MALIN INTERNATIONAL SHIP
REPAIR & DRYDOCK, INC.
320 77TH Street
Galveston, TX 77554
Office: (409) 740‐3314
Fax: (409) 7218
www.malinshiprepair.com
Pier 41 Facilities
MISR’s main yard located in Galveston, TX is easily accessible via land and water and
offers a variety of amenities and services in a secure environment suitable for any
marine application. The facilities at Pier 41 include a 5,300 square foot covered
fabrication area, over 2,600 feet of available berthing space to 36 feet deep, 8 acres of
lay‐down area as well as private on‐site office space available for customer utilization.
Utilities conveniently located throughout the yard include freshwater, electrical, and
compressed air connections.
CERTIFICATIONS/CONTRACTS
Contract GS‐21F‐0148W
PROJECTS
US Government Contracts
Agency: US Coast Guard POC: Kyle Kagami
Telephone No: 409‐766‐5690 Vessel: USCGC Harry Claiborne
Period of Performance: 03/09/09‐03/20/09
Description of Work:
Install a new inclined ladder
Remove existing vertical ladder from 02 to 03 level
Install one (1) new aluminum inclined ladder
Remove sections of rail on 03 level in way of new inclined ladder
Install vertical stanchions to support free ends of rails
Perform non‐destructive testing (NDT) on all new welds
Agency: US Coast Guard POC: Albie D. Evans
Telephone No: 757‐628‐4665 Vessel: USCGC Harry Claiborne
Period of Performance: 03/09/09‐03/20/09
Description of Work:
Complete all welding and covering of cutter’s seabay system
Removed and replaced port and starboard Sea Chest vent lines and valves
Provided underwater videotaping of repair
Agency: Maritime Administration POC: Janice Marshall
Telephone No: 202‐366‐1744 Vessel: M/V “Barbara Lois”
Period of Performance: 07/02/09‐08/14/09
Description of Work:
Crop out, renew, and install a stern bulwark
Fender system on the bulwark
Fender system installed on the stern hull
Replace six (6) ballast vents on the stern of the vessel
Commercial Marine Repair
Agency: Well Ops – A Helix Company POC: Richard Scott
Telephone No: 281‐848‐6559 Vessel: Drilling Rig: Q‐4000
Period of Performance: 10/08/09‐11/04/09
Description of Work:
Replacement of two propulsion pods
Approximately 100 feet of 3” pipe
renewals
Mud pump piping renewals
Added gusset plates and stiffeners in
the moon pool
Double pads and pipe stanchions on
the MPT tower
Agency: REM Offshore POC: Arild Skram
Telephone No: +47 7008 08 95 Vessel: REM FORZA
Period of Performance: 12/15/09‐12/22/09
Description of Work:
Removal and installation of hull inserts
above summer load waterline utilizing
½”, 3/8” ABS plate and ½” X 6” flat bar.
Renew brackets connected between
tank top plate and side shell plate
between frames in ballast water tank.
Ultrasonic, dye, and vacuum box testing
of welds approved by DNV.
Repaired dented hull insert
Change vessel’s main crane rams
Agency: Canyon Offshore – A Helix Company POC: Danny Cook
Telephone No: 713‐996‐4020 Vessel: Northern Canyon
Period of Performance: 4/10/09‐4/15/09
Description of Work:
Assisted in the installation of trencher sub‐frame
Gussets, extension beam supports, and grating
Fabrication of access stairway to trencher platform
Removal of pads Installation of level wind and winch, and
Construction of frame for HPO unit Removed and reinstalled satellite dome Crane to haul container from stern of vessel
Installed aft port side and forward starboard wing walls into place
Sea fastened equipment.
