The Study on Integrated Water Management in the Republic of Bulgaria Final Report - Main Report Chapter 6 JICA CTI Engineering International Co., Ltd. 6-65 CHAPTER 6 6.1 Main Report Chapter 6 Figures
Transcript
  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-65

    CHAPTER 6

    6.1

    Main Report

    Chapter 6

    Figures

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-66 JICA CTI Engineering International Co., Ltd.

    6.2

    Figure 6.2.1 Present BOD Load in EABD

    Figure 6.2.2 Present BOD Load from Unit Area in EABD

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    Figure 6.2.3 Near Future BOD Load in EABD (with under-constructed and tendering WWTPs)

    Figure 6.2.4 Near Future BOD Load from Unit Area in EABD (with under-constructed and tendering WWTPs)

    JICA CTI Engineering International Co., Ltd. 6-67

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-68 JICA CTI Engineering International Co., Ltd.

    Figure 6.2.5 Present TN Load in EABD

    Figure 6.2.6 Near Future TN Load in EABD

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    Figure 6.2.7 Present TP Load in EABD

    Figure 6.2.8 Near Future TP Load in EABD

    JICA CTI Engineering International Co., Ltd. 6-69

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-70 JICA CTI Engineering International Co., Ltd.

    Figure 6.2.9 Present BOD Loads in WABD

    Figure 6.2.10 Present BOD Loads from Unit Area in WABD

    Fig.

    6.2

    .10

    Pre

    sent

    BO

    D L

    oads

    from

    Uni

    t Are

    a in

    WA

    BD

    Fig

    6.2.

    9 P

    rese

    nt B

    OD

    Loa

    ds in

    WA

    BD

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-71

    Figure 6.2.11 Near Future BOD Loads in WABD with Under-constructed and Tendering WWTPs

    Figure 6.2.12 Near Future BOD Loads from Unit Area in WABD

    Fig.

    6.2

    .12

    Nea

    r Fu

    ture

    BO

    D L

    oads

    fr

    om U

    nit A

    rea

    in W

    AB

    D

    Fig.

    6.2

    .11

    Nea

    r Fu

    ture

    BO

    D L

    oads

    in W

    AB

    D w

    ith

    Und

    er-c

    onst

    ruct

    ed a

    nd T

    ende

    ring

    WW

    TPs

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-72 JICA CTI Engineering International Co., Ltd.

    Figure 6.2.13 Present TN Loads in WABD

    Figure 6.2.14 Near Future TN Loads in WABD

    Fig.

    6.2

    .13

    Pre

    sent

    TN

    Loa

    ds in

    WA

    BD

    Fi

    g. 6

    .2.1

    4 N

    ear

    Futu

    re T

    N L

    oads

    in W

    AB

    D

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-73

    Figure 6.2.15 Present TP Loads in WABD

    Figure 6.2.16 Near Future TP Loads in WABD

    Fig.

    6.2

    .16

    Nea

    r Fu

    ture

    TP

    Loa

    ds in

    WA

    BD

    Fig.

    6.2

    .15

    Pre

    sent

    TP

    Loa

    ds in

    WA

    BD

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-74 JICA CTI Engineering International Co., Ltd.

    Maritsa River: y = 0.3116x + 1902.7R2 = 0.8908

    Tundza River: y = 0.3311x + 880.01R2 = 0.7903

    Arda River: y = 1.3142x + 366.81R2 = 0.9243

    0

    5,000

    10,000

    15,000

    20,000

    25,000

    30,000

    35,000

    40,000

    45,000

    0 20,000 40,000 60,000 80,000 100,000 120,000

    Catchment BOD Load (kg/day)

    Riv

    er B

    OD

    Loa

    d (k

    g/da

    y)

