MALL OF AMERICA, PHASE II TRAFFIC STUDY PREPARED FOR: MALL OF AMERICA PREPARED BY: SRF CONSULTING GROUP, INC. SEPTEMBER 06, 2006 SRF NO. 0055391 Approvals: Date Marie Cote, P.E., Principal SRF Consulting Group, Inc. Date Charlie Honchell, P.E., Director of Public Works City of Bloomington, MN
Transcript
Page 1: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

MALL OF AMERICA, PHASE II TRAFFIC STUDY

PREPARED FOR:

MALL OF AMERICA

PREPARED BY:

SRF CONSULTING GROUP, INC.

SEPTEMBER 06, 2006

SRF NO. 0055391

Approvals: Date Marie Cote, P.E., Principal SRF Consulting Group, Inc. Date Charlie Honchell, P.E., Director of Public Works City of Bloomington, MN

Page 2: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

TABLE OF CONTENTS Page

I. INTRODUCTION............................................................................... 1

II. EXISTING CONDITIONS .................................................................. 1 A. LRT Operations ......................................................................... 1 B. Traffic Operations ...................................................................... 3 III. 2012 NO BUILD CONDITIONS ......................................................... 11 A. Assumed Land Use ................................................................... 11 B. Assumed Roadway Improvements for Existing Conditions ....... 11 C. Assumed Roadway Improvements (BCS) ................................. 11 D. Assumed Roadway Improvements (Airport South CIP)............. 14 E. 2012 No Build Operations Analysis - Saturday.......................... 14 F. 2012 No Build Operations Analysis - Thursday ......................... 17 IV. 2012 BUILD CONDITIONS................................................................ 21 A. Assumed Land Use ................................................................... 21 B. Trip Distribution ......................................................................... 22 C. Assumed Roadway Improvements ............................................ 22 D. 2012 Build Operations Analysis - Saturday ............................... 22 E. 2012 Build Operations Analysis - Thursday............................... 30 V. 2030 BUILD CONDITIONS................................................................ 33 A. Assumed Land Use ................................................................... 33 B. Assumed Roadway Improvements ............................................ 34 C. 2030 Build Operations Analysis - Saturday ............................... 34 D. 2030 Build Operations Analysis - Thursday............................... 38 VI. OTHER ISSUES................................................................................ 44 A. Site Plan Review ....................................................................... 44 B. Impacts to IKEA Store ............................................................... 45 V. STUDY CONCLUSIONS AND RECOMMENDATIONS .................... 46 APPENDIX A – Detailed Land Use and Trip Generation ............................. 52

Page 3: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 1

I. INTRODUCTION This report contains the traffic study results for the proposed second phase of development for the Mall of America. The proposed project is located in the northeast quadrant of TH 77 and Lindau Lane in the City of Bloomington (see Figure 1: Project Location). The purpose of this study is to determine the traffic impacts on the adjacent roadway system and necessary improvements to accommodate the traffic increase related to the proposed Mall expansion and other adjacent developments in the area, including activities associated with the Minneapolis/St. Paul International Airport and Bloomington Central Station. This study includes an operations analysis for a Saturday peak hour and a Thursday p.m. peak hour for the following scenarios:

• Existing conditions

• Year 2012 no build and build conditions

• Year 2030 build conditions

Existing, future no build and build conditions take into account light rail transit (LRT) operations. II. EXISTING CONDITIONS This section of the report documents existing conditions in and around the project area. This section documents existing LRT operations and traffic operations. A. LRT Operations Light rail transit has been in use within the study area since December of 2004 and its operation is expected to continue into the future. Because the LRT line directly impacts seven intersections within the study area, delay to motor vehicles as a result of its operation was calculated to include in the traffic operations analysis. In order to determine impacts to the seven intersections, train counts and delays to motorists were identified for both the a.m. and p.m. peak hours. Table 1 shows the number of trains during the a.m. and p.m. peak hours at selected intersections. Table 1 Existing Number of LRT Trains – A.M. and P.M. Peak Hours

Intersection

A.M. Peak Hour (7:30 – 8:30)

P.M. Peak Hour (4:30 – 5:30)

24th Avenue/Killebrew Drive 14 NA 28th Avenue/82nd Street* 16 17 34th Avenue/American Boulevard** 17 16 34th Avenue/Appletree Drive 16 NA Total 63 33 * Trains at this intersection also include impacts to 30th Avenue **Trains at this intersection also include impacts to I-494 and 34th Avenue

Page 4: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

PROJECT LOCATIONMALL OF AMERICA PHASE II TRAFFIC STUDYMall of America/City of Bloomington

Figure 1

aifi

Pc

c

Rai

l oad

r

D NO AL

IV RR E

LA

.

72

73

74

75

67

77

E.

E.

E.

E.

.E

E.

ST.

T.S

T.S

.ST

ST.

.ST

ST.E.

F

NER

D.R

LA BL

VD.

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

.A AV

E.

AV

E.

AV

E. .

AV

E VA

E.

AV

E.

AV

E. .

AV

E

LI

CN

TO

N

PT

OR

OA

K

AN

LD

LA

ND

PA

RK

CO

LS

UM

BU

CI

HO

CA

G

LIO

TE

L

AV

E.

AV

E.

VE

.A

V.

