LSU Petroleum Engineering Research and Technology Transfer Laboratory
“The Well Facility”
2 Parallel 250+ bbl Mud Systemsw/ separate HT-400 Pumps
LSU WELL FACILITY
LSU Well #1 Five Additional Wells On-Site
• 2787’ deep Well #1 simulating subsea well allowing gas injection and lost returns
• 5884’ deep Well #2 simulating surface well allowing gas injection and logs in annulus
• 3 - 2000’ deep gas storage wells
• 1200’ deep diverter demonstration well
• 45’, 0 - 90 degree, inclinable flow tube
• 9600’, 4.5” o.d. horizontal flow loop
Well and Flow System Capabilities
LSU Well #1
Control Room
Choke Manifold
Five Additional Wells On-Site
LSU WELL #1
• 2 - HT400 cementing pumps • Two high capacity mud-gas separators• Two mud de-gassers• 3 - 200 bbl mud tanks + special tanks• Choke manifold for up to 5 chokes• Multiple charge and transfer pumps• Shale shaker• Mud hopper• Inlet and outlet meters for gas and liquids
Circulation System Capabilities
Two Halliburton HT-400 Pumps
LSU WELL FACILITY
Support Utilities
• 480 vac, 3-phase, circuits up to 100 amps
• 120 vac, 1-phase, circuits up to 30 amps
• 100 psig air supply (30 hp)
• City water
• Well Water
• Natural gas (600 psig continuous, up to 3500 psig intermittent)
• Instrumentation for measuring pressure, temperature, and liquid and gas flow rates
High Pressure Natural Gas Compressor
Facilities to Support Training, Research, and Testing
• 2 - 20 person classrooms (1 with audio visual support, 1 adaptable as lunch room or demo room, includes 3 Restrooms)
• Computer lab with 7 PC’s
• Labview data collection system
• Mobile crane and fork lift
• Indoor and outdoor shop areas
• Guttered areas with drain to sump for catching spill and leaks