PROJECT NUMBER:© Eppstein Uhen Architects, Inc.
FEBRUARY 6, 2019
MIDDLETON - CROSS
PLAINS AREA SCHOOL
DISTRICT - POPE FARM
ELEMENTARY SCHOOL
316517-01
CUP SUBMITTAL
MADISON, WI
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTSNOT FOR CONSTRUCTION
A/C air condition
A/E Architect/Engineer
ACT acousticalceiling tile
ADDL additional
ADDM addendum
ADJ adjustable
AFC above finishedcounter
AFF above finished
floor
AFG above finished
gradeAFS above finished
slab
ALT alternate
ALUM aluminum
APPD approved
APT apartmentAP acoustical panel
ASC above suspended
ceiling
BB baseboard
BLDG building
BLT borrowed lite
BLW below
BPL base plateBO bottom of
BOS bottom of steel
CB catch basin,construction bulletin
CF/CI contractor furnished,
contractor installed'
CF/OI contractor furnished,
owner installedCF/VI contractor furnished,
vendor installed
CG corner guard
CIP cast-in-place
CNTR counterCL centerline
CLG ceiling
A
B
C
CLR clear
CM construction
managementCM construction manager
CMU concrete masonry unit
CO cleanout
COL column
CONC concrete
CORR corridorCPT carpet
CSWK casework
CT ceramic tile
CW cold water
CTB ceramic tile base
DEMO demolition
DEPT department
DF drinking fountain
DIA diameterDP decorative panel
DR door
DR FR door frame
DTL detail
DS downspoutDW dishwasher
DWG drawing
E east
EIFS exterior insulation& finish system
EL elevation
EJ expansion joint
ELEC electric
ELEC electricalELEV elevator
EP epoxy
EPS expanded polystyrene
board
EQ equal
ETR existing to remainEXIST existing
EXT exterior
F
G
H
F female
F filler
FA fire alarmFA fluid-applied
FAB fabric
FC file cabinet
FD floor drain
FE fire extinguisher
FEC fire extinguishercabinet
FHC fire hose cabinet
FLR floor
FM factory mutual
FM floor matFO finished opening
FP fire protection
FP fireproof
FPL fireplace
FT fire treated
FTG footing
GA guage
GALV galvanized
GB grab barGC general contractor
GL glass
GLU LAM glue laminated
wood
GR grade, grading
GT groutGYP BD gypsum
HB hose bibb
HC hollow coreHM hollow metal
HORIZ horizontal
HSKP housekeeping
HGT height
HVAC heating, ventilating
& air conditioningHW hot water
HWY highway
T&M time & materials
TEMP temperature
TEMP temporaryTER terrazzo
TERB terrazzo base
TFF top of finished floor
TKBD tackboard
TO top of
TOB top of beamTOC top of concrete
TOJ top of joist
TOPO topography
TOS top of slab
TOS top of steelTYP typical
UNO unless noted otherwise
VERT vertical
VF/CI vendor furnished,
contractor installed
VF/OI vendor furnished,owner installed
VF/VI vendor furnished,
vendor installed
VNR veneer
VIF verify in field
W west
W/ with
W/O without
WC water closetWC wall covering
WD wood
WDB wood base
WDV wood veneer
WH water heaterWP wall protection
WP work point
WT window treatment
XPS extruded polystyrene