AE

BO

NG

NL

OM

IT

O

EC

DA

R

McC

AR

TH

Y

NA

LD

DOH

ITA

GE

ER

TE

RM

INA

L

ME

MO

RIA

L

HI

AY

GH

W

YAEE

NK

DR

.

LA

.

VE

A.

MEADOW VI EWDR .

VE

A.

S.

PK

WY.

ET

RO

M

ORTE

M

DR.

E.

E.

ST.

ST.

ST.

AVE. S.

E. LO D

LKIL EBREW DR.

38

84

86

T.SST.

ST. TS .

ST.

ST.

ST.

ST.

ST.

T.S

TS .

ST.

S .T

ST.

68 1/2

SKYLINE DR.

RIVER RIDGE CIR.

ST.

E.

E.

E.

E.

E.E.

81 T.S

82

38

ST.

ST E.

.ST

ST.

ST.

T.S

ST.E. 93

92

CIN

LT

ON

PO

TR

LA

ND

OA

KLA

ND

KP

AR

UM

US

CO

LB

CH

ICG

OA

ELLIO

T TO

BLO

OM

ING

N

AV

E.

AV

E.

A.

VE

A.

VE

AV

E.

AV

E.

AV

E.

EA

V.

AV

E.

AE

.V

.A

VE

AV

.E

AV

E.

EA

V.

AE

.V

VE

.A

AV

E.

S.

S. S. S. S

.

S.

S.

S.

S.

S.

S.

S.

S.

S.

E.

SH

AK

OPE

E

RD.

RD

.V

E.

A

AV

E.

AV

E.

S.

S. .

S

CR

ET

S

RD

.

.E T.S

LN

I W .

GE

V ELA

22

AV

E.

RID

GE

RD

.R

IVE

R

88

V.

AE

AV

E.

ST.

AV

E.

EF

LL

LO

NG

W A

V.

OE

AV

E.PAR

K

RD.

SPRIG

SIDE

NL.A

OLD

ED

AR

CA

EV

.

MEAD

OW

VIE

W.

RD

61

17

AV

E.

EA

V.

92 1/ 2 ST.

93 1 2 / S .T

PA

RK

RD.

.D

R

OLNG M

WEADOCIR

SCLE

ST.

AV

E.

ST.79 1/2

09

OFFHCSIBLA.

AV

E.

S.

S.

S. S. S.

S.

S.

RIV

ER

V DOL

E.

OSTP

RD.

CIR.CEDAR

1 t7 s

78th

th

th

th

th

nd

rd

4th

5ht

10th

11th

12th

1h

3t 14th

15th

16th

17th

18th

4th

3

8 st1

82nd

6h

E

. .

2t

AV

S

26th79th79th

80th 08 th

n82 d

rd

ht

th

t87 h. 8 hE 7t

ts

t ST81s .

nd

rd

th

nd

h4t 5th

1th

0

11th

12th

3th

113th

14th

15th

T-B

IRD

RD

18th

6t

1h

7t

1h

80th

nd

88th ST.

th

20th

2st

1

19th

18th

th th

15t

ST.

h

T.81st S

t78 h

5th

th

88th

89t ST.h

34th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

C B DAMERI AN LV

LA.

98 th

28th

S

T. S

.

91 st T.S

S.

PPLETR EA E

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24th

AV

E.

S.

NO

RTH

WE

ST

DR

.

EL T DREN E

.ST

DR

.CIT

YV

IEW

D.

R.

DR

INE

RT

NA

TIO

NA

L

76 1 2 / ST.

LI UNDA

CD

RE

AV

AE

.S

.

rd

AIRPORT LA.

TM C RD.

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT SNELLING

NATIONAL CEMETERY

FORT

S

LLI

NE

NG

494494

494

5

13

5

77

77

5

1

1

35

35

1

35

28

BLOOMINGTON2000 POP. 85,172

HE

PI

NNEN

D

OTA

AK

C

YO

UN

TU

CO

NT

Y

30

th A

VE

NO

RT

H

No

rth

PROJECTLOCATION

Page 5: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 3

There were a total of 96 trains during the a.m. and p.m. peak hours, or an average of 16 trains per hour, per location. These numbers are similar to Metro Transit’s LRT schedule and are similar to the assumptions used in the Bloomington Central Station Traffic Study (2004). In addition to identifying the number of trains during the peak hours, the time needed for each train crossing was measured. This time is not the preemption time, but the actual time that the traffic signal allocates to the train crossing (restricting conflicting traffic phases). This time was then incorporated into the traffic operations model to replicate real life traffic operations. Table 2 shows measurements of train crossing times at the seven intersections. Table 2 Time Needed to Accommodate Train Crossing

Intersection NB/EB SB/WB I-494 N. Ramp/34th Avenue I-494 S. Ramp/34th Avenue

70 seconds for back-to-back 40 seconds

34th Avenue/American Boulevard

65 seconds for back-to-back 40 seconds

40 seconds 30 seconds 30 seconds

34th Avenue/Appletree Drive 60 seconds

30th Avenue Signal 70 seconds 65 seconds

70 seconds 155 seconds for back-to-back

28th Avenue/82nd Street 65 seconds 65 seconds 24th Avenue/Killebrew Drive

65 seconds 110 seconds for back-to-back 65 seconds

B. Traffic Operations The existing operations analysis is based on peak hour turning movement counts taken within the study area and delay due to LRT. Peak hour turning movement counts for a Saturday and a typical weekday (Thursday) were collected by SRF in April and May of 2005 at the following key intersections:

