Endesa presenta su proyecto para la realización de una ciudad sostenible en Málaga.
38
Reproduction is forbidden unless authorized. All rights reserved Málaga Smartcity Model of sustainable energy management for the cities of the future 5th Annual Strategic Asset Management for Utilities. Berlin 0 3 | 0 3 | 11 endesa distribución
Transcript
Page 1: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Málaga SmartcityModel of sustainable energy management for the cities of the future

5th Annual Strategic Asset Management for Utilities. Berlin

0 3 | 0 3 | 11endesa distribución

Page 2: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Imagine you could generate only the energy that you need: in your own house, your industry or your street. Using new tecnologies, with renewables energies.

Imagine you know what you consume in each moment, in each electric device you have turned on.Imagine you reduce your consum

20% and contributed to reduced CO2 emission .

Imagine this happens and has a name:

Imagine…

Imagine an intelligent grid which controls all their loads, generators, storage, e.v., customers …

Imagine…

Imagine…

Imagine…Imagine…

Imagine…

Page 3: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

The traditional utilities business will be largely affected

Control Center

Generation Transmission Distribution Final User

Red de transporteCentral generadora Estación elevadora Subestación de transformación

Centro detransformación Usuario final

Control Center

Quality Profitability

Sustainability

Security

Adaptability

Energy Efficiency

Renewable energy over primary energy

CO2 reduction

20%

20%

- 20%

Objectives EU

Objectives ENDESA

Page 4: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

SMART GRIDS The electric company of the future.

SmartCity

Smart Energy Management

Smart Buildings

Smart Energy Generation

Smart and Informed Customer

Smart Mobility

Smart Energy Storage

º

Smart Lighting

@Smart ICT

People

Networks

Citizens become part

of the solutionICT

v• Real-time IP network

Comunications

AMI (Advanced Meter Infrastructure)

v

• Smart meters (electricity, water and gas)• Demand response

• Smart buildings and homes• Smart and informed

customersADA (Advanced Distribution Automation)

v• Real-time monitoring• Network failure and recovery• Network automation

DER (Distributed Energy Resources)

v• Electric vehicles• Energy storage• Distributed generation of renewable sources

GIS

CBM

CIS

DMS

EMS

DSM

OMS

SCADA

AMI

DERADA

ICT

Page 5: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Worldwide initiatives

SubtituloSmart City will become a reference point along with some other international projects already in progress

SmartgridCityBoulder, Colorado$100MStart: 08/2008Xcel Energy

GridSmartColumbus, Ohio$180MStart: 2008American Electric Power + IBM SmartGrid + AMI

Malta70M€ - first stageStart: 2009Enemalta + IBM

EcoCityMasdar - Dubai$ 22.000 M In progressGeneral Electric + IBM

Smart TrafficStockholmCO2 Reduction by 18% IBM Málaga

31 M€Start: 2009Endesa

smart

• Smart City Málaga: the main difference with other projects around the world is working in all the areas related with LV and MV grids: generation, distribution, automation, storage, demand, smartmeters, e-mobility, buildings, customers,….

SmartgridJeju Island Koreai40M$In progressKEPCO

SmartgridDenmarkSmartmettering and AMR

Page 6: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Scope of the project

31 million budget for companies and research centers

4 year and fully functional, technology in the field and important

involvement of final customers

Design and deployment, analysis of results, final reports, and dissemination activities

“Living lab” to test new products and services, proof of concept

“Demo projects call other projects”, new opportunities will arise

as a consequence of this project

Page 7: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Participants

Project coordinators

Research centers

Page 8: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Location: Malaga, new seawalk

MV and LV generation

MV grid automation, new grid

Friendly customers form demand response applications

New expansion area residential

Possibility to incorporate other local initiatives Smart House, G4V, Green Emotion

Support from the governments.

Page 9: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Location

Page 10: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WorkGroups

WP

03

Harm

on

izati

on

wit

h D

EN

ISE

WP

02

Op

era

tio

n d

ep

loym

en

t an

d

com

mu

nic

ati

on

pla

n

WP01 Project managing and monitoring

WP04: Telecommunications

WP05

WP11

WP06

WP07WP09

WP08

WP10 WP12

WP01 – Project Management

WP08 – Energy Efficiency and Demand Response

WP09 – LV Automation

WP10 - Micro generation and storate (DER)

WP11 - SmartMeters (AMI)

WP12 – Electric Vehicles (G2V)

WP04 - Telecomunication

WP03 – Coordination DENISE

WP02 – Deployment and Communication

WP05 – Information Systems

WP06 – MV Automation

WP07 - Mini generation and storage (mDER)

Page 11: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP04 Telecomunication

ICT

75 transformers communicated using PLC, WIMAX and other technologies

Redundant ring architecture

Advanced monitoring and control

@

µStorage

mStorage

Public Lighting

º

Page 12: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP04 Telecomunication

Page 13: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Network Automation

A good part of the telecommunications necessary for this purpose will be PLC though existing lines.Communications between substations take place through fiber optics.

iNode -- Connects the MV with the LV grid . Acts as an autonomous concentrators and sends the control system what happens in the grid.