board (insulated)
ID inside diameter
INSUL insulation
INT interior
JS janitor sink
LAM laminateLAV lavatory
LL live load
MAX maximumMC modular carpet tile
MECH mechancal
MFR manufacturer
MICRO microwave
MIN minimumMIN minute
MISC miscellaneous
MJ movement joint
MO masonry opening
MS mop sinkMTL metal
N north
NA not applicableNIC not in contract
NO number
NM nominal
NS no scale
NTS not to scale
OC on center
OD outside diameter
OF/CI owner furnished,
cointractor installedOF/OI owner furnished,
owner installed
OF/VI owner furnished,
vendor installed
OH DR overhead doorOPH opposite hand
OPNG opening
PJ panel joint
PLAM plastic laminate
PLYWD plywoodPNL panel
PREFAB prefabricated
PREFIN prefinished
PSI pounds per square
inch
PT paintPTN partition
QT quarry tile
QTB quarry tile base
RB resilient base
RCP reflected ceiling plan
RD roof drainREBAR reinforcing steel bars
REC recess
REF reference
REF refrigerator
RF resilient flooringREV revision
RFS room finish schedule
RO rough opening
S southSAN sanitary
SC sealed concrete
SC solid core
SF square foot
SIM simSS solid surface
SST stainless steel
ST stain
ST stair
STN stoneSTNB stone base
STRUCT structure
C
D
E
I
M
N
J
L
O
Q
R
S
P T
W
X
U
V
TRUE
N
PLAN
N
000
B
000.000
0
NAME
0000
TYPE
HEIGHT
XXX00
FLOOR
BASE
WALL
REMARKS
000
000
000
WALL
DOOR
KEYNOTE
REVISION
FURNITURE
EQUIPMENT
WINDOWXX000
CEILING
CASEWORK
FINISH PLAN
A
B
A
ELEVATION
DATUM
VIEW NUMBER
VIEW NAME
VIEW SCALE
DEMOLITION
GRID AND GRID IDENTIFICATION
1 21 2
A000
00
A000
00
SIM
A000
00
SIM
BUILDING
SECTIONS
OTHER
SECTIONS
CONSTRUCTION PHASES
ELEVATIONS
ROOM
DETAILS
TITLE
1/2" = 1'-0"
DIMENSION REFERENCES
EXISTING NEW
NEW EXISTING
19
SIM
TAGSCALLOUTS GRAPHICS
NORTH ARROW
TO OBJECT CENTER TO OBJECT FACEOR OTHER GEOMETRY
EQ EQ EQ 5'-0" 4'-0"
W" x H" x D"
A000
000
Level
0'-0"
A000-000A1
A2
A3
A4
A000A1
A2
A3
A4
KEY PLAN
SHEET INFORMATION
© Eppstein Uhen Architects, Inc.
ISSUANCE AND REVISIONS
PROJECT MANAGER
PROJECT NUMBER
ABBREVIATIONS PROJECT TEAM SHEET INDEX
SYMBOL LEGEND
VICINITY MAP
999 Fourier Drive, Suite 201Madison, WI 53717PHONE: (608) 826-0532www.vierbicher.com
CIVIL
VIERBICHER ASSOCIATES, INC.PROJECT CONTACT:DIRECT PHONE:EMAIL ADDRESS:
Matt Schreiner(608) 821-3961
16745 West Bluemound RoadBrookfield, WI 53005PHONE: (262) 781-1000rasmith.com
STRUCTURAL
R. A. SMITH NATIONAL PROJECT CONTACT:DIRECT PHONE:EMAIL ADDRESS:
Steve Roloff(262) 317-3334
7106 South AvenueMiddleton, WI 53562PHONE: (608) 829-9005
OWNER
MIDDLETON-CROSS PLAINS AREA SCHOOL DISTRICT PROJECT CONTACT:DIRECT PHONE:EMAIL ADDRESS:
GEORGE MAVROULIS(608) 829-9005
300 South Bedford StreetMadison, WI 53703PHONE: (608) 257-5321
CONSTRUCTION MANAGER
J.H. FINDORFF & SON, INC. PROJECT CONTACT:DIRECT PHONE:EMAIL ADDRESS:
