MAHARASHTRA JEEVAN PRADHIKARAN
Name of work :- Malmatha 25 Villages R.R. Water Supply Scheme . Tal. Malegaon
Repairs to Dam, Designing, Providing, Constructing of
Unconventional Water Treatment Plant of 5 MLD capacity, Pure
water Pumping Machinery, L/L & Jointing Connecting Main,
L/Main, Designing Const of RCC ESR, RCC GSR’S, P/L/L &
jointing Distribution System, Miscellenous Work & Trial Run of
scheme for 1 year.
Tender Notice No:- 2 for 2012-2013
Estimated cost :- Rs 9,26,82,960/-
MINUTES OF PRE- BID MEETING HELD ON 6/7/2012
Sr.No. Point raised by Contractor Clarification given by M.J.P.
M/s. R.A. Ghule, Palghar
1 ÃÖ² Ö¾ Ö�Ôú �Î ú. 6 - †Ö¸ü.ÃÖß.ÃÖß. ‹´Ö.²Öß.†Ö¸ü/‡Ô.‹ÃÖ.†Ö¸ü. ²ÖÖÓ¬Ö�Öê (−ÖÖê™ü´Ö¬µÖê) ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›ü�Öê²ÖÖ²ÖŸÖ ¿Öê›üµÖã»Ö ²Öß ´Ö¬µÖê 16 ÖÖÓ¾Öê פü»Öê»Öß †ÃÖæ−Ö †Öò²»Öß Öê™ü¸üß ›üÖ™üÖ ´Ö¬µÖê ‹&æú�Ö 18 ÖÖÓ¾Öê ¤üÖ)Ö×¾Ö»Öê»Öß †ÖÆêüŸÖ ¾Ö ¯ÖÏŸµÖ-ÖÖŸÖ 3 ÖÖÓ¾Öê ˆ¤üÖ. ×™ü‘Ö¸üß, ÖÖ»Ö�Öê, ´ÖÖ−Ö&êú µÖê£Öê ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›ü�Öê ¤üÖ)Ö×¾Ö»Öê †ÖÆêü. ¯Ö�Ö −Ö¾µÖÖ−Öê ²ÖÖÓ¬Ö�Öê ¤üÖ)Ö×¾Ö»Öê»Öê −ÖÖÆüߟÖ. ‡Ô.‹ÃÖ. †Ö¸ü. ŸÖÖê›ü�µÖÖÃÖ ×−Ö×¾Ö¤êü“µÖÖ †™üß−Öê ¾Ö “ÖÖ»Öæ ¤ü ü ÃÖãדÖ−Öê ¤ü¸ü ‘Öê‰ú−Ö ŸµÖÖ“Öß Ø&ú´ÖŸÖ ŸµÖÖŸÖ ¬Ö¹ý−Ö •Ö¸ü Æêü &úÖ´Ö &ú¸ü�ÖÖ¸ü †ÃÖÖ»Ö ŸÖ¸ü“Ö Æêü &úÖ´Ö &ú¸ü�Öê ¿ÖŒµÖ ¾ÖÖ™üŸÖê. †−µÖ£ÖÖ ×−Ö×¾Ö¤êü−ÖãÃÖÖ ü Æêü &úÖ´Ö &ú¸ü�Öê ¿ÖŒµÖ ¾ÖÖ™üŸÖ −ÖÖÆüß.
