Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 1 | P a g e
MADHYA PRADESH MADHYA KSHETRA
VIDYUT VITARAN COMPANY LTD. BHOPAL
ANNUALREGULATORYCOMPLIANCE REPORT FOR
THE PERIOD APRIL‟13 TO MARCH‟14
By- Reporter of Compliance (Central Discom)
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 2 | P a g e
M. P. MADHYA KSHETRA VIDYUT VITARAN COMP. LTD
( Government of M. P. Undertaking)
NishthaParisar, Bijalee Nagar, Govindpura, Bhopal –462023
0755-2678325, 2602036, 35, 33; Fax:2589821
Website:-wss.mpcz.co.in
CIN Number: U40109MP2002SGC01519
No. MD/MK/ROC/R-146/F-19 (A)/613 Bhopal Dated: 23 /06/2014
To
The Secretary
M.P. Electricity Regulatory Commission
E-5 Arera Colony
Metro Plaza (5th
Floor)
Bittan Market 462016
BHOPAL.
Sub : Annual Regulatory Compliance Report for Year ending March‟14.
*****
In compliance to the Clause 6.1 of the MPERC, Bhopal (Guidelines for Reporting Regulatory
Compliance) Regulation, 2005, please find enclosed a draft of Annual Compliance Report in respect of
MPMKVV Co. Ltd, Bhopal for period from April 2013 to March 14. The report has been prepared in the
manner that meets the requirements of the compliance systems and reporting.
The enclosed Annual report covers information about all the details that were required to be
furnished for the period specified as above.
Enclosed report has been discussed by the Board of Director and has their approval for
submission before the Commission.
The licensee, having made due enquiry, is not aware of any breach of any of the obligations of
license conditions or regulations.
Reporter of Compliance Managing Director
M.P.M.K.V.V. Co. Ltd M.P.M.K. V.V. Co. Ltd
BHOPAL BHOPAL
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 3 | P a g e
INDEX,
S. No. Chapter Regulations Clause Page
no
Remarks
1. Details of Format Enclosed 5
2. Regulations covered under report. 7
3. Directions of Regulations fully complied
partially complied and not complied. 8
4. Preamble 9
5. Observation of MD 12
6. Guidelines for Reporting Regulatory
compliance Regulations 2005.
5.2, 5.3, 6.1, 6.2, 6.3, 6.4,
6.5, 6.6, 6.7, 14
7 I MIS Regulations 3.2, 3.3 17
8 II MP Regulation on treatment of other
business of licensee 3 (1), 4 (1), 4 (2) 20
9 III Regulation on establishment of
Ombudsman & Forum 5.4, 5.5 21
10 IV MP Distribution code 5.3.3 22
11 V MP Electricity Supply Code
8.1, 8.8, 8.11, 8.13,
8.14,8.15, 8.17, 9.2, 9.3,
9.4,9.11,9.13,9.15,9.16,10
.3.1,10.3.2,10.3.3,10.3.4,
10.3.5, 10.3.6, 10.3.7,
23
12 VI Conditions of Licensee 7.2, 9.1, 10.2a, 17.13,
20.2, 20.5 29
13 VII Distribution Performance Standard (3.1, 3.2, 3.3,), 5.6, ,8.1,
14.9 31
14 VIII Establishment of Ombudsman/Forums Chapter 1, 3.3, 39
15 IX Security deposit regulations 1.21, 1.22 40
16 MIS Formats. 41
17 Supply code Formats. 51
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 4 | P a g e
18 Formats I to V: Conditions of license. 68
19 Status of providing metering at all incoming
and outgoing feeders of 11 KV and above
for energy accounting
83 Annexure
„A‟
20 Failure of DTR during the Year ending
March‟2014 85
Annexure-
„B‟
21 Failure of Power Transformers during Year
ending March “2014 88
Annexure-
„C‟
22 Projection of Category wise Sales 90 Annexure-
„D‟
23 Projection of Monthly unrestricted and
Restricted Max. demand 92
Annexure-
„E‟
22 Reliability Index for DHQs for Year
ending March “2014 94
Annexure-
„F‟
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 5 | P a g e
DETAILS OF FORMAT ENCLOSED
S.n. Report
name
Format
number
Format name Page no.
1
DPS
a to h Quarterly report on guaranteed distribution performance
standard
35
i Fatal Electrical Accidents 36
j Routine maintenance of power and distribution Transformers
(H.Y)
36
k Power of Distribution and Transformers Failure 37
i Periodical testing of meters 37
m Status of metering for Energy Audit and accounting 38
2 MIS
D1 Demand, Collection, Sale and Arrears Details
42 D2 LT Unmetered (Installation of meters to different categories
for connections )
45
D3 LT meter Urban, Rural 46
D4 HT meters/Metering Equipment
47 D5 Details of irrigation Detected under section 135 48
D6 Distribution & Power Transformer Failure 49
D7 Accident (Electrical) 50
3 ESC
ESC6 Release of new connection with meter only
52 ESC7 Details of Various Type of Meters Installed in area of licensee 55
ESC8 Periodic Inspection/Testing of Meters 60
ESC9 Testing of metres on consumer‟s request .(on deposition of
contest. Fee)
64
ESC10 AII HT Consumers & LT Consumers Having Annual Demand
More than Rs. 10 Lacs. (On Internet on Monthly Basis.) On
company
website ESC11 Disconnection after issue of PFL notice
65
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 6 | P a g e
ESC12 Redressal of disputed/errorous bills related complaints
66
ESC13 Connected Consumers having arrears more than 3 month &
details of permanently disconnected consumers
67
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 7 | P a g e
REGULATIONS COVERED UNDER REPORT
As per provision under MPERC (Guidelines for Reporting Regulatory Compliance) regulation-
2005, following regulations are covered in this report Chapter wise.
Chapter Regulations
I
MIS Regulations.
II
MP Regulation on treatment of other business of licensee.
III
Regulation on establishment of Ombudsman & Forum.
IV MP Distribution code
V MP Electricity Supply Code.
VI
Conditions of Licensee.
VII
Distribution Performance Standard.
VIII
Establishment of Ombudsman/Forums.
IX
Security deposit regulations.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 8 | P a g e
ISSUES, FULLY COMPLIED /PARTIALLY COMPLIED / NOT
COMPLIED
As desired in clause 6.3 of MPERC (guidelines for reporter of regulatory compliance) regulations
2005, fragmentation of the issues of regulatory compliance report in three parts is as under:
(A) Issues Fully Complied
S.n. Regulations Clause reference
1 Guidelines for reporting Regulatory compliance
Regulations 2005.
5.2, 5.3, 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7,
2
MIS Regulations. 3.2, 3.3
3 MP Regulation on treatment of other business of
licensee.
3(1), 4(1), 4(2)
4 Regulation on establishment of
Ombudsman & Forum
5.4, 5.5
5 MP Electricity Supply Code. 8.8, 8.11, 8.13, 8.14, 8.15, 8.17, 9.2, 9.3,
9.4,9.11,9.15,9.16,10.3.1,10.3.2,10.3.3,10.3.4,
10.3.5, 10.3.6, 10.3.7
6 Conditions of licensee.
7.2, 9.1, 10.2a, 17.13, 20.2
7 Distribution Performance Standards Regulation. (3.1, 3.2, 3.3,)5.6, ,8.1
8 Establishment of Forum and electricity ombudsman
Regulations.
Chapter-1., 3.3
9 Security Deposit Regulation.
1.21 , 1.22
(B) (B) Issues Partially Complied.
1. MP electricity Supply Code. 8.1, 9.13
2. Conditions of licensee 20.5
3.
Distribution Performance Standards Regulation.
14.9
(C ) Issues Not Complied
NIL
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 9 | P a g e
ANNUAL REPORT ON REGULATORY COMPLIANCE IN RESPECT
OF MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN
COMPANY LIMITED
YEAR 2013-14
1. Preamble :-
1.1 Requirement under that act :-
One of the function of the State Commission mentioned in Section 86(1-i) of the Electricity Act 2003,
is to specify or enforce standards with respect to quality, continuity and reliability of service by the Licensees
.Accordingly, Hon‟ble MPERC in exercise of powers under Sub-section (1) of Section 181 of the said act notified
on 5th May 2005 the MPERC (Guidelines for reporting of Regulatory Compliance) Regulations,2005. The
objective of “Compliance Reporting System” is mentioned that the licensee should build a sound and effective
regulatory compliance mechanism. The Regulations are applicable to all the licensees in the state including the
MPMKVVCL involved in the business of distribution and retail supply in the areas covered by Commissionaries
of Bhopal, Hoshangabad, Gwalior and Chambal.
1.2 About the licensee :-
Madhya Pradesh Madhya KshetraVidyutVitaran Company Limited (MPMKVVCL) was incorporated
as a wholly owned Government Company on 31st May 2002, under the Companies Act 1956, the same has been
notified vide order No. 5555/RS/4/13/2001 dated 1st July, 2002 of the Government of Madhya Pradesh. The
Company undertakes the activities of distribution and retail supply in the areas covered by the Commissionaries
of Bhopal, Hoshangabad, Gwalior and Chambal. The Company obtained certificate of commencement of
business on 16th July 2002 from Registrar of Companies, Madhya Pradesh and Chattisgarh,
Gwalior.Subsequently vide Government of Madhya Pradesh notification No. 3679/FRS/18/13/2002 dated
31.05.2005, the Company has been provided functional autonomy with effect from 01.06.2005. The Government
of Madhya Pradesh vide its order no. 2671/12/13 dated 29th March, 2012 had transferred all the shares of the
Company to M. P. Power Management Company Limited and subsequently our Company is now a subsidiary of
M. P. Power Management Company Limited, Jabalpur.
1.3 Objective :-
"Madhya Pradesh Madhya KshetraVidyutVitaran Company Limited aims to become one of the best State
Distribution Utilities in India by the year 2014 with continuous improvements in performance and service
standards. We, as a State Distribution Utility, dedicate ourselves to plan, build up, operate and maintain the
Distribution System to facilitate distribution of electricity to the consumers in a secure, reliable and economic
manner. We aim to provide an efficient distribution service in a transparent and non-discriminatory manner by
adopting the best practices and standards. We will always strive to fulfill customer needs by providing quality
services on time, leading to customer satisfaction. This will be achieved by continuous team effort and
improvement in our Quality Management System.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 10 | P a g e
1.4 Salient features of regulations :-
The Regulations provide for;
i Ensure timely submission of periodical reports covering all the items under report.
ii. Appointment of Regulatory of Compliance by each licensee, entrusted with the
responsibility of reporting Regulatory Compliance.
iii. Setting –up reporting procedures for formulation and submission of Half Yearly and
Annual Reports by Reporter of Compliance.
iv Specify the periodical reports to be included and specific areas to be covered, under the
report the Reporter of the compliance.
v. Taking cognizance of the reports by the Top Management/Directors of the Company.
1.5 Reporter of compliance :-
The MP KshetraMadhyaVidyutVitaran Company Limited appointed Smt. Swati Singh,
Chief Engineer-Chief General Manager, O/o MD (CZ), as “Reporter of Compliance” vide order no.
MD/MK/01//Co/1724 Bhopal dated 09/12/2013for reporting Regulatory Compliance to the MPERC
as per the guidelines /regulations of MPERC.
1.6 Reporting procedure :-
The Regulations provide for submission of following reports by the Reporter of Compliance;
i Half Yearly Report April to Sept.by 31st December .
ii Annual Report of financial year by 30th June of next year.
The reports are required to be fragmented in three parts.
i Reports on issues fully complied with.
ii Reports on issues partially complied with and
iii Reports on issues not complied with, along with reasons and future course of
action.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 11 | P a g e
1.7 Submission of earlier report by reporter of compliance:-
In compliance to the Regulation, Following reports have submitted by the reporter of Compliance
beforeHon‟ble Commission for earlier period;
S.No. Report Reference of Submission
1 Half yearly report for period
April‟08to Sept‟08
No.CMD/MK/MD/MPERC/12114Bhopal dated 29-12-
08
2
Annual Report for Year 2008-09
No.CMD/MK/MD/MPERC/1196 Bhopal dated 04-07-
09
3
Half yearly report for period
April‟09 to Sept‟09
Letter No.CMD/MK/MD/MPERC/7079 Bhopal dated
19-12-2009
4
Annual Report for Year 2009-10
Letter No.CMD/MK/MD/MPERC/2346 Bhopal dated
30-06-10
5
Half yearly report for period
April‟10 to Sept‟10
Letter No.CMD/MK/MD/MPERC/2153 Bhopal dated
28-12-11
6 Annual Report for Year 2010-11
Letter No.CMD/MK/MD/MPERC/2534 Bhopal dated
29-06-11 modified date03-07-11
7
Half yearly report for period
April‟11 to Sept‟11
Letter No.CMD/MK/MD/MPERC/1870 Bhopal dated
24-12-11
8 Annual Report for Year 2011-12
Letter No.MD/MK/MD/MPERC/820 Bhopal dated 21-
06-12
9
Half yearly report for period
April‟12 to Sept‟12
Letter No.MD/MK/MD/MPERC/2780 Bhopal dated
17-12-12
10 Annual Report for Year 2012-13
Letter No.MD/MK/MD/MPERC/562 Bhopal dated 06-
06-13
11
Half yearly report for period
April‟13 to Sept‟13
Letter No.MD/MK/MD/MPERC/2114 Bhopal dated
18-01-14
1.8 Annual report for year 2013-14 ;-
The Distribution Licensee has submitted the periodical reports for all the four quarters of the year timely.