Matt Premo(608)442-7076
333 East Chicago StreetMilwaukee, WI 53202Phone: (414) 271-5350www.eua.com
ARCHITECTURAL
EPPSTEIN UHEN ARCHITECTS, INC. PROJECT CONTACT:DIRECT PHONE:EMAIL ADDRESS:
Robin Savola(414) 291-8193
PROJECT INFORMATION
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
699 Walnut Street, Suite 400Des Moines, Iowa 50309515.724.5840
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e s m o i n e s
d e n v e r
4200 North Port Washington RoadGlendale, WI 53212PHONE: (414) 967-4200boelter.com
FOOD SERVICE
THE BOELTER COMPANIES, INC. PROJECT CONTACT:DIRECT PHONE:EMAIL ADDRESS:
Steve Stern(414) 967-4226
901 Whalen Road, Suite AVerona, WI 53593PHONE: (608) 848-9556mepassociates.com
MECHANICAL/ ELECTRICAL/ PLUMBING/ FIRE PROTECTION
MEP ASSOCIATES PROJECT CONTACT:DIRECT PHONE:EMAIL ADDRESS:
Josh Hinson(608) 848-9556
INDEX
G000
316517-01
MIDDLETON -CROSS PLAINSAREA SCHOOLDISTRICT - POPEFARM ELEMENTARYSCHOOL
MADISON, WI
RS
GENERAL
G000 INDEX
PLAT
1 PRELIMINARY PLAT - POPE FARM ESTATES
1 OF 2 FINAL PLAT - POPE FARM ESTATES
2 OF 2 FINAL PLAT - POPE FARM ESTATES
CIVIL
C-1 SITE GENERAL NOTES & LEGENDS
C-2 EXISTING CONDITIONS
C-3 LOT 1 GRADING & EROSION CONTROL PLAN
C-4 ELEMENTARY SCHOOL GRADING & EROSION CONTROL PLAN
C-5 EAST GRADING & EROSION CONTROL PLAN
C-6 WEST GRADING & EROSION CONTROL PLAN
C-7 NORTH GRADING & EROSION CONTROL PLAN
C-8 LOT 1 SITE & UTILITY PLAN
C-9 ELEMENTARY SCHOOL SITE & UTILITY PLAN
C-10 EAST SITE & UTILITY PLAN
C-11 WEST SITE & UTILITY PLAN
C-12 NORTH SITE & UTILITY PLAN
C-13 BASIN DETAIL
C-14 SITE CONSTRUCTION DETAILS
C-15 SITE CONSTRUCTION DETAILS
C-16 SITE CONSTRUCTION DETAILS
C-17 SITE CONSTRUCTION DETAILS
C-18 FIRE ACCESS PLAN
L-1 LANDSCAPE OVERALL
L-2 LANDSCAPE PLAN
ARCHITECTURAL
A099 LOCATOR MAP
A100 CONTEXTUAL SITE INFORMATION
A101 OVERALL FIRST FLOOR PLAN
A102 OVERALL SECOND FLOOR PLAN
A109 OVERALL ROOF PLAN
A201 OVERALL EXTERIOR ELEVATIONS - BLACK AND WHITE
A202 OVERALL EXTERIOR ELEVATIONS - COLOR
A301 3D VIEWS OF PROPOSED DESIGN
A302 3D VIEWS OF PROPOSED DESIGN
A303 3D VIEWS OF PROPOSED DESIGN
A304 3D VIEWS OF PROPOSED DESIGN
ELECTRICAL
E002 SITE PHOTOMETRICS PLAN - NORTH
E003 SITE PHOTOMETRIC PLAN - CENTRAL
E004 SITE PHOTOMETRICS PLAN - SOUTH
E005 LIGHT FIXTURE SCHEDULE
OWNER SIGN-OFFSCHEMATIC DESIGN DOCUMENTS
THE UNDERSIGNED CLIENTAPPROVES THE OVERALL DESIGN CONCEPT OF THE BUILDING PROGRAM, UNIT MIX, UNIT COUNT, PARKING RATIO,FLOOR-TO-FLOOR HEIGHTS, ARCHITECTURAL CHARACTER, SITE PLAN, AND PRELIMINARY FLOOR AND UNIT PLAN DESIGN.
IF THERE ARE SUBSTANTIAL CHANGES TO THE PROJECT SCOPE AFTER CLIENT SIGN-OFF, CHANGES WILL BE SUBJECT TO ADDITIONAL SERVICES.
THE ARCHITECT IS HEREBY AUTHORIZED TO PROCEED TO DESIGN DEVELOPMENT.
EPPSTEIN UHEN ARCHITECTS, INC.