Agency: CGG Veritas POC: Lenny Stanley
Telephone No: 835‐351‐8491 Vessel: CCG LAURENTIAN
Period of Performance: 11/26/07‐12/3/07
Description of Work:
Installed replacement starboard ships service diesel generator
Measurements performed to ensure the adequate coupling size
Machined coupling to fit the replacement generator and engine
Cut 5 x 5 opening in vessel side shell and through the tank bulkhead into the engine room to installed generator
Renewed side shell using 7/16” ABS plate in accordance with the owner’s direction
Agency: Western Geco POC: Lawrence Howard
Telephone No: 832‐868‐7172 Vessel:M/V STONES RIVER
Period of Performance: 7/28/08‐8/15/08
Description of Work:
Removed Containers and equipment Cut container foundations loose from deck
Added angles and flat bar to secure deck boards
Removed wire and wireways Cut down port and starboard exhaust
stacks
Installed rope guard after fabrication Reinstalled stainless steel bulwark
Welded and prepped for paint Removed fuel from tanks and stored in
order to perform hot work repairs
Fuel pumped back into tanks after hot work was completed
Agency: PGS Geophysical POC: Hans‐Peter Waldner
Telephone No: 281‐509‐8376 Vessel: M/V Ramform Valiant
Period of Performance: 10/14/09‐10/20/09
Description of Work:
Removal and installation of both
starboard and port side thrusters
Fabrication of antenna platform and
installation
Removal of twisted anchor chain from
locker
Renewal and fabrication of cooling pipe
and fittings
Repair of cracks and adding of stiffeners
in ballast tank bulkhead
Agency: Martin Midstream POC: Dwain Bankston
Telephone No: 281‐842‐3911 Vessel:M/V PONCIANA
Period of Performance: 2/19/2007‐4/24/2007
Description of Work:
Removed existing condenser and
refrigeration system
Fabrication of Cargo Piping Spools
Installed new cargo piping and exchangers
Marine Repair
Agency: Columbia University Lamont‐Doherty Earth Observatory
POC: Richard Beaudoin
Telephone No: 212‐854‐2331 Vessel:M/V MARCUS G. LANGSETH
Period of Performance: 3/16/2007‐ 9/02/2007
Description of Work:
Removal and installation of gun rails
All star hydraulic work and welding
Repair of overhead in seismic lab
High seas net (Dome GPS) installation
Agency: Edison Chouest POC: Willie Danos
Telephone No: 985‐601‐4128 EXT: 51615 Vessel: M/V C‐LEGEND
Period of Performance: 04/2009
Description of Work:
Performed work on ballast tank
Repaired cracked 8 ¾” ID x 14 ¾” OD
ballast pipe (overboard discharge line)
Installed double plate
Re‐welded both sides of bulkhead
Agency: Edison Chouest POC: Willie Danos
Telephone No: 985‐601‐4128 EXT: 51615 Vessel: M/V GECO PEGASUS
Period of Performance: 11/2009
Description of Work:
Executed pipe work on CO2 system
Removal and installation of an 8 ft piece of
½ in galvanized pipe
Original piping was cut in half and
removed
New piping was cut and threaded in (2)
sections, then reinstalled with a ½ in union
Agency: Interocean American Shipping POC: Odd Helgas
Telephone No: 609‐502‐3732 Vessel: M/V HONOR
Period of Performance: 05/2008
Description of Work:
Removal of lagging and framing from
around base to access boiler
Repair cracks in lining
Reinstallation of lagging and framing
Repairs were also completed on the deck
lift
All star hydraulics were removed and
repaired
Removed and repaired clutch slave
cylinder for one of the deck lift trucks
Commercial Outside Machine/Fabrication
Agency: Crowley Maritime POC: Carly Remm
Telephone No: 904‐727‐2131 Vessel: M/V ATB RESOLVE
Period of Performance: 01/15/10‐01/16/10
Description of Work:
Removal of motor to pump couplings,
Drilling of locking set screws and
setting of mechanical seals
Reinstallation of couplings
Repaired and tested fire suppression
system
Removed, disassembled, and
reassembled system’s pneumatic
actuators
Removed and installed new cooler
from the starboard side aft engine
room overhead
Machining of aluminum engine covers
and in‐shop fabrication of new vacuum
tank.
Agency: Crowley Maritime POC: Trent Skladany
Telephone No: 904‐727‐2448 Vessel: Tug Integrity/Barge 650‐4
Period of Performance: 07/19/09‐07/23/09
Description of Work:
Removed heat exchanger
Fabricated heat blankets
Reinstalled new heat exchanger
Fabricated new insulation blankets at
MISR shop
Fabricated and installed copper nickel
spool pieces and supply and return
lines.
