Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai – 400051] Website: www.mahadiscom.in PUBLIC NOTICE Comments / Suggestions on MSEDCL’s Annual Performance Review (APR) Petition for FY 2007-08 under MYT framework, truing up for FY 2006-07 and determination of ARR and tariff for FY 2008-09 (MERC Case No 72 of 2007) 1. The MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (MSEDCL) had filed the original Petition on January 11, 2008, for Approval of Annual Performance Review (APR) for FY 2007-08 under the MYT framework, truing up for FY 2006-07 and determination of ARR and tariff for FY 2008-09 before the Maharashtra Electricity Regulatory Commission under the provisions of Electricity Act, 2003 and MERC (Terms and Conditions of Tariff) Regulations, 2005, which was admitted by the Commission for hearing on 14.01.2008. MSEDCL had published a Public Notice under Section 64 (2) of the Act on admission of the Petition. 2. The petition filed by MSEDCL on 11 th Jan 2008 sought a significant increase in revenue requirement as it had captured the impact of the deductions made by the GoM. MSEDCL and GoM both being concerned about the possible steep rise in tariff, a spontaneous consultative dialogue was opened between the two. MSEDCL trusted its efforts to showcase its inability to carry the cost of the deductions from subsidy payments as the liabilities were not in the books of accounts of MSEDCL after restructuring of MSEB. The discussions has resulted in a situation that the GoM has taken cognizance of the difficulties of MSEDCL. Government of Maharashtra vide its letter No. Reforms 2008/C.R. 44/NRG-3 dated 1 st March 2008, has agreed to bear the liabilities pertaining to principal & interest on loans taken by the erstwhile M.S. Electricity Board prior to restructuring, i.e. prior to 6th June 2005, along with other liabilities like State Government Bonds, Loan from Power Finance Corporation, Banks and others, Repayment under Central Plan Allocation and CPSU Bonds, as approved by the cabinet on 20 th May 2005.
Transcript
Page 1: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 1 of 30

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED[Plot No. G-9, Prakashgad, Bandra (E), Mumbai – 400051]

Website: www.mahadiscom.in

PUBLIC NOTICE

Comments / Suggestions on MSEDCL’s Annual Performance Review (APR) Petitionfor FY 2007-08 under MYT framework, truing up for FY 2006-07 and determination

of ARR and tariff for FY 2008-09 (MERC Case No 72 of 2007)

1. The MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (MSEDCL) had filed the original Petition on January 11,2008, for Approval of Annual Performance Review (APR) for FY 2007-08 under the MYT framework, truing up for FY 2006-07 and determination ofARR and tariff for FY 2008-09 before the Maharashtra Electricity Regulatory Commission under the provisions of Electricity Act, 2003 and MERC(Terms and Conditions of Tariff) Regulations, 2005, which was admitted by the Commission for hearing on 14.01.2008. MSEDCL had published aPublic Notice under Section 64 (2) of the Act on admission of the Petition.

2. The petition filed by MSEDCL on 11th Jan 2008 sought a significant increase in revenue requirement as it had captured the impact of the deductions madeby the GoM. MSEDCL and GoM both being concerned about the possible steep rise in tariff, a spontaneous consultative dialogue was opened betweenthe two. MSEDCL trusted its efforts to showcase its inability to carry the cost of the deductions from subsidy payments as the liabilities were not in thebooks of accounts of MSEDCL after restructuring of MSEB. The discussions has resulted in a situation that the GoM has taken cognizance of thedifficulties of MSEDCL. Government of Maharashtra vide its letter No. Reforms 2008/C.R. 44/NRG-3 dated 1st March 2008, has agreed to bear theliabilities pertaining to principal & interest on loans taken by the erstwhile M.S. Electricity Board prior to restructuring, i.e. prior to 6th June 2005, alongwith other liabilities like State Government Bonds, Loan from Power Finance Corporation, Banks and others, Repayment under Central Plan Allocationand CPSU Bonds, as approved by the cabinet on 20th May 2005.

Page 2: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 2 of 30

3. Under the circumstances described above, MSEDCL has now filed its Revised Petition on 13.02.2008 after removing the impact of deductions by GoM.It is to be noted that the proposed tariff schedule in the current petition has also undergone little change with proposed introduction of two new categories.Therefore, the petitions filed by MSEDCL for Annual Performance Review of FY 2007-08 and for determination of ARR and Tariff for FY 2008-09 on30/11/2007 and 11/01/2008 stands modified accordingly. The Commission has admitted the revised Petition for hearing on 05.03.2008, and directedMSEDCL to publish the Public Notice under Section 64 (2) of the Act on admission of the Petition.