    Maritsa River BasinTundza River BasinArda River Basin

    ME1

    Figure 6.2.17 EABD: Co-relation between Present Catchment BOD Load and River BOD

    Struma River: y = 0.3901x + 510.62R2 = 0.8829

    Mesta River: y = 0.5332x + 89.984R2 = 0.9969

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    0 5000 10000 15000 20000 25000 30000

    Catchment BOD Load (kg/day)

    Riv

    er B

    OD

    Loa

    d (k

    g/da

    y)

    Struma River BasinMesta River Basin

    ME1

    Figure 6.2.18 WABD: Co-relation between Present Catchment BOD Load and River BOD Load

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-75

    Figure 6.2.19 EABD Proposed High Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks

    Figu

    re 6

    .2.1

    9 E

    AB

    D P

    ropo

    sed

    Hig

    h Pr

    iori

    ty T

    owns

    for W

    aste

    wat

    er T

    reat

    men

    t and

    Impr

    ovem

    ent o

    f Sew

    erag

    e N

    etw

    orks

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-76 JICA CTI Engineering International Co., Ltd.

    Figure 6.2.20 WABD Proposed High Priority Towns for Wastewater Treatment and Improvement of Sewarage Networks

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-77

    Figure 6.2.21 EABD Proposed Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks

    Figu

    re 6

    .2.2

    1 E

    AB

    D P

    ropo

    sed

    Hig

    h an

    d M

    ediu

    m P

    rior

    ity T

    owns

    for

    Was

    tew

    ater

    Tr

    eatm

    ent a

    nd Im

    prov

    emen

    t of S

    ewer

    age

    Net

    wor

    ks

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-78 JICA CTI Engineering International Co., Ltd.

    Figure 6.2.22 WABD Proposed High and Medium Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    Figure 6.2.23 Implementation Schedule: Practical Scenario

    JICA CTI Engineering International Co., Ltd. 6-79

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    JICA CTI Engineering International Co., Ltd. 6-80

    Figure 6.2.24 Surveillance and Operational Monitoring Network

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    Figure 6.2.25 Proposed Key and Improvement Monitoring Zones in EABD and WABD

    JICA CTI Engineering International Co., Ltd. 6-81

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    6.3

    Figure 6.3.1 Proposed Irrigation Facilities to be Improved (EABD)

    JICA CTI Engineering International Co., Ltd. 6-82

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-83

    Figure 6.3.2 Proposed Irrigation Facilities to be Improved (WABD)

    Figu

    re 6

    .3.2

    Pro

    pose

    d Ir

    riga

    tion

    Faci

    litie

    s to

    be Im

    prov

    ed (W

    AB

    D)

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-84 JICA CTI Engineering International Co., Ltd.

    DUMMY

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-85

    6.4

    Figu

    re 6

    .4.1

    New

    Qua

    ntita

    tive

    Gro

    undw

    ater

    Mon

    itori

    ng N

    etw

    ork

    Figure 6.4.1 New Quantitative Groundwater Monitoring Network

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-86 JICA CTI Engineering International Co., Ltd.

    Figu

    re 6

    .4.2

    New

    Qua

    litat

    ive

    Gro

    undw

    ater

    Mon

    itori

    ng N

    etw

    ork

    Figure 6.4.2 New Qualitative Groundwater Monitoring Network

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-87

    6.5

    Figure 6.5.1 Ownership and maintenance Responsibility in Bulgaria

    Figu

    re 6

    .5.1

    Ow

    ners

    hip

    and

    mai

    nten

    ance

    Res

    pons

    ibili

    ty in

    Bul

    gari

    a

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-88 JICA CTI Engineering International Co., Ltd.

    6.6

    Figure 6.6.1 Balance between Water Resources Potential and Water Demand along Main Stream of the Struma River Basin (Average in Jul. to Sep.)