CLIENT SIGNATURE DATE
DATE DESCRIPTION
MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
LOCATOR MAP
316517-0101/09/2019
APPROXIMATE BUILDING LOCATION
MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
CONTEXTUAL SITE INFORMATION
316517-0101/09/2019
AERIAL VIEW - LOOKING WEST
AERIAL VIEW - LOOKING EAST VIEW - LOOKING EAST
VIEW - LOOKING WEST
DN
157'-6"
118'
-11
1/2"
STAIR
MENS
OT/PT
FOURTH GRADE
FOURTH GRADEFOURTH GRADEFOURTH GRADE
FOURTH GRADE
FOURTH GRADE SGI FOURTH GRADE SGI
THIRD/FOURTH GRADEBUBBLE CLASSROOM
THIRD GRADE
THIRD GRADETHIRD GRADETHIRD GRADE
THIRD GRADE SGITHIRD GRADE SGI
FOURTH GRADECOLLABORATION
CROSS CATMECHANICAL ROOM
THIRD CUBBY ALCOVE(138 CUBBIES)
THIRD GRADE TEAMROOM
SENSORY
SENSORY
THIRD GRADECOLLABORATION
PSYCHOLOGIST
GUIDANCE
THIRD GRADE STORAGE
STAFF TLT
FOURTH GRADE CUBBYALCOVE (138 CUBBIES)
ADVANCED LEARNINGSTRATEGIST
FOURTH GRADESTORAGE
FOURTH GRADE TEAMROOM
PE STORAGE
PE OFFICE
RECEIVING
GYMNASIUM
MAINTENANCE WORKSHOP/STORAGE
CORRIDOR
CORRIDOR
DISHWASHING
MAIN OFFICE WORKROOM
MAINTENANCE OFFICE
STAFF LOUNGE
PRINCIPALCONFERENCE ROOM
RECEPTION/WAITING
NURSE
COMMONS STORAGE
THIRD GRADE
KITCHEN/SERVINGCORRIDOR
COORDINATORFOURTH GRADE MENS
FOURTH GRADE WOMENS
FOURTH GRADE TLT
TLT
GEOTHERMAL ROOM
CROSS CAT STORAGE
GEOTHERMAL PUMPROOM
TLT/SHWR
SENSORY
VESTIBULE
WOMENS
JANITORS CLOSET
STAIR
MAIN ENTRY
COMMONS/CAFETERIASOCIAL STAIRS
STAIR
CORRIDOR
STORAGE
NURSE TLT
STORAGE
STORAGE
SERVER
PARAWORKS
MOTHER'S ROOM
SOCIAL WORKER
STORAGE
STAFF TLT
CORRIDOR
OT/PT STORAGE
DATA
JANITOR'S CLOSET
CORRIDOR
STORAGE
ELEVATOR
SGI
COLLABORATION
ALCOVE
THIRD GRADE MENS
THIRD GRADE WOMENS
THIRD GRADE TLT
ALCOVE
241'-11"
293'-6"
139'-3"
174'
-6"
OVERALL FIRST FLOOR PLAN
316517-01
1/9/2019MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
1/16" = 1'-0" A2FIRST FLOOR OVERALL PLAN
TRUE
N
KINDERGARTEN
KINDERGARTEN
KINDERGARTEN
MECHANICAL ROOM
KINDERGARTEN TEAMROOM
FIRST GRADE
FIRST GRADEFIRST GRADEFIRST GRADE
FIRST GRADESECOND GRADE
SECOND GRADESECOND GRADESECOND GRADE
SECOND GRADE SGI
BUBBLE CLASSROOM
SECOND GRADE SGI FIRST GRADE SGI FIRST GRADE SGI
SECOND GRADECOLLABORATION
FIRST GRADECOLLABORATION
KINDERGARTENCOLLABORATION
KINDERGARTEN CUBBYALCOVE (126 CUBBIES)
LGI
MUSIC
LGI STORAGE
MUSIC STORAGE
KINDERGARTENKINDERGARTEN
CROSS CAT/BUBBLECLASSROOM
KINDERGARTEN GRADESTORAGE
TLT/SHWR
SENSORY
SECOND GRADE TEAMROOM
STAFF TLT
SENSORY
SENSORY
ART
JANITOR'S CLOSETSECOND GRADE GRADE
STORAGE
READING SPECIALIST
FIRST GRADE GRADESTORAGE
FIRST GRADE TEAMROOM
LMC STORAGE
MAKER SPACE
LMC WORKROOMART STORAGE
MECHANICAL ROOM
ELECTRICAL ROOM
GENERATOR ROOM
OUTDOOR GYM STORAGE
SECOND GRADE
FIRST GRADE CUBBYALCOVE (138 CUBBIES)
182'
-4"
K-TLT
K-TLT K-TLT
FIRST GRADE TLT
FIRST GRADE MENS