4. The salient features of the Petition are provided below:

Table 1: Aggregate Revenue Requirement of MSEDCL (Rs. Crore)Previous Year(FY 2006-07)

Current Year(FY 2007-08)

Ensuing Year(FY 2008-09)Sl. No Particulars

MERC Order Audited MERCOrder

RevisedEstimate

MERCOrder Projections

1 Power Purchase Expenses 13632 14925 14633 13546 12415

2 Operation and maintenance Expenses 1893 2490 2047 2263 2157 2507

2.1 Employee Expenses 1445 1926 1572 1644 1657 1791

2.2 Administration and General Expenses 108 148 116 172 122 235

2.3 Repair and Maintenance Expenses 340 416 359 447 378 481

3Depreciation, including advance againstdepreciation 352 608 389 417 435 463

4 Interest on Long-term Loan Capital 314 261 422 323 679

5Other Interest and Finance Charges,including Working Capital interest

256185 285 255 285 274

6 Provision for Bad Debts 207 299 267 279 276 269

7 Other Expenses 41 6 2 5 2 5

Page 3: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 3 of 30

Previous Year(FY 2006-07)

Current Year(FY 2007-08)

Ensuing Year(FY 2008-09)Sl. No Particulars

MERC Order Audited MERCOrder

RevisedEstimate

MERCOrder Projections

8 Income tax 0 86 86 86 86

9 Transmission Charges paid/payable 1280 1352 1460 1471 1472

10 Contribution to Contingency Reserves 50 50 50 53 56 63

11 Incentives / Discounts 166 72 66 75 72 79

12Interest on WC due to shortfall inCollection Efficiency

67 53

13 Prior Period Expenses 38

14 Total Revenue Expenditure 17,877 20338 19530 18938 18364

15 Add: Return on Equity Capital 391 518 409 563 430 635

16 Less: Non tariff Income 734 887 953 904 1072 1074

17 Aggregate Revenue Requirement 17,534 19969 18986 18597 17925

Table 2: Truing up for FY2006-07Rs. Crore

Particulars MSEDCL Petition MERC Approved FY 2006-07 Actual True –up Amount

Net Annual Revenue Requirement 20,635 17,534 19,968 2,434

Revenue from Sale of Power 18,942 17,170 18,863 1,693

Page 4: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 4 of 30

Revenue Gap / (Surplus) 1,693 364 1,105 741

Revenue Adjustment from surplus of FY 05 -137 -137 0

Revenue Adjustment from surplus of FY 06 -227 227

Remaining Revenue gap / (Surplus) 1,693 0 968 968

Revenue Gap Calculation of FY 2007-08

Rs CroreAmount

Particulars

Estimated Revenue requirement for FY 2007-08 18,597

Estimated Revenue from Sale of Power 18194

Estimated Revenue Gap for FY 2007-08 403

Table 3: Revenue at Existing Tariffs (Rs. Crore)

Previous Year (FY 2006-07) Current Year (FY 2007-08) Ensuing Year (FY 2008-09)Sl. Particulars

MERC Order Audited MERC Order Revised Estimate Projected1 Revenue 17,170 18,863 18194 17143

Page 5: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 5 of 30

Table 4: Energy Balance for FY 2006-07, FY 2007-08 and FY 2008-09

Particulars Units FY 2006-07 FY 2007-08 FY 2008-09

Purchase from MSPGCL MUs 46,383 46,137 46,947

Purchases from other sources within the State MUs 3,601 7,741 13,976

Total Purchase from within the State MUs 49,984 53,878 60,923

Effective gross purchase from outside the State MUs 25,537 25,072 26,943Central Generating Station MUs 18,950 20,423 21,578

UI MUs 1,786 399 0

Kawas/ Gandhar/ Traders MUs 4,802 4,251 5,365

Inter-State transmission losses % 4.75% 4.98% 5.16%

Net purchase from outside the State MUs 24,325 23,838 25,552

Total Power Purchase payable MUs 75,521 78,951 87,866

Energy at Transmission Periphery MUs 74,310 77,716 86,475Intra- State Losses % 4.85% 4.85% 4.85%

Energy at Distribution Periphery MUs 70706 73947 82281Distribution losses % 30.5% 26.5% 22.5%