×−Ö×¾Ö¤êüŸÖ −Ö´Öã¤ü &êú»µÖÖ−ÖãÃÖÖ ü ‹&æú�Ö 16 ÖÖÓ¾ÖÖ´Ö¬Öᯙ 16 ‡Ô.‹ÃÖ.†Ö¸ü. “Öê ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›üÖ¾ÖµÖÖ“Öê †ÖÆêü, ¾Ö ‹&æú�Ö 17 ‡Ô.‹ÃÖ.†Ö¸ü.¾Ö 2 •Öß.‹ÃÖ. †Ö¸ü. −Ö¾µÖÖ−Öê ×−Ö×¾Ö¤êüŸÖᯙ ¿Öê›üµÖã»Ö ²Öß ´Ö¬µÖê −Ö´Öã¤ü &êú»µÖÖ¯ÖÏ´ÖÖ�Öê ²ÖÖÓ¬ÖÖ¾ÖµÖÖ“Öê †ÖÆêüŸÖ. −Ö¾µÖÖ−Öê ²ÖÖÓ¬ÖÖ¾ÖµÖÖ“Öê ‡Ô.‹ÃÖ.†Ö¸ü. ¾Ö ¯ÖÖ›üÖ¾ÖµÖÖ“Öê ‡Ô.‹ÃÖ.†Ö¸ü. ÆüµÖÖ •ÖÖ ÖÖ Ã¾ÖŸÖÓ¡Ö †ÖÆêüŸÖ. ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›ü�µÖÖ ×¾ÖÂÖµÖß“Öß &úÖµÖÔ¾ÖÖÆüß ¾Ö ŸµÖÖ“Öê ¤ü¸ü Æêü ×−Ö×¾Ö¤êüŸÖᯙ †™üß ¾Ö ¿ÖŸÖá−ÖãÃÖÖ¸ü †ÖÆêüŸÖ. ŸµÖÖŸÖ ²Ö¤ü»Ö −ÖÖÆüß. ‡Ô.‹ÃÖ. †Ö¸ü. “Öê ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›ü�µÖÖ“Öß ²ÖÖ²Ö Ã¾ÖŸÖÓ¡Ö¯Ö�Öê ¿Öê›üµÖæ»Ö ²Öß ´Ö¬µÖê −Ö´Öæ¤ü &êú»Öê»Öß −ÖÃÖæ−Ö ÃÖ²Ö ¾Ö&Ôú −ÖÓ.6 ´Ö¬µÖê ŸµÖÖ“Öß ŸÖôû ×™ü¯Ö ¤êü�µÖÖŸÖ †Ö»Öê»Öß †ÖÆêü. ×›üÃÖ´Öë™ü»Öà Ö &ú¸ü�µÖÖÃÖÖšüß &úÖê�ÖŸÖßÆüß †¤üÖµÖ Öß Ã¾ÖŸÖÓ¡Ö¯Ö�Öê †−Öã–ÖêµÖ −ÖÖÆüß. ‡Ô.‹ÃÖ. †Ö¸ü. “Öê ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›üŸÖÖ−ÖÖ ×•Ö×¾ÖŸÖ †£Ö¾ÖÖ ‡ŸÖ¸ü ´ÖÖ»Ö´Ö¢Öê“Öß &úÖê�ÖŸÖßÆüß ÆüÖ−Öß ÆüÖê�ÖÖ¸ü −ÖÖÆüß µÖÖ“Öß ÃÖÓ¯Öæ�ÖÔ ¤ü-ÖŸÖÖ &Óú¡ÖÖ™ü¤üÖ¸üÖ−Öê ‘µÖÖ¾ÖµÖÖ“Öß †ÖÆêü.
Chief. Engineer (Water management)
New Administrative Bldg., Gr.Floor,
Kanhaiya Nagar, Kopari,
Thane (East) – 400 603
web www.mahamjp.com
Tel. No. : 022/25322335
022/25320860
022/25320203
022/25326020
Fax : 022/25320207
e-mail : [email protected]
ŸÖÃÖë“Ö ÃÖÓ²ÖÓ¬ÖßŸÖ ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›üŸÖÖ−ÖÖ ŸÖê ŸÖÖê›ü�µÖÖŸÖ µÖêŸÖ †ÃÖ»µÖÖ²ÖÖ²ÖŸÖê ±ú»Ö&ú šüôû&ú¯Ö�Öê פüÃÖŸÖᯙ †¿µÖÖ¯ÖÏ&úÖ¸êü &úÖµÖÔãÖôûÖ¾Ö¸ü »ÖÖ¾Ö�µÖÖŸÖ µÖÖ¾ÖêŸÖ. µÖÖ -Öê¡ÖÖ»ÖÖ ÃÖÓ¸ü-Ö�Ö &ãú¯Ö�Ö (Barricading) †Ö¾Ö¿µÖ&úŸÖê−ÖãÃÖÖ¸ü ¾Ö †Ö¾Ö¿µÖ&ú ŸµÖÖ &úÖ»ÖÖ¾Ö¬Öֵ߯ÖÔŸÖ ‘ÖÖ»Ö�µÖÖŸÖ µÖÖ¾Öê.
2 ÃÖ² Ö¾ Ö�Ôú �Î ú. 7 - ×¾ ÖŸÖ¸ü �Ö ¾ µ Ö¾ Ö Ã£Ö Ö »Öê ²Ö¸ü ¯ ÖÖ™ Ôü- ²ÖÖ²Ö &Îú.1 ¯ÖÖ‡Ô¯Ö )ÖÖê¤üÖ‡Ô :- ÃÖ¸üÖÃÖ¸üß ¤ü¸ü ¯Ö&ú›ü»Öê»ÖÖ †ÖÆêü ŸÖÖê &ú´Öß ¾ÖÖ™üŸÖÖê ÃÖ²Ö¾Ö&Ôú 4 ´Ö¬Öᯙ ¤ü¸ü ¾Ö ÃÖ²Ö¾Ö&Ôú 2 ´Ö¬Öᯙ ¤ü¸üÖŸÖ ±ú¸ü&ú ¾ÖÖ™üŸÖÖê. ¤ü¸üÖ²ÖÖ²ÖŸÖ Ã™ÒüüÖ™üÖ &úÃÖÖ ¯Ö&ú›ü»ÖÖ µÖÖ“Öß &ãúšêüÆüß −ÖÖë¤ü −ÖÖÆüß.