The licensee has also reported compliance on other points to be covered under the report is based on above
mentioned reports, and discussions/analysis is thereon.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 12 | P a g e
OBSERVETIONS BY THE MD
ON COMPLIANCE OF VARIOUS REPORTS.
The reports submitted under regulatory compliance were discussed from time to time with the MD,
MPMKVVCL by Reporter of Compliance. The observations by the MD are mentioned hereunder: various
8.1 Timely Submission:-
It was observed that all the periodical reports and the other compliances have been submitted timely and
regularly. This needs to be ensured in future also.
8.2 MIS Reports:-
The MIS reports for all the four quarters of year have been submitted timely, covering all the items.
Observations in following regardsareof significance.
8.2.1 Vigilance Checking:-
Intensive Vigilance Checking of connections has been done by vigilance& (O&M) staff. 39071 cases
registered under section 135 during the year 13-14 and 8949 cases decided in the court.
8.2.2 T & D Losses:-
The T & D Loss recorded for the year14 is 30.88%.thishas dropped down by 1.03% as compared to last
year loss of 31.91%.
8.2.3 STOP/Defective metreplacement:-
The overall percentage of stop/defective meters at the end of year 13-14 is 2.33% whereas last year it was
4.77%.
8.2.4 Distribution of transformer failure:-
The Distribution X‟mer failure during the year 13-14 is 15980 higher than the last year failure 12879.
8.2.5 Accidents:-
The fatal ElectricalAccident of outsider has been increased as compared to previous year.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 13 | P a g e
8.3 Distribution Performance Standards:-
The MIS reports for all the four quarter of year have been submitted timely, covering all the items.
Observations in following regards are of significance.
8.3.1 Feeder metering for energy audit:-
Out of 1430, 33 KV feeders & 3679, 11KV feeders, feeder metering has been done on 1295 & 3091
i.e. 91 % and 84% respectively.
8.3.2 Sale Forecasting:-
The sale of units during the year 13-14 has been increased by 2243.55 MU as compared to last year and it
may further increase in the ensuring year.
8.3.4 Reliability index of 11 KV feeders:-
11 KV feeder reliability Index has been improved as compared to last year and is within the
permissible limit.
8.3.5 DTR/PTR failure:-
The DTR failure rate has gone up by 0.97% whereas PTR failure rate has gone down by 0.67%.
****
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 14 | P a g e
(MPERC (GUIDE LINES FOR REPORTING OF REGULATORY
COMPLIANCE)
REGULATIONS, 2005
This Annual report for the period from April‟13 to March‟14 covers status of compliance on nine clauses
of „Guidelines for reporting of Regulatory compliance Regulations-2005‟ Out of these nine clauses all nine clauses
complied in full. Brief details of status of compliance against each issue are as below.
I. Directions covered in clause 5.2:- To submit a issue wise status report on all issues requiring
implementation of directives, status of compliance, partial compliance and non-compliance be
reported for the prescribed period. Such report should also contain justified reasons on the issues
where the directions could not be complied, if any.
i. Status of Compliance
Issue wise report is being submitted on all issues requiring implementation along with their status for
specified period. Justified reasons are also reported where issues are partial complied or not complied.
ii. MD‟s observations on status of compliance:-
This directive is being complied in full.
iii. Target date proposed for achieving full compliance/additional remarks, if any:-
No.
II. Direction covered in clause 5.3:- To ensure internal audit by ROC. To authenticate information
submitted through the Managing Director with the knowledge of Board of Directors of the licensee.
i. Status of Compliance:-
ROC on a regular basis is auditing the information being submitted on regulatory compliance and these
reports are being studied and signed by MD. Reports are being put up to Board of Directors for obtaining
their approval.
ii. MD‟s observations on status of compliance:-
This directive is being complied in full.
iii. Target date proposed for achieving full compliance/additional remarks, if any:-
No.
III. Directions covered in clause 6.1:- The licensee shall submit “Regulatory Compliance Report” to the
commission half-yearly and annually. The report should be based on the issues as per relevant
format specified in Annexure A (Content of compliance report) for the licensee.
i. Status of Compliance:-
Regulatory compliance reports are regularly being submitted half-yearly and annually. All the
issues as specified in Annexure A are covered in these reports.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 15 | P a g e
ii. MD‟s observations on status of compliance:-
This directive is being complied in full.
iii. Target date proposed for achieving full compliance/additional remarks, if any:-
No.
IV Directions covered under clause 6.2:-The licensee shall be guided by but not be
limited to the items specified in the Annexure A.
i. Status of Compliance:-
Issues not included in Annexure „A‟, but are relevant for reporting are also being covered in
compliance report. Status of some issues covered in amendments of different Regulations and found
relevant for reporting are also covered in reports.
ii. MD‟s observations on status of compliance:-
This directive is also being complied in full.
iii Target date proposed for achieving full compliance/additional remarks, if any:-
No.
V. Directions covered under clause 6.3:- The “Regulatory Compliance Report” should be fragmented
in three parts as given below.
a. Report on issues fully complied with.
b. Report on issues partially complied with and details reasons for
partial compliances and future course of action to achieve full compliance.
c. Report on issues not complied with and detailed reasons and future course of action to
achieve compliance
i. Status of Compliance:-
Status of each issue has been mentioned in the report and in addition, a summary of issues fully
complied and partially complied is prepared and attached with the report.
ii. MD‟s observations on status of compliance:-
This directive is being fully complied.
iii. Target date proposed for achieving full compliance/additional
remarks, if any:-
No.
VI Directions covered under clause 6.4:- Regulatory Compliance report shall be signed by the Report of
Compliance and also by the Managing Director of the licensee.
i. Status of Compliance:-
Regulatory compliance report submitted to MPERC is being signed by Reporter of compliance and
Managing Director of the licensee.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 16 | P a g e
ii. MD‟s observations on status of compliance:-
This directive is fully complied.
iii Target date proposed for achieving full compliance/additional remarks, if any:-
No.
VII. Directions covered under clause 6.5:- Board of Directors of the licensee shall approve the
“Regulatory Compliance Report” before its submission to the commission.
i. Status of compliance:-
Regulatory compliance Report is being put up to Board of Directors and approval is obtained for
every report. Some time when it is likely to be delayed from the due date of submission, a draft report
is submitted to commission with the signatures of Reporter of Compliance and MD and subsequently
approval from BOD is conveyed.
ii. MD‟s observations on status of compliance:-
This directive is fully complied.
iii. Target date proposed for achieving full compliance/additional remarks, if any:-
No.
VIII Directions covered under clause 6.6:- A certificate shall be attached with the Regulatory Compliance
report as is given at Annexure „B‟. (Half-Yearly/Annual Regulatory Compliance Report).
i. Status of compliance:-
Certificate in accordance to the provision in regulation is being attached with every Regulatory
compliance Report.
ii. MD‟s observations on status of compliance:-
This directive is fully complied.
iii. Target date proposed for achieving full compliance/additional remarks, if any:-
No
IX Direction covered under clause 6.7:-Regulatory Compliance Report Shall be submitted Half yearly
for the period from April 13 to September 13 by 31ST
December and Consolidate report for the
financial year by 30th
June.
i. Status of Compliance:-
Periodicity of report as per provision in Regulation is being maintained
ii. MD‟s observations on status of compliance:-
This directive is being complied fully.
iii. Target date proposed for achieving full compliance/additional remarks, if any:-
No.
*****
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 17 | P a g e
CHAPTER-I
MIS REGULATIONS
This Annual report covers status of compliance of the directives on two identified clauses
(3.2, 3.3) of MIS regulation (Gazette notification No. 888 dated 02.04.2004 and published in official
Gazette on dated 30.04.2004). Both the clauses (3.2, 3.3) arefullycomplied. The status of compliance
is shown in enclosed formats (D1 to D7).
The status of submission of reports witching prescribed limit to submit MPERC
as below:-
Duration Due date Date of submission of Report
First quarter ending June 2013 15.08.2013 23.08.2013
Second quarter ending Sept‟2013 15.11.2013 22.11.2013
Third quarter ending December‟2013 15.02.2014 07.02.2014
Forth quarter ending March‟ 2014 15.05.2014 15.05.2014
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 18 | P a g e
foSALIENT FEATURES OF MIS
r achieving full compliance/ additional remarks,
A. T & D Losses, Collection efficiency and AT&C Efficiency
Period T& D losses (%) Absolute AT & C
efficiency (%)
Collection efficiency
(%)
Year ending
March 2014 30.88 69.12 100
B. Stopped/Defective meters (LT)
Region Area No. of Metered
consumers
S/D meters at
the end of Year
% of S/D
meters at the
end of Year
Bhopal
Urban 797685 2237 0.28
Rural 588430 8173 1.39
Gwalior
Urban 565362 11578 2.04
Rural 353280 31841 9.01
Discom
Urban 1363047 13815 1.01
Rural 941710 40014 4.25
2304757 53829 2.33
Percentage of stopped defective meter has been reduce and compared to last year. March
2013. As per directive of commission the percentage of stopped defective meter has bring down less
than 3%.
C. Stopped/Defective meters HT
Region No. Consumers Defective meters
ME Meters
Bhopal 1186 0 1
Gwalior 549 0 0
Discom 1735 0 1
At the end of March 2014, 0 Nos. MEs and 1Nos. HT meters remained defective. Replacement of
this Meter is being ensured.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 19 | P a g e
D. Irregularities Detected under section-135
Region Connection
checked
Case
Registered
Case
submitted
to Court
Cases
Compounded
Cases
decided by
Court
Bhopal 112727 21385 6923 7326 5306
Gwalior 59502 59502 17686 7283 3643
Discom 172229 39071 14206 10969 8949
As a result of intensive checking of connections by vigilance and O&M staff 39071 cases
registered under section 135.
E. DTR failure.
Distribution transformer failure during the period under report has remained as under.
S.
No.
Region No of DTRs installed
As on 30.03.14
No of DTRs failed %age of DTR failed
1 Bhopal 71734 8978
12.51
2 Gwalior 76667 7002
9.13
Discom 148401 15980 10.76
F. Accidents
391 Fatal and 119 Non-fatal electrical accidents occurred during the period under report.
Region
Fatal Electrical Non-fatal Electrical
Depp.
Employees outsiders Animals Total
Depp.
Employees outsiders Animals Total
Grand
Total
Bhopal 4 60 67 131 16 27 07 50 181
Gwalior 7 78 175 260 23 45 01 69 329
Discom 11 138 242 391 39 72 08 119 510
Out of above 391, 11fatal accidents occurred to departmental employees, 138 accidents to
outsidersand242 to animals. Field staff has been asked to spread awareness towards safe working on
lines and to use safety appliances. It was gathered from reports that most of the outsiders who met
with accidents were involved in theft of electricity/interference with live wires and unsafe working
with electrical appliances.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 20 | P a g e
CHAPTER-II
M.P. REGULATION ON TREATMENT OF INCOME OF OTHER
BUSINESS OF LICENSEE
This Annual report for the period from April 13 to March‟14 covers status of compliance on
three identified clauses (3.(1), 4(1), 4(2)) of "M.P. Regulation on treatment of income of other
business of license" for implementation – All three clauses (3.(1), 4(1), 4(2)) are complied in full.
*****
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 21 | P a g e
CHAPTER-III
ESTABLISHMENT OF FORUM AND ELECTRICITY
OMBUDSMAN REGULATIONS
This Annual report covers status of compliance on twoidentifiedclauses (5.4, 5.5)
pertaining to MPERC regulation of “Establishment of Forum and Electricity Ombudsman for
Redressal of grievances of the consumers” (Published in Official Gazette on dated
30.04.2004). All the two clauses (5.4, 5.5)have been complied in full.
*****
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 22 | P a g e
CHAPTER-IV
MP DISTRIBUTION CODE
Clause no.:- 5.3.3 5 year Demand forecast starting with ensuing year, revised Annually
by 31st march 2014 every year.
i) Status of Compliance:-
Load demand of various categories of consumers and forecast of demand of
power within the area of supply in each of succeeding five years has been
prepared and copy enclosed as Annexure D&E.
ii) MD's observation on status of Compliance:-
The directive is fully complied by the Discom.
iii) Target date proposed for achieving full compliance/ additional remarks if
any:-
No.