Energy available for Sales MUs 49147 54358 63776

Table 5: Trajectory of Operational Parameters (Distribution Losses and Collection Efficiency)Distribution Losses (%) Collection Efficiency (%)Sl. No Particulars

FY 2006-07 FY 2007-08 FY 2008-09 FY 2006-07 FY 2007-08 FY 2008-09

Page 6: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 6 of 30

Actual Estimated Projected Actual Estimated Projected1 MSEDCL 30.5% 26.5% 22.5% 94.07% 95.07% 96.07%

Table 6: MSEDCL’s Capacity addition plan (Figures in Rs. Crore)Expenditure Planned & Capitalisation Projected

Sl.No

Name of ProjectEstimated

Cost

Expenditureincurred tillFY 2006-07 FY 2007-08 FY 2008-09

Expenditure Capitalisation Expenditure CapitalisationAPDRP 1748.88 515.48 265.7 265.68 967.7 1255.6

Phase-I 1136.54 515.48 52.0 52.0 569.1 856.9Phase-II 359.58 0.00 213.7 213.7 145.9 145.9

Phase-III 252.76 0.00 252.8 252.8Infra plan Works 10612.51 243.14 600.00 483.1 3000.0 1560.0Gaothan Feeder Separation Scheme 2572.31 269.29 650.0 493.4 1653.0 1077.5

Gaothan Feeder Separation Scheme-I 1126.31 269.29 400.0 267.4 457.0 356.2Gaothan Feeder Separation Scheme-II 1446.00 0.00 250.0 226.0 1196.0 721.3

Automatic Meter Reading 84.00 0.00 41.00 41.00 20.0 20.0DPDC & others 1042.34 476.89 338.90 476.9 158.5 338.9

DPDC / Non-Tribal 88.76 42.09 46.7 42.1 0.0 46.7DPDC / SCP 56.35 16.57 39.8 16.6 0.0 39.8DPDC / TSP + OTSP 64.30 31.35 33.0 31.4 0.0 33.0

Page 7: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 7 of 30

Expenditure Planned & Capitalisation ProjectedSl.No

Name of ProjectEstimated

Cost

Expenditureincurred tillFY 2006-07 FY 2007-08 FY 2008-09

Expenditure Capitalisation Expenditure CapitalisationSPA:PE 635.60 282.98 164.5 283.0 131.7 164.5P:SI 113.44 74.28 15.0 74.3 16.9 15.0P:IE 83.89 29.62 40.0 29.6 9.9 40.0

RGGVY 419.90 0.00 26.52 25.5 173.0 165.6On-going REC & PFC distribution Schemes 457.76 187.89 105.2 107.7 86.4 109.7

P.F.C. Urban Distribution Scheme 206.51 136.00 42.3 40.0 28.2 46.5MIDC Interest free Loan Scheme 150.00 40.47 40.0 44.8 30.0 35.0Evacuation 11.25 1.78 2.9 2.9 3.2 3.2Evacuation Wind Generation 90.00 9.64 20.0 20.0 25.0 25.0

Ag. Metering 766.00 0.00 0.00 0.00 383.0 383.0 JBIC 19.77 2.88 16.89 11.99 0.0 5.9

Fixed Capacitor scheme. 19.82 0.00 7.50 6.63 12.3 13.2DTC metering 95.59 65.29 30.30 30.30 0.0 0.0MIS ( Communication backbone ) 138.83 28.98 71.60 59.50 20.0 34.2DRUM 167.81 0.00 40.00 40.00 127.8 127.8R & M ( Load Management) 62.15 2.54 59.61 30.00 0.0 32.2Total 18207.67 1792.38 2253.2 2071.7 6601.7 5123.5

Page 8: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 8 of 30

Table 7: Aggregate Revenue Gap of MSEDCL for FY 2007-08 and FY 2008-09 (Rs. Crore)

Sl. Particulars FY 2007-08* FY 2008-091 Annual Revenue Requirement 18,597 17925

2 Revenue from Existing tariff 18194 17143

3 Revenue gap 403 782

4True up amount for FY 2006-07 (after considering gains and losses due tocontrollable/ uncontrollable factors)

968

5 Total Additional Claims 886 Requirement on Account of Pending Claims 10777 Revenue Gap in respective years 403 2915

Net Revenue Requirement of FY 2008-09Sl. Particulars FY 2008-091 Revenue Gap at Existing tariff 2915

2Provisional True-Up Requirement of FY 2007-08(according to the requirement of Hon’ble MERC during Technical validation)

403

4 Net Revenue Requirement 3319

5. MSEDCL has proposed to introduce two new consumer categories - Power looms and Flour Mills separated from LT V industry.

