Provision of Passenger Amenities and facilities, and its improvements at Railway Stations is one of the most important aspect in Railway Services.
Passenger Amenities
1. Provision of Electronic Train/Coach Indication/ Passenger Guidance Board is being provided at Lalaguda, Moula Ali, Charlapalli, Ghatkesar, Malkajgiri, Dayanand Nagar, Safilguda, Ramakrishnapuram Gate, Ammuguda, Alwal, Cavalry Barraks, Bolarum, Bolarum Bazar, G Pochampalli, Gowdavalli, Medchal stations under MMTS Phase II project with cost of ̀ 4.59 crore.
2. Installation of Electronic Train/ Coach Indication/ Passenger Guidance Board is being done at Ammuguda, Sanatnagar, Firoziguda, Suchitra Centre, Bhudevinagar, Neredmet, Moula Ali Housing Board Colony as a part of MMTS Phase II project with cost of ̀ 3.90 crore.
3. Proposed for construction of Toilets at Lallaguda Gate, Safilguda, Ramakistapuram, Ammuguda, Cavalry Barracks, Alwal and Bolarum Bazar with an estimated cost of ̀ 4.46 crore.
4. Proposed for Platform extension works at Cherlapalli, Lallaguda, Ramakistapuram, Safilguda, Ammuguda, Alwal, Bolarum Bazar and Dayanand Nagar with an extimated cost of ̀ 9 crore.
5. Proposed for development of circulating area at Ammuguda, Cavalry Barracks, Alwal, bolarum Bazar, lallaguda Gate, Safilguda and Ramakistapuram with an extimated cost of ̀ 2.38 crore.
Station Amenity Amount Status
Malkajgiri Toilets `1 lakh Constructed
Ghatkesar Platform Works `30 lakh Completed
Malkajgiri Platform Works `1.11 crore Completed
Borabanda 2 Escalators
Hitech City 2 Escalators `6.00 crore Proposed
Fatehnagar 2 Escalators
Borabanda CCTV Cameras
Hitech City CCTV Cameras
Bharatnagar CCTV Cameras `1.84 crore Proposed
Fatehnagar CCTV Cameras
Bharatnagar 2 ATVMs
Hitech City 2 ATVMs
Borabanda 2 ATVMs
Malkajgiri 2 ATVMs `16.5 lakh Installed
Ghatkesar ATVM
Bolarum ATVM
Nature Cure Hospital ATVM
Hitech City 2 CoTVMs `13.5 lakh Installed
Bharatnagar CoTVM
Malkajgiri CIB/TIB `14.14 lakh Provided
Moula Ali Adarsh Station `3.60 crore Developed
Moula Ali Circulating Area `1.80 crore Developed
Bolarum Bazar PF Shelter `3.1 lakh Proposed
Dayanand Nagar PF Shelter `3.2 lakh Proposed
Hitech City Toilets `0.10 crore In Progress
Bharat Nagar Toilets `0.10 crore In Progress
Bharat Nagar 2 Lifts `1 crore In Progress
Borabanda 2 Lifts `1 crore In Progress
Hitech City 2 Lifts `1 crore In Progress
LallagudaGate 1 Lift `0.5 crore In Progress
9 Stations Wi-Fi `14 lakh Provided
Provision of Stoppage
1.Tr.No.17417/17418 Tirupati-Sainagar Shirdi-Tirupati Weekly Express given stoppage at Malkajgiri
2 .Tr.No.18112/18111 Yesvantpur-Tatanagar-Yesvantpur Weekly Express given stoppage at Moula-Ali
3 . T r . N o . 1 7 2 2 9 / 1 7 2 3 0 Thiruvananthapuram Central– Hyderabad-Thiruvananthapuram CentralSabari Express given stoppage at Charlapalli
Extension of Service
1. Tr.No.57448 Mahabubnagar–Secunderabad Passenger is extended to Mirzapalli with stoppages at Lallaguda Gate, Malkajgiri, Dayanandnagar, Safilguda, Ramakistapuram Gate, Ammuguda, Cavalry Barracks, Alwal, Bolarum Bazaar, Bolarum, Gundlapochampalli, Gowdavalli, Medchal, Dabilpura, Kuchavaram Halt and Manoharabad stations.
