Date post: | 22-Jan-2018 |
Category: |
Documents |
Upload: | michael-nuschke |
View: | 267 times |
Download: | 10 times |
WHO IS WHO
Jim Smitherman – Building Manager
• Contact
• (512) 471-3460
Shallaco McDonald – Technical Staff Assistant
• Contact
• (512) 471-7867
LOCATION AND
HOURS
We are located on the 1st floor of CPE in room 1.408A
Our hours are
• 7:30 am – 4:30 pm Monday through Thursday
• 7:30 am – 4:00 pm Friday
• The shop is open for consultation from 1 – 2 pm Monday
through Thursday
• If you are unable to make that time window feel free to email
or call us to set up an appointment
WHAT WE DO
We offer the graduate students and undergraduate
laboratories technical support in experimentation.
Our services include:
Design Consultation
Machining Parts
Equipment Repair
Welding
Laboratory Support
and Much More
YOU NEED TO KNOW ABOUT TWO
TYPES OF ALARMS IN THE
BUILDING
THERE’S THE GAS
MONITORING SYSTEM
AND THE FIRE
ALARM SYSTEM
GMS LEVEL 1 ALARM
Evacuates the floor that the incident is detected on
A blue strobe will flash and an alarm will sound
You are required to evacuate the floor of concern and wait for the all-
clear to re-enter
GMS LEVEL 2 ALARM
Evacuates the entire building!
A blue strobe will flash and a voice will give you evacuation
instructions
You are required to evacuate the entire building and go to your
predetermined evacuation area
Instructions for re-entry will be provided to the group leader
FIRE ALARM
There is only one level with the Fire Alarm System
A full building evacuation is required!
A white strobe will flash and the fire alarm will offer
evacuation instructions
A Fire Alarm is treated the same as a GMS Level 2 Alarm
OUR SHOP
Ru
th C
raw
ford
B
reak
ro
om
1
.44
8
Ke
vin
1-1
35
4Su
pp
ort
Se
rvic
es
1.4
50
B
ED
C
Suit
e 1
.45
0
Te
ri T
amm
y Ed
die
1-0
95
5 1
-04
44
1
-20
23
A1
-34
13
Up
Load
ing
Do
ck1
.47
0
1.4
60
Po
lym
ers
Lab
1-6
90
9
Jim
1-3
46
01
.40
2
Sh
alla
co
1-7
86
7
1.4
08
A
Elev
ato
r
#3
1.4
E3
Elev
ato
r
#4
1
.4E4M
ech
anic
alR
oo
m
1.4
90
26
4P
roje
cts
Lab
1.4
80
26
4 L
ab
1.4
40 Fu
n L
ab
1.4
20
Co
mp
ute
rLa
b
1.4
18
Ran
dy
1-4
92
8
1.4
22
J
aso
n
1-5
75
3
1.4
22
A
Eke
rdt
1.4
24
Ngo
McD
anie
lLe
on
har
dt
1-3
59
8
Wo
me
n's
1.4
92
M
en’s
1.4
96
Uti
litie
s
1.1
51
De
par
tme
nt
Sto
rage
1.4
46
A
Gra
du
ate
Stu
de
nt
Lou
nge
1-5
11
81
.44
6
C4
Toxi
cG
as
1-3
59
8
Wel
din
gSh
op
EF-1
0
Cu
sto
dia
lSe
rvic
es
1.1
26
Scan
nin
gEl
ectr
on
Mic
rosc
op
e
1.4
72
Gas
C
ylin
der
Sto
rage
1.0
06
EF-8
Mac
hin
e Sh
op
1.4
08
1-1
09
1
Stai
rs#3 1.4
S3
Ch
em
ical
En
gin
ee
rin
g1
st F
loo
rA
pri
l 20
14
2-6
14
8
1.4
00
1.4
00
1.4
00
1.4
00
1.4
70
A B
1.500
A
D
AB
FIR
E
FIR
E
C4 Midas
GMS
BA
Up U
p
EF-1
10
EF-2
9
EF-1
11
A/B
EF-1
12
A/B
HARDWARE AND
MATERIALS
The shop is equipped with a modest
supply of hardware and materials.
When you are in need of hardware, fittings, tubing, or
material feel free to stop by and see if we can help!
If we don’t have it on hand we can usually point you in the
right direction to obtain it.
RECOMMENDED VENDORS
If we don’t have the part in stock, you’ll need to order it.
We have a list of vendors on our site: www.che.utexas.edu
Click ‘Department Services’ ‘Machine Shop’ ‘Vendors and Materials’
CNC MACHINING
We have a Haas CNC with four axis capabilities.
Programs will be provided by the shop.
The machine is capable of machining parts up to 14” x 36”.
3D PRINTER
We have a MakerBot Replicator 2X dual head printer.
It prints ABS and Dissolvable filament.
Models need to be in OBG or STL format.
Software is available to test your models for printability!
MODEL AND DRAWING FORMATS
The shop uses SolidWorks so SLDPRT files are
preferred.
Prints should be dimensioned in standard (Imperial
system) dimensions.
Metric to standard conversion can lead to mistakes!
LOANER TOOLS
We have a large selection of tooling available
for borrowing.
The tools must be signed out before they can
leave the shop.
Some of the tools available are:
Screwdrivers, Hammers, Socket Wrenches, Tube Benders,
Soldering Irons, Allen Wrenches, Calipers and Many More.