• Lindau Lane/TH 77 Ramps/IKEA Way • Lindau Lane/22nd Avenue

• Lindau Lane/24th Avenue • Killebrew Drive/TH 77 Ramps/20th Avenue

• Killebrew Drive/22nd Avenue • Killebrew Drive/24th Avenue

• 24th Avenue/I-494 Interchange • 24th Avenue/82nd Street

• American Boulevard/IKEA Driveway • American Boulevard/Thunderbird Road

• American Boulevard/24th Avenue • American Boulevard/28th Avenue

• American Boulevard/34th Avenue • 34th Avenue/I-494 North Ramps

• 34th Avenue/I-494 South Ramps

• Old Shakopee Road/86th Street

• 28th Avenue/82nd Street

• Old Shakopee Road/TH 77 East Ramp

Page 6: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 4

It is important to note that the operations analysis for the proposed Mall of America Phase II was completed for the typical Saturday peak hour (3:00 to 4:00 p.m.) and typical Thursday p.m. peak hour (4:30 to 5:30 p.m.). An operations analysis for the typical weekday a.m. peak hour will be completed for the Airport South AUAR update, under a separate study at a later date. All of the intersections are signalized with the exception of American Boulevard/IKEA Driveway. This intersection is side-street stop controlled. Existing geometrics, traffic controls and peak hour traffic volumes for the key intersections are shown in Figures 2 through 5. Traffic Assumptions

In addition to the turning movement counts, traffic data, operations analyses and assumptions from the Mall of America Phase II Traffic Study (2003), the Mall of America DEIS (2000), the Airport South AUAR (2002) and the Bloomington Central Station Traffic Study (2004) were also reviewed. Based on the previous studies, the following assumptions for existing conditions were made:

• Based on the following data, an adjustment factor of 1.3 was applied to the existing Thursday turning movements counts into and out of the Mall of America and IKEA:

o The Mall of America Phase II Traffic Study (2003) included an operations analysis for the weekday p.m. peak hour for a typical peak month in August. A factor of 1.3 was applied to adjust counts from May to August.

o August 2003 TH 77 ramp volumes at Killebrew Drive and Lindau Lane were 15 percent higher than April 2003 volumes.

o Total Mall traffic into and out of the site was 3,620 cars during the weekday peak hour in May 2005.

• Based on the following data, no adjustment factor was applied to the existing Saturday turning movement counts:

o The Mall of America DEIS (2000) and Airport South AUAR (2002) did not include a Saturday operations analysis.

o The Mall of America Phase II Traffic Study (2003) included an operations analysis for Saturday peak conditions.

o Additional Mall visitor data from the Phase II study indicated a Saturday/Thursday ratio of 1.8 – May 2005 counts calculate a ratio of 2.1.

o Data collection for May 14, 2005 was on the fishing opener weekend with rainy weather conditions.

o Total traffic into and out of the Mall (May 2005) was 7,445 vehicles during the peak hour (3:00 to 4:00 p.m.) – significantly higher than a typical weekday peak period (previous data).

o Volumes collected for the Lindau Lane origin-destination study on May 21, 2005 were approximately 20 percent lower than those collected on May 14, 2005.

o TH 77 ramp volumes at Killebrew Drive and Lindau Lane for April 2005 were the same or higher than those from August 2004.

Page 7: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2005 SATURDAY PEAK HOUR TRAFFIC VOLUMES (3 PM to 4 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 2

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

18th

th16

17th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

T-B

IRD

R

DIK

EA

WA

Y

NO

RT

H

Nort

h

201

15

201

45 86

45

IKE

A D

rive

way

American

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

68

197

147

310

768

93

84

476

122

94

436

90

188

Lindau Ln

IKE

A w

ay

103

227

356 40

25

46

145

28

182

Lindau Ln

22nd A

ve

165

774

415

210

24th

Ave

. S

Lindau Ln

24th

Ave

35

5

16

341

11

55

56

4

29

6

26

82nd St.

163

975

633

530

9

36

23

9

20

th A

ve

.

Killebrew Dr.

124

257

41

350

339

80

7

24

25

43

4

1

57

2

3

75

22

nd

St.

Killebrew Dr.

32

55

74

525

156

167

2

52

114 9

11

5

1

22

7

9

24

th A

ve

.

Killebrew Dr.

52

1

67

6 64

397

682

80

56

3

14

Th

un

de

rbird

Rd

27

150

202

16

159

71

8 72

6

5

8

8

8

9

American Blvd

Page 8: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2005 SATURDAY PEAK HOUR TRAFFIC VOLUMES (3 PM to 4 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 3

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

18th

th16

17th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

AW

AY

T-B

IRD

R

D

NO

RT

H

No

rth

3

14

13

18

22

14

6

10

8

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

115

20

108

14

1

4

22

American Blvd

28

th A

ve

American

166

37

13

117

48

10

9

5

78

13

2

1

0

8

7

1

3

34

th A

ve

American Blvd

82nd St. 0

1

3

71

3

242

3

52

57 1

20

9

2

00

2

TH 77 Ramp

8

3

7

94

1

37

1

09

21

7 11

2

0

2

40 4

OS

R

86th St.