ÃÖ²Ö¾Ö&Ôú 4 ´Ö¬Öᯙ &úÖ´Ö Æêü ´Öã)µÖ Öã¹ýŸ¾Ö¾ÖÖ×Æü−Öß“Öê †ÖÆêü ¾Ö ÃÖ²Ö¾Ö&Ôú 7 ´Ö¬Öᯙ &úÖ´Öê ×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖê“Öê †ÖÆêü. ¤üÖê−Æüß &úÖ´Öê •µÖÖ ×šü&úÖ�Öß &ú¸üÖ¾ÖµÖÖ“Öß †ÖÆêüŸÖ ŸµÖÖ ×šü&úÖ�Öß •Ö×´Ö−Öß“µÖÖ ÃŸÖ¸üÖ´Ö¬µÖê ±ú¸ü&ú †ÃÖ»µÖÖ´Öãôêû ÃÖ¸üÖÃÖ¸üß ¤ü¸üÖŸÖ ±ú¸ü&ú †ÖÆêü. ¤üÖê−Æüß ×šü&úÖ�Öß ÃÖ¸üÖÃÖ¸üß ¤ü¸ü &úÖœüŸÖÖÓ−ÖÖ ÖéÆüßŸÖ ¬Ö¸ü�µÖÖŸÖ †Ö»Ö껵ÖÖ Ã™ÒüÖ™üÖ“Öê ¯ÖÏ´ÖÖ�Ö )ÖÖ»Ö߻֯ÖÏ´ÖÖ�Öê †ÖÆêü. ÃÖ²Ö¾Ö&Ôú-4 ( Öã¹ýŸ¾Ö¾ÖÖ×Æü−Öß ) ¾Ö 7 (×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖÖ) Strata
classification
For
Gravity
main
For
Distribution
Soil,soft
murum
11% 24%
Hard murum 11% 13%
Soft rock 25% 18%
Hard rock by
blasting
37% 5%
Hard rock by
mechanical
means
16% 40%
Total 100% 100%
3 ´Öê�ò ú×− Ö�ú »Ö ¯ÖÖ™ Ôü - ²ÖÖ²Ö &Îú. 1 - ±»ÖÖê ×´Ö™ü¸ü²ÖÖ²ÖŸÖ :- ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö´Ö¬µÖê ±»ÖÖê ×´Ö™ü¸ü“Öê ïÖê×ÃÖ×±ú&êú¿Ö−Ö ×¤ü»Öê»Öê −ÖÖÆüß. ŸÖÃÖê“Ö ²ÖÖ•ÖÖ¸üÖŸÖᯙ ¤ü¸ü Æêü •ÖÖÃŸÖ †ÃÖ»µÖÖ−Öê ŸÖê ¤ü¸ü ÖÏÖÆüµÖ ¬Ö¸üÖ¾ÖêŸÖ Æüß ×¾Ö−ÖÓŸÖß.úú
±»ÖÖê ×´Ö™ü¸ü²ÖÖ²ÖŸÖ ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö ÃÖÖê²ÖŸÖ •ÖÖê›ü�µÖÖŸÖ †Ö»Öê»Öê †ÖÆêüŸÖ. ¤ü¸ Æêü ×−Ö×¾Ö¤êüŸÖ −Ö´Öã¤ü &êú»µÖÖ¯ÖÏ´ÖÖ�Öê ¸üÖÆüŸÖß»Ö.
