1 South American Astronomical Coordination Committee (SAACC) Meeting - April 17, 2019 LSST Networks Construction and Commissioning Jeffrey Kantor South American Astronomy Coordination Committee (SAACC) Meeting April 17, 2019
Transcript
Page 1: LSST Networks Construction and Commissioning South ...

1SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

LSSTNetworksConstructionandCommissioning

JeffreyKantor

SouthAmericanAstronomyCoordinationCommittee(SAACC)Meeting

April17,2019

Page 2: LSST Networks Construction and Commissioning South ...

2SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

SummitSiteSummitFacilityTelescopeandCamera

DataAcquisitionCrosstalkCorrection

NetworksandPathDiversitybetweenSitesandCenters

BaseSiteBaseCenter

Long-termstorage(copy1)DataAccessCenter

DataAccessandUserServices

HQSiteHQFacility

ObservatoryManagementScienceOperationsEducationandPublic

Outreach

ArchiveSiteArchiveCenterAlertProduction

DataReleaseProductionCalibrationProductsProduction

EPOInfrastructureLong-termStorage(copy2)DataAccessCenter

DataAccessandUserServices

FrenchSiteSatelliteProcessing

CenterDataReleaseProduction

Page 3: LSST Networks Construction and Commissioning South ...

3SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

LSSTLongHaulNetworkLinks(BaselineFY21)

Tucson

LaSerena

CerroPachon

Santiago

SaoPaolo

Chicago40x10GbAURA(ScienceData)

20x10GbAURA(OCS/TCSControl)

Panama

1x100Gb1x40–100GbREUNA

2x100GbAmlight/ANSP/RedCLARA

CC-IN2P3Lyon

Miami

100Gb(spectrum)Amlight/AngolaCable

Champaign

2*100GbNCSA/ICCN

Santiago

BocaRaton

10GbAmlight/internet2

10GbIN2P3

10x10GbNon-LSSTAURA(Fail-over) 100Gb

(spectrum)AmLight/RNP/RedCLARA(viaBuenosAires)

SecondaryPath

PrimaryPath

SLAC,OtherDOE

10GbESnet(institutional)

2x100GbEsnet/FLR/i2

Page 4: LSST Networks Construction and Commissioning South ...

4SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

ESNetforLSST

WASH

PHILNEWY32AOANEWY1118TH

BOSTALBA

BUFF

CLEV

JACK

CHAR

RALE

CHAT

ASHB

PITT

ATLA

DETR

INDI

CINC

LOUI

NASH

MEMP

JCSN

BATO

DALL

KANS

STLO

TULS

SANA

ALBQ

ELPA

DENV

PUEB

PHOE

TUCS

SALT

LASV

SAND

LOSA

SANL

RENO

BOIS

SEATOLYM

PORT

EUGE

SACR

SUNN

STAR

CHIC EQCH

HOUS

HOUH

BALT

Ciena_Map v12pld 9/30/2016

ESnet6 Optical Footprint: Add/DropsWave options Atla-Chic

atla-cr5rtr

LSSTDWDM

ESnetIP/MPLS core

star-cr5rtr

chic-cr5rtr

to Florida

MREN 8700

StarLight

NCSArtr1

ATLA HUB180 PeachTree(Site A)

Pre-FY21

100G100G

100G

100G

100G

100G

Before FY21 but after 2018 there will be a switch between the DWDM and alta-cr5 rtr. The handoff will be 1x100G.

atla-cr5rtr

LSSTDWDM

star-cr5rtr

chic-cr5rtr

to Florida

MREN 8700

Starlight

NCSArtr1

Post-FY21

100G 100G

100G

100G

100G

ESnetDWDM

ESnetDWDM

ESnetDWDM

LSST SW

LSST SW

LSST SW

100G

100G

100G

100G

100G

100G

PS

PS

PS

Last update 1/18/2018

600 W. Chicago(Site B)

710 N. Lake Shore Drive(Site C)

LSST SW

PS

NCSArtr2

NCSArtr2

710 N. Lake S

hore Drive

(Site C

)

600 W. C

hicago

(Site B)

100G

ATLA HUB180 PeachTree(Site A)

100G

FY20(2x20Gbps) FY21+(2x100Gbps)

Page 5: LSST Networks Construction and Commissioning South ...

5SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

Base–LDF100GbpsNetworkDemonstration

−  FollowinguponthefirstsuccessfultransferofdigitaldataoverLSST/AURAfiberopticnetworksfromtheSummitSiteonCerroPachon,ChiletotheBaseSiteinLaSerena,ChileandontotheArchiveSiteatNCSAinChampaigninDecember2017,thatachieved44Gbpssustaineddatarate.