Running of Special trains 1. Bolarum to Gadwal 12 special trains 2. Bolarum to Mahabubnagar 1 special train 3. Malkajgiri to Basar 24 special trains 4. Malkajgiri to Nizamabad 10 special trains (Total 47 special Trains)
Passenger Train Services
Details of Special Trains/ Provision of Stoppages/ Extension of Trains in Malkajgiri Parliamentary Constituency Jurisdiction.
RAIL DEVELOPMENTAL WORKS Malkajgiri Parliamentary Constituency Jurisdiction
South Central Railway serving the entire state of Telangana, major portion
of Andhra Pradesh and considerable portion of Karnataka, Maharastra states and small parts
of Tamilnadu and Madhya Pradesh.
Malkajgiri Parliamentary Constituency falls under Telangana State. Entire
Railway Network of this constituency is being served by
South Central Railway.
SOUTH CENTRALRAILWAY
Shri Narendra ModiHon’ble Prime Minister
Malkajgiri Parliamentary Constituency
RAIL DEVELOPMENTAL WORKS
Malkajgiri Parliamentary Constituency Jurisdiction
Infrastructural Development
New Railway Lines1. Construction of new line under MMTS - Phase II for
a distance of 84 Kms with an estimated cost of `817 crore is under progress
2. Proposed for Extension of MMTS - Phase II upto Yadadri for a distance of 33 Kms with an estimated cost of ̀ 412 crore.
Electrification of Railway LinesIt is proposed for electrification of Manmad – Dhone for a distance of 868 Kms with an estimated cost of `1031 crore.
Capacity enhancement
1. Upgradation of Yard remodeling works are completed in Malkajgiri and Moula ali with the cost of ̀ 95 lakh.
2. Development of loading facilities for handling containers is completed with a cost of ` 25 lakh at Medchal.
3. Development of satellite terminal at Charlapalli station is under progress with the cost of ` 220 crore.
4. Proposed for Conversion of Siding 1 as UP loop (coaching fit) and Siding 2 as goods loop with direct reception and dispatch facilities at Moula Ali with an estimated cost of ̀ 5.73 crore.
Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs)/ Road under/over Bridges are constructed / proposed for construction at various stations/ locations in Malkajgiri Parliamentary Constituency Jurisdiction.
Safety – The First Priority
ASSEMBLY SEGMENTS
Proposed FOBsStation Cost in `crore
Moula Ali 1.53
Lallaguda Gate 1.10
Malkajgiri 1.85
Bolarum 1.10
Green Initiatives
1. Towards Environment/conservation measures , Revival of Water bodies is completed in the jurisdiction of Malkajgiri parliamentary Constituency with a cost of ̀ 1.04 lakh.
2. Towards energy saving LED lighting is provided in all stations.
3. 617 kWp Solar Panels at Lallaguda Workshop, 120 kWp Solar panels at EMU Car Shed/Moula-Ali and 20 kWp Solar Panels at Diesel Loco Shed/Moula-Ali are installed.
With a view to strengthen safety at Level Crossing gates and to avoid untoward incidentsand also to provide seamless journey to road traffic, the following Road under/overBridges are constructed/proposed for construction under Malkajgiri Parliamentary constituency.
Road Over / Under Bridges
Road Over Bridges (ROB)
1. Construction of ROB in lieu of LC No.15-T between Secunderabad and Kazipet with the cost of ̀ 42.57 crore.
2. Construction of ROB between Cherlapally and Ghatkesar in lieu of LC No.12 with the cost of `32.20 crore is in progress.
3. Construction of ROB between Gundlapochampalli and Medchal Stations in lieu of Manned LC No.246/A with an estimated cost of ̀ 38 crore is in progress.
Road Under Bridges (RUB)
1. RUB at Lallaguda Gate Station Yard in lieu of LC No.256 is under progress with Sanctioned Cost of `29.10 crore
2. Proposed for construction of RUB in lieu of LC No.254 at Safilguda with an estimated cost of `30.82 crore. Alignment to be finalised by State Govt.
3. Proposed for construction of RUB between Ammuguda and Moula Ali Stations in lieu of LC No.BP-8 with an estimated cost of ` 29.99 crore and Alignment to be finalised by State Govt.
4. Construction of RUB between Ammuguda and Moula Ali Stations in lieu of LC No.BP-11 witn an estimated cost of ̀ 27 crore is in progress.
Medchal
Malkajgiri
Qutbullapur
Kukatpalle
Uppal
Lal Bahadur Nagar
Secunderabad Cantt.
Construction of FoB at Moula-Ali with the cost of `1.61 crore is in progress.