4 ²ÖÖ ²Ö �Î ú. 4 :- ÆüÖ‰úÃÖ &ú−ÖꌿÖ−Ö :- ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö´Ö¬µÖê ÆüÖ‰úÃÖ &ú−Öꌿ֓Öê ïÖê×ÃÖ×±ú&êú¿Ö−Ö ×¤ü»Öê»Öê −ÖÖÆüß. ŸÖÃÖê“Ö ¯ÖÖ‡Ô¯Ö &ãúšü»ÖÖ ¾ÖÖ¯Ö¸üÖµÖ“ÖÖ, ŸµÖÖ“Öê ïÖê¿Ö»Ö, ±êú¸üÖê»Ö ¾Ö ¾ÖÖò™ü¸ü ×´Ö™ü¸ü ‡ŸµÖÖ¤üß“Öß ´ÖÖ×ÆüŸÖß ×¤ü»Öê»Öß −ÖÖÆüß. ²ÖÖ•ÖÖ¸üÖŸÖᯙ ¤ü¸üÖ¯Öê-ÖÖ ×−Ö×¾Ö¤êüŸÖᯙ ¤ü¸ü &ú´Öß †ÖÆêüŸÖ ²ÖÖ•ÖÖ¸üÖŸÖ ×´Ö™ü¸ü“Öß Ø&ú´ÖŸÖ †Ó¤üÖ•Öê ¹ý. 1000 ŸÖê 1500 †ÃÖ»µÖÖ−Öê ×−Ö×¾Ö¤êüŸÖᯙ ¤ü¸üÖ−Öê
ÆüÖ‰úÃÖ &ú−ÖꌿÖ−Ö²ÖÖ²ÖŸÖ“Öß ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö ÃÖÖê²ÖŸÖ •ÖÖê›ü»Öê»Öê †ÖÆêüŸÖ. ÆüÖ‰úÃÖ &ú−ÖꌿÖ−Ö´Ö¬µÖê †Ûß֟¾ÖÖŸÖ †ÃÖ»Ö껵ÖÖ −Öôû •ÖÖê›ü�µÖÖÓ−ÖÖ ±úŒŸÖ •Ö»Ö´ÖÖ¯Ö&êú ²ÖÃÖ×¾Ö�µÖÖ“Öß ²ÖÖ²Ö ‹¾Öœüß“Ö µÖÖ ²ÖÖ²Öà´Ö¬µÖê †ÓŸÖ³ÖæÔŸÖ †ÖÆêü. •Ö»Ö´ÖÖ¯Ö&úÖ“ÖÖ ¯Öã¸ü¾ÖšüÖ Ã¯Öê×ÃÖ×±ú&êú¿Ö−Ö¯ÖÏ´ÖÖ�Öê &Óú¡ÖÖ™ü¤üÖ¸üÖ−Öê &ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ¤ü¸ Æêü ×−Ö×¾Ö¤êüŸÖ −Ö´Öã¤ü &êú»µÖÖ¯ÖÏ´ÖÖ�Öê ¸üÖÆüŸÖß»Ö.
&úÖ´Ö ÆüÖê�Öê ¿ÖŒµÖ ¾ÖÖ™üŸÖ −ÖÖÆüß. ×−Ö×¾Ö¤êüŸÖ ¤ü¸ü ¹ý. 825 &úÃÖÖ ¯Ö&ú›ü»ÖÖ †ÖÆêü ŸÖê ¤üÖ)Ö¾ÖÖ¾Öê †−µÖ£ÖÖ ¯ÖÏŸµÖ-Ö &úÖ´ÖÖ“Öê ¸êü™ü †ò−µÖÖ»ÖêÃÖêÃÖ &ú¹ý−Ö ¤ü¸ü ¬Ö¸üÖ¾ÖÖ.
5 ¯ÖÖ‡Ô Ö ¾ÖÖÆüŸÖã&ú )Ö›üß, êüŸÖß, ×ÃÖ´Öë™ü, Ùüᯙ ¾Ö ‡ŸÖ¸ü ´Ö™êü׸üµÖ»Ö“Öê ¤ü¸ü 5 ×&ú.´Öß. ¯Öê-ÖÖ •ÖÖ¤üÖ“Öê ¤ü ü ÖÏÖÆüµÖ ¬Ö¸üÖ¾ÖêŸÖ.
Öã¹ýŸ¾Ö¾ÖÖ×Æü−Öß“Öê ¯ÖÖ‡Ô¯Ö Æêü ´Ö•Ö߯ÖÏÖ &ú›æü−Ö ¯Öã¸ü¾Ö�µÖÖŸÖ µÖê�ÖÖ¸ü †ÃÖã−Ö ŸÖê ¯ÖÏŸµÖ-Ö &úÖµÖÔãÖôûÖ¾Ö¸ü •µÖÖ ×šü&úÖ�Öß ¿ÖŒµÖ †ÖÆêü ŸµÖÖךü&úÖ�Ö“µÖÖ •ÖÖ Öê¾Ö¸ü ˆ¯Ö»Ö²¬Ö &ú¹ý−Ö ¤êü�µÖÖŸÖ µÖê�ÖÖ¸ü †ÖÆêüŸÖ, ¾Ö Æêü †ÓŸÖ¸ü 5 ×&ú.´Öß ¯Ö׸üÃÖ¸üÖ“µÖÖ †ÖŸÖ“Ö ¸üÖÆüÖ�ÖÖ¸ü †ÖÆêü. )Ö›üß, ×ÃÖ´Öë™ü,Ùüᯙ Æêü 5.×&ú.´Öß “µÖÖ ¯Ö׸ü‘ÖÖŸÖ ˆ¯Ö»Ö²¬Ö †ÖÆêüŸÖ. ¸êüŸÖß²ÖÖ²ÖŸÖ 5 ×&ú.´Öß “µÖÖ ¾Ö¸üᯙ †ÓŸÖ¸ü Æêü ´Ö㻵ÖÖÓ&ú−ÖÖŸÖ ÖéÆüßŸÖ ¬Ö¸ü�µÖÖŸÖ µÖê�ÖÖ¸ü †ÖÆêü.