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 2000 4000 0 8000 10000 12000

    Watershed Area (km2)

    (P-D

    )/P (%

    )

    600

    Average (2004)75%

    90%95%

    (Potential - Demand) / Potential - Average in July to September

    -50.0-40.0-30.0-20.0-10.0

    0.010.020.030.040.050.060.070.080.090.0

    100.0

    0 2000 4000 6000 8000 10000 12000

    Watershed Area (km2)

    (P-D

    )/P (%

    )

    Average (2004)

    75%

    90%

    95%

    Irrigation Loss = Current Condition (48-74%) Irrigation Area = 5% of Potential Area

    Irrigation Loss = 30% Irrigation Area = 100% of Potential Area

    ST1

    ST2

    ST3

    ST8

    ST9ST7

    ST10 ST5 ST6

    ST4

    ST1ST2ST3

    ST4

    ST5

    STD1

    ST6

    ST7ST8

    ST9

    ST10

    ST1ST2ST3

    ST4

    ST5

    STD1

    ST6

    ST7ST8

    ST9

    ST10

    ST1

    ST8

    ST7ST9 ST10

    ST6 ST5

    ST4

    ST2 ST3

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-89

    Figure 6.6.2 Balance between Water Resources Potential and Water Demand along Main Stream of the Mesta River Basin (Average in Jul. to Sep.)

    (Potential - Demand) / Potential - Average in July to September

    -50.0-40.0-30.0-20.0-10.0

    0.010.020.030.040.050.060.070.080.090.0

    100.0

    0 500 1000 1500 2000 2500 3000Watershed Area (km2)

    (P-D

    )/P (%

    )

    Average (2004)

    75%

    90%

    95%

    Irrigation Loss = Current Condition (64%) Irrigation Area = 15% of Potential Area

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 500 1000 1500 2000 2500 3000

    Watershed Area (km2)

    (P-D

    )/P (%

    )

    Irrigation Loss = 30% Irrigation Area = 100% of Potential Area

    Average (2004)

    75%

    90%

    95%

    ME1 ME3 ME2 ME4 ME5 ME6

    ME1

    ME2

    MEI1

    ME3

    ME4

    ME5

    ME6

    DO1

    DO2

    ME1

    ME2

    MEI1

    ME3

    DO1

    DO2

    ME4

    ME5

    ME6

    ME1 ME2 ME3

    ME4 ME5 ME6

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-90 JICA CTI Engineering International Co., Ltd.

    Irrigation Loss = Current Condition (73%) Irrigation Area = 5% of Potential Area

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 1000 2000 3000 4000 5000 6000Watershed Area (km2)

    (P-D

    )/P (%

    )

    Figure 6.6.3 Balance between Water Resources Potential and Water Demand along Main Stream of the Arda River Basin (Average in Jul. to Sep.)

    Irrigation Loss = 30% Irrigation Area = 100% of Potential Area

    Average (2004)

    75%

    90%

    95%

    AR3 AR4 AR5 AR2 AR6

    AR1

    AR2

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 1000 2000 3000 4000 5000 6000Watershed Area (km2)

    (P-D

    )/P (%

    )

    Average (2004)

    75%

    90%

    95%

    AR1 AR2

    AR3 AR4 AR5 AR6

    AR1

    AR3AR4

    AR5ARV1 AR6

    BI1

    ARC1ARK1

    AR2AR3

    AR1

    AR4AR5

    ARV1 AR6

    BI1

    ARC1ARK1

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-91

    Irrigation Loss = Current Condition (61-84%) Irrigation Area = 5% of Potential Area

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 1000 2000 3000 4000 5000 6000 7000 8000 9000

    Watershed Area (km2)

    (P-D

    )/P (%

    )

    Figure 6.6.4 Balance between Water Resources Potential and Water Demand along Main Stream of the Tundzha River Basin (Average in Jul. to Sep.)