*****
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 23 | P a g e
CHAPTER-V
M.P. ELECTRICITY SUPPLY CODE – 2013
This Annual report for the period from April' 13 to March‟14 covers status of compliance on
thirty identified clauses of supply code. Out of these Thirty clauses(8.1, 8.8, 8.11, 8.13, 8.14,
8.15, 8.15, 8.17, 9.2, 9.3, 9.4, 9.11,9.13, 9.14, 9.15 , 9.16, 10.3.1, 10.3.2, 10.3.3, 10.3.4,
10.3.5,10.3.6, 10.3.7, 10.3.10, 10.3,11. 10.3.12)Twenty four clauses ( 8.8, 8.11, 8.13, 8.14, 8.15,
8.17, 9.2, 9.3, 9.4, 9.11,9.15, 9.16,10.3.1, 10.3.2,10.3.3,10.3.4, 10.3.5, 10.3.6, 10.3.7)complied in
full, while Two clause(8.1, 9.13,)have been partially complied .The status of compliance is
shown in enclosed formats (ESC 6 to ESC 13).ESC 10 is uploaded on company website
(i) Direction given in clause no. 8.1 NoNew connection shall be given without a meter
and cut-out or a Miniature Circuit Breaker (MCB) or Circuit Breaker (CB) of
appropriate specification complying with relevant standards. The Licensee should
procure sufficient quantity of suitable meters/metering equipments for new service
connections, providing metered for un-metered connections and replacement of
stopped/defective meters/metering equipments.
i) Status of Compliance:-
During the period under report, 203345permanent connections have been released
Out of which 100% meterizetion done in urban area for DLF category only few
connections are without meter in rural area. Meters are being installed on un-metered
DLF consumer of rural area after completing formalities.3685 connections have been
released without meter to Agriculture category, the format enclosed as ESC 6.
During this year 2013-14,no new energy meter purchased. The meters have
installed form the available stock. The efforts are being taken up for meterizetion of
un-metered DLF and agriculture consumer in rural area from the sufficient stock
available.
Status of availability of single phase and three phase (5-30 amp) at different A/S as on
31.03.2013
Bhopal Area Store Gwalior Area Store Guna Area Store Closing stock (as on
31.03.2013) 1
Phase
3
Phase Total
1
Phase
3
Phase Total
1
Phase
3
Phase Total
1
Phase
3
Phase Total
49604 19123 68727 80724 23996 104720 44003 12272 56275 174331 55391 229722
ii) MD‟s observation on status of compliance:-
No new connection of DLF category has been served without meter. The efforts
are being taken for meterizetion of un-metered DLF and agriculture consumers in
rural area moreover DTR meterizetion of agriculture consumers is also being
taken up. The directive is being complied partially.
iii) Target date proposed for achieving full compliance/additional remarks, if
any:-
No.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 24 | P a g e
(ii) Directions given in Clause 8.13 "The licensee shall submit a list of all the types of
meters installed in its area of operation, to the Commission annually. The
information shall include the specification of each type of meter and the total
number of units of each type in use and in stock with the licensee"
i. Status of compliance:
The list of all the types of meters installed in its area of operation is shown in
format ESC 7.Panel of suitable makes of meter manufacturers has been
prepared as under:-
S.
No.
NAME & ADDRESS OF THE VENDOR (M/S)
1 HPL SocomecPvt. Ltd.,
Atmaram Mansion, 1/21 Asaf Ali Road,
New Delhi
2 Genus Power Infrastructures Ltd.,
SPL-3, RIICO Industrial Area,
Sitapura, Tonk Road,
Jaipur-302022
3 Secure Meters Limited,
P.O. Box-30, Pratapnagar Industrial Area,
Udaipur-313003
4 Bentec Electrical & Electronics Pvt. Ltdl 150 Upen Banerjee Road,
KolKata-700060
5 LinkwellTelesystemPvt. Ltd. GowraClassisc, 1-11-252/1/A Begumpet
Hyderabad
6 M/s Elymer International Pvt. Ltd., 37, Bungalow Road, Ist Floor, Delhi-07
7 Landis+ Gyr Ltd. J.K. Millenium Centre. 7th Floor. 46 D, Jawaharlal Nehru
Road. KolKata -700071 West Bengal .
8 Avon Meters Pvt. Ltd. D-15-16-17 Industrial Focal Point, Drabassi 140507
Punjab Near Chandigarh
9 M/s Elymer Electrical Pvt. Ltd., 37, Bungalow Road, Ist Floor, Delhi-07
10 Larsen & Toubro Limited, North Wing, 2nd Floor, Gate No. 7 Saki Vihar
Road, Powai Campus (East) Mumbai-400072
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 25 | P a g e
Basic Technical Specification & prices.
a. 0.5S, 3 P 4 Wire, DTR Meter, Order No. 1494 dated 15.06.13 -
i) Capacity 5 Amp.
ii) Voltage 3x240V, +20%-30%
iii) Type of display Seven Segment LCD Display
iv) Class of accuracy 0.5 S
v) Parameter on display Phase and line Voltage, Current, Power factor
overall KVA, KW, KVAR, Frequency, KVAh,
Kwh/KVArh (lag/lead), MD, in KW/KVA
vi) Communication Mode Optical Communication Port-RS 232
vii Price Rs.7574.26 per meter inclusive of all taxes
b. 0.2S 3 Phase 3 Wire 132 KV/110 Volt, Order No. 1518 dated 12.08.13
i) Capacity 1 amp, CTPT operated
ii) Voltage 63.5 Volt (P-N) + 20% to -30%
iii) Type of display Digital (Seven digit, liquid crystal display)
iv) Class of accuracy 0.2S
v) Parameter on display Meter Sr. No. Real time & date phase wise line
current, phase wise voltage, phase wise P.F.,
Instant average P.F. Frequency, Instant load in
KVA, Active and Reactive Power, Active
energy import, Apparent energy import, cum.
tamper count, MD Reset count cum maximum
demand, MD alongwith date & time of
occurrence in KW & KVA
vi) Communication Mode Optical Communication Port-RS 232 GSM
compatible.
vii) Price Rs.23000/- per meter inclusive of all taxes
S.
No.
Name of the Firm
(M/s. )
P.O. No. &
Date
Type of Meter Qty.
Procured
(in Nos.)
Price of Meter
(Unit FOR price
inclusive of all
taxes & duties
excl. Entry Tax) 1 M/s Genus Power
Infrastructure Ltd., Jaipur 1494 dated
15.06.13 3 Phase 4 Wire -5/Amp
LTCT Meter, Accuracy
Class 0.5S with Optical
Communication Port-
RS-232.
2349 Nos. @ Rs.7574.26
Rs.17791936.74
2 M/s Secure Meters Ltd.,
Udaipur 1518 dated
12.08.13 3 Phase 3 Wire 132
KV/110 V, -/1 Amp
CTPT operated HT
Trivector Meter,
Accuracy Class 0.2S
with optical
communication and
GSM compatible.
15 Nos. @ Rs.23000/-
Rs. 345000/-
3 M/s Secure Meters Ltd.,
Udaipur
1548 dated
07.02.14
3 Phase 4 Wire 3 Phase
3 Wire 33 KV/110 V
0.5 S Electronic Meter
160 Nos.
10 Nos.
@ Rs.4359/-
Rs. 741030/-
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 26 | P a g e
c. 0.5S, 3 P 4 Wire, Order No. 1548 dated 07.02.14 -
i) Capacity 1 Amp.(Basic Current) CTPT operated
ii) Voltage 110 V (Phase to Phase) 63.5 V (Phase to
Neutral)
iii) Type of display Auto & Push Button Display
iv) Class of accuracy 0.5 S
v) Parameter on display Time, Date, Demand in kVA, MD, PF,
Frequency, Voltage, Current Active &
Apparent Load, Cumulative MD (KVA),
Cumulative Power (Kwh)
vi) Communication Mode RS-232 Optical Communication Port with
additional Port RS-485
vii) Price Rs.4359.00 per meter inclusive of all taxes
d. 0.5S, 3 P 3 Wire, Order No. 1548 dated 07.02.14 -
i) Capacity 1 Amp.(Basic Current) CTPT operated
ii) Voltage 110 V (Phase to Phase)
iii) Type of display Auto & Push Button Display
iv) Class of accuracy 0.5 S
v) Parameter on display Time, Date, Demand in kVA, MD, PF,
Frequency, Voltage, Current Active &
Apparent Load, Cumulative MD (KVA),
Cumulative Power (Kwh)
vi) Communication Mode RS-232 Optical Communication Port with
additional Port RS-485
vii) Price Rs.4359.00 per meter inclusive of all taxes
ii. MD's observation on status of compliance:-
The directive is fully complied.
iii. Target date proposed for achieving full compliance/additional remarks, if
any:-
No
(ii) Direction given in clause no. 9.13 It shall be the responsibility of the licensee to
ensure that no default in payment is continued beyond a reasonable period subject to a
maximum of three months without action for temporary disconnection. The authorized
official of the licensee will ensure that all the cases pertaining to default in payment are
monitored regularly and timely action is initiated for temporary or permanent
disconnection.
i) Status of Compliance:-
The Company takes due care in case of default in payment. All HT Consumers
are given 15 days notice, as per Supply Code, 2013 in case payment is not
received by due date. The HT Consumers are temporarily disconnected invariably
in case of default. Similar treatment is given to all Domestic, Non-Domestic and
Industrial Consumer. The Statement of number of disconnection notices served
and amount received during the year 2013-14 is given below:-
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 27 | P a g e
Amt. in Lakh
Region Disconnection noticed
issued
Amount received
before actual
disconnection
Amount received
after expiry of
notice
1 2 3 4
Bhopal 841 2952.96 470.77
Gwalior 416 1175.93 227.35
Total 1257 4128.89 698.12
From the above, it is clear that Company is vigilant in recovery of arrears. The
temporary disconnection of defaulting consumers is being done at distribution
center level. The Priority is given for disconnection of defaulter consumers
having more arrears irrespective of the period of arrears. Government
connections and connections of public utility are generally not disconnected as
their payment are received subsequently, generally consolidated.
ii) MD‟s observation on status of compliance:-
The CGMs & GMs of the field units are perusing hard to recover the arrear,
however they againbeen have separately advised.
iii) Target date proposed for achieving full compliance/additional remarks, if
any:-
Full compliance could be observed only after sufficient manpower is managed
when Company‟s financial health is improved.
(iii) Direction given in code-2013 clause no. 9.14 If a consumer fails in payment of any
bill in full, without the approval of the authorized Officer, by the due date, the service
connection of the consumer will be liable to be disconnected on temporary basis after
giving not less than fifteen clear days‟ notice in writing to such consumer. Effort should
be made that before disconnecting a domestic connection; an adult member of the
family should be informed. If the proof of removal of the cause for disconnection is
produced to the satisfaction is produced to the satisfaction of the Licensee‟s employee
deputed for the purpose, the supply shall not be disconnected.
i) Status of Compliance:-
A monthly disconnection notice is generated by the billing software. For high
value consumer list is being published on Company Website
ii) MD‟s observation on status of compliance:-
The field offices have been given instruction to monitor serving Disconnection
Notices immediately after due date, and effect disconnection if payment is not
received within 15 days.
iii) Target date proposed for achieving full compliance/additional remarks, if
any:-
No.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 28 | P a g e
(iv) Direction given in code-2013 clause no. 9.15 After temporary disconnection, the
supply shall be restored only after the consumer pays the outstanding
charges/dues/amount of instalment fixed along with disconnection-reconnection
charges.
i) Status of Compliance:-
Field officer are complying this directive.
ii) MD‟s observation on status of compliance:-
Agree
iii) Target date proposed for achieving full compliance/additional remarks, if
any:-
No
(v) Direction given in code-2013 clause no. 9.16 The consumer shall be required to
make a written request to the licensee if the consumer wishes to get his connection
temporarily disconnected for a period up to six months. For duration of temporary
disconnection the consumer shall be liable to pay in advance all the monthly charges
that are fixed in nature like fixed charge, minimum charge, metering charges etc. The
consumer shall also be liable to pay disconnection /reconnection charges to avail the
facility of temporary disconnection. The period of „disconnection on request‟ can be
extended on receipt of a request in writing and on necessary charges being deposited in
advance.
i) Status of Compliance:-
The directives are fully complied with
ii) MD‟s observation on status of compliance:-
Agree
iii) Target date proposed for achieving full compliance/additional remarks, if
any:-
No.