Page 9: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 9 of 30

a) LT-V: Power Loom

MSEDCL proposes that this category will be applicable for power loom industry operating in a common shed or individual shed, and using electricity

for the purpose of power loom industry, including Humidification Plant, Kandi Machine, Compressor, etc. This tariff will not be applicable for

consumers doing job works. Also, it should be noted that the subsidised tariff should not be applicable to a consumer having only the other allied

machinery of weaving preparatory without any power loom.

Any industry having any or all of the following activities/machinery is a weaving preparatory unit and can be considered as eligible for power loom

tariff, provided the said industry does also have weaving machinery (Power looms), In other words, an industry having any or all of the following

mentioned weaving preparatory machinery and do not have power looms in the same premises under one roof, then such industry shall not be eligible

for Power loom tariff. Further the following list of machinery may not be an exhaustive list and may also include such other machinery necessary for

weaving preparatory

1. Single yarn Sizing

2. Twist Sizing

3. Warping

4. Pirn Winding

5. Twisting

6. Yarn Dying

7. Humidification Plant

8. Dust Separator etc.

b) LT-V: Flour mills

Page 10: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 10 of 30

MSEDCL proposes that this category will be applicable for Flour Mills operating in a common shed or individual shed, and using electricity for the

purpose of Flour Mills. This tariff will be applicable to Flour mill operating at 0 to 10 HP. This tariff will be applicable to all the flour mills excluding

Masala Mills, Rice Mills, etc.

The retail tariff proposed by MSEDCL is summarized below:

HT Tariff

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

HT Category

HT I -IndustriesHT I- (ExpressFeeders) 300 310 450 500 364 500 4.77 6.69 40%

HT I- (NonExpressFeeders)

300 340 450 460 362 470 4.13 5.51 34%

HTII - SeasonalCategory 300 435 345 500 435 500 5.79 6.66 15%

TODConsumption

Page 11: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 11 of 30

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

2200 Hrs-0600Hrs -85 -85

0600 Hrs-0900Hrs & 1200Hrs- 1800Hrs

0 0

0900 Hrs-1200Hrs 80 80

1800 Hrs-2200Hrs 110 110

HT IIIRailways 415 680 432 580 4.44 5.82 31%

HT IV- PublicWater Works(PWW)

3.48 2.18 -37%

Express Feeders 300 300 100 200 357 200Non-ExpressFeeders 300 320 100 200 344 200

HTV -Agricultural 25 160 25 160 160 160 1.78 1.78 0%

HT VI - BulkSupply 3.27 4.75 45%

Page 12: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 12 of 30

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

ResidentialComplex 150 260 160 380 260 401

CommercialComplex 150 450 160 620 450 599

Mula PravaraElectric Co-opSociety(MPECS)

200 300 100 150 300 150 3.52 1.76 -50%

Note: Rounding of energy charges to nearest multiple of 10 and fixed charges nearest multiple of 5.

LT Tariff

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

LT Category

Domestic (LT1)

Page 13: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 13 of 30

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

BPL (0-30Units) 3 40 3 40 40 40 0.42 0.42 0%

Consumption> 30 Units PerMonth

3.58 3.84 7%

0-100 Units 30 200 30 210 200 210 2.64 2.77 5%101-300 Units 30 370 30 400 370 400 3.94 4.23 8%301-500 Units 30 500 35 550 500 541 5.10 5.51 8%Above 500Units 100 575 115 660 575 631 5.88 6.46 10%

Three PhaseConnection 100 100

Additional fixed charge of Rs 100 per 10 kW load or part thereof above 10kW load shall be payableNon Domestic(LT II) 5.49 5.97 9%

0-100 Units 90 320 95 340 320 340101-200 Units 90 400 95 430 400 443Above 200units 100 560 300 600 560 579

Three PhaseConnection 150 150

Additional fixed charge of Rs 150 per 10 kW load or part thereof above 10kW load shall be payable