FIRST GRADE WOMENS
MATH SPECIALIST
VESTIBULE
K-TLT
WOMENS
TLT
MENS
GARAGE
COPY ROOM
SPEECH/LANGUAGE
ELL
INSTRUCTIONAL COACH
LMC CONFERENCE ROOM
COMPUTER LAB
LMC
KILN
CORRIDOR
175'
-11"
ELEVATOR
ALCOVEALCOVE
COLLABORATION
STAIRS
CORRIDORCORRIDOR
CORRIDORCORRIDORCORRIDOR
CORRIDOR
CORRIDOR
SECOND GRADE MENS
SECOND GRADE WOMENS
SECOND GRADE TLTSECOND GRADE CUBBYALCOVE (138 CUBBIES)
K-TLT
SGI
STAIR
STAIR
STAIR
241'-2"
139'-3"
293'-6"
163'-10"
OVERALL SECOND FLOOR PLAN
316517-01
1/9/2019MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
1/16" = 1'-0" A2SECOND FLOOR OVERALL PLAN
TRUE
N
0863-010863-02
AR
EA
A
AR
EA
C
AR
EA
A
AR
EA
B
AR
EA
B
AR
EA
C
+27'-5"
+29'-4"
+29'-4"
+26'-4"
+29'-4"
+28'-11 1/2"
+28'-2 1/2"
+26-4"
+25-6"
+26'-4"
+26'-1"
+25'-6"
+27'-6 1/2"
+28'-10"
+28'-9"
RD
OF
RD
OF
RD
OF
RD
OF
RD
OF
RD
OF
RDOF
RDOF
RD
OF
RD
OF
OF RD
OF RD OF
RD
241'-2"
163'-10"
175'
-11
1/2"
182'
-4"
260'-4"
166'-9"
ROOF PLAN LEGEND
RD INDICATES ROOF DRAIN WITH SUMP PAN
OF INDICATES OVERFLOW ROOF DRAIN WITH SUMP PAN
INDICATES SLOPE DIRECTION OF ROOF AND TAPERED INSULATION.
NO HATCH INDICATES SLOPED STRUCTURE.
INDICATES FLAT STRUCTURE AND TAPERED INSULATION WITH MINIMUM SLOPE OF 1/4" PER FOOT, UNLESS NOTED OTHERWISE.
INDICATES TAPERED INSULATION/SADDLES/CRICKETS WITH MINIMUM SLOPE OF 1/2" PER FOOT, UNLESS NOTED OTHERWISE.
OVERALL ROOF PLAN
316517-01
1/9/2019MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
KEYNOTES PER SHEET0863-01 METAL-FRAMED SKYLIGHT #1 (LARGE)
0863-02 METAL-FRAMED SKYLIGHT #2 (SMALL)
1/16" = 1'-0" A2OVERALL ROOF PLAN
TRUE
N
ROOF WILL NOT
HOUSE MECHANICAL
UNITS OR
SCREENING.
1ST FLR100'-0"
1ST FLR100'-0"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
DOWNLIGHTING ON
UNDERSIDE OF CANOPY
MP-1 AND MP-2MP-4, TYP
BR-2
V-1, TYP
MP-4
GL-1, TYP GL-3, TYP GL-2, TYP GL-1, TYP
GL-3, TYP
GL-1, TYP MP-2, TYP
MP-3, TYP MP-3, TYP
BR-1, TYP
BR-2 MP-3
BR-2, TYP
12'-8
"
MP-3
12'-0
"
30'-4
"
MP-3, TYP
1ST FLR100'-0"
1ST FLR100'-0"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
30'-4
"
BR-1, TYP BR-2, TYP
MP-2, TYP
GL-2, TYP GL-1, TYP
1ST FLR100'-0"
1ST FLR100'-0"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
WALL MOUNTED EGRESS
LIGHT FIXTURE
WALL MOUNTED EGRESS
LIGHT FIXTURE
BR-1, TYP
MP-1 AND MP-2
GL-3GL-3, TYP
GL-1V-1 2'-0
"10'-8
"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
WALL MOUNTED EGRESS
LIGHT FIXTURE
DOWNLIGHTING ON
UNDERSIDE OF CANOPY
DOWNLIGHTING ON
UNDERSIDE OF CANOPY
15'-8
"
18'-8
"
15'-8
"
BR-1
WALL MOUNTED EGRESS
LIGHT FIXTURE
MP-1 AND MP-2BR-2, TYPBR-1, TYP
MP-2, TYPGL-1, TYP GL-2 GL-1, TYP GL-1, TYP
GL-1, TYP
GL-1 V-1
MP-3, TYP
MP-3
EXTERIOR MATERIAL SCHEDULE
MP-1 DARK GREEN METAL PANEL
MP-2 LIGHT GREEN METAL PANEL
MP-3 DARK GRAY METAL PANEL