******
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 29 | P a g e
CHAPTER-VI
CONDITIONS OF LICENSE
This Annual report for the period from April‟ 2013 to March‟14 covers status of compliance
on Six identified clauses (7.2, 9.1, 10.2a, 17.13, 20.2, 20.5)of MPERC conditions of distribution
license for distribution licensee-2004, out of these Five clauses (7.2, 9.1, 10.2a, 17.13, 20.2,) are
complied fully, and only one clauses (20.5) is partially complied. The status of compliance is shown in
enclosed formats (I to V).
i) Direction given in Clause no.7.2:- “Profit & Loss account, Balance sheet, Cash flow
statement.
i) Status of Compliance:-
The Annual Financial Statement of Profit & Loss, Balance Sheet and Cash Flow
Statement for Financial Year 2013-2014 are under process and will be prepared
within the scheduled time
ii) MD‟s observation on status of compliance:-
The Annual Financial Statements of MP MK VV Co. Ltd. For Financial year 2013-14
will be prepared within time.
iii) Target date proposed for achieving full compliance/additional remarks, if any:-
Within the stipulated time i.e till 30th Sept. 2014.
ii) Direction given in Clause no. 9.1:-“Various details about licensee‟s business in
formats enclosed with regulations.”
i) Status of Compliance:-
Various details about licensee‟s business in format I to V is enclosed
ii) MD‟s observation on status of compliance:-
Agree
iii) Target date proposed for achieving full compliance/additional remarks, if any:-
No.
iii) Direction given in Clause no. 10.2a:- “Highlights of the annual investment plan as well as
permission for reallocation of funds within approved schemes.”
i) Status of Compliance:-
Year wise actual achievement upto the FY 13-14 has been given and provision for
next three year i.e. FY 14-15 to FY16-17 has also mentioned.
ii) MD‟s observation on status of compliance:-
Investment plan has been updated and approved by H‟ble commission .
iii) Target date proposed for achieving full compliance/additional remarks, if
any. NO
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 30 | P a g e
The entire capital investment of Rs. 5544.28 crore has been prepared from various funding
Agency as mentioned in the table below:-
iv) Direction given in Clause no. 20.5:- A compilation of the existing codes and practices
relating to construction of the Licensee‟s Distribution System and its Distribution
facilities shall be filed with the commission by Licensee within 60 days of the grant of
this Licence. The Licensee shall follow the existing codes and practices with such
modification as the Commission may direct from time to time. The construction
practices shall be reviewed and upgraded by the Licensee from time to time, as
appropriate, based on relevant technological improvements.
i) Status of Compliance:-
The construction practices is being reviewed and upgraded by the Licensee from time to
time, as appropriate, based on relevant technological improvements and changes.
i) MD‟s observation on status of compliance:-
Company‟s own code and practices relating to construction is being reviewed and
upgraded
ii) Target date proposed for achieving full compliance/additional remarks, if any.
No.
S.
No.
Name of
Scheme
Plan
10-11
(Actual)
Plan
11-12
(Actual)
Plan
12-13
(Actual)
Plan
13-14
(Actual)
Plan
14-15
Plan
15-16
Plan
16-17 Total
1 System Strengthening
Scheme 139.37 131.61 260.44 238.00 255.00 270.00 1127.86 2422.28
2 New Agriculture
pump connection 46.82 58.67 143.84 162.46 101.13 67.59 41.17 621.68
3 Feeder Separation 45.53 117.71 199.37 143.08 105.00 0.00 0.00 610.69
4 R-APDARP 52.11 146.99 184.95 145.72 112.04 10.77 9.53 662.11
5 ADB-II 40.13 154.79 216.97 172.16 117.60 0.00 0.00 701.65
6 RGGVY 93.16 113.10 103.03 65.93 82.64 0.00 0.00 457.86
7 HUDCO 25.58 0.00 0.00 0.00 0.00 0.00 0.00 25.58
8 DFID 19.90 12.51 0.00 0.00 0.00 0.00 0.00 32.41
9 HVDS for agriculture
Pump 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10
Distribution
infrastructure For
urban slums/ Illegal
colonies
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Other 9.13 0.89 0.00 0.00 0.00 0.00 0.00 10.02
TOTAL 471.73 736.27 1108.60 927.35 773.41 348.36 1178.56 5544.28
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 31 | P a g e
CHAPTER-VII
DISTRIBUTION PERFORMANCE STANDARDS
This Annual report for the period from April 2013 to March‟14 covers status of compliance
on Four identified Clauses ((3.1, 3.2, 3.3,)5.6, 8.1, 14.9) of MPERC Distribution Performance
standards regulation No. 1902 dated 13th July, 2004, published in official gazette on dated 16th July,
2004. Out of above, three (((3.1, 3.2, 3.3,)5.6, 8.1) clauses are compiled in full, one (14.9) partially
complied.
a) Distribution Performance Standard Clause no. 14.9 :- The distribution licensee
shall provide energy accounting and audit meters at all incoming and outgoing feeders
with 11 KV and above capacity so as to facilitate to account for the energy input and
consumed in the various segments of sub-transmission system and the energy loss. .
i) Status of Compliance:-
The meterization work of balance 33 & 11 KV Un-Metered feeder is under
progress. The status of providing metering at all incoming and outgoing 33 and 11
KV feeder is enclosed (Annexure-A). MPMKVVCL has, given target for 100%
feeder meterization of balanced feeders to its field unit during 2013-14.
ii) MD‟s observation on status of compliance:-
The directive is being complied Partially.
iii) Target date proposed for achieving full compliance/additional remarks, if
any.
I. Directions given in clause 3.1,3.2,3.3 Distribution Performance standards
Duration Due date Date of submission of Report
First quarter ending June 2013 31.07.2013 30.07.2013
Second quarter ending Sept‟2013 31.10.2013 31.10.2013
Third quarter ending December‟2013 31.01.2014 30.01.2014
Forth quarter ending March‟ 2014 30.04.2014 30.04.2014
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 32 | P a g e
The salient activities covered under regulations are described as under.
(a) Normal fuse off calls:-
Permitted deviation: Urban - 5 % , Rural - 5 %
Particulars 2013-2014
Bhopal Gwalior Total
Instances occurred Urban
153476 144598 298074
Rural 39545 42642 82187
Achievement with in prescribed
limits
Urban 153423 144499 297922
Rural 39470 42562 82032
Achievement not within prescribed
limits
Urban 53 99 152
Rural 75 80 155
Percentage deviation
Urban 0.03 0.07 0.05
Rural 0.19 0.19 0.19
The percentage deviation is well within permitted limits.
(b) Line Breakdowns :-
Permitted deviation: Urban-5%, Rural- 5%
Particulars 2013-2014
Bhopal Gwalior Total
Instances
occurred
Urban 1179 4383 5562
Rural 1827 7839 9666
Achievement
with in prescribed
limits
Urban 1179 4343 5522
Rural 1827 7350 9177
Achievement not
within prescribed
limits
Urban 0 40 40
Rural 0 489 489
Percentage
deviation
Urban 0.00 0.91 0.72
Rural 0.00 6.24 5.06
The percentage deviation is well within permitted limits more efforts have been taken in Rural to maintain
this limit.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 33 | P a g e
c ) Replacement of failed Distribution Transformers :-
Permitted deviation : Urban -5 %, Rural - 5 %
Particulars 2013-2014
Bhopal Gwalior Total
Instances occurred
Urban 454 1528 1982
Rural 8524 5474 13998
Achievement with in prescribed
limits
Urban 440 1496 1936
Rural 7756 5074 12830
Achievement not within
prescribed limits
Urban 14 32 46
Rural 768 400 *1168
Percentage deviation
Urban 3.08 2.09 2.32
Rural 9.01 7.31 8.34
*All failed transformers which could not be replaced within prescribed limit are because of arrear
more than 50%
(d) Meter Complaints :-
Permitted deviation: Urban-0.5 %, Rural-2.0 %
Particulars 2013-2014
Bhopal Gwalior Total
Instances occurred
Urban 20913 12738 33651
Rural 4632 5954 10586
Achievement with in prescribed
limits
Urban 20913 12716 33629
Rural 4632 5935 10567
Achievement not within
prescribed limits
Urban 0 22 22
Rural 0 19 19
Percentage deviation
Urban 0 0.17 0.11
Rural 0 0.32 0.17
The percentage deviation is well within permitted limits.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 34 | P a g e
There is no percentage deviation.
(e) New Connections/Additional Loads :-
Permitted deviation : Urban - Nil Rural- Nil
Particulars 2013-2014
Bhopal Gwalior Total
Instances occurred
Urban 40080 33376 73456
Rural 29361 18701 48062
Achievement with in prescribed limits
Urban 40005 33356 73361
Rural 29304 18674 47978
Achievement not within prescribed limits
Urban 75 20 95
Rural 57 27 84
Percentage deviation
Urban 0.19 0.06 0.13
Rural 0.19 0.14 0.17
The deviations are 0.13% in urban and 0.17 % in rural areas as against NIL % permitted
(f) Transfer of Ownership and Conversion of Service :-
Permitted deviation: Urban -2.0%, Rural - 2.0%
Particulars 2013-2014
Bhopal Gwalior Total
Instances occurred Urban
819 1075 624
Rural 13 1189 646
Achievement with in prescribed limits Urban
819 1075 624
Rural 13 1189 646
Achievement not within prescribed limits Urban
0 0 0
Rural 0 0 0
Percentage deviation Urban
0 0.00 0
Percentage deviation Rural 0 0.00 0
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 35 | P a g e
(g) Billing Mistakes :-
Permitted deviation: Urban-0.1%, Rural- 0.1%
Particulars
2013-2014
Bhopal Gwalior Total
Instances occurred
Urban 21451 39977 61428
Rural 4732 6421 11153
Achievement with in
prescribed limits
Urban 21451 39977 61428
Rural 4732 6421 11153
Achievement not
within prescribed
limits
Urban 0 0 0
Rural 0 0 0
Percentage deviation
Urban 0.00% 0.00% 0
Rural 0.00% 0.00% 0
No percentage deviation noted.
(h) Voltage Variations :-
Particulars 2013-2014 (FY)
Bhopal Gwalior Total
Instances occurred 342 90 380
Achievement with in prescribed limits 342 90 380
Achievement not within prescribed limits 0 0 0
Percentage deviation 0 0 0
All the complaints received for voltage variations were attended well within Time limits set in regulation
and no deviation noted during the period under report
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 36 | P a g e
(i) Fatal electrical Accidents :-
Details of fatal electrical accidents to human during the period from April 13 to March 14 are as under:
Name of Region Accidents2013-2014 (FY)
Departmental Outsiders Total
Bhopal 4 60 64
Gwalior 7 78 85
Total 11 138 149
Total 149 fatal electrical accidents occurred to human during April‟ 13, to march‟14, out of which 11
were of departmental employees and 138 outsiders. In order to minimize accidents, Company has
organized Pathshala Program in all the rural and divisions from Jan to May 2013.In this program line
staff has been trained for safely carrying out the quality maintenance/construction works using proper
safety appliances and proper T&P. They have been trained for safe execution of line works. The
instruction booklets in Hindi were distributed to all the participants during the program. The kit
comprising of T&P and safety appliances has been provided to all the concern line staff as per norms.
It is expected that aforesaid activity will definitely bring down the quantum of accidents in the current
financial year.
(j) Maintenance of Power and Distribution transformers :-
Status for the year 2013-14 has remained as under.
(A) Power Transformers
Regions Total No.
Transformers As
on 30-03-2014
No of Transformer for which
Quarterly maintenance
done
Half yearly maintenance done
Bhopal 937 875 1719
Gwalior 795 727 1207
Discom 1732 1602 2926
(B) Distribution Transformers
Regions Total no.
Transformers as on
31-03-2014
Quarterly maintenance
done
Annual maintenance done
Bhopal 71734 9969 14886
Gwalior 76667 25165 38682
Discom 148401 35134 53568
maintenance of 33/11 KV S/s,lines, 2926 PTRs and 53568 DTRs has been done.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 37 | P a g e
(k) Failure of Transformers:-
Status of failure of power and Distribution Transformers has remained as under:
(A) Power Transformers
Region Transformer
Installed As on
31-03-2014
Transformers failed
April‟13– March ‟14
Percentage Failure
Bhopal 937 5 0.53
Gwalior 795 7 0.88
Discom 1732 12 0.69
(B) Distribution Transformers
Region Transformer
Installed as on
31-03-2014
Transformers failed
April‟13– March ‟14
Percentage Failure
Bhopal 71734 8978 12.52
Gwalior 76667 7002 9.13
Discom 148401 15980 10.77
As per the guidelines issued by the commission to bring down power transformer rate below 1.5 % in the
ensuring year. The power transformer failure rate has been reduced from 1.65 %to0.69 % in this year
2013-14 and DTR failure has gone high as compared to last year percentage failure of 9.79%.
(l) Periodical Testing of Meters. :-
Status of Periodical testing of meters remained as under :
Category Region Meters
installed as on
01.04.13
Meters due
for testing as
per esc up to
march 2014
Meters
tested
% age achievement
HT Bhopal 1118 1118 1118 100
Gwalior 503 503 496 98
Discom CZ 1621 1621 1614 99
Single
Phase
Bhopal 1127796 225559 169347 75
Gwalior 785567 157113 122720 78
Discom CZ 1913363 382672 292067 76
Three
Phase
Bhopal 194150 64717 39231 60
Gwalior 65124 21708 14601 67
Discom 259274 86425 53832 62
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 38 | P a g e
HT meters 99%, single Phase LT meters 76% and 3 Phase LT meters 62% tested up to
march14 out of meters due for testing for FY 13-14
(m) Status of metering for energy audit :-
Status of metering for energy audit at the end of March-14 remained as under:
Region No. Of ht
feeders
metering points
Feeders provided with
meters
Defective meters % of defective
meters
33 KV 11 KV 33 KV 11 KV 33 KV 11 KV 33 KV 11 KV
Bhopal 889 2028 807 1793 73 146 8.21 18.09
Gwalior 541 1298 488 1319 84 36 6.65 2.24
Total 1430 3326 1295 3112 157 182 12.12 5.84
1430 Nos. metering points on 33 kV feeders have been provided by 1295meters.Out of
these157 meters have become defective and action to replace these defective meters is in
process.
3326Nos.metering points on 11 kV feeders have been provided by 3112 meters. Out of these
182 meters have become defectives. Field officer is in process of providing meters on balance
feeders and replacement of defective meters.