LT VIIIAdvertisementand Hoarding

400 1,400 430 1,510 1,400 1510 14.43 15.58 8%

Page 14: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 14 of 30

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

LT V -Industries 4.23 4.89 16%

0-20 KW 150 300 190 310 300 380Above 20 KW 100 400 130 520 400 511

TODConsumption2200 Hrs-0600Hrs -85 -85

0600 Hrs-0900Hrs &1200 Hrs-1800Hrs

0 0

0900 Hrs-1200Hrs 80 80

1800 Hrs-2200Hrs 110 110

LT V -Powerloom 4.23 4.23 0%

0-20 KW 150 300 300Above 20 KW 100 400 400

LT V -FlourMills 150 300 300 3.37 3.37 0%

Page 15: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 15 of 30

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

Public WaterWorks (LT III) 1.81 1.17 -36%

0-20 kW 50 125 15 110 125 11020-40 kW 60 175 15 110 175 11040-50 kW 90 250 15 110 250 110Agriculture(LT IV)UnmeteredTariff 1.85 1.85 0%

Zones withConsumptionnorm <1318hrs/HP annum

150 150

Zones withConsumptionnorm >1318hrs/HP/annum

180 180

Metered Tariff(IncludingPoultry Farms)

15 110 15 110 110 110 1.23 1.23 0%

Street Light(LT VI) 2.65 2.65 0%

Page 16: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 16 of 30

Existing Tariff Proposed Tariff Average Energy Chargeincluding ASC Charges

Average Billing Rate and PercentageIncrease

CategoriesFixed / Demand

Charge(Rs /service

connection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Fixed / DemandCharge

(Rs /serviceconnection/ monthor Rs /kVA/ monthor Rs /HP/ month)

EnergyCharge(Paise /kWh)

Existing(Paise/kWh)

Proposed(Paise/kWh)

ExistingBilling Rate(Rs/KWh)

ProposedBilling Rate(Rs./KWh)

PercentageIncrease (%)

Grampanchayat,A, B & C ClassMunicipalCouncil

30 230 30 230 230 230

MunicipalCorporationAreas

30 270 30 270 270 270

LT VII-TemporaryConnection

10.78 10.80 0%

TemporaryConnections(OtherPurposes)

250 1,050 270 1,050 1,050 1,050

TemporaryConnections(Religious)

200 200 215 220 200 220

LT IX -Multiplexes &ShoppingMalls

300 850 325 920 850 920 9.55 10.32 8%

Note: Rounding of energy charges to nearest multiple of 10 and fixed charges nearest multiple of 5.

6. The voltage-wise wheeling charges and wheeling losses proposed by MSEDCL for FY 2008-09 is summarized below:

Page 17: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 17 of 30

Voltage Level Unit Wheeling Losses Wheeling Charges

33 kV Level Rs/KW/Month 6% 269

22/11 kV level Rs/KW/Month 9% 316

LT level Rs/KW/Month 26.5% 29

7. Load Shedding versus purchase of costly powerFY 2006-07Load Shedding protocol effective from 21st January 2006 till 6th Feb 2007

Groups Urban & industrial Agglomeration Other Region Ag. Dominated

Hrs. Hrs. Hrs.A 2.5 4.5 11B 3 5 11.5C 3.5 5.5 12D 4 6 12

Load Shedding protocol effective from 7th Feb 2007 till 4th March 2007

Page 18: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 18 of 30

Groups Urban & industrial Agglomeration Other Region Ag. Dominated

Hrs. Hrs. Hrs.A 3.5 6.5 13B 4 7 13.5C 4.5 7.5 14D 5 8 14

Load Shedding protocol effective from 5th March 2007 till 25th April 2007

Groups Urban & industrial Agglomeration Other Region Ag. Dominated

Hrs. Hrs. Hrs.A 4 6 13B 4.5 6.5 13.5C 5 7 14D 5.5 7.5 14

Load Shedding protocol effective from 26th April 2007 till 22nd May 2007

Page 19: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 19 of 30

Groups Urban & industrial Agglomeration Other Region Ag. Dominated

Hrs. Hrs. Hrs.A 4.5 6.5 14B 5 7 14.5C 5.5 7.5 15D 6 8 15

Load Shedding protocol effective from 23rd May 2007 till date

Groups Urban & industrial Agglomeration Other Region Ag. Dominated

Hrs. Hrs. Hrs.A 3 5 10.5B 3.75 5.5 11C 4.5 6 11.5D 5.25 6.5 12

a. Relationship of load shedding with costly power purchase and hence with ASC

Page 20: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 20 of 30

The basic premise of ASC was that consumers benefiting from the reduced load shedding hours vis-à-vis the uniform load sheddinghours should pay for the costly power procured to mitigate load shedding, through Additional Supply Charge in addition to the baseretail tariffs. Details are available in chapter of ASC contained in APR petition.

b. Extent of load shedding if the costly power purchase is not undertaken – month-wise projections for FY 2008-09§ Considering all sources