−  100GbpsdemonstrationfromLaSerena–NCSANovember14,duringSupercomputing2018.Datasetis10TBofDECampublicdata.UsingSCInetconnectionsfromMiami–Dallas–Chicago.DM-provided“watch”JupyterHubapplicationwillbeusedtomonitortransferfromDataTransferNode(DTN)toGPFSfile-system/disk.

Via Atlantic

DWDM

LSSTDWDM10x10G

1

2

3

4

5

6

La Serena REUNA

LSSTDWDM10x10G

1

2

3

4

5

AmLightAndes1

1/1

1/2

1/3

1/4

1/5

3/2

3/110G SR

1G UTP

DWDM

AmLight

Via Pacific

100G Leased AmLightAMPATH01

7/2

AmLightAMPATH02

7/2

8/1

Cent

ury

Link

100G LR4

CLARA/SCL AMPATH ICCN NCSA/NPCF

5x100G

7/1

7/1

NCSAEX9214

NCSAMX960

NIC

9/1/0

100G DTNeth0

6/1

Dell Z9100

7

8

9

10

en

p6

s0

100G DAC

6

7

8

9

10

1/6

1/7

1/8

2/6

2/7

AmLightAndes2

3/2

3/1

6/1

SC18SCINet

StarLight & MREN

100GDTN

Version: SC18.0929.01

Date: 09.29.2018

Author: LSST-NET

Ready

Pending

OOB

NVMeNVMeNVMe

NVMe

100G

DTN

NVMeNVMe

NVMeNVMeNVMe

NVMeNVMe

NVMe

Co

rsa

De

ll Z

91

00

-ON

AMIS

Sens

or

8700HD

SC18

AMIS

Sens

or

8/2

AMISSensor

Mirror

Mirror

Mirror

1

14

3321

OOB

SC15

SC14

SL-10

100G DTNs

Page 6: LSST Networks Construction and Commissioning South ...

6SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

End-to-EndNetworkBandwidthEvolution

Page 7: LSST Networks Construction and Commissioning South ...

7SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

Summit–BaseFiberPostImprovements

Page 8: LSST Networks Construction and Commissioning South ...

8SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

BaseDataCenterFY19

From: Luis Corral [email protected]: RE: BDC racks in La Serena

Date: January 30, 2019 at 1:26 PMTo: Ron Lambert [email protected], Jeff Kantor [email protected]

Therackswereunloadedsafelyandwemarkedtheperimeterwithhelpfromthesafetyteam,I

askedGiovannitoinstallacoverifpossibletoprotecttheracksfromthemorningdew.My

preliminaryreportisthatalltheracksarrivedingoodcondi>onbuttheofficialinspec>onhasto

bedonebyRon,

--LuisCorralNetworkArchitect–LargeSynop>cSurveyTelescope(LSST)

Email:[email protected]

Phone:+56-51-2205320

From:RonLambert

Sent:Wednesday,January30,20192:37PM

To:JeffKantor<[email protected]>;LuisCorral<[email protected]>

Subject:Re:BDCracksinLaSerena Wildo. I am also requesting if there is room in the bdc to store them.Ron

Get Outlook for Android

Page 9: LSST Networks Construction and Commissioning South ...

9SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

RecentAccomplishments

−  Base–LDF100GbpsDemonstrationatSupercomputing2018−  StartedBaseFacility

–  Installationofracks,PDUs,etc.–  MoveofexistingLSST,CISS,Geminiequipment–  InstallationofnewLSSTequipment–  Cabling,wired/wirelessnetworks,VOIPinoffices,etc.

−  InstalledfiberforAuxiliaryTelescope(startofobservingendofFY19)−  CompletedrepairsonSummit–BaseFiberposts(interruptedbyearthquake)−  FinalizedagreementforESnetservice

–  Atlanta–Chicago–  FY202x20Gbps,FY212x100Gbps

Page 10: LSST Networks Construction and Commissioning South ...

10SouthAmericanAstronomicalCoordinationCommittee(SAACC)Meeting-April17,2019

FY19RemainingMajorActivities/Milestones

−  CompleteSummitNetworkcabling,accessswitches,Wi-Fi,VOIP(allFY)−  Summitserverinstallations(AuxTel,EFD,MW,ESAS/ECS,TMA,Camera

rooms,...)(allFY)−  InstallLSSTDWDMSummit–Base(May)−  InstallBaseDataCenterracks,moveexistingequipment,installnew

networkswitchesandservers(May)−  DWDMpurchaseandactivationofSpectrumLink(May)−  Cableoffices,rooms,installaccessswitches,Wi-Fi,VOIP(June)−  ImplementationofFY202x20GbpsESNet(September)