***
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 39 | P a g e
CHAPTER-VIII
Establishment of Ombudsman/Forums
This Annual report March2014 covers status of compliance on two identified clauses
(1., 3.3) pertaining to MPERC regulation of “Establishment of Forum and Electricity
Ombudsman for Redressal of grievances of the consumers” (Published in Official Gazette on
dated 30.04.2004). All the two clauses (1, 3.3) have been complied in full.
Status of Redressal of consumer complaint
S.no. PERIOD OPENING
BALANCE AS
ON 01.04.13
PENDING
NO. OF CASE
RECEIVED
NO. OF CASE
DECIDED
PENDING
1 April 13 to
March 14 50 77 108 19
***
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 40 | P a g e
CHAPTER-IX
SECURITY DEPOSIT REGULATIONS
This Annual report covers status of compliance on two identified Clauses (1.21, 1.22)
of MPERC (Security deposit) regulations 2004 (Gazette Publication No. 2560 dated
22.09.2004 and published in official Gazette on date 01.10.2004. Which was further revised
vide M.P. Gazette notification published on 04.09.09.Both the Clauses (1.21, 1.22) are
complied in full.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 41 | P a g e
MIS FORMATS
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 42 | P a g e
ANNUAL REPORT ON OVERALL MIS PERFORMANCEFORMAT: D1 Year Ending March 14
DISCOM (CZ)
S. No. Particulars Units Discom
1 2 3 6 1 Total Input LAKH 1651762.00
2 Total Sales LAKH 1141679.00
3 Total Demand Rs Cr 5622.33
4 Total Collections Rs Cr 5975.34
5 Total actual collection efficiency % 100.00
6 Absolute (AT&C) efficiency achieved % 69.12
7 No. of consumers (HT+LT) NO 2938391
8 Total Connected/Contracted Load MW 5605.49
9 Distribution losses % 30.88
10 Average Tariff Rs/Unit 4.92
11 Total arrear Rs Cr 1898.58
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 43 | P a g e
ANNUAL REPORT ON OVERALL MIS PERFORMANCE
FORMAT: D1
BHOPAL (BR)Year Ending March 14
S. No. Particulars Units Discom
1 2 3 6
1 Total Input LAKH 969312.00
2 Total Sales LAKH 7125.32.00
3 Total Demand Rs Cr 3507.43
4 Total Collections Rs Cr 3660.77
5 Total actual collection efficiency % 100.00
6 Absolute (AT&C) efficiency achieved % 73.51
7 No. of consumers (HT+LT) NO 1805763
8 Total Connected/Contracted Load MW 3299.46
9 Distribution losses % 26.49
10 Average Tariff Rs/Unit 4.92
11 Total arrear Rs Cr 522.78
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 44 | P a g e
ANNUAL REPORT ON OVERALL MIS PERFORMANCE
FORMAT: D1
GWALIOR (GR) Year Ending March 14
S. No. Particulars Units Discom
1 2 3 6
1 Total Input LAKH 682450.00
2 Total Sales LAKH 429147.00
3 Total Demand Rs Cr 2114.9
4 Total Collections Rs Cr 2314.57
5 Total actual collection efficiency % 100.00
6 Absolute (AT&C) efficiency achieved % 66.00
7 No. of consumers (HT+LT) NO 1132628
8 Total Connected/Contracted Load MW 2306.03
9 Distribution losses % 34.00
10 Average Tariff Rs/Unit 4.93
11 Total arrear Rs Cr 1375.80
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 45 | P a g e
S.no. Name of
region
Category No.
OfLTconsumers
at the end of year
No. Of meters
installed
during the
year
No. Of LT
consumer
without
meters as the
end of the year
% age of LT consumers
without meters at the end of
year
1 2 3 4 5 6 7
1 Bhopal
Domestic
(i) Life line 453934 21542 179009 39.44
(ii)Other than life
line 956299 24415 41518
4.34
Agriculture 235240 0 197935 84.14
Other 159104 0 0 0.00
Total 1804577 45957 418462 23.19
2 Gwalior
Domestic
(i) Life line 208497 5803 43709 20.96
(ii)Other than life
line 646339 10904 9352 1.45
Agriculture 161043 78 43709 27.14
Other 116200 0 0 0.00
Total 1132079 16785 213437 18.85
3 Discom
Domestic
(i) Life line 662431 27345 222718 33.62
(ii)Other than life
line 1602638 35319 50870
3.17
Agriculture 396283 78 326256 82.33
Other 275304 0 32055 11.64
Total 2936656 62742 631899 21.52
INS
INSTALLATION OF METERS TO DIFFERENT CATEGORIES OF UNMETERD LT CONNECTIONS
FORMAT: D2
Year Ending March 14
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 46 | P a g e
STOPPED/DEFECTIVE METERS (LT) FORMAT: D3
Year Ending March 14
Name of region Area Stopped/
Defective meter
as on 01.04.13
Fresh S/D meters
added
S/Dmeters
replaced
during the
year
Balance
S/Dmeter at
the end of the
year((col
3+col4)-5)=6)
Total metered
consumers at the
end of the year
% age of S/Dmeters
at the end of year
(col6/col7*100 =8)
1 2 3 4 5 6 7 8
Bhopal
Urban 10222 45929 53914 2237 797685 0.28
Rural 11339 17883 21049 8173 588430 1.39
Total 21561 63812 74963 10410 1386115 0.75
Gwalior
Urban 47719 36613 72754 11578 565362 2.04
Rural 34367 5247 7773 31841 353280 9.01
Total 82086 41860 80527 43419 918642 4.70
Discom
Urban 57941 82542 126668 13815 1363047 1.01
Rural 45706 23130 28822 40014 941710 4.25
Total 103647 105672 155490 53829 2304757 2.33
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 47 | P a g e
STOPPED/DEFECTIVE METERS (HT) FORMAT: D4
Year Ending March 14
Region
Total meters
installed
Stopped/Defective
meter as on 01.04.13
Fresh s/ d meters
added
Total s/d meters S/d meters replaced
during the year
Balance s/d meters at
the end of year
Me Meters Me Meter Me Meter Me Meter Me Meter
1 2 3 4 5 6 7 8 9 10 11 12
Bhopal 1186 4 0 78 42 82 42 82 41 0 1
Gwalior 549 0 0 21 3 21 3 21 3 0 0
Discom 1735 4 0 99 45 103 45 103 44 0 1
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 48 | P a g e
DETAILS OF IRREGULARITIES DETECTED UNDER SECTION 135
FORMAT: D5
Year Ending March 14
Name of
region
Connection checked Irregularities detected
under sec 135
Cases filed in court Cases compounded Cases decided by
court
1 2 3 4 5 6
Bhopal 112727 21385 6923 7326 5306
Gwalior 59502 17686 7283 3643 3643
Discom 172229 39071 14206 10969 8949
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 49 | P a g e
DETAILS OF DISTRIBUTION FAILURE FORMAT: D-6
Year Ending March 14
Name of region No. Of x 'mer installed as on
31.03.14
X'mer failed during the year. X' mer replaced during the
year.
% age of x‟ mer
failed 1 2 3 4 5
Urban
Bhopal 12902 461 454 3.61
Gwalior 12091 1528 1537 12.63
Discom 24993 1989 1991 7.96
Rural
Bhopal
58832 8517 8589 14.47
Gwalior
64576 5474 5597 8.47
Discom 123408 13991 14186 10.81
Discom
Urban 24993 1989 1991 7.96
Rural 123408 13991 14186 10.81
Total 148401 15980 16177 10.76
DETAILS OF POWER TRANSFORMER FAILURE
Name of region No. Of x' mer installed as on
31.03.14
X' mer failed during the year. % age of x‟ mer failed
1 2 3 5
Bhopal 937 5 0.53
Gwalior 795 7 0.88
Discom 1732 12 0.69
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 50 | P a g e
DETAILS OF ACCIDENTS
FORMAT: D7
Year Ending March 14
ELECTRICAL
REGION FATAL NON-FATAL
Dept
Employees
Outsider Animal Total Dept
Employees
Outsider Animal Total
Bhopal 4 60 67 131 16 27 7 50
Gwalior 7 78 175 260 23 45 1 69
Discom 11 138 242 391 39 72 8 119
NON ELECTRICAL
REGION FATAL NON-FATAL
Dept
Employees
Outsider Animal Total Dept
Employees
Outsider Animal Total
Bhopal 2 2 0 4 12 0 0 12
Gwalior 1 0 0 1 9 3 0 12
Discom 3 2 0 5 21 3 0 24
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 51 | P a g e
Supply Code Formats.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 52 | P a g e
RELEASE OF NEW CONNECTIONS WITH METER ONLY FORMAT: ESC 6
Year Ending March 14
DISCOM (CZ) S.no. Category Total no. Of new
connections released
during the year
No. Of new connections
released without meter
Total no. Of existing
metered connections at
the end of year
Total no. Of existing unmetered
connections at the end of year
1 DL&F 137924 0 1547786 50870
2 Non Domestic 8765 0 224879 0
3 Water Works 1730 0 8327 0
4 I.P 1910 0 30489 0
5 Agriculture 17400 3685 1430 326256
6 St.Light 1419 0 2483 0
7 BPL 23523 0 444833 222718
8 Others 10674 0 44530 32055
TOTAL 203345 3685 2304757 631899
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 53 | P a g e
RELEASE OF NEW CONNECTIONS WITH METER ONLY
FORMAT: ESC 6
Year Ending March14
BHOPAL (BR)
S. no. Category Total no. Of new
connections
released during the
year
No. Of new
connections released
without meter
Total no. Of existing
metered connections
at the end of year
Total no. Of existing unmetered
connections at the end of year
1 DL&F 71404 0 908800 41518
2 Non Domestic 5217 0 133406 0
3 Water Works 171 0 4146 0
4 I.P 868 0 15335 0
5 Agriculture 11713 0 770 197935
6 St. Light 3 0 1578 0
7 BPL 18340 0 280045 179009
8 Others 0 0 42035 0
TOTAL 107716 0 1386115 418462
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 54 | P a g e
RELEASE OF NEW CONNECTIONS WITH METER ONLY
FORMAT : ESC 6
Year Ending March14
GWALIOR (GR)
S.no. Category Total no. Of new
connections released
during the year
No. Of new
connections released
without meter
Total no. Of
existing metered
connections at the
end of year
Total no. Of existing unmetered
connections at the end of year
1 DL&F 66520 0 638986 9352
2 Non
Domestic 3548 0 91473
0
3 Water
Works 1559 0 4181
0
4 I.P 1042 0 15154 0
5 Agriculture 5687 3685 660 128321
6 St.Light 1416 0 905 0
7 BPL 5183 0 164788 43709
8 Others 10674 0 2495 32055
TOTAL 95629 3685
918642
213437
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 55 | P a g e
DETAILS OF VARIOUS TYPE OF METERS INSTALLED IN AREA OF LICENSEE
FORMAT ESC 7
DISCOM (CZ)Year Ending 14
S.no. Type of meters no. Of meters installed as at the end of year
1 Single phase electro mechanical 342359
2 Single phase- electronic 1774400
3 Three phase electro mechanical 4816
4 Three phase electronic 175934
5 Three phase whole current meter 3671
6 Three phase LTCT 3577
(A) LT TOTAL
2304757
8 HT Meter- Electro Mechanical 0
9 HTMeter- Electronic 1735
(B) HT TOTAL 1735
TOTAL (A+B) 2306492
Year Ending March 14
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 56 | P a g e
DETAILS OF VARIOUS TYPE OF METERS INSTALLED IN AREA OF LICENSEE
FORMAT ESC 7
BHOPAL (BR) Year Ending March‟14
S.no. Type of meters No. Of meters installed as at the end of year
1 Single phase electro mechanical 184083
2 Single phase- electronic 1071276
3 Three phase electro mechanical 1570
4 Three phase electronic 125193
5 Three phase whole current meter 2474
6 Three phase LTCT 1519
(A) LT TOTAL 1386115
8 HT Meter- Electro Mechanical 0
9 HTMeter- Electronic 1186
(B) HT TOTAL 1186
TOTAL (A+B) 1387301
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 57 | P a g e
DETAILS OF VARIOUS TYPE OF METERS INSTALLED IN AREA OF LICENSEE
FORMAT ESC 7
Year Ending March 14 GWALIOR (GR)
S.no. Type of meters No. Of meters installed as at the end of year
1 Single phase electro mechanical 158276
2 Single phase- electronic 703124
3 Three phase electro mechanical 3246
4 Three phase electronic 50741
5 Three phase whole current meter 1197
6 Three phase LTCT 2058
(A) LT TOTAL 918642
8 HT Meter- Electro Mechanical 0
9 HTMeter- Electronic 549
(B) HT TOTAL 549
TOTAL (A+B) 919191
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 58 | P a g e
PERIODIC INSPECTION / TESTING OF METERS FORMAT ESC 8
DISCOM (CZ) Year Ending March 14
S.no. Particulars Category Total no. Of meters
installed at the end of
the year
No. Of meters inspected/
tested during year for
verification of its accuracy
% of no. Of meters
inspected/ tested during
year for verification of its
accuracy
% no. Found
defective
Electro
mechanical
Electro
nic
Electro
mechanical
Electronic Electro
mechanical
Electron
ic
Electro
mechanic
al
Ele
ctr
oni
c
1
Single Phase 342359 1774400 89381 361413 26 20 0 2
Three Phase
Commercial 2432 65899 1513 14439 62 22 0 0
Industrial 925 22043 148 5016 16 23 0 0
Others 1459 87992 1923 20798 132 24 0 0
Total 4816 175934 3584 40253 74 23 0 0
3 Three Phase
Whole
Current
Commercial 0 2363 0 776 0 33 0 0
Industrial 6 794 0 437 0 55 0 0
Others 0 508 0 213 0 42 0 0
Total 6 3665 1426 0 39
Three Phase
CTMeters
Commercial 0 1225 0 608 0 50 0 0
Industrial 0 1578 0 950 0 60 0 0
Others 0 774 0 417 0 54 0 0
Total 0 3577 0 1975 0 55 0 0
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 59 | P a g e
6 HT Meters 0 1735 0 1789 0 103 0 0
7 HT CT/PT
Set
0 1735 0 1789 0 103
TOTAL
347181 1959311 92965 408645 27 21 0 0
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 60 | P a g e
PERIODIC INSPECTION / TESTING OF METERS FORMAT ESC 8
Year Ending March 14
BHOPAL (CZ)
S.