Considering availability from all sources (in Hrs)

MONTH Group Urban & Industrial agglomeration Other region Ag. Dominated*

A 3.00 5.00 10.5B 3.75 5.5 11C 4.5 6 11.5

APRIL--08

D 5.25 6.5 12A 2.75 4.75 10.00B 3.5 5.25 10.5C 4.25 5.75 11

MAY--08

D 5 6.25 11.5A 1.50 3.00 6.50B 2.25 3.5 7C 3 4 7.5

JUNE—08/July’08/Aug’08

D 3.75 4.5 8

A 2.25 4.00 8.50

B 3 4.5 9C 3.75 5 9.5

SEPTEMBER—08/ Oct’o8

D 4.5 5.5 10

Page 21: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 21 of 30

Considering availability from all sources (in Hrs)

MONTH Group Urban & Industrial agglomeration Other region Ag. Dominated*

A 2.75 4.75 10.00B 3.5 5.25 10.5C 4.25 5.75 11

NOVEMBER—08/December’08

D 5 6.25 11.5A 2.25 4.00 0.00B 3 4.5 0.00C 3.75 5 0.00

JANUARY--09

D 4.5 5.5 0.00A 3.00 5.00 0.00B 3.75 5.5 0.00C 4.5 6 0.00

FEBRUARY—09/March’08

D 5.25 6.5 0.00

Note : *RCI Consumers in Agri- Dominated areas will be benefited by reduced load shedding and will get power as per LS protocol of Otherregions

§ Considering RGPPL as costly power, Costly Power not undertaken

Considering availability without costly power (in Hrs)

Page 22: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 22 of 30

MONTH Group Urban & Industrialagglomeration Other region Ag. Dominated*

A 6.75 10.25 15.0

B 7.5 10.75 15.5

C 8.25 11.25 16

D 9 11.75 12

APRIL--08

Additional one day staggering to Industries(Weekly)A 5.50 8.50 14.50

B 6.25 9 15

C 7 9.5 15.5

D 7.75 10 16

MAY—08

Additional one day staggering to Industries(Weekly)A 3.25 5.25 11.50B 4 5.75 12C 4.75 6.25 12.5

D 5.5 6.75 13JUNE—08

Additional one day staggering to Industries( Fortnightly)

A 3.50 5.75 12.00

B 4.25 6.25 12.5

C 5 6.75 13JULY—08

D 5.75 7.25 13.5

Page 23: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 23 of 30

Considering availability without costly power (in Hrs)

MONTH Group Urban & Industrialagglomeration Other region Ag. Dominated*

Additional one day staggering to Industries(Weekly)

A 3.50 5.75 12.50

B 4.25 6.25 13

C 5 6.75 13.5AUGUST--08

D 5.75 7.25 14

Additional one day staggering to Industries(Weekly)

A 3.75 6.00 13.00

B 4.5 6.5 13.5

C 5.25 7 14SEPTEMBER--08

D 6 7.5 14.5

Additional one day staggering to Industries(Weekly)

A 5.00 7.75 14.50

B 5.75 8.25 15

C 6.5 8.75 15.5

OCTOBER--08

D 7.25 9.25 16

Page 24: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 24 of 30

Considering availability without costly power (in Hrs)

MONTH Group Urban & Industrialagglomeration Other region Ag. Dominated*

Additional one day staggering to Industries(Weekly)A 7.00 10.50 14.50

B 7.75 11 15

C 8.5 11.5 15.5

D 9.25 12 16

NOVEMBER--08

Additional one day staggering to Industries(Weekly)A 6.75 10.25 14.50

B 7.50 10.75 15.00

C 8.25 11.25 15.50

D 9.00 11.75 16.00

DECEMBER--08

Additional one day staggering to Industries(Weekly)A 6.50 10.00 0.00

B 7.25 10.5 0.00

C 8 11 0.00

D 8.75 11.5 0.00

JANUARY--09

Additional one day staggering to Industries(Weekly)FEBRUARY--09 A 7.50 11.25 0.00

Page 25: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 25 of 30

Considering availability without costly power (in Hrs)

MONTH Group Urban & Industrialagglomeration Other region Ag. Dominated*

B 8.25 11.75 0.00

C 9 12.25 0.00

D 9.75 12.75 0.00Additional one day staggering to Industries(Weekly)

A 8.50 12.50 0.00

B 9.25 13.00 0.00

C 10.00 13.50 0.00

D 10.75 14.00 0.00

MARCH--09

Additional one day staggering to Industries(Weekly)

Note : *RCI Consumers in Agri- Dominated areas will be benefited by reduced load shedding and will get power as per LS protocol of Otherregions

MSEDCL would like to submit that if RGPPL is considered as non-costly source than the higher cost of RGPPL power would have to borne by all thecategories of consumers who are actually not benefited from the reduce load shedding. Hence, MSEDCL has considered RGPPL as costly source, so thatconsumers benefiting from the reduced load shedding hours vis-à-vis the uniform load shedding hours should pay for the costly power procured to mitigateload shedding.