4

4

2

3

75

25

6

17

5

22

2

34

th A

ve

.

I-494 Ramp

85

9

155

1

82

22

9

17

5

20

4

34

th A

ve

.

I-494 Ramp

222

1

123

American

30

44

70

155

33

86

2

31

10

41

50

10

4

1

02

7

58

24

th A

ve

American Blvd

52

1035

29

264

4

12

35

6

27

9

9

7

85

8

24

th A

ve

.

I-494 Ramp

OS

R

Page 9: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2005 WEEKDAY PEAK HOUR TRAFFIC VOLUMES (4:30 PM to 5:30 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 4

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

Aw

ay

NO

RT

H

No

rth

354

13

416

24 14

20

IE

A D

ivay

Kr

ew

American Blvd

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

82

441

63

67

1

56

63

34

364

66

128

Lindau Ln

IKE

A w

ay

15

293

241

7 9

9

134

7

177

Lindau Ln

22nd A

ve

85

51

3 328

107

24th

Ave

. S

Lindau Ln

24th

A

ve

34

3

33

1

45

82nd St.

82

916

500

461

480

89

20th

Ave

.

Killebrew Dr.

89

471

120

209

224

117

3

04 11 74

2

23

1

2

90

22

nd

St.

Killebrew Dr.

27

326

483

108

70

210

2

51

20

9 8

1

03

11

2

1

97

24

th A

ve

.

Killebrew Dr.

3

5

21

5

22

4

64

61

2

119

11

93

17

249

400

264

217

183

35

291

108

Th

un

de

rbird

Rd

29

311

64

29

1

7

59

American Blvd

20

358

58

2

7

7

4

2

Page 10: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2005 WEEKDAY PEAK HOUR TRAFFIC VOLUMES (4:30 PM to 5:30 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 5

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

AW

ay

NO

RT

H

Nort

h

5

25

52

19

93 2

12

5

5

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

473

95

131

30

40

0

57

American Blvd

28th

Ave

American

388

55

77

532

55

20

11

9

15

0

15

5

2

0

2

34

7

0

34

th A

ve

American Blvd

82nd St. 0

0

3

100

7

371

3

77

22 5

36

4

2

52

4

OS

R

TH 77 Ramp

31

10

61

140

9

65

2

23

66

61

0

38

2

60

15

OS

R

86th St.

8

5

5

4

15

33

7

32

1

10

8

34

th A

ve

.

I-494 Ramp

57

4

228

2

88

27

7

34

6

88

7

34

th A

ve

.

I-494 Ramp

83

1

136

American

321

158

204

236

103

120

11

4

75

2

62

1

02

6

77

6

2

24

th A

ve

American Blvd

104

848

31

158

4

91

68

0

33

8

2

00

76

0

24

th A

ve

.

I-494 Ramp

Page 11: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 9

• Based on information from the previous LRT Operations section, the intersections of 34th Avenue and I-494 North ramp, I-494 South ramp and American Boulevard, a single train will be modeled requiring 45 seconds of signal time. Back-to-back trains require 90 seconds of signal time. As part of the model, ramp intersections were modeled as an all-red phase. American Boulevard was modeled as a northbound/southbound green phase.

• Based on information from the previous LRT Operations section, the remaining intersections impacted by LRT, a single train will be modeled requiring 70 seconds of signal time, with back-to-back trains requiring 140 seconds of signal time. The intersections of 34th Avenue/Appletree Drive, 28th Avenue/82nd Street, and 30th Avenue were modeled as an all-red phase. At 24th Avenue and Killebrew Drive, the LRT phase restricts southbound movement and northbound through movement.

Traffic Operations Analysis

Saturday and Thursday operations analyses were conducted for the mid August p.m. peak hour (3:00 to 4:00 p.m. and 4:30 to 5:30 p.m.) at each of the intersections to determine how traffic currently operates within the project area. Unsignalized and signalized intersections were analyzed using the Synchro/SimTraffic software. The SimTraffic software was used to review lane utilization, weaving and queues between closely spaced intersections and determine level of service results. The operations analyses identify a Level of Service (LOS) which indicates the quality of traffic flow through an intersection. Intersections are given a ranking from LOS A through LOS F. LOS A indicates the best traffic operation, with vehicles experiencing minimal delays. LOS F indicates an intersection where demand exceeds capacity, or a breakdown of traffic flow. LOS A through D are generally considered acceptable by drivers. LOS E indicates that an intersection is operating at, or very near its capacity, and that vehicles experience substantial delays. For the unsignalized intersection at American Boulevard/IKEA Driveway, special emphasis was to providing an estimate for the LOS of the side-street (driveway) approach. Traffic operations at an unsignalized intersection with side-street stop control are calculated two ways. First, consideration is given to the overall intersection level of service. This takes into account the total entering volume into the intersection and the capability of the intersection to support these volumes. Second, it is also important to consider the level of service on the side-street approach. Since the mainline does not have to stop at an unsignalized intersection that has side-street stop control, the majority of intersection delay is attributed to the side-street approaches. It is typical of intersections with higher mainline traffic volumes to experience high levels of delay (poor levels of service) on the side-street approaches, but an acceptable overall intersection level of service during the peak hour periods. Results of the operations analyses are shown in Table 3. Most of the key intersections, with the exception of Lindau Lane/TH 77 Ramps/IKEA Way and Killebrew Drive/22nd Avenue, are presently operating at acceptable levels of service.