No.
Particulars Category Total no. Of meters
installed at the end of
the year
No. Of meters inspected/
tested during year for
verification of its accuracy
% of no. Of meters
inspected/ tested during
year for verification of its
accuracy
% no. Found defective
Electro
mechanical
Electro
nic
Electro
mechanical
Electronic Electro
mechanical
Electr
onic
Electro
mechanical
Electr
onic
1
Single Phase 184083 1071276 72840 255234 39.57 24 0 1
Three Phase
Commercial 512 41381 1228 8442 239.84 20 0 0
Industrial 39 9871 39 3033 100.00 31 0 0
Others 1019 73941 1688 15846 165.65 21 0 0
Total 1570 125193 2955 27321 188.22 22 0 0
3
Three Phase
Whole
Current
Commercial 0 1798 0 578 0 32 0 0
Industrial 0 415 0 283 0 68 0 0
Others 0 261 0 160 0 61 0 0
Total 0 2474 0 1021 0 41 0 0
Three Phase
CTMeters
Commercial 0 395 0 266 0 67 0 0
Industrial 0 713 0 398 0 56 0 0
Others 0 411 0 374 0 91 0 0
Total 0 1519 0 1038 0 68 0 0
6 HT Meters 0 1186 0 1293 0 109 0 0
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 61 | P a g e
7 HT CT/PT
Set
0 1186 0 1293 0 109 0 0
TOTAL
185653 1202834 75795 29635 41 2 0.00 0
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 62 | P a g e
PERIODIC INSPECTION / TESTING OF METERS FORMAT ESC 8
GWALIOR (CZ)Year Ending March 14 S.no. Particulars Category Total no. Of meters installed
at the end of the year
No. Of meters inspected/
tested during year for
verification of its accuracy
% of no. Of meters
inspected/ tested during
year for verification of its
accuracy
% no. Found
defective
Electro
mechanical
Electronic Electro
mechanical
Electron
ic
Electro
mechanical
Electronic Electro
mechanical
Ele
ctro
nic
1
Single Phase 158276 703124 16541 106179 10 15 0 1
Three Phase
Commercial 1920 24518 285 5997 15 24 0 0
Industrial 886 12172 109 1983 12 16 0 0
Others 440 14051 235 4952 53 35 0.06 0
Total 3246 50741 17170 12932 529 25 0.06 0
3 Three Phase
Whole Current
Commercial 0 565 0 198 0 35 0 0
Industrial 6 379 0 154 0 41 0 0
Others 0 247 0 53 0 21 0 0
Total 6 1191 0 405 0 34 0 0
Three Phase
CTMeters
Commercial 0 830 0 342 0 41 0 0
Industrial 0 865 0 552 0 64 0 0
Others 0 363 0 43 0 12 0 0
Total 0 2058 0 937
0 46 0
0
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 63 | P a g e
6 HT Meters 0 549 0 496 0 90 0 0
7 HT CT/PT Set 0 549 0 496 0 90 0 0
TOTAL
161528 758212 33711 15266 21 2 0 0
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 64 | P a g e
TESTING OF METERS ON CONSUMER'S REQUEST ON DEPOSITION OF CONTEST FEE FORMAT ESC 9
DISCOM Year Ending march 14
S. No. Category No. Of
consumers who
applied for
testing their
meters
No. Of consumers
whose meters tested
within 30 days
applications
No. Of
consumers
whose meters
could not be
tested within
30 days of
application
Reasons
of delay
in
testing
No. Of
meters found
within
permissible
Limits of
accuracy
Against col.4
No.of meters
Found
beyond
permissible
Limits of
Accuracy
Against col.4
No. Of type of
Meters found
beyond permissible
limits of
Accuracy
against col.4
Electro-mech Electonic
1 2 3 4 5 6 7 8 9 10
BHOPAL REGION
1 Domestic 2661 2661 0 0 1238 1423 39 1384
2 Commercial 527 527 0 0 214 313 22 291
TOTAL 3188 3188 0 0 1452 1736 61 1675
GWALIOR REGION
1 Domestic 5394 5394 0 0 3374 1997 755 1241
2 Commercial 1155 1155 0 0 567 614 253 362
3 Industrial
Power 53 53 0 0 50 0 0 0
4 Water
Works 0 0 0 0 0 0 0 0
TOTAL 6602 6602 0 0 3991 2611 1008 1603
DISCOM
1 Domestic 8055 8055
0 0 4612 3420 794 2625
2 Commercial 1682 1682
0 0 781 927 275 653
3 Industrial
Power 53 53
0 0 50 0 0 0
4 Water
Works 0 0 0 0 0 0 0 0
TOTAL 9791 9791 0 0 5444 4347 1069 3278
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 65 | P a g e
DISCONNECTION AFTER ISSUE OF PFL NOTICE
FORMAT ESC 11
Year Ending 14
DISCOM (CZ)
S.
No.
Name of circle No. Of consumers
where meter
readings not done
during two
consecutive reading
cycles
No. Of consumers to
whom 2nd PFL
notices issued
No. Of consumers
where readings
could not be done
after issue of 2nd
PFL notice
No. Of consumers
to whom 24 hours
notice issued under
sec 163 (3) of e-act
2003 against col. 4
No. Of connections
disconnected
against col. 5
1 2 3 4 5 6 7
BHOPAL REGION
1 City Bhopal 3496 1616 96 37 44
2 Bhopal 790 285 285 271 71
3 Vidisha 127 127 0 0 0
4 Shehore 664 18 0 0 0
5 Rajgarh 39 17 0 0 0
6 Hoshangabad 60 60 10 10 10
7 Betul 72 50 7 5 5
TOTAL 5248 2173 398 323 130
GWALIOR REGION
1 Gwalior City 1854 218 50 0 0
2 Gwalior 8 0 0 0 0
3 Morena 88 51 0 0 0
4 Bhind 0 0 0 0 0
5 Guna 648 158 0 0 0
6 Shivpuri 0 0 0 0 0
7 Sheopur 205 430 0 0 0
TOTAL 2803 857 50 0 0
TOTAL DISCOM 8051 3030 448 323 130
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 66 | P a g e
S.
No.
Circle No. Of
complaints
pending at the
beginning of
year
No. Of
complaints
received
during the
year
Total of col.
3 & 4
No. Of complaints
resolved during
the year out of col.
5
No. Of complaints
resolved within 7 days
of receipt of
application out of col. 5
No. Of
complaints
pending at the
end of year
Reasons for
delay in
resolving
complaints for
differnce of col
(6-7) 1 2 3 4 5 6 7 8 9
BHOPAL REGION
1 City Bhopal 0 18037 18037 18037 18037 0
2 Bhopal 0 1910 1910 1910 1910 0
3 Vidisha 0 3996 3996 3996 957 0
4 Shehore 0 2969 2969 2969 857 0
5 Rajgarh 0 571 571 571 554 0
6 Hoshangabad 0 5047 5047 5047 5047 0
7 Betul 0 544 544 536 536 0
TOTAL 0 33074 33074 33066 27898 0 0
GWALIOR REGION
1 Gwalior City 0 29696 29696 29696 29696 0
2 Gwalior 0 2326 2326 2326 2326 0
3 Morena 0 2879 2879 2879 2879 0
4 Bhind 0 462 462 462 462 0
5 Guna 0 2165 2165 2165 2165 0
6 Shivpuri 0 6196 6196 6196 6053 0
7 Sheopur 0 2674 2674 2674 2675 0
TOTAL 0 46398 46398 46398 46256 0
TOTAL DISCOM 0 79472 79472 79464 74154 0
REDRESSAL DISPUTED/ERRONEOUS BILLS RELAED COMPLAINTS
FORMAT ESC 12
Year Ending March 14
DISCOM (CZ)
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 67 | P a g e
CONNECTED CONSUMERS HAVING ARREARS FOR MORE THAN 3 MONTHS & DETAILS OF
PERMANANTLY DISCONNECTED CONSUMER
FORMAT ESC 13
Year EndingMarch14
DISCOM (CZ)
S.n Name of circle No.of connected consumers
who are in arrears of more
than three months
Amount of arrears
against col. 3
(Rs,inlacs)
Reasons for non
disconnection of
consumers of col. 3
No.of
connections
permanently
disconnected
Amount of arrears against
col. 6 (Rs. In lakhs)
1 2 3 4 5 6 7
BHOPAL REGION
1 City Bhopal 31245 915.21 Being Govt. offices/
Water Works/ Street Light
/ VIPs / etc.
60490 4354.97
2 Bhopal 21092 2514.87 30212 6001.72
3 Vidisha 1010 67.21 20639 567.62
4 Shehore 28183 1387.86 6673 153.35
5 Rajgarh 814 230.74 17537 770.97
6 Hoshangabad 18867 119.84 37293 1590.54
7 Betul 26340 335.24 8295 217.38
TOTAL 127551 5570.97 181139 13656.55
GWALIOR REGION
1 Gwalior City 20377 4572.18 Govt Connections
belongs to public
interest .and disputed
connections pending for
deceision at court.
40481 3910.11
2 Gwalior O&M 6948 320.33 18436 1625.16
3 Morena 13218 13284.47 17554 7228.02
4 Bhind 19214 1138.60 5162 1259.80
5 Guna 885 330.31 22475 1451.10
Shivpuri 26863 4014.02 12250 502.31
7 Sheopur 49210 8413.93 4659 542.19
TOTAL 136715 32073.84 121017 16518.69
TOTAL DISCOM 264266 37644.81 302156 30175.24
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 68 | P a g e
Formats I to V:
Conditions of license.