6 ³ÖÖ¾Ö¾ÖÖœü ¤ü ü Æêü ×−Ö×¾Ö¤êüŸÖ ÃÖ´ÖÖ×¾Ö™ü −ÖÃÖ»µÖÖ−Öê, ¯Ö׸ü¯Ö¡Ö&úÖ−ÖãÃÖÖ¸ü ³ÖÖ¾Ö¾ÖÖœüß“Öê ¤ü¸ü &úÃÖê ŸÖß−Ö ™ü¯µÖÖŸÖ &ú¸üÖ¾ÖµÖÖ“Öê ¾Ö ŸµÖÖ−ÖãÃÖÖ¸ü ³ÖÖ¾Ö¾ÖÖœüß“Öê ¤ü ü &úÃÖê ¯Ö&ú›ü�ÖÖ¸ü µÖÖ“Öê ´ÖÖ ÖÔ¤ü¿ÖÔ−Ö &ú¸üÖ¾Öê Æüß ×¾Ö−ÖÓŸÖß.
&úÖ´ÖÖ“Öß ‹&æú�Ö ´Öã¤üŸÖ 30 ´Ö×Æü−Öê †ÖÆêü ŸµÖÖŸÖᯙ ¯ÖÏŸµÖ-Ö &úÖ´Ö Æêü 18 ´Ö×Æü−µÖÖŸÖ ¯Öæ�ÖÔ &ú¸üÖ¾ÖµÖÖ“Öê †ÖÆêü ¾Ö ¯Öãœüᯙ 12 ´Ö×Æü−µÖÖŸÖ µÖÖê•Ö−ÖÖ “ÖÖ»Ö¾ÖÖ¾ÖµÖÖ“Öß †ÖÆêü. 18 ´Ö×Æü−µÖÖŸÖ ¯Öæ�ÖÔ &ú¸üÖ¾ÖµÖÖ“µÖÖ &úÖ´ÖÖ“ÖÖ ²ÖÖ¸ü“ÖÖ™Ôü ×−Ö×¾Ö¤êüŸÖ ü¤êü�µÖÖŸÖ †Ö»Öê»ÖÖ †ÖÆêü. ŸµÖÖ“ÖÖ †³µÖÖÃÖ &ú¹ý−Ö &Óú¡ÖÖ™ü¤üÖ¸üÖ−Öê ¤êü&úÖ¸ü ³Ö¸ü�Öê †¯Öê×-ÖŸÖ †ÖÆêü.
ERRATA
Sr.no Page no Printed as Read as
1 Schedule ‘A’ Place of Delivery at Malmatha
Dam store at Village Virane
Tal malegaon
Place of Delivery @ Work
site.
2 Sub Work No :- 1 -
Repairs to dam
Item no 1 :- Dry stone
pitching
Unit of Item – per Rm Unit of Item – Per Sqm
3 Sub Work No :- 1-
Repairs to dam
Item no 3:- Royalty
charges
Royalty charges Item No.3 of sub work
No.1 will not be executed .
Instead of this Royalty
charges will be
reimburssed to contractor
only after submission of
receipt from revenue
department in original .
4 Specification inrespect
of Sub Work 6- Item
No.1
Design condition – “The
contractor can alternatively
quote with is on design with
following ”
The contractor should
design ESR’s with
following condition
5 Specification inrespect
of Sub Work 6- Item
No.1- General
GENERAL – c) For ESR the
horizontal piping for
inlet,outlet, overflow & bypass
shall be provided up to
d) 5 m from outer, brace.
c) For ESR the horizontal
piping for inlet,outlet,
overflow & bypass shall
be provided up to 5 m
from outer, brace.
6 NOTES OF
SCHEDULE B
20) In case of supply of pipes
valves etc.
20) In case of supply of
pipes & valves etc.
The pump shall be confirming
to IS 9079/17979 & suitable
for + 10% to – 25% variations.