Agency: Edison Chouest POC: Willie Danos
Telephone No: 985‐601‐4128 EXT: 51615 Vessel:M/V GECO PEGASUS
Period of Performance: December 2009
Description of Work:
CO2 Pipework
removal and installation of 8 ft piece of ½
in galvanized pipe
cut and threaded new piping in (2) sections
Installed ½ in union
Agency: Odfjell POC: Rune Fanebust
Telephone No: +47 55 27 44 58 Vessel: M/V BOW PRIMA
Period of Performance: October 2008
Description of Work:
Stern Tube Bearing Renewal
Controllable Pitch Propeller Repair
Tail Shaft Load Testing
Commercial Inside Machine/Fabrication
Agency: Edison Chouest POC: Willie Danos
Telephone No: 985‐601‐4128 EXT: 51615 Vessel: M/V C‐PIONEER
Period of Performance:
Description of Work:
Designed drilling fixture to allow the
drilling and tapping of a stripped out bolt‐
hole in stainless steel aft shaft coupling
Fabricated fixture and drilled and tapped
for larger 30mm bolts
machined opening in dog bones to
accommodate 30mm bolt
installed dog bone on shaft coupling
applied specified torque to coupling bolts
Agency: Secunda Marine Services POC:
Telephone No: 902‐463‐7678 Vessel: M/V BOLD ENDURANCE
Period of Performance: 8/18/08
Description of Work:
Reconditioning of engine
Installation of new liner kits, rods, and
main bearings
Engine resealed with new gaskets and o‐
rings
Installation of oil pump, W‐water pump
and F‐water pumps
Agency: Gulf Sulphur Services POC:
Telephone No: 409‐765‐1206 Vessel: Turbine Sulfur Pump
Period of Performance: December 2009
Description of Work:
Exterior Sandblasting of Turbine Pump
Bushing and seal Inspection
Fabrication of stainless steel pump shaft
Installed piping heat shield
Agency: Odfjell POC: Jan Magnus Hestdal
Telephone No: +47 55 27 45 42 Vessel:M/V BOW SPRING
Period of Performance: July 2008
Description of Work:
Cylinder head resurfacing
Agency: Secunda Marine Services POC:
Telephone No: 902‐463‐7678 Vessel:M/V BOLD ENDURANCE
Period of Performance: 8/18/08
Description of Work:
Fabricated (2) Stainless Steel Pump Shafts
(14 3/16 Long X 2.883 OD with 3” Long X
2.360 OD step and flanged end with 3 1/2”
holes drilled 120 degrees apart)
Phenolic Bushing Fabrication
Drilling and tapping of broken bolts
Agency: Seabulk Tankers, Inc. POC: Harvey J. Mott
Telephone No: 954‐627‐5259 Vessel: Seabulk Trader
Period of Performance: October 2009
Description of Work:
Pressure Vacuum Valve Repair
Flame Screen Installation
PV Valve Repacking
Commercial Crane
Agency: Canyon Offshore – A Helix Company POC: Danny Cook
Telephone No: 713‐996‐4020 Vessel: Northern Canyon
Period of Performance: 4/10/09‐4/15/09
Description of Work:
Removed the launch and recovery system from vessel’s back deck
Reinstall level wind and trencher winch
Set containers on the ship’s deck that could not be reached by the vessel’s crane
Agency: Boa Marine Services POC: Tim Redland
Telephone No: 832‐466‐4250 Vessel: M/V BOA SUB C
Period of Performance: 2/5/2010 ‐
Description of Work:
Mounted a 500 ton spool of wench cable to a shore‐side spooling apparatus
Utilized both 650 ton and 500 ton cranes in tandem
Agency: Con‐Dive POC: Kevin Bernard
Telephone No: 713‐591‐0556 Vessel:
Period of Performance: 7/20/08‐7/26/08
Description of Work:
Utilized 750 Ton shore crane to unload/load
100 Ton ship crane components
Fabricated 6 x 16 Lifting frame
Hoisted components and reel from dockside
to barge deck
Agency: PGS Geophysical POC: Hans‐Peter Waldner
Telephone No: 281‐509‐8376 Vessel: M/V RAM FORM VALIANT
Period of Performance: 10/14/09‐10/20/2009
Description of Work:
Starboard and Port Side Thruster Removal/
Installation
Utilization of 500 Ton Crane
Agency: TTS Marine POC: Torsten Paas
Telephone No: +1 954 493 6405 Vessel:M/V CAP ORTEGAL
Period of Performance: 2/8/09‐2/11/09
Description of Work:
Crane Boom repair
Fabricated Boom Jig Fixture
Alignment Plate installation
Fabricated transition pieces and center
brace
Ultrasonic weld testing
Replaced (4) Pad eyes and (2) Sheaves
Applied Primer and Paint
Agency: Well Ops‐ A Helix Company POC: Richard Patton
Telephone No: 281‐848‐6559 Vessel: Drilling Rig: Q‐4000
Period of Performance: 10/08/09‐11/04/09
Description of Work:
Heavy lift of Propulsion Pods
Placed Pods shore‐side on prefabricated
cradles
Agency: Dockendale Shipping Company, LTD. POC: D’sa J. Eddy
E‐mail: [email protected] Vessel:M/V DS VANGUARD
Period of Performance: 4/12/2009‐4/17/2009
Description of Work:
Crane Pedestal Removal
Slewing Bearing Replacement
Jib Bearing replacement
Load Testing
Agency: Clipper Elite Carriers S.A. POC: Niels Giltrup
Telephone No: 713‐953‐2242 Vessel:M/V CARRIBEAN CARRIER
Period of Performance: March 2008
Description of Work:
Removed/Reinstalled Crane Jib
Removed damaged sections of jib
Fabricated new jib sections
Ultrasonic weld testing
Crane and Jib load testing
Re‐spooled Crane Cable
Agency: Texas Department of Transportation POC:
Telephone No: Vessel:
Period of Performance: 11/17/2008
Description of Work:
Assisted the Texas Department of Transportation
incident response and recovery services up righting of overturned vehicles removal of large obstructions from
roadways removal of boats from the Galveston
Causeway
Agency: Western Geco POC: Keith Graham
Telephone No: 713‐689‐6589 Vessel: Geco Pegasus
Period of Performance: 2009‐Present
Description of Work:
Provide crane service
Trash Removal
Load Vessel Supplies
Fabrication
Agency: Dow Chemical POC:
Telephone No: Project: Stainless Steel Pressure Vessel
Period of Performance:
Description of Work:
Fabricated stainless steel pressure
vessel to the customer’s specs, within
the required timeline.
