L&Q’s Extensions Programme
Regional Housing Pot Targeted Funding Stream 2008-2011
13 November 2009
Pippa Read
Special Projects
Coordinator
The Programme: a summary
• £1.61 million from the TFS’s 2008-11 bidding round (entirely externally funded)
• Will deliver 20 extended properties – 3 or 4 beds on completion • 10 in 09/10 and a further 10 in 10/11• Must house 100 people on completion i.e. 20 x 3bed 5person • Prioritises properties that provide larger family accommodation • Prioritises properties that are cost effective to convert – i.e. lofts • Properties must meet DHS on completion• Properties must also meet HCA’s DQS for rehab schemes• Tenanted properties or voids considered • Will only consider residents with a positive assessment from HM• Completes with residents in situ
The money: the bid
• GLA Act 2007 – new mayoral housing responsibilities
• Takes lead on allocation of TFS, which provides ‘funding for programmes to address some of the most pressing housing issues within London’s existing stock’
• 5 strands, 1 being ‘increasing the number of 3 bedroomed and larger social rented homes’
• All funds (£285m) allocated via a single bidding round – 1 form!
• Bids made by July 08 with confirmation in Dec 08• Next bidding round likely to be late 10 early 11• Money received as SHG from the HCA
The money: in practice
• The bid: 20 properties for £1.61 million:• £80,500 per home
– £70,000 works – £10,500 on-costs
• Currently (3 on-site):• £64,519 per home
– £48,958 works– £15,561 on-costs
• Recognised early that on-costs would be high• Consultant/HQI• Party Wall/Building Regs • Development allowances • VAT • Contingency
• Works costs must be kept under control • Lofts that do not require planning permission • Helps with timescales – long process from identification to approval
to SOS
Identifying properties: what we were looking for
• Over 30 years old• Gable end or terrace• High roof pitch • Room for additional stair core• Overcrowded if tenanted
Identifying properties: the logistics
• First stage filtering:• HM and PS take the lead:
– PS inspected properties referred to them from HM (those registered as overcrowded on transfer list)
– Voids team inspected potential voids – HM also conducted a targeted letter writing campaign to
certain roads with properties considered suitable. They then filtered the results based on occupancy
• Second stage filtering • Special Projects and our Consultant
– Inspected the referred properties – Initial feasibility conducted
• Individual submissions to HCA • Design and Standards Advisor • Bids clinic
Tricky bits
• Finding properties – an on-going process• Managing residents’ expectations • Internal financial/legal issues:
– Outstanding mortgages– Loan covenants
• Working with funders:• Not just a loft but:
– HQIs – minimum room sizes/sustainability– Ancillary facilities – WCs/storage