Page 12: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 10

Table 3 Existing Peak Hour Capacity Analysis Level of Service Results

Level of Service Intersection Saturday

Peak Thursday P.M. Peak

Lindau Lane/TH 77 Ramps/IKEA Way E (C) D Lindau Lane/22nd Avenue C B Lindau Lane/24th Avenue B B Killebrew Drive/TH 77 Ramps/20th Avenue C B Killebrew Drive/22nd Avenue E (C) B Killebrew Drive/24th Avenue D D 24th Avenue/I-494 Single-Point Interchange D C 24th Avenue/82nd Street B B American Boulevard/IKEA Driveway * A/A A/A American Boulevard/Thunderbird Road B A American Boulevard/24th Avenue C C American Boulevard/28th Avenue A A American Boulevard/34th Avenue D D 34th Avenue/I-494 North Ramps D D 34th Avenue/I-494 South Ramps D C 28th Avenue/82nd Street D C Old Shakopee Road/86th Street A B Old Shakopee Road/TH 77 East Ramp B B

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. Note: Parentheses indicate LOS with assumed improvements listed below. Queuing at all freeway ramp terminal intersections was reviewed and addressed for the existing conditions. Based on site observations and the traffic analysis, queuing problems exist during the Saturday p.m. peak hour at the intersection of Lindau Lane/TH 77 Ramps/IKEA Way. Traffic at times will spill back to the southbound TH 77 CD roadway. The improvement listed below eliminates this queuing problem. In order for the intersections of Lindau Lane/TH 77 Ramps/IKEA Way and Killebrew Drive/22nd Avenue to operate at acceptable levels of service, the following improvements are recommended: Lindau Lane/TH 77 Ramps/IKEA Way

• Eliminate access from northbound TH 77 to eastbound Lindau Lane • Remove concrete median on the west approach to allow southbound TH 77 traffic to

make an eastbound right-turn movement on Lindau Lane to the existing MOA near Nordstrom’s

Page 13: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 11

Killebrew Drive/22nd Avenue

• Construct an additional eastbound left-turn lane to provide dual left-turn lanes III. YEAR 2012 NO BUILD CONDITIONS Future traffic operations analyses were conducted for the year 2012 no build conditions. The land use, street network assumptions, and operations results are discussed in this section of the report. A. Assumed Land Use The year 2012 no build condition assumes that there will be no development associated with Mall of America Phase II. It does, however, assume that adjacent growth and development identified as part of the Bloomington Central Station Traffic Study, the Airport South AUAR, and the Minneapolis/St. Paul International Airport expansion has occurred (see Figure 6: Adjacent Development Locations). For specific details on the amount of development occurring on adjacent land, please refer to Appendix A (Table A-1). B. Assumed Roadway Improvements for Existing Conditions Based on the existing conditions analysis, the following improvements are assumed in the year 2012 no build analysis: Lindau Lane/TH 77 Ramps/IKEA Way

• Eliminate access from northbound TH 77 to eastbound Lindau Lane • Remove concrete median on the west approach to allow southbound TH 77 traffic to

make an eastbound right-turn movement on Lindau Lane to the existing MOA near Nordstrom’s

Killebrew Drive/22nd Avenue

• Construct an additional eastbound left-turn lane to provide dual left-turn lanes C. Assumed Roadway Improvements listed in the Bloomington Central Station

Traffic Study As a result of the Bloomington Central Station Traffic Study, the following improvements are assumed in the year 2012 no build analysis: American Boulevard

• American Boulevard will operate as a westbound one-way roadway between West Road and 34th Avenue with three through lanes

Page 14: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

ADJACENT DEVELOPMENT LOCATIONSMALL OF AMERICA PHASE II TRAFFIC STUDYMall of America/City of Bloomington

Figure 6

c

Pac

ifi

Rai

lrado

DONAL

IVERR

.LA

72

73

74

75

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

T.S

.ST

ST.

ST.

ST.E.

FERNDR.

AL BL

DV

.

ON

IAG

D

AV

E.

AV

E.

AV

E.

AE

V.

AV

E.

AV

E.

AV

E.

EA

V.

AV

E.

AV

E.

AV

E.

A.

VE

CL

INT

ON

OR

TP

OA

K

LD

AN

LA

ND

PR

KA

CO

LU

MB

US

CH

IC

AG

O

ELLIO

T

AV

E.

V.

AE

AV

E.

AV

E.

NB

LO

OM

IG

TO

N

CE

DA

R

McC

YA

RT

H

LD

ON

AD

TG

HE

RI

AE

TE

RM

INA

L

ME

MO

RIA

L

GH

AH

IW

Y

YANKEE

DR

.

LA

.

AV

E.

MEADOW VI EW.RD

AV

E.

.S

Y.

PK

W

ET

RO

M

ORTE

M

DR.

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

I E WK LL BRE DR.

83

84

86

ST.ST.

S .T .ST

ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

S YLIN DRK E .

I ER RIDGE C RR V I .

ST.

E.

.E

E.

E.

E.E.

81 ST.

82

38

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 93

92

CL

IO

NN

T

OR

AN

DP

TL

OA

LN

KA

D

PA

RK

LC

OU

MB

US

IA

GC

HC

O

LL

IOT

E

LB

OO

MIN

GT

ON

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AV

E.