Page 26: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 26 of 30

c. The ASC matrix proposed, for different hours of load shedding, based on the costly power purchase being projected, for both the above scenarios

ASC matrix considering RGPPL as Costly SourceASC MATRIX

HT-I Industry

Industry On express feeder having no staggering day 52.82%

Industry (Not on express feeder) 38.93%

HT III –RAILWAY 52.66%

LT-V Industry 37.32%

LT Domestic , LT Non Domestic and HT VI Bulk Supply in Industrial & Urban AgglomerationArea

21.35%

LT Domestic , LT Non Domestic and HT VI Bulk Supply in Other Regions13.33%

8. Regulatory Liability Charges (RLC)The issue pertaining to Regulatory Liability Charges is subjudice. Without prejudice to its rights, MSEDCL submits the present status which is as under:-

(a) Vide MERC Order dated 18-5-2007 and subsequent Clarificatory Order dated 24-8-2007, MERC had given directions for refund of RLC.

(b) MSEDCL had preferred an appeal against the original Order dated 18-5-2007 in the Appellate Tribunal, New Delhi.

Page 27: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 27 of 30

(c) MSEDCL had preferred a Review Petition before the Hon’ble Commission against the Clarificatory Order dated 24-8-2007.

(d) MERC vide its Order dated 1-11-2007 rejected the Review Petition of MSEDCL.

(e) MSEDCL preferred an appeal against this rejection Order of MERC along with the earlier Orders.

(f) The Appellate Tribunal vide its Order dated 23-01-2008 directed MERC to hear the Review Petition of MSEDCL.

In view of above-mentioned judgement of the Appellate Tribunal, MSEDCL has submitted on 06th February 2008 that MSEDCL’s review petition dated 24th

September 2007 needs to be heard by the Hon’ble Commission. In view of the above-mentioned facts, it is humbly submitted that the RLC issue may bedealt separately.

9. Copies of the following documents can be obtained on written request from the Offices of MSEDCL mentioned below, and all divisional offices ofMSEDCL:a) Executive Summary of the proposals (free of cost, in Marathi or English)b) Detailed Petition documents along with CD (in English) (on payment of Rs 250/- in cash or by DD/ Cheque drawn on MAHARASHTRA STATE

ELECTRICITY DISTRIBUTION COMPANY LIMITED payable at Mumbai).c) Detailed Petition documents (in English) (on payment of Rs. 200/-).d) CD of detailed Petition document (in English) (on payment of Rs. 50/-).

Head Office: Superintending Engineer (TRC)5th Floor, Prakashgad,Plot No. G-9, Bandra (E),Mumbai – 400 051

Telephone No. 022 - 26476843 Fax No. 022 - 26475012

e-mail : [email protected]

Page 28: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 28 of 30

Other Offices:

1. The Chief Engineer(O&M), MSEDCL, Bhandup Urban Zone,Vidhyut, L.B.Marg,Bhandup, Mumbai-400078 STD Code- 022,Phone : 25663984 Fax: 25663990E-mail : [email protected]

2. The Chief Engineer(O&M), MSEDCL, Kalyan Zone,Tejashree, Jahangir Maidan, Karnik Road,Kalyan-421301 STD Code-0251,Phone : 2328283, Fax:2329488E-mail : [email protected]

3.The Chief Engineer(O&M),MSEDCL, Konkan Zone,Ratnagiri,New Adm.Bldg., Nachane Road,Ratnagiri-415639 STD Code-02352Phone :222049 Fax: 226504E-mail: [email protected]

4. The Chief Engineer(O&M),MSEDCL, Adm.Bldg.,Tarabai Park, Kolhapur-416003 STD Code-0231Phone :2650581 Fax: 2658060E-mail [email protected]

5. The Chief Engineer(O&M),MSEDCL,77, Adm. Bldg, 1st Floor, Old Power House,Sale lane, Latur Zone, Latur.STD Code-02382Phone : 253866 Fax: 251866E-mail [email protected]

