Department of civil EngineeringDepartment of civil Engineering BUITEMS BUITEMS
‘ ‘AJNABIHANS’AJNABIHANS’ seniors seniors
HAMAYUN KHAN KAKAR 9026HAMAYUN KHAN KAKAR 9026 ABDUL AHAD KAKAR 8904ABDUL AHAD KAKAR 8904 BAYAZEED ROSHAN ACHAK 8920BAYAZEED ROSHAN ACHAK 8920 SYED SIKANDAR SHAH 10225SYED SIKANDAR SHAH 10225 NAJEEB TAREEN 8765NAJEEB TAREEN 8765
ACKNOWLEDGEMENT ACKNOWLEDGEMENT
We are Grateful to ALMIGHTY ALLAH for giving us the endurance to complete this presentation. All the Studies and calculation work Executed in Connection with this presentation were carried out with the help of N.H.A and under the supervision & Guidance of DR ABDUL MANAN BAZAI. And We would like to express our sincerest to our Honourable Teacher who provided such a great opportunity to do this combine work, and without team work the completion of this presentation of availability of construction machinery in Quetta would not have been materialized .
Construction Machinery AvailableConstruction Machinery Available In Quetta In Quetta
Construction machineryConstruction machinery Residential construction machineryResidential construction machinery Pavement construction machineryPavement construction machinery Hydraulic structure MachineryHydraulic structure Machinery Crushing machineryCrushing machinery Form work equipmentsForm work equipments Surveying and levelling apparatusSurveying and levelling apparatus
compaction Rollercompaction Roller
GRADERGRADER
GraderGrader
EXCAVATOREXCAVATOR
LOADERLOADER
DOZERDOZER
DUMPERDUMPER
TRACTOR AND TROLLEYTRACTOR AND TROLLEY
CRUSHING PLANTCRUSHING PLANT
STEEL SHATTERING PLATESSTEEL SHATTERING PLATES
SCAFOLDINGSCAFOLDING
DUMPY LEVEL THEODOLITEDUMPY LEVEL THEODOLITE
Water tankWater tank
HOURLY COST (HOURLY COST (IN RSIN RS))
CONSTRUCTION CONSTRUCTION MACHINEMACHINE
Hourly Operating Cost Hourly Operating Cost (Rupees)(Rupees)
Front End LoaderFront End Loader 3,0163,016
Tractor trolleyTractor trolley 1,4461,446
Grader 165.HPGrader 165.HP 2,6212,621
HOURLY COSTHOURLY COST
Dumper 18 tonDumper 18 ton 1,3721,372
Excavator 100 H.PExcavator 100 H.P 1,5521,552
Combustion RollerCombustion Roller 11701170
Front End LoaderFront End Loader 3,0163,016
HOURLY COSTHOURLY COST
Crane 45 tonCrane 45 ton 1,6901,690
Concrete CutterConcrete Cutter 368368
Rock drillerRock driller 284284
Water Tank up to 4000 Water Tank up to 4000 litrelitre
500500
Places Where Construction Places Where Construction Machinery is AvailableMachinery is Available
Alamo chowkAlamo chowk Double roadDouble road Airport roadAirport road Saryab roadSaryab road
Procurement CriteriaProcurement Criteria
Advance paymentAdvance payment The agreement on a stamp paper The agreement on a stamp paper Return Date FixedReturn Date Fixed On side pick (construction machinery) On side pick (construction machinery)
rent on clientrent on client Per hour charging or monthly chargingPer hour charging or monthly charging
ContributionContribution
Hamayun Bazai 20%Hamayun Bazai 20% Sikandar shah 20%Sikandar shah 20% Abdul ahad kakar 20%Abdul ahad kakar 20% Bayazeed roshan 20%Bayazeed roshan 20% Najeeb tareen 20%Najeeb tareen 20%
THANKS THANKS FOR YOUR FOR YOUR ATTENTION… ATTENTION…
THANKS THANKS FOR YOUR FOR YOUR ATTENTION ATTENTION……