AV

E.

EA

V.

V.

AE

AV

E.

V.

AE

AV

E.

AV

E.

AV

E.

AV

E.

VE

.A

VA

E.

.S S

. S. S. S

.

S.

S.

S.

S. .

S

S.

S.

S.

S.

.E

SH

AK

OPE

E

D.R

RD

.A

VE

.

AV

E. .

AV

E

.S S

.

S.

CR

ES

T

RD

.

E. ST.

GLENVIEW LA.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

.A

VE

AV

E.

ST.

EA

V.

FE

LL

LO

GN

OW

AV

E.

AV

.EPAR

K

DR .

SRING

SIDE

P

A.L

OD

LD

AR

CE

VA

E.

MEAD

OW

VIE

WR

D.

16

71

AV

E.

VE

A.

92 /2 1 T.S

93 1/2 TS .

AK

PR

RD.

RD

.

LO NG MEADOWCIR CLES

ST.

VE

.A

ST.79 1/2

09

OFFHCSIBLA.

AV

.E

S. .

S

S. S. S.

S.

S.

RIV

ER

V OLDE.

POST

RD.

CIR.CEDAR

71st

78th

th

th

th

th

nd

rd

4th

t5

h

10th th

11

1h

2t

13th 14th

15th

16th

17

ht

18th

3t

4h

81st

82nd26

th A

VE

. S

.

26th79thh79t

8 th0 0th8

82nd

rd

ht

th

87thE. 87th

st

81st ST.

nd

rd

th

nd

t4

h

5th

10th

11th

12th

13th

13th

14th

h15t

T-B

ID

R R

D

8h

1t

h1

6t

17

th

80th

dn

T.88th S

th

0th

2

1st

2

19th

18th

th th

h15t

ST.

st ST.81

th78

5th

th

88th

89th S .T

34th

A

VE

S

..

HIL

LR

IDG

E

AEX

NL

ADER

RD.

A ERICAN BLVM D

LA.

89 ht

28th

S

T. S

.

91 st ST.

S.

APPLETREE

SQUARE

RD

.

SA

OE

HK

PE

OLD

.E

th2

4A

VE

.S

.

ON

RTH

WE

ST

.D

R

LE RTEND E

ST.

DR

.CIT

YV

IEW

DR

.D

.R

NR

IT

EN

AT

ION

AL

76 1/2 ST.

LI DAUN

RC

ED

AA

VE

.S

.

rd

AI RRPO T LA.

MTC RD.

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT SNELLING

NATIONAL CEMETERY

S

FORT

NELL

ING

494494

494

5

13

5

77

77

5

1

1

35

35

1

35

28

BLOOMINGTON2000 POP. 85,172

ENNEPIN

HD

KAOTA

OU

TY

CN

OY

CU

NT

3h

0t

A

VE

NO

RT

H

No

rth

Bloomington Central Station

Kelley Farms

RPZBlock

Robert MuirProperty

AdjoiningLands

MAC

Page 15: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 13

American Boulevard/28th Avenue • Construct an eastbound right-turn lane (250 feet) • Restripe the northbound inside through lane to a left-turn lane • Extend the northbound left-turn lane to 200 feet • Replace north-south split phasing with protected left-turn phasing

American Boulevard/West Road (30th Avenue)

• Installation of a traffic signal • Convert the eastbound through lanes into dual right-turn lanes • The east approach will include dual left-turn lanes and two through lanes. The inside

through lane will end and become the outside left-turn lane at this intersection. • The south approach will include dual left-turn lanes

American Boulevard/Metro Drive East

• Construct a westbound left-turn lane (200 feet) American Boulevard/International Drive/East Road (33rd Avenue)

• Convert to a right-in/right-out/eastbound left-in access Old Shakopee Road/East Road (33rd Avenue)

• Installation of a traffic signal • The north approach will include a left-turn lane, a shared left-turn/through lane and a

right-turn lane. • Construct a westbound right-turn lane (300 feet)

Old Shakopee Road/West Road (30th Avenue)

• Installation of a traffic signal • Construct an eastbound left-turn lane (350 feet) • The north approach will include dual left-turn lanes and a right-turn lane. This approach

was modeled with what is shown on the proposed site plan, an inside left-turn lane of approximately 100 feet and a second full-length left-turn lane.

Old Shakopee Road/28th Avenue

• Restripe the southbound left-turn lane to a through lane • Construct a southbound left-turn lane (250 feet) • Construct an eastbound left-turn lane (300 feet) • Construct an eastbound right-turn lane (300 feet) • Construct an additional westbound left-turn lane (300 feet)

Page 16: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 14

D. Assumed Roadway Improvements listed in the Airport South CIP The following improvements listed in the City’s Airport South CIP are assumed in the year 2012 no build analysis: Killebrew Avenue at 20th Avenue

• Construct an additional eastbound left-turn lane to provide dual left-turn lanes

Old Shakopee Road, 24th Avenue to 30th Avenue

• Reconstruct with two through lanes in each direction, and a median with left- and right-turn lanes

Old Shakopee Road, 86th Street to Cedar Avenue

• Reconstruct with two through lanes in each direction, and a median with left- and right-turn lanes

American Boulevard

• Reconstruct with an additional westbound through lane (three through lanes) from 28th Avenue to 34th Avenue, and a median with left-turn lanes

American Boulevard at 24th Avenue

• Construct an additional westbound right-turn lane to provide dual westbound right-turn lanes

E. Year 2012 No Build Traffic Operations Analysis – Saturday To determine how well the existing and assumed roadway improvements listed above will accommodate year 2012 no build traffic forecasts (see Figures 7 and 8), an operations analysis was conducted for Saturday peak conditions (3:00 – 4:00 p.m.). A background growth rate of one percent per year was assumed for all traffic that passes through the study area. Results of the analysis shown in Table 4 indicate that all intersections operate at acceptable levels of service during the Saturday peak hour.

