+ All Categories
Home > Documents > Madison OH1 Presentation-FINAL

Madison OH1 Presentation-FINAL

Date post: 02-Jun-2018
Category:
Upload: chs-blog
View: 220 times
Download: 0 times
Share this document with a friend

of 15

Transcript
  • 8/11/2019 Madison OH1 Presentation-FINAL

    1/15

    Madison Corridor Bus Rapid Transit Study

    Open House #1Maria Koengeter, SDOT

    Thomas Brennan, Nelson\NygaardSeptember 30, 2014

  • 8/11/2019 Madison OH1 Presentation-FINAL

    2/15

    Presentation overview

    Why Madison?

    Study outcomes and goals

    Timeline

    How to use tonights open house

    2

  • 8/11/2019 Madison OH1 Presentation-FINAL

    3/15

    Mission: delivering a first-rate transportation system for Seattle.

    Vision: a vibrant Seattle with connected people, places, and products.

    SDOTs mission & vision

    3

  • 8/11/2019 Madison OH1 Presentation-FINAL

    4/15

    SDOTs values

    4

  • 8/11/2019 Madison OH1 Presentation-FINAL

    5/15

    Background

    2012 Transit Master Plan

    Identified 5 priority corridorsbased on:

    Ridership Travel time savings

    City-wide analysis

    Concept for corridor

    limits and type of service

    5

  • 8/11/2019 Madison OH1 Presentation-FINAL

    6/15

    Project need and goals

    Make transit faster and more reliable

    Make the transit rider experience better with morecomfortable stops and faster boarding

    Enhance pedestrian connections

    Develop a parallel bike corridor

    Advance streetscape and public spaces

    6

  • 8/11/2019 Madison OH1 Presentation-FINAL

    7/15

    Current phase:Project Definition Study

    Statement of project purpose and need

    Develop and analyze two corridor design concepts

    Evaluate and screen design concepts

    10% design, engineering, and cost estimates

    Develop implementation strategy and identify elements

    for early delivery

    7

  • 8/11/2019 Madison OH1 Presentation-FINAL

    8/15

    Study approach and timeline

    8

  • 8/11/2019 Madison OH1 Presentation-FINAL

    9/15

    Study outcomes

    Develop a transit designconcept that:

    Has community and elected

    official support

    Is backed by a viable phasingand implementation plan

    Positions the City for futurefunding opportunities to helpdesign and build the project

    9

  • 8/11/2019 Madison OH1 Presentation-FINAL

    10/15

    Tonights meeting

    How do you use the corridor?

    Whats working? What could be improved?

    What key locations should we consider?

    What else do we need to know as we moveforward into this study?

    10

  • 8/11/2019 Madison OH1 Presentation-FINAL

    11/15

    Open house orientation: stations

    11

  • 8/11/2019 Madison OH1 Presentation-FINAL

    12/15

    Talk with project staff

    Ask questions

    Share your ideas

    Comment on sticky notesand attach to boards ormap

    Write on your commentcard and return beforeyou leave

    Open house orientation: at thestation

    12

  • 8/11/2019 Madison OH1 Presentation-FINAL

    13/15

    Station 5: map exercise

    Using sticky dots andnotes, help us identifylocations where there

    are issues, concerns oropportunities for:

    Transit service

    Pedestrian/bicycleconditions

    Loading or on-streetparking

    Public space and thestreetscape

    13

  • 8/11/2019 Madison OH1 Presentation-FINAL

    14/15

    Please sign-in at the frontto be added to the projectmailing list

    Please return commentcard before you leave

    Project Website

    http://www.seattle.gov/transportation/madisonBRT.htm

    Comments and updates

    14

  • 8/11/2019 Madison OH1 Presentation-FINAL

    15/15

    Questions?

    [email protected]| (206) 733-9865

    http://www.seattle.gov/transportation/madisonbrt.htm

    http://www.seattle.gov/transportation

    mailto:[email protected]:[email protected]:[email protected]

Recommended