    Irrigation Loss = 30% Irrigation Area = 70% of Potential Area

    Average (2004)

    75%

    90%

    95%

    TU1 TU3 TU5

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 1000 2000 3000 4000 5000 6000 7000 8000 9000

    Watershed Area (km2)

    (P-D

    )/P (%

    )

    Average (2004)

    75%

    90%

    95%

    TU2

    TU4TU5

    TUM1

    TU8

    TU3

    TU7

    TU1

    TU6

    TU6 TU7 TU8 TU4

    TU3TU4

    TU2 TU5TU2TUM1

    TU7

    TU1

    TU6

    TU8

    TU1

    TU4 TU7 TU8

    TU3 TU6 TU5

    TU2

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-92 JICA CTI Engineering International Co., Ltd.

    Irrigation Loss = Current Condition (60-74%) Irrigation Area = 5% of Potential Area

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 5000 10000 15000 20000 25000Watershed Area (km2)

    (P-D

    )/P (%

    )

    Figure 6.6.5 Balance between Water Resources Potential and Water Demand along Main Stream of the Maritsa River Basin (Average in Jul. to Sep.)

    Irrigation Loss = 30% Irrigation Area = 30% of Potential Area

    Average (2004)75%90%95%

    MA1

    MA7 MA3 MA4 MA5 MA6

    MA2

    (Potential - Demand) / Potential - Average in July to September

    -50.0

    -40.0

    -30.0

    -20.0

    -10.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    0 5000 10000 15000 20000 25000

    Watershed Area (km2)

    (P-D

    )/P (%

    )

    Average (2004)75%90%95%

    MAT1

    MA2

    MA6

    MA4MA3

    MA1MAZ1

    MA5

    MA7

    MAT2

    MAT3

    MAT4MAU1

    MAV1

    MAP1 MAS2

    MAS1

    MAL2

    MAL1

    MAZ2

    MAZ3

    MAH1

    MAT1

    MAT2

    MA2

    MA6

    MA4MA3

    MA1MAZ1

    MA5

    MA7

    MAT3

    MAT4MAU1

    MAV1

    MAP1 MAS2

    MAS1

    MAZ2

    MAZ3

    MAL2

    MAL1 MAH1

    MA1

    MA2

    MA7 MA3 MA4 MA5 MA6

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    6.7

    JICA CTI Engineering International Co., Ltd. 6-93

    Note: On the top curve indicates location of time series in Figure 6.7.2

    Figure 6.7.1 BOD Concentrations in the Struma River for Different Future Scenarios at Low Flow Situation

    150000.0 200000.0[meter]

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0[meter] BOD - 25-9-2004 16:00:00 Struma_WQ_NearFutureLoss10.re

    100000.0 150000.0 200000.0[meter]

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0[meter] BOD - 22-9-2004 12:00:00 Struma_WQ_HighPrioriFuture.res1

    150000.0 200000.0[meter]

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0[meter] BOD - 22-9-2004 16:00:00 Struma_NearFuture_WQ.res11

    100000.0 150000.0 200000.0[meter]

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0[meter] BOD - 22-9-2004 12:00:00 Struma_WQ_HighMediumFuture.res

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-94 JICA CTI Engineering International Co., Ltd.

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    [mg/l] BOD. Near Future 10% loss - Red; High Priority - Grey; High Medium Priority - Green ConcentrationST_M 55183.00 BODST_M 55183.00 BODST_M 55183.00 BOD

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    5.5

    6.0[mg/l] BOD. Present - Black; Near Future - Blue; Near Future loss 10% - Red Concentration

    ST_M 55183.00 BODST_M 55183.00 BODST_M 55183.00 BOD

    Note: Location marked on Figure 6.7.1

    Figure 6.7.2 BOD Concentration during the Year at a Station the Middle Reach of the Struma River.