Agency: Tool Inc. POC: Cathy Busbey
Telephone No: Project: Mud Production Tanks
Period of Performance: September 2010
Description of Work:
Constructed (3) mud production
tanks.
Utilized plate‐ roll to fabricate tank
walls.
Welded and pressure tested vessels
to customers standards.
Agency: Schlumberger Technology Corporation POC: Rod Shampine
Telephone No: 281-285-8479 Vessel:
Period of Performance: March 2009
Description of Work:
Fabricated Pressure Vessel
Repaired and Modified existing Pressure
Vessels
Agency: Boa Marine Services POC: Tim Redland
Telephone No: 832‐466‐4250 Vessel:M/V BOA SUB C
Period of Performance: 2/6/2010‐2/16/2010
Description of Work:
Fabricated Spooling Tower Support Skid
Attached skid to Spooling Towers
Agency: Odfjell Management AS POC: Jan Magnus Hestdal
Telephone No: +47 55 27 45 42 Vessel:M/V BOW ATLANTIC
Period of Performance: June 2009
Description of Work:
Fabricated Engine Room Vent Silencer
using 1/8” carbon steel plate rolled into
52.5” OD
Installed 2” of sound insulation
Sandblasted and coated 1/8” galvanized
perforated metal with zinc primer
Agency: Helix POC: Richard Patton
Telephone No: 281‐848‐6559 Vessel:
Period of Performance: December 2007
Description of Work:
Fabricated 30 Ton 33’ X 33’ Carousel Base at
MISR yard
Coatings
Agency: Helix Energy Solutions POC: Richard Patton
Telephone No: No: 281‐848‐6559 Vessel: Q‐4000
Period of Performance: 10/15/10‐ 10/25/10
Description of Work:
Coated 18” 90 degree pipe with flame sprayed
coating to extend overboard discharge piping
life.
Agency: Schlumberger Technology Corporation POC: Rod Shampine
Telephone No: 281-285-8479 Vessel:
Period of Performance: March 2009
Description of Work:
Applied Powder‐Coating to Pressure Vessel
Agency: American Cargo Transport Corp. POC:
Telephone No: 206‐243‐1800 Vessel:M/V AMERICAN TRADER
Period of Performance: May 2009
Description of Work:
Sandblasted (2) 11’ x 26’ and 11’ x 40’
cargo ramp doors
Applied (3) Coat Paint System (Bar‐Rust
235, Catha Coat 302, T‐10 Thinner)
Agency: Western Geco POC: Lawrence Howard
Telephone No: 832‐868‐7172 Vessel:M/V STONES RIVER
Period of Performance: 7/28/08‐8/15/08
Description of Work:
Prepping and painting in way of deck
boards wireways
Applied bulwark coating
Agency: Helix POC: Richard Patton
Telephone No: 281‐848‐6559 Vessel:
Period of Performance: December 2007
Description of Work:
Sandblasting
Applied 3 part epoxy coating to carousel
base
Agency: Lott Ship Agency POC: Bill Lott
Telephone No: 251‐433‐1621 Vessel:M/V ACERGY POLAR QUEEN
Period of Performance: May 2009
Description of Work:
Hydro‐blasted original paint from heli‐deck
Cleaned Prepped and laid out area to be
painted
Applied multiple paint coatings to heli‐
deck; approved by ship’s inspector
Agency: ID Wallem POC:
Telephone No: Vessel: OBELIX BULKER
Period of Performance: 6/10/2011‐6/29/2011
Description of Work:
Removed twisted rudder stock
Fabricated 10’ x 18’ x 20’ cofferdam
Installed cofferdam and inspected rudder
for damage
Machined new key way in rudder stock
Reinstalled rudder stock
Removed, aligned, and reinstalled steering
gear
Agency: Superior Energy POC: Nick Mayon
Telephone No: 337‐364‐9704 Vessel: DB Superior Performance
Period of Performance: Dec. 2010
Description of Work:
De‐rig of SAT system
Disposed of vessel waste
Removal of fairleads, cow‐catchers, and
tender work
Provided logistics support
Installed equipment to make vessel ready
for Panama Canal passage