Major Projects. Recover from water in dry air system/ MuTr repairs -December ’05 MPC South - January ’06 TOF West - February-March ’06 PHENIX simulated run test - April ’06 RXNP - May ’06 HBD - June ’06 MPC North - July ’06 Prepare for run 6/7. Water in Dry Air System. - PowerPoint PPT Presentation
Popular Tags:
18
Major Projects Recover from water in dry air system/ MuTr repairs -December ’05 MPC South - January ’06 TOF West - February-March ’06 PHENIX simulated run test - April ’06 RXNP - May ’06 HBD - June ’06 MPC North - July ’06 Prepare for run 6/7
Transcript
Page 1: Major Projects

Major Projects

• Recover from water in dry air system/ MuTr repairs -December ’05

• MPC South - January ’06• TOF West - February-March ’06• PHENIX simulated run test - April ’06• RXNP - May ’06• HBD - June ’06• MPC North - July ’06• Prepare for run 6/7

Page 2: Major Projects

BBC South

BBC North

Water found in all Tygon distribution

tubes

Water in Dry Air System

Page 3: Major Projects

Water in Dry Air System

Water flowing from the BBC south was similar to this naturally occurring phenomenum

South

North

Water also may be in MuTr North and

South

Page 4: Major Projects

TOF W Installation

TOF W Installation Fixture and

access platform

Still waiting for the detectors to arrive

Page 5: Major Projects

TOF W Fabrication

MRPC’s

MRPC’s

Feedthru boards

Page 6: Major Projects

½ box with detectors

HV bus

Gas pipe

HV connectors

Holes for

installation wheels

Gasket

signal cables

TOF W Fabrication

Page 7: Major Projects

TOF W Assembly

Page 8: Major Projects

HBD Gas Monitoring

HBDtransparency

monitor hutch

Page 9: Major Projects

Module Preparationu-shaped brick skins too tight(≈1 mm)

imperfect wrappingperfect drawings

leave out TYVEK, aluminum?

thinner bricks from stainless steel

wedges are ok and will be separately fitted to the crystals (UIUC)

192 crystals

4 wedges w/ 29 crystals each (45 lbs)

4 bricks w/19 crystals each (30 lbs)

MPC Status

Page 10: Major Projects

MPC Production

Page 11: Major Projects

Other RequiredWork

• CM lift table modification• New Helium Bags• Dry air system upgrade ??• Conceptual design efforts in support of

future detector upgrades• Sub System Maintenance (TBD)• Bridge Utilities

Page 12: Major Projects

HBDInstallation/

Access

CM scissor lift tableExtensions

(extends table 22” east & west;Steps up 8”)

Page 13: Major Projects

• CM Crane design• Integration support work for Future Detectors (NCC, SVTX,

FVTX, RPC)• CM region access stairs• Discretionary improvements to existing equipment

• EC: Fix/replace fibers, Noisy FEM’s in DC, PC, DC water flow interlocks, TEC replace p/s and FEM’s, ARCNET on fiber to all racks?

• WC: Replace bucketless buckets in AGEL racks, noisy FEM’s in DC, PC

• MuTr & MuID: HV repair, troublesome FEM’s, blue logic repairs, MUTR cosmic ray trigger with LL1?

• E F & I: Verify installation of transient suppression in all racks, Bucket maintenance, Fan replacement, Communication testing to UVC HV mainframes, tighten connections on distribution panels, fiber repairs

Additional Beneficial Work

Page 14: Major Projects

CM Region Crane & Cable Routing

Concept

Cable Trays to route cables NCC Detector from Bridge

CM Crane north-south & east-west motions; extended travel east to existing crane coverage

Crane Supports use existing flux return notches

Page 15: Major Projects

Additional Beneficial Work

• DAQ Electronics: Replace/test GL12GTM, STTP’s, blue logic trigger racks?

• Computing: Backups: test reliability, weed out unreliable hardware and servers, upgrade network

• Gas System– Reinstall all recalibrated mass flow controllers in gas

racks– Rearrange regulator and flow meters for N2 on TEC

and TOFW PID controllers– Purchase Calibration gas for TEC ethane analyzer

– R & R TEC gas manifolds to accommodate work on pre-amp/shaper boards

Page 16: Major Projects

• Energy Conservation • Clean/organize under the tracks• Move extra I-beams & pipe to storage • Electronics lab (new shelves?)• Clean & organize storage areas:

• Assembly hall • Shelves near transformers• Trailers• Wire

Conservation &

Housekeeping

Page 17: Major Projects

C-A Tasks

• MMS Lampshade removal/replacement• Dry air supply trap/timed drain• Replace emergency fan louvres • Rewire/add IR ceiling lights on emergency power • Replace WC sliding platform hoisting cables • Install access platforms from EC top north and MMS

eyebrow • Analyze/balance rack water distribution• Flammable gas hut heating • Mixing house exhaust fan maintenance

Page 18: Major Projects

SD 06 Schedule

Needs

more detail