Major Oil Sands upgrader Fort McMurray, Canada This document is the property of Technip and is not intended to be a binding contractual document. Any information contained herein shall not result in any binding obligation on the part of Technip, or any of its affiliates, and is provided for information purposes only. Technip – March 2011 Our projects CONTACTS: Technip Italy 68 Viale Castello della Magliana 0014 Rome Italy Phone: +1 39 06 65 981 CONTACT: External Communications Manager Office: + 39 06 6598 1 Technip USA, Inc. 555 West Arrow Highway Claremont, California 91711 USA Phone: +1 909 447 3600 CONTACT: Wes Larsen Project Manager Onshore Division Office: +1 909 447 3745 Technip has executed several contracts in the Canadian Oil Sands: The primary ugrading unit followed a FEED contract completed in 2007. Technip has executed several EPCM including the Diluent Recovery Unit (DRU) and the Delayed Coker Unit (DCU) The Hydrogen unit is one of the world’s largest plants. Several other contracts ranging from DBM & EDS to EPCM have been executed or are under execution including DCU Expansion project Calgary Alberta Vancouver Fort McMurray www.technip.com
Transcript
Page 1: Major Oil Sands upgrader

Major Oil Sands upgrader

Fort McMurray, Canada

This document is the property of Technip and is not intended to be a binding contractual document. Any information contained herein shall not result in any binding obligation on the part of Technip, or any of its affiliates, and is provided for information purposes only. Technip – March 2011

Our projects

CONTACTS:Technip Italy68 Viale Castello della Magliana0014 RomeItalyPhone: +1 39 06 65 981

CONTACT:External Communications ManagerOffice: + 39 06 6598 1

Technip USA, Inc.555 West Arrow HighwayClaremont, California 91711USAPhone: +1 909 447 3600

CONTACT:Wes LarsenProject ManagerOnshore DivisionOffice: +1 909 447 3745

Technip has executed several contracts in the Canadian Oil Sands: The primary ugrading unit followed a FEED contract completed in 2007.

Technip has executed several EPCM including the Diluent Recovery Unit (DRU) and the Delayed Coker Unit (DCU) The Hydrogen unit is one of the world’s largest plants. Several other contracts ranging from DBM & EDS to EPCM have been

executed or are under execution including DCU Expansion project

Calgary

Alberta

Vancouver

Fort McMurray

www.technip.com

Page 2: Major Oil Sands upgrader

Major Oil Sands upgrader2 Major Oil Sands upgrader 3

Detail engineering

Procurement of equipment and materials

Modules fabrication

Construction

Pre-commissioning of the unitsOperational since February 2009

Facilities and scope of work

Technip successfully rose to challenges in Alberta.This is oil country. And these are the Canadian oil sands. Challenging, untamed, vast… among the last, best, greatest global hopes for a reliable, stable supply of oil energy for years to come.

Diluent recovery unit

Delayed coker unit

Hydrogen plant

Diluent recovery unit

A 292,000 bpsd Diluent Recovery Unit (DRU) for the recovery of the diluent used to dilute bitumen from oil sands

More than 3,200 people worked on site at peak of construction

Diluent recovery unit & delayed coker unit 3d model

Delayed coker unit

A 123,000 bpsd Delayed Coker Unit (DCU) for the upgrading of the bitumen into valuable liquid hydrocarbon products

8 million man-hours injury free

Full range of services from feasibility studies to the supply of complete plants proven by a successful track record

Technip is used to working in remote areas with minimal infrastructure and a reduced supply chain to call on.

Centres of excellence: Rome, Italy (Refineries), Claremont, USA (Hydrogen)

Hydrogen plant

The Hydrogen unit is the world’s second largest single train hydrogen plant

It produces high purity hydrogen, which is used to upgrade Athabasca bitumen to sweet synthetic crude oil

Based on Technip proprietary Reformer technology

Manhours executed: 1.9 million

Start-up: September 2008

The Technip offer