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-95

    Note: On the top curve indicates location of time series in Figure 6.7.4

    Figure 6.7.3 BOD Concentrations in the Mesta River for Different Future Scenarios at Low Flow Situation

    180000.0 200000.0 220000.0 240000.0 260000.0 280000.0 300000.0[meter]

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    [meter] BOD - 17-9-2004 12:00:00 Mesta_WQ_NearFuture.res11

    180000.0 200000.0 220000.0 240000.0 260000.0 280000.0 300000.0[meter]

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    [meter] BOD - 16-9-2004 04:00:00 Mesta_WQ_NearFutureLoss10.res11

    180000.0 200000.0 220000.0 240000.0 260000.0 280000.0 300000.0[meter]

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    [meter] BOD - 17-9-2004 04:00:00 Mesta_WQ_HighPrioriFuture.res11

    180000.0 200000.0 220000.0 240000.0 260000.0 280000.0 300000.0[meter]

    4600000.0

    4610000.0

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    [meter] BOD - 17-9-2004 04:00:00 Mesta_WQ_HighMediumFuture.res11

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-96 JICA CTI Engineering International Co., Ltd.

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    [mg/l] BOD. Present - Black; Near Future - Blue; Near Future loss 10% - Red ConcentrationME_M 18535.17 BODME_M 18535.17 BODME_M 18535.17 BOD

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    [mg/l] BOD. Near Future 10% loss - Red; High Priority - Grey; High Medium Priority - Green ConcentrationME_M 18535.17 BODME_M 18535.17 BODME_M 18535.17 BOD

    Note: Location marked on Figure 6.7.3

    Figure 6.7.4 BOD Concentration during the Year at a Station the downstream Reach of the Mesta River

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-97

    Note: On the top curve indicates location of time series in Figure 6.7.6

    Figure 6.7.5 BOD Concentrations in the Arda River for Different Future Scenarios at Low Flow Situation

    320000.0 340000.0 360000.0 380000.0 400000.0 420000.0[meter]

    4570000.0

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    [meter] TOTAL BOD - 8-11-2004 00:00:00 Arda_WQ_NearFuture10LossWQAdd.res11

    320000.0 340000.0 360000.0 380000.0 400000.0 420000.0[meter]

    4570000.0

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    [meter] TOTAL BOD - 8-11-2004 00:00:00 Arda_WQ_HighPrioriFuture.WQAdd.res11

    320000.0 340000.0 360000.0 380000.0 400000.0 420000.0[meter]

    4570000.0

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    [meter] TOTAL BOD - 8-11-2004 00:00:00 Arda_WQ_HighMediumPrioriFutureWQAdd.res1

    320000.0 340000.0 360000.0 380000.0 400000.0 420000.0[meter]

    4570000.0

    4580000.0

    4590000.0

    4600000.0

    4610000.0

    4620000.0

    [meter] TOTAL BOD - 8-11-2004 08:00:00 Arda_WQ_NearFutureWQAdd.res11

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-98 JICA CTI Engineering International Co., Ltd.

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    [MG/L] BOD. Near Future 10% loss - Red; High Priority - Grey; High Medium Priority - Green TOTAL BODAR_M 97672.14AR_M 97672.14AR_M 97672.14

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    [MG/L] BOD. Present - Black; Near Future - Blue; Near Future loss 10% - Red TOTAL BODAR_M 97672.14AR_M 97672.14AR_M 97672.14

    Note: Location marked on Figure 6.7.5

    Figure 6.7.6 BOD Concentration during the Year at a Station the Middle Reach of the Arda River

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-99

    Note: On the top curve indicates location of time series in Figure 6.7.8

    Figure 6.7.7 BOD Concentrations in the Tundzha River for Different Future Scenarios at Low Flow Situation

    350000.0 400000.0 450000.0 500000.0[meter]

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] TOTAL BOD - 19-12-2004 04:00:00 WQ_Tundzha_NearFuture2WQAdd.res11

    350000.0 400000.0 450000.0 500000.0[meter]

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] TOTAL BOD - 19-12-2004 12:00:00 WQ_Tundzha_NearFutureLoss10WQAdd.res1

    350000.0 400000.0 450000.0 500000.0[meter]

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] TOTAL BOD - 18-12-2004 12:00:00 WQ_Tundzha_HighPrioriFutureWQAdd.res11

    350000.0 400000.0 450000.0 500000.0[meter]

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] TOTAL BOD - 19-12-2004 00:00:00 WQ_Tundzha_HighMediumPrioriFutureWQAdd.re

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-100 JICA CTI Engineering International Co., Ltd.

