Low Voltage Equipment Solutions Switchboard Retrofill
• Problem:
• Obsolete Federal Pacific switchboard component failures
• Solution:
• Remove Federal Pacific gear
• Retrofill with Eaton Magnum circuit breaker with electronic trip unit, Power Expert Meter (PXM), and Pow-R-Line C feeder panel
• Rating: 480V, 3000A, 100kA
• Installation: 14 Hour outage
PRE-MODERNIZATION
POST-MODERNIZATION
Eaton Electrical Engineering Services & Systems Division
Low Voltage Equipment Solutions Replacement of aging equipment
• Problem:
• Failure of equipment due to age
• Solution:
• Remove FPE bolted pressure switches
• Retrofill with Eaton Magnum breakers and feeder panels
• Rating: 480A, 3200A, 65kA
• Installation: 20 hour outage
PRE-MODERNIZATION
POST-MODERNIZATION
Eaton Electrical Engineering Services & Systems Division
Low Voltage Equipment Solutions
Replacement of aging equipment
• Problem:
• Outdated breakers
• Solution:
• Removal of Siemens breaker, feeder breakers, bus, and sheetmetal
• Retrofill with Eaton Magnum breakers and drawout JGC panelboard breakers
• Rating: 480V, 1200A, 100kA
• Installation: 16 hour outage
PRE-MODERNIZATION
POST-MODERNIZATION
Eaton Electrical Engineering Services & Systems Division
DURING MODERNIZATION
Medium Voltage Equipment Solutions Incident energy reduction switch/fuse to breaker
• Problem:
• Requirement to reduce incident energy without funding for entire switchgear replacement
• Solution:
• Remove 15kV load interrupter air switch/fuse
• Retrofill Eaton 15kV VCP-T breaker with remote close/trip and electronic trip unit
• Installation: 10 hour outage
PRE-MODERNIZATION
POST-MODERNIZATION
Eaton Electrical Engineering Services & Systems Division
Medium Voltage Equipment Solutions Replacement of outdated breakers and relaying
• Problem:
• Obsolete breaker and electromechanical relaying
• Solution:
• Remove Allis Chalmers breaker
• Retrofill with Eaton VCPW-HD breakers and GE relaying/metering
• Rating: 35kV, 1200A
• Installation: 24 hour outage
PRE-MODERNIZATION
POST-MODERNIZATION
Eaton Electrical Engineering Services & Systems Division
Transformer Modernization Transformer termination enclosures
• Project:
• (2) Westinghouse 24,000kVA transformer secondary termination enclosures
• Solution:
• Custom enclosure, new secondary bus terminations, and cabling
• Rating: 135,000:13,800Y/7980V
• Installation: 10 hour outage
PRE-MODERNIZATION
POST-MODERNIZATION
Eaton Electrical Engineering Services & Systems Division
DURING MODERNIZATION
Controls Solutions Remote breaker relaying and metering
• Project:
• Remotely locate 15kV breaker controls
• Solution:
• Custom control enclosure (UL Listed)
• HMI display panel
• Communication to customer DCS
• Circuit breaker remote racking
• Schweitzer relaying
Eaton Electrical Engineering Services & Systems Division
Safety Controls Solutions Remote ARMS (Arc Reduction Maintenance Switch) Enclosure
• Problem:
• High incident energy while performing maintenance on switchgear
• Solution:
• Reduce the incident energy by installing the remote ARMS enclosure and remotely activating the ARMS function on the trip unit of the breaker feeding the switchgear.
Eaton Electrical Engineering Services & Systems Division
ATS Controls Solutions ATS control panel
• Project:
• Develop ATS scheme for 3 utility sources
• Solution:
• Dual GE PLC automatic transfer switch control panel
• HMI display panel
Eaton Electrical Engineering Services & Systems Division
FACTORY TESTING
FIELD INSTALLED
Design Capabilities Full 3-dimensional CAD modeling