The pump shall be
confirming to IS
9079/17979 & suitable for
head variation with + 10%
to – 25% variations.
7 SUB WORK NO:-3
PURE WATER
PUMPING
MACHINERY
Item No.1
Motor shall be totally enclosed
type fan cooled mounted on
same shaft on common base
plate.
Motor shall be totally
enclosed type fan cooled
mounted on same shaft on
common base plate, and
not less than 7.5 HP. The
motor shall have sufficient
reserve marging while
running on specified head
range.
8 SUB WORK NO:-3
PURE WATER
PUMPING
MACHINERY
Item No.3
The sluice valve shall confirm
IS 780PN1
The sluice valve shall
confirm IS 14846 /
780PN1.
1) (A) ------ 50 Kg 1 (A) ------ Suitable Qty.
ICTPN 4 Pole SFU
ICTP 3 Pole SFU
ICDP 2 Pole SFU
3) Change over switch 3) Rotary Change over
switch
12)A)-- Starter & DOL starter
for
12)A)--Starter for pumps &
DOL starter for Vaccum
pumps
9 SUB WORK NO:-3
PURE WATER
PUMPING
MACHINERY
Item No.6
17) Self----- 2 No. 17) Self----- As required
Item No.8 (A) : CABLE Item No.7 (A) : CABLE
Item No.8 (B) : CABLE Item No.7 (B) : CABLE
Item No.8 (C) : CABLE Item No.7 (C) : CABLE
Item No.9 : TOOLS Item No.8 : TOOLS
10 SUB WORK NO:- 3
PURE WATER
PUMPING
MACHINERY
Item No.10 : EARTHING Item No.9 : EARTHING
´Ö.•Öß. ¯ÖÏÖ. •Ö »Ö¾ µÖ¾ Öã ÖÖ¯Ö −Ö š üÖ�Öê. ×¾ ÖÂÖµ Ö :- ×−Ö ×¾ Ö¤ üÖ ¯Öæ¾ ÖÔ ²Öî šü�úß“ Öê ‡×Ÿ Ö¾ Öé¢ Ö
�úÖ´Ö Ö“ Öê −Ö ÖÓ¾ Ö :- ´Ö Öôû´ ÖÖ £ÖÖ ¾ Ö 2 5 / ÖÖÓ¾ Öê ¯ÖÏ Ö¤ êü׿ Ö� ú ¯ÖÖ� Ö߯ Öã ü¾ Ö šüÖ µ ÖÖê• Ö −ÖÖ, ŸÖ Ö. ´ÖÖ »Ö ê/ ÖÖÓ¾ Ö, ו Ö. −Ö Ö׿ Ö�ú
¬Ö¸ü�ÖÖ“Öß ¤ãü¹ýßÖß, 5 ¤ü.»Ö.×»Ö. -Ö´ÖŸÖê“Öê •Ö»Ö¿Ö㬤üß&ú¸ü�Ö &ëú¦ü ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê, ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ¿Ö㬤ü ¯ÖÖ�µÖÖ“Öß ¯ÖÓ¯Öß Ö ´Ö׿Ö−Ö¸üß ¯Öã¸ü¾Ö�Öê,&ú−Öꌙüà Ö ´Öê−Ö ¾Ö ÖÏò¾Æüß™üß ´Öê−Ö ™üÖ&ú�Öê •ÖÖê›ü�Öê ¾Ö “ÖÖ“Ö�Öß ‘Öê�Öê, ×¾Ö×¾Ö¬Ö -Ö´ÖŸÖꓵÖÖ ÃÖ»ÖÖêÆü Ó“Ö ¾Ö ³Öæßָü ™üÖŒµÖÖÓ“Öê ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ×¾Ö×¾Ö¬Ö ¾µÖÖÃÖÖ“Öß ¯Öß¾ÆüßÃÖß ¯ÖÖ‡Ô Ö ×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖÖ ¯Öã¸ü¾Ö�Öê ™üÖ&ú�Öê ¾Ö •ÖÖê›ü�Öê ¾Ö µÖÖê•Ö−ÖÖ ‹&ú ¾ÖÂÖÔ “ÖÖ»Ö×¾Ö�Öê ‡. †Ó¤üÖ×•ÖŸÖ Ø&ú´ÖŸÖ ¹ý.9,26,82,960/- ÃÖÓ¤ ü³Ö Ô :- ×−Ö×¾Ö¤üÖ ÃÖã“Ö−ÖÖ &Îú. 2 ÃÖ−Ö 2012-13