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 69 | P a g e
SHORT TITLE DESCRIPTION OF THE PROPOSED UNDERTAKING
FORMAT : I
NAME OF THE COMPANY - Madhya Pradesh Madhya KshetraVidyutVitaran Company Limited
REGISTERED ADDRESS - O/o M.D. NishthaParisar, Govindpura, Bhopal, Madhya Pradesh 462023
DATE OF INCORPORATION - 31st May, 2002
DATE OF REGISTRATION - 31st May, 2002
DATE OF COMMENCEMENT - 16th July, 2002
OF BUSINESS
SHARE CAPITAL - Authorized Share Capital - Rs. 2500,00,00,000/-
- Issued Capital - Rs. 17,633,243,500/-
NUMBER OF SUBSCRIBER - 10- Shareholders
NAME OF THE MD - ShriNiteshVyas
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 70 | P a g e
NAME OF ALL DIRECTORS:-
1 ShriManuSrivastava
2 ShriNiteshVyas
3. ShriShrimanShukla
4 Shri A.C. Chakrabortti
5 Shri V. K. Singh
6 ShriMukulDhariwal
7. Shri K. K. Khare
8. Shri S.R. Prasad
Company Secretary:- Mrs.Shairill A . Dubey
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 71 | P a g e
SECRETARY
Proposed Organization Structure (
Distribution
Proposed functions (Please Tick)
Distribution
Transmission
Trading
Any other (please describe)
Licence Applied for (Please Tick)
Retail Supply License
Distribution License
Bulk Supply License
Transmission License
Proposed functions (Please Tick)
Bulk Supply
System Operator/Load Dispatch
Transmission
Sub-Transmission
Distribution
Retail Supply
Any other (please describe)
√
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 72 | P a g e
INTERFACE POINTS BETWEEN TRANSCO AND DISCOM (CENTRAL ZONE)
Format-II
INTERFACE POINTS BETWEEN TRANSCO AND DISCOM ( CENTRAL ZONE )
JUNE 14 ( INCOMERS )
LOCATION NAME OF FEEDERS
VOLTAGE NO. OF DETAILS OF METERS
DETAILS OF CT DETAILS OF PT LEVEL METERING
POINTS TYPE CLASS OF
ACCURACY RATIO
CLASS OF ACCURACY
RATIO CLASS OF
ACCURACY
1 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
2 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
3 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
4 132KV KURAWAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
5 132KV KURAWAR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 33KV/110
V 0.5
6 132KV SEHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
7 132KV SEHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
8 220KV ASHTA 100MVA 220/33KV TRANSFORMER 33KV 2 STATIC
0.2s 1200/1 0.2
33KV/110 V
0.5
9 132KV ASHTA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
10 132KV ASHTA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
11 132KV SHYAMPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.5
12 132KV ICHHAWAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
13 220KV BAIRAGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
14 220KV BAIRAGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
15 132KV BEORA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
16 132KV BEORA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
17 132KV KHILCHIPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
18 132KV KHILCHIPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
19 132KV SARANGPUR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 33KV/110
V 0.5
20 132KV SARANGPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110 0.5
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 73 | P a g e
V
21 132KV SARANGPUR 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
22 132KV PACHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
23 132KV PACHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
24 132KV JEERAPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.5
25 220KV RAJGARH(BEORA) 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2
33KV/110 V 0.5
26 220KV ITARSI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
27 220KV ITARSI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
28 220KV SARNI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
29 220KV SARNI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
30 132KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
31 132KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
32 132KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.5
33 132KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
34 132KV MULTAI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
35 132KV MULTAI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
36 132KV GUDGAON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
37 220KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2
33KV/110 V 0.5
38 132KV CHICHOLI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
39 220KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
40 132KV HARDA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 33KV/110
V 0.5
41 132KV HARDA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
42 220KV HOSANGABAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
43 220KV HOSANGABAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
44 220KV HOSANGABAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
45 132KV SEONI MALWA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 33KV/110
V 0.5
46 132KV BANKHEDI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
47 132KV SULTANPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 74 | P a g e
48 132KV MACT BHOPAL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
49 132KV MACT BHOPAL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
50 132KV MACT BHOPAL 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 33KV/110
V 0.5
51 220KV MANDIDEEP
40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
52 220KV MANDIDEEP 100MVA 220/33KV TRANSFORMER 33KV 2 STATIC
0.2s 1200/1 0.5
33KV/110 V
0.5
53 132KV MANDIDEEP 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
54 132KV MANDIDEEP 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
55 132KV RAISEN 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
56 132KV RAISEN 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
57 132KV RAISEN 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
58 132KV BARELI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
59 132KV BARELI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
60 132KV BARELI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
61 132KV GAIRATGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
62 132KV NASURALLAHGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
63 132KV NASURALLAHGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
64 132KV GOPALPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
65 220KV VIDISHA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.2 33KV/110
V 0.2
66 220KV VIDISHA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.2 33KV/110
V 0.2
67 132KV BERASIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
68 132KV BERASIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
69 132KV BERASIA 16MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
70 132KV SIRONJ 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
71 132KV SIRONJ 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
72 132KV GANJBASODA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
73 132KV SHAMSABAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
74 220KV BHOPAL 100MVA 220/33KV TRANSFORMER 33KV 2 STATIC
0.2s 1200/1 0.5
33KV/110 V
0.5
75 132KV BHOPAL(CH.) 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 75 | P a g e
76 132KV BHOPAL(CH.) 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
77 132KV BHOPAL(CH.) 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
78 132KV BHOPAL(CH.) 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 33KV/110
V 0.5
79 132KV AYODHYANAGAR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
80 132KV AYODHYANAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
81 132KV AMRAWAD KHURD 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5
33KV/110 V 0.5
82 220KV GWALIOR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
83 220KV GWALIOR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
84 220KV GWALIOR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 33KV/110
V 0.5
85 132KV MOTIJHEEL 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 33KV/110
V 0.5
86 132KV MOTIJHEEL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
87 132KV MOTIJHEEL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
88 132KV BANMORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
89 132KV BANMORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
90 132KV TIGRA ROAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
91 132KV TIGRA ROAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
92 132KV MORAR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 33KV/110
V 0.5
93 132KV MORENA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
94 132KV MORENA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
95 132KV AMBAH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
96 132KV AMBAH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
97 220KV SABALGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
98 220KV SABALGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
99 132KV JORA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 33KV/110
V 0.5
100 132KV PORSA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
101 220KV MEHGAON 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
102 220KV MEHGAON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
103 220KV MEHGAON 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110 0.2
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 76 | P a g e
V
104 132KV BHIND 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
105 132KV BHIND 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
106 132KV SEONDHA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
107 132KV SEONDHA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
108 132KV SEONDHA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
109 132KV DATIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
110 132KV DATIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
111 132KV DABRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
112 132KV DABRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
113 132KV DABRA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
114 220KV MALANPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
115 220KV MALANPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
116 132KV LAHAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
117 132KV RON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
118 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
119 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
120 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
121 132KV ASHOKNAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
122 132KV ASHOKNAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
123 132KV RAGHOGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
124 132KV RAGHOGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110
V 0.5
125 132KV BHONRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
126 132KV BHONRA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 33KV/110
V 0.5
127 132KV BHONRA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.5 400/1 0.5 33KV/110
V 0.5
128 132KV ARON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
129 132KV ARON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.5 800/1 0.5 33KV/110
V 0.5
130 132KV MAKSOODANGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2
33KV/110 V 0.5
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 77 | P a g e
131 132KV CHANDERI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.5
132 220KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
133 220KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
134 132KV PICHHORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
135 132KV PICHHORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
136 132KV PICHHORE 12.5MVA 132/66/33KV TRANSFORMER 33KV 1 STATIC 0.2s 200/1 0.5
33KV/110 V 0.5
137 132KV PICHHORE 5MVA 66/33KV TRANSFORMER 33KV 1 STATIC 0.2s 100/1 0.5 33KV/110
V 0.5
138 132KV PICHHORE 5MVA 66/33KV TRANSFORMER 33KV 1 STATIC 0.2s 100/1 0.5 33KV/110
V 0.5
139 132KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.6 33KV/110
V 0.5
140 132KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
141 132KV SHIVPURKALA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5
142 132KV SHIVPURKALA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
143 132KV SHIVPURKALA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110
V 0.2
144 132KV KARERA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110
V 0.5.5
145 132KV KOLARAS 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
146 132KV VIJAYPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33KV/110
V 0.2
TOTAL 149
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 78 | P a g e
DESCRIPTION OF THE PROPOSED AREA
Format : III S. No. PARAMETER UNIT DATA as on 31.03.2014 SOURCE
1 Area Sq km 96069 Census data 2011
2 Gross Cropped Area Sq km NA Census data 2011 not received
3 Gross Irrigated area Sq km NA -do-
4 Forest area Sq km NA -do-
5 Population No 22394122 Census data 2011
6 Scheduled Caste/Scheduled Tribe Population No 4088159/2337793 Census data 2011
7 Total Population BPL No NA Census data 2011 not received
8 SC/ST Population Below Poverty Line(BPL) No NA Census data 2011 not received
9 Total number of Households No 4446283 Census data 2011
10 No.of Rural Households No 3095345 Census data 2011
11 No.of urban Households No 1350938 Census data 2011
12 No.of Households electrified No 2891905 Census data 2011
13 No.of Rural Households electrified No 1632245 Census data 2011
14 No.of Urban Households electrified No 1259660 Census data 2011
15 Percentage of Households electrified % 65.04%
16 No.of Districts No 16 Census data 2011
17 No.ofCommissioneries No 4 Census data 2011
18 No.of Tehsils No 104 Census data 2011
19 No.of Villages No 16650 Census data 2011
20 No.of villages electrified ( As per old definition) No 15446 Company Data
21 No of villages electrified ( As per new definition) No 12583 Company Data
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 79 | P a g e
INFORMATION ABOUT DISTRIBUTION LICENSEE (INCLUDING DEEMED LICENSEE)
FORMATE-IV
Category No. of Consumer
Contracted/
Connected Load Energy Billed
Working
Meters
Defective
Meters
Consumers
Without Meters
Arrears as on
March-14
No. KW MU No. No. No. Rs. In Lakh
LT
Domestic 2268092 2039578 218.39 2054305 92529 273588 119477.51
Non-Domestic 230611 563647 50.23 222355
8256 0 16929.84
Public Water Works 8569 54662 20.13 8109
460 0 1877.6
Street Lights 2483 23457 9.23 2311
172 0 611.45
Industrial 30618 263234 18.27 29421
1197 0 7435.9
Irrigation Pump 395768 1728962 822.10 395734
34 326256 37135.18
Other Agricultural 515 3037 9.74 468 47 32055 158.96
Total LT 2936656 4676577 1148.09 2712703 102695 631899 183626.44
HT
Railway Traction 18 290700 75.65 18 0 0 0.22
Coal Mines 5 10872 3.12 5 0 0 0
Industrial 863 426896 163.00 862 1 0 6320.09
Non-Industrial 703 135068 27.96 701 2 0 38.51
Seasonal 8 1143 0.17 8 0 0 74.38
Irrigation 24 4352 0.48 24 0 0 7.4
Water Works 71 32434 12.45 71 0 0 46.09
Bulk Residential 43 27461 11.58 43 0 0 -8.79
Total HT 1735 928926 294.41 1732 3 0 6477.9
Grand Total 2938391 5605503 1442.50 2714435 102698 631899 190104.34
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 80 | P a g e
INFORMATION ABOUT DISTRIBUTION LICENSEE (INCLUDING DEEMED LICENSEE)
FORMATE-V S.N Parameter Unit Data
1 No.of Region No 2
2 No.of Circles No 14
3 No.ofDivisions No 49
4 No.of Sub-Divisions No 72
5 No.of Distribution Centres (City zone (68)+ Town Zone (19)+D/c (260) ) No 347
6 No.of Fuse off call centres No
7 Length of 33 KV line ckm 13923
8 Length of 11 KV line ckm 92133
9 Length of LT Line ckm 108591
10 Total No.of 33 KV feeders No 1430
11 Total No.of 11 KV feeders No 3679
12 Total No.of 33 KV feeders metered No 1295
13 Total No.of 11 KV feeders metered No 3091
15 Total no. or Transformers with rating of:
a) 750 KVA/630 KVA No 0/01
b) 630 KVA No 01
c) 500 KVA No 50
d) 400 KVA No 01
e) 315 KVA No 1269
f) 300 KVA 09
g) 250 KVA No 12
h) 200 KVA No 8641
i) 160 kVA No 12
j) 150 KVA No 05
k) 100 KVA No 28123
l) 75 KVA 0
m) 63 KVA No 34450
n) 50 KVA 03
o) 25 KVA No 65744
p) 16 KVA No 7249
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 81 | P a g e
q) 5 KVA /10 KVA No 5/2827
17 Total number of Distribution transformers No 148401
18 Total number of power transformers No 1732
Total Transformation capacity
a) Power Transformer MVA 7913.1
b) Distribution Transformer MVA 8933.01
19 Energy Input MU 1651762
20 Energy billed MU 1141679
21 Energy Lost % 30.88
22 Amount billed RsCr 5622.33
23 Amount collected RsCr 5975.34
24 Percentage Collected % 106.27
25 Total Arrears Rs Lakhs 1901014.42
a) Arrears<90 days Rs Lakhs 14049.13
b) Arrears between 90-180 days Rs Lakhs 18208.73
c) Arrears > 180 days Rs Lakhs 157846.56
26 No. of HT & LT consumers with Arrears above 10 lakh No 3491
27 No. of LT consumers with Arrears above Rs.25,000/- No 4327
28 Total Number of technical employees No 10205
a) Total number of non-technical employees No 2671
b) Total number of employees No 12,876
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 82 | P a g e
Status of Providing Metering
At All Incoming and Outgoing Feeders of 11KV
And Above For Energy Accounting
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 83 | P a g e
STATUS OF 33/11 KV METERING INSTALLED FOR ENERGY AUDITING AT THE END OF MAR.'2013 - CENTRAL DISCOM
Annexure-A
S.
NO
.
NAME OF
CIRCLE
STATUS OF
33/11KV
SUB-
STATION
DETAILS OF 33 KV FEEDER DETAILS OF 11 KV FEEDER
TOT
AL
NO.
OF
S/S
TOT
AL
NO.
OF
POW
ER
X/ME
R
33 KV FEEDER METERING
INSTALLED
METERIN
G TO BE
PROVIDED
METER/ME
FOUND
STOP/
DEFECTIVE
11 KV FEEDER METERING
INSTALLED
METERING
TO BE
PROVIDED
METER/ME
FOUND STOP/
DEFECTIVE
TOTAL
NO. OF
33KV
FEEDE
R
NO.
OF
MET
ERIN
G
POIN
T
METER M.E.
ME
TE
R
M.E
.
ME
TER M.E.
TOTA
L NO.
OF
11KV
FEED
ER
NO.
OF
METE
RING
POIN
T
METER M.E. MET
ER M.E.
MET
ER M.E.