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    [MG/L] BOD. Present - BLACK. Near Future -BLUE. Near Future 10% loss - RED. TOTAL BODTU_M 113096.54TU_M 113096.54TU_M 113096.54

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    5.5

    [MG/L] BOD. Near Future 10% loss - RED. High Priority - GREY. High Medium Priority - GREEN. TOTAL BODTU_M 113096.54TU_M 113096.54TU_M 113096.54

    Note: Location marked on Figure 6.7.7

    Figure 6.7.8 BOD Concentration during the Year at a Station the Middle/Downstream Reach of the Tundzha River

  • The Study on Integrated Water Management in the Republic of Bulgaria

    Final Report - Main ReportChapter 6

    JICA CTI Engineering International Co., Ltd. 6-101

    Note: On the top curve indicates location of time series in Figure 6.7.10

    Figure 6.7.9 BOD Concentrations in the Maritsa River for Different Future Scenarios at Low Flow Situation

    220000.0 240000.0 260000.0 280000.0 300000.0 320000.0 340000.0 360000.0 380000.0 400000.0 420000.0 440000.0 460000.0[meter]

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] BOD - 25-9-2004 16:00:00 Maritsa_WQ_NearFuture.res11

    220000.0 240000.0 260000.0 280000.0 300000.0 320000.0 340000.0 360000.0 380000.0 400000.0 420000.0 440000.0 460000.0[meter]

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] BOD - 25-9-2004 16:00:00 Maritsa_WQ_NearFutureLoss10.res11

    220000.0 240000.0 260000.0 280000.0 300000.0 320000.0 340000.0 360000.0 380000.0 400000.0 420000.0 440000.0 460000.0[meter]

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] BOD - 25-9-2004 16:00:00 Maritsa_WQ_HighPrioriFuture.res11

    220000.0 240000.0 260000.0 280000.0 300000.0 320000.0 340000.0 360000.0 380000.0 400000.0 420000.0 440000.0 460000.0[meter]

    4620000.0

    4630000.0

    4640000.0

    4650000.0

    4660000.0

    4670000.0

    4680000.0

    4690000.0

    4700000.0

    4710000.0

    4720000.0

    4730000.0

    [meter] BOD - 25-9-2004 16:00:00 Maritsa_WQ_HighMediumPrioriFuture.res11

  • Final Report - Main Report Chapter 6

    The Study on Integrated Water Managementin the Republic of Bulgaria

    6-102 JICA CTI Engineering International Co., Ltd.

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    4.5

    4.0

    3.5

    3.0

    2.5

    2.0

    1.5

    1.0

    5.0

    [mg/l] BOD. Present - Black; Near Future - Blue; Near Future loss 10% - Red ConcentrationME_M 18535.17 BODME_M 18535.17 BODME_M 18535.17 BOD

    1-1-2004 20-2-2004 10-4-2004 30-5-2004 19-7-2004 7-9-2004 27-10-2004 16-12-2004

    4.5

    4.0

    3.5

    3.0

    2.5

    2.0

    1.5

    1.0

    5.0

    [mg/l] BOD. Near Future 10% loss - Red; High Priority - Grey; High Medium Priority - Green ConcentrationME_M 18535.17 BODME_M 18535.17 BODME_M 18535.17 BOD

    Note: Location marked on Figure 6.7.9

    Figure 6.7.10 BOD Concentration during the Year at a Station the Downstream Reach of the Maritsa River

    CHAPTER 6 RIVER BASIN MANAGEMENT PLANChapter 6 Figures


Recommended