Page 17: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 NO BUILD SATURDAY PEAK HOUR TRAFFIC VOLUMES (3 PM to 4 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 7

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

A

wa

y

NO

RT

H

No

rth

225

15

230

45 90

45

IKE

A D

rive

way

American Blvd

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

70

200

150

310

415

545

4

80

12

5

95

440

90

190

Lindau Ln

IKE

A w

ay

105

230

360 40

25

50

145

30

185

Lindau Ln

22nd A

ve

16

5

82

0

415

210

24th

Ave

. S

Lindau Ln

24th

A

ve

80

5

20

345

15

55

56

5

31

5

60

82nd St.

165

1080

595

680

940

240

20th

Ave

.

Killebrew Dr.

125

365

45

375

465

80

725

25

435

1

60

25

75

22nd S

t.

Killebrew Dr.

35

160

120

530

280

170

255

115

30

1

20

1

30

1

30

24

th A

ve

.

Killebrew Dr.

53

0

73

0 65

395

280

80

56

5

15

Th

un

de

rbird

Rd

30

175

205

20

185

75

10

10

30

6

0

1

0

9

0

American Blvd

Page 18: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 NO BUILD SATURDAY PEAK HOUR TRAFFIC VOLUMESMALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 8Pac

ific

Rai

lroad

D NO AL

R VEI R

A.

L

27

37

74

75

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

ST.

T.S

S .T

ST.E.

FERNDR.

AL BL

VD.

NO

IAG

D

AV

E.

AV

E.

AV

E.

AV

E.

AV

.E

AV

E.

VE

.A

.A

VE

AE

.V

AV

E.

AV

E. .

AV

E

CLIN

TO

N

PO

RT

OA

K

LA

ND

LA

ND

PR

KA

CO

LM

BU

SU

IC

HC

AO

G

LO

TE

LI

AV

E.

AV

E.

AV

E.

AV

E.

OB

LO

MIN

GT

ON

CE

DR

A

AM

cCR

TH

Y

DA

LO

ND

ITA

HE

RG

E

TE

RM

INA

L

ME

MO

RIA

L

HG

HY

IW

A

YNKEE

A

DR

.

LA

.

V.

AE

ME DOWA VI WE

RD.

AV

E.

S.

PK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

.E

E.

ST.

ST.

ST.

E. OLD

L EBREKI L W DR.

83

84

86

ST.ST.

ST. ST.

S .T

ST.

ST.

ST.

.ST

.ST

ST.

ST.

S .T

ST.

68 1/2

SKY DR.LINE

I DGE R VER RI CIR.

ST.

E.

E.

E.

E.

.EE.

81 ST.

82

83

T.S

ST E.

ST.

ST.

ST.

TS .

ST.E. 93

92

LIN

TO

NC

PO

RT

LA

ND

NO

AK

LA

D

PK

AR

UM

UC

OL

BS

CH

ICA

GO

EI

TL

LO

BLO

OM

ING

TO

N

AV

E.

AE

.V V

AE

.

VE

.A A

VE

.

VE

A.

VE

.A

AV

E.

AV

E. .

AV

E E.

AV V

EA

.

AV

E.

AV

.E

VE

A.

AE

.V

AV

E.

S.

S. S. .

S

S.

S.

S.

.S

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

.R

DA

V.

E

AV

E. .

AV

E

.S S

.

S.

CR

ES

T

D.

R

E. ST.

GLENVIEW LA.

22

AV

E.

IR

DG

ER

D.

RIV

RE

88

AV

E.

AV

E.

ST.

.A

VE

FE

LL

LN

GO

OW

. A

VE

EA

V.PAR

K

RD.

SPRINGSIDE

.LA

OD

LR

CE

DA

.A

VE

MEAD

WE

OVI

WR

D.

16 17

AV

E.

AV

E.

9 1/2 2 ST.

93 1/2 ST.

RP

AK

RD.D

.R

LO NG MEADOWCIR CLES

T.S

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S. S.

.S

S.

RIV

ER

V DOL

E.

POST

RD.

CIR.CE RDA

71st

78th

th

th

th

th

dn

dr

4th

5th 0h

1t

11th

12th

13

th 14th

15th

16th

1th

7 18th

34th

81st

82nd26th

AV

E. S

.

79tht79 h

80th t80 h

82nd

dr

ht

th

87th hE. 87t

st

81st ST.

dn

rd

ht

nd

t4

h

5th

10th

11th

1t

2h

13th

31

th

14th

5th

1

t18

h

th1

6

17

ht

80th

nd

8th ST.8

th

h2

0t

21

st

19

th

18

th

th th

15th

ST.