´ÖÖôû´ÖÖ£ÖÖ ¾Ö 25 ÖÖÓ¾Öê ¯ÖÏÖ¤êü׿Ö&ú ¯ÖÖ�Ö߯Öã¸ü¾ÖšüÖ µÖÖê•Ö−ÖêÓŸÖ ÖÔŸÖ ¬Ö¸ü�ÖÖ“Öß ¤ãü¹ýßÖß, 5 ¤ü.»Ö.×»Ö. -Ö´ÖŸÖê“Öê •Ö»Ö¿Ö㬤üß&ú¸ü�Ö &ëú¦ü ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê, ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ¿Ö㬤ü ¯ÖÖ�µÖÖ“Öß ¯ÖÓ¯Öß Ö ´Ö׿Ö−Ö¸üß ¯Öã¸ü¾Ö�Öê,&ú−Öꌙüà Ö ´Öê−Ö ¾Ö ÖÏò¾Æüß™üß ´Öê−Ö ™üÖ&ú�Öê •ÖÖê›ü�Öê ¾Ö “ÖÖ“Ö�Öß ‘Öê�Öê, ×¾Ö×¾Ö¬Ö -Ö´ÖŸÖꓵÖÖ ÃÖ»ÖÖêÆü Ó“Ö ¾Ö ³Öæßָü ™üÖŒµÖÖÓ“Öê ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ×¾Ö×¾Ö¬Ö ¾µÖÖÃÖÖ“Öß ¯Öß¾ÆüßÃÖß ¯ÖÖ‡Ô Ö ×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖÖ ¯Öã¸ü¾Ö�Öê ™üÖ&ú�Öê ¾Ö •ÖÖê›ü�Öê ¾Ö µÖÖê•Ö−ÖÖ ‹&ú ¾ÖÂÖÔ “ÖÖ»Ö×¾Ö�Öê ‡. &úÖ´ÖÖ&ú׸üŸÖÖ ×¤ü−ÖÖÓ&ú 6/07/2012 ¸üÖê•Öß ¤ãü. 12.00 ¾ÖÖ•ÖŸÖÖ ×−Ö×¾Ö¤üÖ ¯Öæ¾ÖÔ ²Öîšü&ú ‘Öê�µÖÖŸÖ †Ö»Öß ÃÖ¤ü¸ü ²Öîšü&úßÃÖ )ÖÖ»Öᯙ †×¬Ö&úÖ¸üß ¾Ö šêü&êú¤üÖ¸ü ˆ¯ÖÛÃ£ÖŸÖ ÆüÖêŸÖê.
†. �Î ú. †×¬ Ö�ú Ö- µ ÖÖÓ“ Ö ê −ÖÖ Ó¾ Ö ¯Ö¤ ü−ÖÖ´ Ö
1 ÁÖß. −Ö¸ëü¦ü &êú¸ü&ú¸ü ´Öã)µÖ †×³ÖµÖÓŸÖÖ(•Ö¾µÖ)
2 ÁÖß. ‹ÃÖ. •Öß. &úÖ×»Ö&êú, †¬Öß-Ö&ú †×³ÖµÖÓŸÖÖ ,´ÖÓ›üôû †Öî¸Óü ÖÖ²ÖÖ¤ü
3 ÁÖß. ÃÖß.•Öß. ÃÖÖê−ÖÖ¾Ö�Öêü, ¯ÖϳÖÖ¸üß &úÖµÖÔ&úÖ¸üß †×³ÖµÖÓŸÖÖ,×¾Ö.−ÖÖ׿Ö&ú
4 ÁÖß. ›üß.²Öß. ¯ÖÖ™üᯙ ¾Ö׸üšü »Öê)ÖÖ †×¬Ö&úÖ¸üß
5 ÁÖß. ‹ÃÖ.‹»Ö.¸üÖê&ú›êü ˆ¯Ö †×³ÖµÖÓŸÖÖ (•Ö¾µÖ)
6 ÁÖß. ¾Æüß.¾ÖÖµÖ.»ÖÖê™ü�Ö&ú¸ü ×¾Ö³ÖÖ ÖßµÖ »Öê)ÖÖ¯ÖÖ»Ö(•Ö¾µÖ)
7 ÁÖß. •Öê.‹´Ö. )Ö¸êü ˆ¯Ö †×³ÖµÖÓŸÖÖ (•Ö¾µÖ) ´ÖÖ»Öê ÖÖÓ¾Ö
�Óú¡ ÖÖ™ü¤ üÖ ¸ü Ø�ú¾ Ö Ö Ÿµ ÖÖ“ Öê ¯ÖÏ ×Ÿ Ö×− Ö ¬ Öß
1 ¯ÖÏןÖ×−Ö¬Öß, ´Öê. †Ö¸ü.‹. ‘Öã»Öê, ¯ÖÖ»Ö‘Ö¸ü
2 ¯ÖÏןÖ×−Ö¬Öß, ´Öê. ´ÖÓ Ö»Ö¤üÖÃÖ ‡−±ÏúÖ™êü&ú ¯ÖÏ.×»Ö.¯Öã�Öê
ÃÖ¤ü¸ü ²Öîšü&úßŸÖ ¾Ö üᯙ &úÖ´ÖÖ“µÖÖ ×−Ö×¾Ö¤üÖ²ÖÖ²ÖŸÖ &Óú¡ÖÖ™ü¤üÖ¸üÖ&ú›æü−Ö ˆ¯ÖÛÃ£ÖŸÖ &ú¸ü�µÖÖŸÖ †Ö»Öê»Öê ´Öã§êü ¾Ö µÖÖÓ−ÖÖ
´Ö•Ö߯ÖÏÖŸÖ±ìú ¤êü�µÖÖŸÖ †Ö»Öê»ÖÖ )Öã»ÖÖÃÖÖ ŸÖÃÖê“Ö ´Ö.•Öß.¯ÖÏÖ. ´ÖÖ±ÔúŸÖ &úÖÆüß ´ÖãªÖ²ÖÖ²ÖŸÖ(Errata) ¿Ö㬤üß¯Ö¡Ö &ú¸ü�µÖÖŸÖ †Ö»Öê †ÃÖæ−Ö ¯ÖÏ¯Ö¡Ö ÃÖÖê²ÖŸÖ •ÖÖê›ü»Öê †ÖÆêü. ÃÖ¤ü¸ü ¿Ö㬤üß¯Ö¡Ö (Errata) ÃÖ¾ÖÖÔ−Öã´ÖŸÖê ´ÖÖ−µÖ &ú¸ü�µÖÖŸÖ †Ö»Öê. ²Öîšü&úßŸÖ ˆ¯ÖÛã֟ÖÖÓ“Öê †Ö³ÖÖ¸ü ´ÖÖ−Öæ−Ö ²Öîšü&ú ÃÖÓ¯Ö®Ö &ú¸ü�µÖÖŸÖ †Ö»Öß.
Sub work No.7 :- Mechanical part Item No.1 :-EEC Mark Bulk water meter ( As per shedule B)
Providing, installing and giving satisfactory field testing of various mm dia. Flanged ends
bulk water meter EEC mark without remote reading facility with FGI 250 cast iron body or
suitable moc class B conforming to ISO 4064 marked to read in metric system, alongwith
manufactureres test and guarantee certificate including cost of materials and labour etc
complete.
One Bulk water meter of each size shall be got calibrated from a) FCRI Palakkad, b) IDEMI
