..............................
Note: Default Core methods reference are given in Applicable Documents paragraph.
Input parameters: (new parameters may be added)
Network type: GSM 900 Y GSM 1800 Y
GSM 1900Y
System release: ..........................
BTS type: .............. BTS configuration: ..........................
Type of connection of the BTS : StarY
ChainedY
LoopedY
....................................................... .......................................................
....................................................... .......................................................
....................................................... .......................................................
7/27/2019 Low Noise Dacs
32/33
PROJECT:............................
SITE NAME:.......................
FOLIO /.....
RECORD:...................
This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.
S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION
PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 32
In the action following chart, To Use? column MUST be filled by the coordinator before the site
operation.
Action Condition To USE? Sheet SITE Sheet OMC OK NOK
Hardware checks ; . S1
Site status checks;
. S2
Site shutdown ; . S3 LO2, UN2
Cabinet power off;
. S4
Equipment removing;
. S5
Ambient air thermistor
installation
;
. S6
New equipments
installation
;
. S7
Cabinet power up;
. S8
Site return in service;
. S9 LO2, UN2
UN7,
Final checks;
. S10
7/27/2019 Low Noise Dacs
33/33
PROJECT:............................
SITE NAME:.......................
FOLIO /.....
RECORD:...................
The following parts MUST be filled by the commissioner during the site operation.
Additional results:
Base cabinet : Serial Number:..............
Extension 1 cabinet : Serial Number:..............
Extension 2 cabinet : Serial Number:..............
Comments:
Sign off :
Coordinator Commissioner Customer representative
Company name
Functions
Name
Signature
Date
Z END OF DOCUMENTY