MP-4 YELLOW METAL PANEL
BR-1 DARK GRAY BRICK
BR-2 TAN BRICK
GL-1 STOREFRONT
GL-2 SPANDREL
GL-3 CURTAIN WALL
V-1 PRECAST VENEER
OVERALL EXTERIOR ELEVATIONS
316517-01
02/06/2019MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
1/16" = 1'-0" C1EAST ELEVATION
1/16" = 1'-0" B2NORTH ELEVATION
1/16" = 1'-0" B5SOUTH ELEVATION
1/16" = 1'-0" A2WEST ELEVATION
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
1ST FLR100'-0"
1ST FLR100'-0"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
DOWNLIGHTING ON
UNDERSIDE OF CANOPY
MP-1 AND MP-2MP-4, TYP
BR-2
V-1, TYP
MP-4
GL-1, TYP GL-3, TYP GL-2, TYP GL-1, TYP
GL-3, TYP
GL-1, TYP MP-2, TYP
MP-3, TYP MP-3, TYP
BR-1, TYP
BR-2 MP-3
BR-2, TYP
12'-8
"
MP-3
12'-0
"
30'-4
"
MP-3, TYP
1ST FLR100'-0"
1ST FLR100'-0"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
30'-4
"
BR-1, TYP BR-2, TYP
MP-2, TYP
GL-2, TYP GL-1, TYP
1ST FLR100'-0"
1ST FLR100'-0"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
WALL MOUNTED EGRESS
LIGHT FIXTURE
WALL MOUNTED EGRESS
LIGHT FIXTURE
BR-1, TYP
MP-1 AND MP-2
GL-3GL-3, TYP
GL-1V-1 2'-0
"10'-8
"
2ND FLR114'-8"
2ND FLR114'-8"
ROOF129'-4"
ROOF129'-4"
UPPER ROOF136'-4"
UPPER ROOF136'-4"
CLERESTORY ROOF138'-0"
CLERESTORY ROOF138'-0"
WALL MOUNTED EGRESS
LIGHT FIXTURE
DOWNLIGHTING ON
UNDERSIDE OF CANOPY
DOWNLIGHTING ON
UNDERSIDE OF CANOPY
15'-8
"
18'-8
"
15'-8
"
BR-1
WALL MOUNTED EGRESS
LIGHT FIXTURE
MP-1 AND MP-2BR-2, TYPBR-1, TYP
MP-2, TYPGL-1, TYP GL-2 GL-1, TYP GL-1, TYP
GL-1, TYP
GL-1 V-1
MP-3, TYP
MP-3
EXTERIOR MATERIAL SCHEDULE
MP-1 DARK GREEN METAL PANEL
MP-2 LIGHT GREEN METAL PANEL
MP-3 DARK GRAY METAL PANEL
MP-4 YELLOW METAL PANEL
BR-1 DARK GRAY BRICK
BR-2 TAN BRICK
GL-1 STOREFRONT
GL-2 SPANDREL
GL-3 CURTAIN WALL
V-1 PRECAST VENEER
OVERALL EXTERIOR ELEVATIONS - COLOR
316517-01
02/06/2019MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
1/16" = 1'-0" C1EAST ELEVATION
1/16" = 1'-0" B2NORTH ELEVATION
1/16" = 1'-0" B5SOUTH ELEVATION
1/16" = 1'-0" A2WEST ELEVATION
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
SCALE: 1/16" = 1'-0"
32'16'0' 8'4'
SOUTHEAST AERIAL
3D VIEWS OF PROPOSED DESIGN
MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
LOCATOR MAP
316517-0102/06/2019
SCALE: 1" = 160'
320'160'0' 80'40'
MAIN ENTRY
3D VIEWS OF PROPOSED DESIGN
MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
LOCATOR MAP
316517-0102/06/2019
SCALE: 1" = 160'
320'160'0' 80'40'
WEST ENTRY
3D VIEWS OF PROPOSED DESIGN
MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
LOCATOR MAP
316517-0102/06/2019
SCALE: 1" = 160'
320'160'0' 80'40'
NORTHWEST AERIAL
3D VIEWS OF PROPOSED DESIGN
MIDDLETON - CROSS PLAINS AREA SCHOOL DISTRICT - POPE FARM ELEMENTARY SCHOOL
LOCATOR MAP
316517-0102/06/2019
SCALE: 1" = 160'
320'160'0' 80'40'