6. The Chief Engineer(O&M),MSEDCL, Aurangabad Zone,Vidyut Bhawan, Dr.BabasahebAmbedkar Marg, Aurangabad-431001STD Code- 0240Phone : 22334065 Fax: 2331056E-mail : [email protected]

7. The Chief Engineer(O&M),MSEDCL, Adm.Bldg., Rasta Peth,Pune-411011STD Code- 020Phone : 26131389 Fax: 26132052E-mail : [email protected]

8. The Chief Engineer(O&M),MSEDCL, Amravati Zone, AkolaVidhyut Bhawan, Ratanlal Plot,Akola-444005STD Code- 0724Phone : 2434476 Fax: 2438025E-mail : [email protected]

9. The Chief Engineer(O&M), MSEDCL, Nagpur Rural Zone,Vidhyut Bhawan, Katol Road,Nagpur-440013STD Code- 0712Phone : 2591976 Fax: 2591927E-mail: [email protected]

Page 29: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 29 of 30

10. The Chief Engineer(O&M), MSEDCL, Nagpur Urban Zone,Prakash Bhawan, Link Road,SadarNagpur-440001STD Code-0712Phone: 2531561 Fax: 2520178E-mail: [email protected]

11. The Chief Engineer(O&M), MSEDCL, Nashik Zone,Vidyut Bhawan, Nashik RoadNashik -422101STD Code-0253Phone: 2462491 Fax: 2461581E-mail: [email protected]

10. The Commission has directed MSEDCL to invite objections or comments from the public on the above Petition through this Notice. Objections orcomments may be sent to the Secretary, Maharashtra Electricity Regulatory Commission, 13th Floor, Centre No. 1, World Trade Centre, Cuffe Parade,Mumbai – 400 005 [Fax : 22163976 : E-mail - [email protected]] by March 30, 2008, along with proof of service on the SE (TRC),MSEDCL. Public is also free to file objections or comments at the time of Public Hearing in the specified formats and in specified number of copies.

11. Every person who intends to file objections or comments can file the same in English or in Marathi, in four copies, and should carry the full name, postaladdress and e-mail address, if any, of the sender. It should be indicated whether the objections or comments is being filed on behalf of any organization ofcategory of consumers. It should also be mentioned if the sender wants to be heard in person, in which case opportunity would be given by theCommission at the Public Hearing to be held at the following venues, for which no separate notice will be given.

Sl. Place /Venue of Public Hearing Date Time1 Amravati

Sant Gyaneshwar Sanskritik Bhavan, Morshi Road, Amravati03.04.2008(Thursday)

11:00 hours

2 NagpurMeeting Hall, Ravi Bhavan, Civil Lines Nagpur

04.04.2008(Friday)

11:00 hours

3 AurangabadMeeting Hall, Office of the Divisional Commissioner, Aurangabad

07.04.2008(Monday)

11:00 hours

4 NashikNiyojan Bhavan, Collector Office Compound, Nashik

09.04.2008(Wednesday)

11:00 hours

Page 30: MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED ... · Page 1 of 30 MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [Plot No. G-9, Prakashgad, Bandra (E), Mumbai

Page 30 of 30

5 PuneMeeting Hall, Office of the Divisional Commissioner, Pune

11.04.2008(Friday)

11:00 hours

6 Navi MumbaiConference Hall, 7th floor CIDCO Bhavan, CBD, Belapur, Navi- Mumbai -400614

16.04.2008(Wednesday)

11:00 hours

Note: In case of any change in the date/venue of the Public Hearing due to any reasons, the same will be intimated through Public Notice

12. Stakeholders should note that objections or comments filed prior to the admission of the revised Petition, i.e., objections or comments filed on theearlier admitted APR Petition of MSEDCL, will not be considered. Stakeholders are requested to file objections or comments on the revisedPetition, in order to be considered.

13. MSEDCL shall reply to each of the objections or comments received within three days of the receipt of the same but not later than April 2, 2008 for allthe objections or comments received till March 30, 2008. Stakeholders can submit their rejoinders on replies provided by MSEDCL either during thepublic hearing/s or latest by April 20, 2008.

14. The detailed Petition document and the executive summary are available on MSEDCL’s website www.mahadiscom.in and the executive summary is alsoavailable on the website of the Commission [http://www.mercindia.org.in] in downloadable format (free of cost).

Signature

Name : Mr Arijit Ghosh

Designation: Director (Finance) MSEDCL


Recommended