SS1WAN IP

SS2SS3

iSocke t

LV Grid

iSocket - Connects to the LV grid to generators, storage and loads, implements functions for local regulation.

WP04 Telecomunication

Page 14: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP05 Systems. Information Technologies

Center for deployment of information systems needed for advanced and intelligent smartGrid management,

Systems for Monitoring Communications

System for SmartMeters

System for Distribution automation

System for Data adquisition

System for Demand response

System for Consumer Portal

System for Electric vehicle management

System for Project collaboration

Armonización con el proyecto DENISE

Despliegue operacional y marketingG

esti

ón d

e pr

oyec

to

y co

mu

nic

ació

n

AM

I

Red

MT

mD

ER

Tele

com

un

icac

ion

es

Red

BT

DER

Ges

tión

Dem

anda

V2

G

Tecnología

Adquisición de datos

Ges

tión

de

Vehí

culo

s

Ges

tión

de

la D

eman

da

Con

sum

erPo

rtal

Tele

gest

ión

Sist

ema

Col

abor

ativ

o

Show Room

Mon

itoriz

ació

nC

omun

icac

.

Dis

trib

ució

n

Mon

itoriz

ació

n

Sm

artG

rid

The System z10,

the flagship of the IBM Systems

Page 15: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP06 MV Network Automatization

San  Sebastiá

n

Polígono

6058 0 

(PF,C ) 

7108(2B)

7107  (PM)

314 402398 

(PF,P M)

389

LAIV

394

9153 7 (C)

MUPRESP A

81478  (PF,mG )

Nueva  Diputació

n

NU_DIPUTA C

7111Depuradora

4780102105

6096 5 

(2A)

77457

7236 1

65293  (C) 

Nuevo  Tabacaler

a 324(2PM, 

PF)

10102 0

83606

EMASA  Pacífico

8233 3

8233 4 

(2A)

7865 7

7865 8

7616 1

80159(µG, 

Alum)

P81693  (Suministro

)

E.D.A.R  (mG)

Emasa

312  (µG)

307  (2A,µG)

387(2B)

349

403  (PM,µG

)404

6266 3 

(C,2A )

6263 7 (C)

PANIFI

CAD

7105(µG,2.2

A)HIPER

Polid.  Municipal

7109 AKY

102810

7423 0 

(PF)

7423 1

7423 2

7423 3 

(2B)

7423 4

7423 5

10281 1 (PM)

10485 6

69067 (µG)

1009757423

6 (PF)

7423 7

(2A)74229

7668  (PM‐C)

7083  (2A)

RTVA CSur

ErausquinINDUSTRIA

L

HIPER

CUEVAS_BAJ

TABAC

ALERA

PACÍFIC

O

TRRE

MOLI

PATO‐2

E.D.A.R.

A1

A3

A4

A5

A6

7110  (C)

321

Depurador a

SIN COMUNICACIONES. Solo tener en cuenta en pruebas

810801 

(PF)802

797  (2B

)799

74221  (C)

73551

Supercor

397396 395(2B)

392391390843 

(PF)

7927297 

(2B)663

729 9

781  (PF

)

730 0

335(PF)

7296(PF)

70043  (C,mG)

A comunicar con otras tecnologías:

71273 NAVINCO

CT

CT

CT Ormazábal

CT NO Ormazábal

CT(C)Cliente 

especial

CT compartido

CLIENT CT propiedad clienteLínea prop.cliente

PF PuntofronteraPM – 1ª maniobra2A - 2ª maniobra A2B - 2ª maniobra BµG – Generación BTmG – Generación MTAlum – Alumbrado

CT CT con telecontrol

CT CT no incluidoCambio maniobra

Cambio cabinas

491

4 9 1

529 203 425 351

395

89

175

301

647

391117117582

333

247281174279177171

1075

634

642197234

1075

7864448445139

207

187

94

101 2

349304 384 427 244 266 225

121

143

451

279 300 145 100 221

450

36219 17 780 80 74 609

824271

160

131906695256211

759

299 218 80

394

257 461 303 339 2

686

GOAL. To deploy an intelligent system for MV automatization with optimal solution -- economic, funcional and operative – for the new network requirements (distributed generation, electric vehicles, storage, renewables integration, etc)

Page 16: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP09 LV Network Automatization

Page 17: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP07 and WP10 Mini and Micro Generation and Storage

Mini Storage:

Trade Fairs of Málaga:

storage of 100kW /200kWh

Micro Storage:

3 x storage Sistems 5 kW/10 kWh

2 x CHP 5 kW

Generators:

33 kW LV

12,94 MW MV

70043 Pal. Ferias 0,1 Mw

81693 E.D.A.R. 10 Mw

403 Selene 3,8 Kw

69067 Finca El Pato 8 10 Kw

7105 Mainake 2 Kw

80159 Chiringuitos.Playa 10 Kw

307 Guindos 2,2 Kw

312 Pta.Blanca 5 Kw

µ-storage

º

M-storage

Lights Public

º

Photovoltaic

71273 Navinco 0,1 Mw

81478 Diputación 2,74 Mw

º

Page 18: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP07 Mini Generation and Storage

