LV PS system and DCS Domenico Elia – INFN Bari. LV PS and regulators: current scheme, tests Regulator board: proto2, design considerations DCS: first PVSS based developments. Tests at CERN (Michel, Petra … ):. test performed with 10 chips (bus card A), Iload  5.5 A - PowerPoint PPT Presentation
13
Domenico Elia ALICE SPD meeting - February 4, 2003 1 Sezione di Bari LV PS system and DCS Domenico Elia – INFN Bari LV PS and regulators: current scheme, tests Regulator board: proto2, design considerations DCS: first PVSS based developments
Transcript
Page 1: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

1

Sezione di Bari

LV PS system and DCSDomenico Elia – INFN Bari

LV PS and regulators: current scheme, tests

Regulator board: proto2, design considerations

DCS: first PVSS based developments

Page 2: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

2

Sezione di Bari

LV PS and voltage regulators (I)

test performed with 10 chips (bus card A), Iload 5.5 A

SEMTECH EZ1580 (7A) voltage regulators used

9 mt distance between chips and regulators

Tests at CERN (Michel, Petra … ):

detector works fine with such remote regulation(but with small variation of Iload, within 100 mA)

grouping of ANALOG and DIGITAL powers also OK

Page 3: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

3

Sezione di Bari

LV PS and voltage regulators (II)

Current scheme: regulators outside magnet door (>10 mt from SPD):

no need for rad-hard devices spaces, cabling, cooling issues much less critical

reduced amount of power lines: 2 regulators each half-stave (instead of 7) 1 LV power source each half-sector

VRs

10 mt 30 mtInternal PP

Page 4: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

4

Sezione di Bari

LV PS and voltage regulators (III)

characterization of SEMTECH regulators

test setup with long cables (11 mt between VR and load)

ripple rejection and active load tests

ELIND-30KL 38/80 and Wiener PL6012 as power sources

other commercial regulators with remote sensing

Further activities in Bari:

Antonio’s talk

Page 5: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

5

Sezione di Bari

Voltage Regulator board (I)

New prototype:

still using ST-L4913 rad-hard voltage regulators

power channels needed for 2 half-staves(total of 8 VRs: 4 x single + 2 x parallel schemes)

ALTERA FPGA implementing control logic(VERILOG code written by Michele Caselle)

INHIBIT and OVC flags available for control functionality

full board control via JTAG (still under test)

Page 6: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

6

Sezione di Bari

TAP

LV input

to load

JTAG connector

HV input

ALTERA FPGA control via JTAG ST-L4913 VR

Voltage Regulator board (II)

Page 7: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

7

Sezione di Bari

TCK, TMS, TDI, TDOand TRST*

ALTERA FPGAfor JTAG Control

INHIBITOVC

With a new Inhibit configuration

LV input

to load

HV input

Voltage Regulator board (III)

Page 8: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

8

Sezione di Bari

Voltage Regulator board (IV)

Concerns for final VR board design:

number of LV channels to provide

segmentation, total number of boards

location of the board and related issues

choice of voltage regulator

on-board control issues (FPGA etc…)

connection with external world (JTAG, other bus …)

Page 9: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

9

Sezione di Bari

DCS developments (I)

PC with Win2K devoted to SPD control developments

PVSS2 and Framework 1.2 software installed

HV control sector:

CAEN HV OPCserver 2.0 installed and configured on same PC

CAEN SY1527 equipped with A1519 board (12 HV channels)

Test station setup in Bari lab:(in collaboration with Leonid Vinogradov)

Page 10: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

10

Sezione di Bari

DCS developments (II)

PVSS2Framework

CAEN OPC Server

CAEN SY1527HV board: A1519

Framework selection of SY1527 with 1 HV board

Page 11: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

11

Sezione di Bari

DCS developments (III)

SPD HV-LV preliminary control panel

Hierarchical structure

Page 12: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

12

Sezione di Bari

DCS developments (IV)

Example of monitoring panels for 12 HV channels

(1 half-sector)

Page 13: LV PS system and DCS Domenico Elia – INFN Bari

Domenico Elia ALICE SPD meeting - February 4, 2003

13

Sezione di Bari

DCS developments (IV)

LV control sector:

WIENER PL6021 PS equipped with Kvaser PCIcan-Q card

Kvaser card drivers installed and tested

test of CANbus in progress

Wiener OPC server not available

contacts with ALICE DCS and IT/CO people: SLiC.OPCserver

next: continue integration of control subsystems