LTP3 Development. Sean Parks Nottinghamshire County Council. LTP3 development process. Identify local transport priorities and challenges Review our transport priorities and challenges Determine the strategic options Determine the programmes of measures. How you ranked the transport goals. - PowerPoint PPT Presentation
Popular Tags:
21
LTP3 Development Sean Parks Nottinghamshire County Council
Transcript
Page 1: LTP3 Development

LTP3 Development

Sean ParksNottinghamshire County Council

Page 2: LTP3 Development
Page 3: LTP3 Development

LTP3 development process

1. Identify local transport priorities and challenges

2. Review our transport priorities and challenges

3. Determine the strategic options4. Determine the programmes of measures

Page 4: LTP3 Development

How you ranked the transport goalsBusinesses Public Stakeholders

Supporting economic growth 1 1 1

Contribute to better safety, security and health

2 2 4

Improve the quality of life 3 3 3

Tackle climate change 4 4 5

Promote equality of opportunity

5 5 2

Page 5: LTP3 Development

Identified challenges• Tackling congestion• Improve connectivity to inter-urban, regional and international

networks• Supporting regeneration and business growth• Addressing the transport impacts of growth• Reducing transport’s impact on the environment• Development of a low-carbon transport system• Encouraging active travel• Improving personal safety• Provision of an affordable, reliable, and convenient public

transport network• Improving access particularly from rural areas• Maintaining the existing transport infrastructure

Page 6: LTP3 Development

Nottingham City Council

Chris CarterTransport Strategy Manager

Page 7: LTP3 Development
Page 8: LTP3 Development

Key Challenges• Tackling congestion to support business competitiveness• Connectivity to strategic regional/national networks• Increasing capacity to accommodate growth• Delivering a low carbon transport system and adapting to

climate change• Neighbourhood transformation • Influencing travel behaviour and promoting active travel• Effective partnership working/delivering against different

agendas

Page 9: LTP3 Development

Nottingham Options1. Prioritise essential maintenance, casualty reduction and

support for existing public transport services.2. Maximise benefits from major public transport investment

and planned introduction of Workplace Parking Levy.3. Support urban regeneration particularly regeneration zones,

and Strategic Regeneration Frameworks.4. Expand Area Capital Fund approach.5. Support more walking and cycling.6. Electrification of the transport system and more resilient

networks.

Page 10: LTP3 Development

Planned MeasuresMajor Schemes• NET Phase 2 and planning for future

phases• Station Hub• Linkbus network expansion

-: Supported through introduction of the Workplace Parking Levy from 2012

• Ring Road major scheme

And responding to:

• A453 (M1 to Nottingham)• Midland Mainline upgrading and

electrification• High Speed Rail

Page 11: LTP3 Development

Planned Measures• Supporting regeneration and housing growth

including:– Cross city bus transit routes– Connecting Eastside/Broad Marsh– re-introduction of traditional street layouts– Green Infrastructure links e.g. River Leen

Corridor, Embankment and Broxtowe Country Park

• Community-led priorities – footways, parking and traffic management schemes and local accessibility schemes

Page 12: LTP3 Development

• Smarter Choices – business support package, car club, journey planning information

• Upgraded walking and cycling networks • Network management – advanced traffic control

technologies, road works permit scheme • 20 mph zones in residential areas• Greening the transport fleet – Ecolink (ethanol

fuelled), Centrelink (electric), fleets, promoting the take up of private electric vehicles

Page 13: LTP3 Development

Derbyshire County Council

Jim SeymourTransportation Strategy Manager

Page 14: LTP3 Development
Page 15: LTP3 Development

Derbyshire OptionsBalancing the transport goals:1. Emphasis on supporting economic growth, better

safety, security and health, quality of life and healthy natural environment (based on results of Derbyshire Surveys in 2009)

2. Emphasis on tackling climate change and supporting economic growth (described as the biggest challenge in DfT DaSTS)

3. Tackling inequality (not a popular choice in consultations, but important to Derbyshire – rural accessibility and deprived urban areas)

Page 16: LTP3 Development

Measures in Greater Nottingham Area?

Key areas of work likely to be around:

Helping settlements to ‘stand on their own feet’e.g. development of cycling network

Ensuring accessibility to higher-level services in Nottingham, Derby etc e.g. provision of Ilkeston rail station

Page 17: LTP3 Development

Your chance to consider and debate the options

Your chance to input your views and shape the new plans

1. What new measures do you want to see in the new LTPs?

2. What are the key cross-boundary issues?

Group Discussion

Page 18: LTP3 Development

Feedback from Group Discussions

Page 19: LTP3 Development

Conclusions and Next Steps

Gary Smerdon-WhiteGreater Nottingham Transport Partnership

Page 20: LTP3 Development

• Summing up• Big Wheel Business Club website• Next steps for LTP3

Page 21: LTP3 Development

The next steps and consultationSpring 2010

– Stakeholder consultation on LTP options (from April/May)– Statutory consultation on Strategic Environmental Assessment/Integrated

Impact Assessment (from April/May)

Summer/Autumn 2010– Consultation on draft LTP Strategy & Implementation Plan (from Aug/Sep)– Statutory consultation on SEA (from Aug/Sep)

Spring 2011– Submission to Department for Transport (31 March 2011)– Plan effective (1 April 2011)