Page 19: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP10 Micro Generation and Storage

Page 20: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP08 Energy Efficiency

Edificio Nueva Diputación de Málaga

Diputación de Málaga

Nuevo Edificio Ayuntamiento Málaga

Hotel Puerta Málaga

Estadio Atletismo Ciudad de Málaga

Hotel Vincci Málaga

Mercadona

Clínica Quirón

Solar FV

Cogeneration

Trigeneration

Centro Acuático de Málaga

Palacio DeportesJosé Mª Martín Carpena

To develop all the systems for domestic customers, offices and public buildingsGOAL

Page 21: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP08 Energy Efficiency and Demand Response

In this project we will test advanced energy efficiency and demand response services in residential and SMEs, allowing the customer to become an active agent in the distrobution network. These services can be grouped in three different categories:

1. Information and analysis

tools (INF)

2. Energy Management and

price signals

3. Demand response (DR)

with direct load control

Page 22: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP08 Energy Efficiency. Conceptual Design. Domestic

Services and Applications

Customer- centric web

page

Retail Business

Grid Operation

Sub- station

Transf.

InternetInternet

PLC (?) Home

Area

Network

Retail Company

Distribution Company

Consumer Portal

LV GridLV Grid

Residential / SMEs

SmartMeter

Gateway

INF

DR

EM DR

Page 23: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP08 Energy Efficiency. Public Lighting

60 test LED and Halogenuro public lights

9 lights with wind generation

10 lights with photovoltaic generation

200 lights points remote controlled

12.100 w total power controlled

Page 24: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP08 Energy Efficiency. Public Lighting and FV

Page 25: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP11 AMI

13.000.000

Concentrators

Comm Network

PLC Communications

MeterMeter

140.000 Cenelec A Band

PLC of 28.8 kbps operated at 4.8 kbps

BPSK modulation

Security (AES-128 bits hardware encryption)

Field-proven METERS & MORE PROTOCOL

Architecture adapted to european regulation

Central Systems

Homes

Transformer

Functionalities:

AMMS System – central management and cordination of the whole metering system.

Electronic meters – Real-time operation. Allow the energy control and measurement, the remote connection / disconnection, over 6 tariff periods tarifarios.

Concentrator - Detects and manages (real-time, fully automated) the new meters conected ti the grid.

PLC-Power Line Communications– Automatic management of any network change.

Communication protocol, based in METERS & MORE, with all the reliability of Enel technology and experience.

Page 26: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP11 AMI

Cenelec A Band

PLC of 28.8 kbps operated at 4.8 kbps

BPSK modulation

Security (AES-128 bits hardware encryption)

Field-proven METERS & MORE PROTOCOL

Page 27: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

3.000 SmartMeters PLC compatibles with METER&MORE

First installations in Spain

PLC and GPRS

WP11 AMI

Page 28: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP11 AMI

Page 29: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP11 AMI

Page 30: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

WP12 Electric Vehicles

10 electric vehicles (BYD, Mitsubishi, ….)

2 plug-in hybrids

6 charge posts

Integration with renewable sources

V2G deployed (Microvett)

G4V, Green Emotion…

Page 31: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Control and Monitoring Center

º

CMC

Page 32: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Control and Monitoring Center

Page 33: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Control and Monitoring Center

Page 34: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Control and Monitoring Center

Page 35: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

@70 CCDD PLC40km MVL

3.000 Meters

200kw/h MV3* 10 kw/h LV

13Mw MV100Kw LV

Deployment of a public lighting system with 200 elements, micro wind (600w) and (85wp) photovoltaic generation

12 electricvehicles

º

CUSTOMERS300 industrial

900 service12.000 domesticDuration 4 Years

Budget 31 million €Consumed energy: 70 GWh/year,

Smartcity will save 6.000 Ton CO2 per year

Relevant Information

Page 36: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Value Proposal for the city of Malaga

Involves one of the most significant challenges that society will face this century.

Turns the initiative into an international showplace to display technology relevant to the project.

Enables experience gaining and the addition of new capabilities which will encourage future research and development.

Puts in a competitive position both the industry and the national R+D, particularly in Andalucía.

Others initiatives in Málaga:

Malaga Valley (to promote ICT)

Eurocities member

Convenant of Mayors

G4V,Green Emotion.

Malaga and Andalucía region have become a window and an international point of reference

It yields knowledge and added value capabilities which will strengthen the development of the industry and the national R+D at the right moment

From past to future: Málaga City Hall

Benefits and Results

Page 37: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved

Grid of today + ICT = Grid of the future

Thank you for you attention

www.smartcitymalaga.com

[email protected]

Photovoltaic and wind generators street lighting at the sea walk next summer

Page 38: Málaga Smartcity

Reproduction is forbidden unless authorized. All rights reserved


Recommended