Mumbai c )CWPRS Pune d) Any other instiute approved by MJP and calibration certificate
shall be produced. The manufacturer test certificate guaranty card for all meters.
Item No.2 :- C.I. Stainers :- C.I. strainers T Basket type with flanged end and stainless steel
or brass mesh with opening of 2.50 MM to 3.00MM and suitable for operating pressure of
6kg/cm2
Item No. :- M.S. specials – Providing and supplying ISI standard MS specials of required
thickness with 3 coats of approved make epoxy paint from outside & inside including all
taxes, octroi, inspection charges, transportation to site etc. complete.
Item No.3 :- Mechanical Joints –
Manufacturing supplying of C.I. Mechanical compression flanged/ socket tail pieces suitable
for making flanged connection with the plain barrel of C.I. spun pipes ( As per IS 1538/2001)
and D.I pipes as per IS 8329/2000) . The tail pieces to be supplied complete with sealing
rubber gasket of SBR cast iron follower glands and mild steel nut bolts. The whole assembly
should be mechanically and hydraulically tested to the provision as laid down in IS
1538/1993. The rates are inclusive of cost of material of warding charges sales tax, loading,
transportation and unloading at departmental store etc. complete as directed.
Item No.4 :- House connection with domestic meter –
For the existing house connections only, water meter is to be supplied and to be fixed at the
appropriate location preferebly near / in the premises, house or as directed by engineer-in-
charge.
Providing, installing & giving satisfactory field testing of domestic water meter horizontal
inferential multi jet type with magnetic type with magnetic drive and dry dial suitable for
ambient 50 degree calicoes temp. to be sealed against tempering complete with coupling at
both end confirming to class B along with manufacture test certificate and guaranty
certificate including cost of all material and labour. The rate includes providing and
supplying 15MM dia water meter on existing consumer connection, with required labour
charges etc complete. The water meter shall be ISI mark confirming to IS 779/1994. The
works shall be carried out as directed by engineer-in-charge. 10% of meter quantity shall be