1 CITY BHOPAL 61 121 52 200 200 200 0 0 0 7 249 249 249 249 0 0 0 0 2 O&M BHOPAL 132 226 85 182 161 161 21 21 14 14 490 490 377 377 127 127 48 36 3 VIDISHA 50 83 27 74 66 66 8 8 1 5 209 209 199 199 19 19 7 10 4 RAJGARH 74 126 46 101 91 91 10 10 31 28 293 293 272 272 11 11 48 58 5 SEHORE 58 113 33 69 67 67 2 2 0 2 209 209 187 187 22 22 0 13 6 BETUL 56 113 37 133 122 122 11 11 1 4 246 246 255 255 11 11 6 13
7 HOSHANGABA
D 85 155 61 130 100 100 30 30 26 37 332 332 254 254 89 89 37 80
BHOPA REGION
516 937 341 889 807 807 82 82 73 97 2028 2028 1793 1793 279 279 146 210
8 CITY GWALIOR 40 82 26 54 54 0 0 0 5 170 170 170 170 0 0 0 0 10 9 O&M GWALIOR 87 137 27 104 103 1 1 21 28 292 292 255 255 37 37 37 23 99
10 MORENA 59 108 41 65 56 9 9 0 2 197 197 170 170 27 27 27 0 0 11 BHIND 43 77 31 62 58 4 4 0 8 166 166 145 142 21 24 24 0 29
12 SHIVPURI 64 109 28 80 72 8 5 0 14 220 220 180 192 40 28 28 1 71
13 SHEOPUR 39 65 15 39 25 14 14 10 10 122 122 54 54 68 68 68 6 9
14 GUNA 93 178 59 137 120 17 16 5 17 440 440 324 336 116 104 104 6 51
GWALIOR REGION
425 756 227 541 488 53 49 36 84 1607 1607 1298 1319 309 288 288 36 269
CENTRAL DISCOM 941 1693 568 1430 1295 860 131 118 157 1704 3635 3326 3112 2102 567 567 182 479
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 84 | P a g e
Failure of DTR
During Year Ending March‟14
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 85 | P a g e
DISTRIBUTION TRANSFORMER FAILURE(URBAN)
Annexure-B Format – 6(i)
Year Ending March 14
Sl no Circle No of
transforme
rs installed
as on
31.03.14
No of
transformer
s servicing
predominan
tly*
agricultural
consumers
Defective
trans. Start of
year
Trans.
Failed
during the
year(no)
Trans.
Replaced/
repaired
during the
year (no)
Defective trans. At end of
the year
Percentage of
transformers
replaced within 7
days
No. % of
total No (5+7-
8=9)
% of total
1 2 3 4 5 6 7 8 9 10 11 BHOPAL REGION
1 CITY
BHOPAL 7803 37 0 0.00 97 90 7
0.09 92.78
2 O&M
BHOPAL 1428 0 0 0.00 196 196 0
0.00 100.00
3 VIDISHA 697 19 0 0.00 42 42 0 0.00 100.00
4 SHE 387 0 0 0.00 19 19 0 0.00 100.00
5 RAJGARH 836 37 0 0.00 62 62 0 0.00 100.00
6 H'BAD 1084 11 0 0.00 32 32 0 0.00 100.00
7 BETUL 667 0 0 0.00 13 13 0 0.00 100.00
TOTAL 12902 104 0 0.00 461 454 7 0.05 98.48
GWALIOR REGION
1 CITY
GWALIOR 5001 0 0 0.00 228 228 0 0.00 100.00
2 GWALIOR 823 165 19 2.73 93 93 19 2.49 83.04
3 MORENA 2555 223 49 0.75 380 380 49 1.94 95.24
4 BHIND 1726 185 31 0.25 593 597 27 1.56 100.00
5 GUNA 802 39 1 0.12 51 51 1 0.12 98.08
6 SHIVPURI 663 62 137 6.31 172 175 134 20.21 74.15
7 SHEOPUR 298 78 18 1.40 11 13 16 5.56 86.67
TOTAL 12091 752 255 0.94 1528 1537 246 2.09 93.78
DISCOM 24993 856 255 0.47 1989 1991 253 0.01 94.81
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 86 | P a g e
DISTRIBUTION TRANSFORMER FAILURE (RURAL) Format – 6(i)
Sl No Circle No of
Transfor
mers
installed
as on
31.03.14
No of
transforme
rs servicing
predomina
ntly*
agricultura
l
consumers
Defective
Trans. Start
of year
Trans.
failed
during
the
Year(No)
Trans.
replaced/
repaired
during the
year (No)
Defective Trans. at end
of the year
Percentage
of
transforme
rs replaced
within 7
days No. %
of
tota
l
No (5+7-
8=9)
% of total
1 2 3 4 5 6 7 8 9 10 11 BHOPAL REGION
1 O&M
BHOPAL 15192 13202 25 0.19 2195 2184 36 0.24 98.38
2 VIDISHA 6885 5885 14 0.23 1489 1498 5 0.07 99.67 3 SEHORE 7176 6416 19 0.30 1100 1112 7 0.10 99.37 4 RAJGARH 12662 8766 104 1.08 1804 1856 52 0.41 99.27
5 H'BAD 10177 8036 24 0.25 1144 1156 12 0.12 98.97
6 BETUL 6740 4731 2 0.34 785 783 4 1.06 99.49
TOTAL 58832 47036 188 0.37 8517 8589 116 0.20 98.67
GWALIOR REGION
1 (O&M)GWALI
OR 9767 7582 112 0.01 1370 1454 28 0.29 98.04 2 MORENA 10729 8348 9 0.00 798 802 5 0.05 99.40 3 BHIND 7803 6136 40 0.00 546 558 28 0.36 95.22
4 GUNA 18920 12012 95 0.01 1757 1719 133 0.70 92.72 5 SHIVPURI 8957 6658 24 0.00 759 780 3 0.03 99.62 6 SHEOPUR 8400 6950 40 0.00 244 284 0 0.00 100.00
TOTAL 64576 47686 320 0.51 5474 5597 197 0.31 96.58
DISCOM 123408 94722 508 0.44 13991 14186 313 0.25 97.84
DISCOM
URBAN 24993 856 255 0.47 1989 1991 253 0.01 94.81
RURAL 123408 94722 508 0.44 13991 14186 313 0.25 97.84
TOTAL 148401 95578 763 0.91 15980 16177 566 0.38 96.61
*Transformers where at least 70% of the connected load is for agricultural connections
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 87 | P a g e
Failure of Power Transformers
During Year Ending March14
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 88 | P a g e
POWER TRANSFORMER FAILURE
Annexure “c” S. N. Circle PTR in service
As on 31.03.14
PTR failed during reporting year % failure
1 BPL(City) 121 0 0.00
2 BPL (O&M) 226 3 1.33
3 Vidisha 83 2 2.41
4 Sehore 113 0 0.00
5 Rajgarh 126 0 0.00
6 Hos'bad 155 0 0.0
7 Betul 113 0 0.00
Total 937 5 0.53
1 Gwl. City 88 0 0.00
2 Gwalior (O&M) 144 0 0.00
3 Morena 112 1 0.89
4 Bhind 85 1 1.18
5 Guna 192 3 1.56
6 Shivpuri 109 0 0.00
7 Sheopur 65 2 3.08
Total 795 7 0.88
Total Discom 1732 12 0.69
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 89 | P a g e
PROJECTION OF CATEGORY WISE
SALES
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 90 | P a g e
PROJECTION OF CATEGORY WISE SALES
Annexure-D
S.NO
. SALES IN MU
ACTUALS ESTIMATES PROJECTION
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16
LT
LV-1 Domestic 1599 1893 2064 2514 3500.84 4358.79 4987.29
LV-2 Non-Domestic 410 479 532 626 717.00 883.08 906.51
LV-3 P.W.W. & Street Light 181 223 236 306 321.66 432.50 592.56
LV-3 Industrial 183 193 204 256 261.64 359.19 384.11
LV-5 Agriculture 2320 2540 2794 3190 3946.85 4683.35 5,570.67
Total 4693 5328 5830 6892 8747.99 10716.91 12,441.14
HT
HV-1 Railway Traction 678 704 760 831 850.82 978.45 978.45
HV-2 Coal Mines 33 34 33 33 34.73 34.73 34.73
HV-3 Industrial & Non-Industrial 1326 1536 1702 1908 2,219.83 2,477.95 2,528.27
HV-4 Seasonal 1 1 2 2 1.81 2.05 2.37
HV-5 Irrigation & Water Works 77 80 99 107 159.34 192.99 234.46
HV-6 Bulk Residencial 126 141 152 167 169.03 190.37 216.82
HV-7 Bulk Supply to Exm. 10 0 0 0 3435.56 3876.54 3995.10
Total 6942 7824 8577 9940 12,183.55 14,593.45
16436.24
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 91 | P a g e
PROJECTION OF MONTHLY UNRESTRICTED AND
RESTRICTED MAXIMUM DEMAND IN MW FOR NEXT FIVE
YEARS
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 92 | P a g e
PROJECTION OF MONTHLY UNRESTRICTED AND RESTRICTED MAXI. DEMAND
IN MW FOR NEXT FIVE YEARS.
Annexure-E
Year Ending March 14
S.No. Month
Max. Demand in MW (Rest.) Max. Demand in MW (Un-Rest.)
2013-14 2014-15 2015-16 2016-17 2017-18 2013-14 2014-15 2015-16 2016-17 2017-18
1 April 2443 2387 2578 2784 3007 2443 2387 2578 2784 3007
2 May 2362 2398 2590 2797 3021 2362 2398 2590 2797 3021
3 June 2157 2145 2317 2502 2703 2280 2145 2317 2502 2703
4 July 1924 2057 2222 2400 2592 1924 2057 2222 2400 2592
5 August 1954 2029 2192 2367 2557 1954 2029 2192 2367 2557
6 September 2726 2300 2484 2683 2897 2726 2300 2484 2683 2897
7 October 2714 3004 3244 3504 3784 2714 3004 3244 3504 3784
8 November 3147 3291 3555 3839 4146 3147 3291 3555 3839 4146
9 December 3321 3276 3538 3821 4127 3321 3276 3538 3821 4127
10 January 2996 3125 3375 3645 3937 2996 3125 3375 3645 3937
11 February 2960 2803 3027 3269 3531 2960 2803 3027 3269 3531
12 March 2296 2683 2897 3129 3379 2296 2683 2897 3129 3379
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 93 | P a g e
Reliability Index for DHQs
For year ending March‟14
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 94 | P a g e
REPORT OF OUTAGES OF 11 KV FEEDERS Annexure-F Year Ending March 14
S.No. Town Type
of
Town
No.Of
Feeder
s On
Last
Day Of
The
Month
Total
No.Of
Outages
of
feeders
During
the
month
Total
Duration
Of
Outages of
Feeders
During
the
month(in
Feeder
Minutes)
Cumulative
No.Of
Outages
w.e.f.1 st
April till
lastday of
The month
Cumulative
Duration of
Outages
w.e.f.1st April
till lastday of
month(in
Feeder
Minutes)
Monthly
Average
No.of
Outages
of
feeders
(COL5/
COL4)
Monthly
Average
Duration
of Outages of
Feeders
(in
Minutes)(COL
6/COL4)
Monthly
Feeder
Reliability
Index*(%)
Cumulative
Average
No.of
Outages of
Feeders
(COL7/CO
L4)
Cumulative
Average
Duration of
Outages of
Feeders
( in
Minutes)(C
OL8/COL4)
Cumulative
Feeder
Reliability
Index**
(%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
BHOPAL REGION
1 Bhopal SC 249 1921 43629 15807 509675 7.71 175.22 99.61 63.48 2046.89 99.61
2 Raisen DH 3 31 2160 308 19496 10.33 720.00 98.39 102.67 6498.80 98.76
3 Vidisha DH 17 147 6840 2112 91380 8.65 402.35 99.10 124.24 5375.29 98.98
4 Sehore DH 15 206 3070 2570 43880 13.73 204.68 99.54 171.33 2925.36 99.44
5 Rajgarh DH 2 7 322.8 99 4493 3.50 161.40 99.64 49.50 2246.40 99.57
6 H'bad DH 9 262 3929 2585 61085 29.11 436.60 99.02 287.22 6787.20 98.71
7 Harda DH 6 148 2075 1527 39526 24.67 345.90 99.23 254.50 6587.70 98.75
8 Betul DH 9 216 5174 2256 55131 24.00 574.93 98.71 250.67 6125.67 98.83
GWALIOR REGION
1 Datia DH 13 52 1812 774 25244.4 4.00 139.38 99.69 59.54 1941.88 99.63
2 Guna DH 13 419 6922.2 3983 68302.8 32.23 532.48 98.81 306.38 5254.06 99.00
3 Gwalior MT 167 1164 55200 44036 545700 6.97 330.54 99.26 263.69 3267.66 99.38
4 Morena DH 23 337 18420 4075 237720 14.65 800.87 98.21 177.17 10335.65 98.03
5 Sheopur DH 7 46 3438.6 172 24090.6 6.57 491.23 98.90 24.57 3441.51 99.35
6 Shivpuri DH 19 224 15426 2915 230275.8 11.79 811.89 98.18 153.42 12119.78 97.69
7 AshokNagar DH 4 278 2649 2419 27965.2 69.50 662.25 98.52 604.75 6991.30 98.67
8 Bhind DH 16 107 7980 1489 141120 6.69 498.75 98.88 93.06 8820.00 98.32
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 95 | P a g e
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 96 | P a g e
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 97 | P a g e
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 98 | P a g e
Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 99 | P a g e