81st T S .

78th

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 th

28

th S

T. S

.

91 st ST.

.S

APPLETREE

SQUARE

.R

D

SA

KP

HO

EE

OLD

E.

2t

4h

AV

E.

S.

TH

ES

T

NO

RW

DR

.

LE DTEN R E

ST.

DR

.CT

YI

VIE

WR

.D

DR

.

INT

ER

NA

TIO

NA

L

76 1/2 ST.

LINDAU

DC

EA

RA

VE

.S

.

rd

A RPORT LA.I

TCM

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

S

IN

FORT

NELL

G

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

N

N

HENEPI

DAKOTA

CU

NY

OT TY

CO

UN

30

th A

VE

.

20

th A

VE

.

2N

E2

D A

V.

IKE

AW

AY

T-B

IRD

R

D

26th

NO

RT

H

No

rth

50

55

70

20

25

60

10

10

55

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

255

30

200

50

60

25

American Blvd

28th

Ave

American

170

40

15

2

90

35

0

13

5

10

510

60

34th

Ave

American Blvd

82nd St. 0

5

5

105

5

250

40

295 5

210

220

5

O

SR

TH 77 Ramp

10

5

45

95

5

40

11

02

60

15

2

0

2

95

50

OS

R

86th St.

5

40

5

5

90

36

0

40

0

23

0

34

th A

ve

.

I-494 Ramp

125

0

405

4

35

33

0

30

0

39

0

34

th A

ve

.

I-494 Ramp

330

0

340

American

190

70

70

155

40

105

2

35

10

75

15

5

10

5

1

07

0

60

24

th A

ve

American Blvd

65

1040

35

390

5

03

07

0

39

5

1

60

89

0

24

th A

ve

.

I-494 Ramp

Page 19: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 17

Table 4 Year 2012 No Build Peak Hour Capacity Analysis - Saturday Level of Service Results

Level of Service Intersection Saturday Peak

Lindau Lane/TH 77 Ramps/IKEA Way C Lindau Lane/22nd Avenue C Lindau Lane/24th Avenue B Killebrew Drive/TH 77 Ramps/20th Avenue C Killebrew Drive/22nd Avenue C Killebrew Drive/24th Avenue D 24th Avenue/I-494 Single-Point Interchange D 24th Avenue/82nd Street B American Boulevard/IKEA Driveway * A/B American Boulevard/Thunderbird Road B American Boulevard/24th Avenue C American Boulevard/28th Avenue A American Boulevard/34th Avenue B 34th Avenue/I-494 North Ramps D 34th Avenue/I-494 South Ramps D 28th Avenue/82nd Street D Old Shakopee Road/86th Street A Old Shakopee Road/TH 77 East Ramp B

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. Queuing at all freeway ramp terminal intersections was reviewed for year 2012 no build conditions. Based on the traffic analysis, queuing problems will not develop during the Saturday p.m. peak hour. F. Year 2012 No Build Traffic Operations Analysis – Thursday To determine how well the existing and assumed roadway improvements listed above will accommodate year 2012 no build traffic forecasts (see Figures 9 and 10), an operations analysis was conducted for Thursday peak conditions (4:30 – 5:30 p.m). A background growth rate of one percent per year was assumed for all traffic that passes through the study area. Results of the analysis shown in Table 5 indicate that the intersection of 34th Avenue/I-494 North Ramps will operate at unacceptable levels of service during the Thursday peak hour.

Page 20: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 NO BUILD WEEKDAY PEAK HOUR TRAFFIC VOLUMESMALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 9

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

R

D

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

IT-B

RD

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

AW

AY

h26t AVE. S

NO

RT

H

No

rth

425

15

450

25 15

20

IE

A D

ivay

Kr

ew

American Blvd

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

85

280

340

1

60

65

35

365

70

130

Lindau Ln

IKE

A W

ay

15

300

245 10

10

10

135

10

180

Lindau Ln

22nd A

ve

85

61

0 330

110

24th

Ave

. S

Lindau Ln

24th

A

ve

345

390

80

82nd St.

85

1405

450

645

480

90

20th

Ave

.

Killebrew Dr.

90

960

120

190

430

120

305

15

75

2

30

15

90

22nd S

t.

Killebrew Dr.

75

815

595

110

275

210

255

210

60

105

11

5

2

60

24

th A

ve

.

Killebrew Dr.

4

0

26

5

25

4

70

70

5

165

15

95

20

220

200

265

220

185

35

300

110

Th

un

de

rbird

Rd

30

380

65

30

2

0

60

American Blvd

20

395

60

3

0

1

0

4

5

Page 21: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 NO BUILD WEEKDAY PEAK HOUR TRAFFIC VOLUMESMALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 10

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

R

D.

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

BI

T-

RD

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

AW

AY

NO

RT

H

Nort

h

55

75

120

20

170

50

15

10

55

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

1160

125

145

70

90

0 5

American Blvd

28th

Ave

390

60

80

350

505

155

20

1350

125

34th

Ave

American Blvd

82nd St. 0

0

5

210

10

375

60

990 5

370

270

5

TH 77 Ramp

35

10

240

140

10

65

225

780

10

40

325

80

O

SR

86th St.

10

40

5

990

765

500

190

34th

Ave.

I-494 Ramp

130

0

540

600

700

525

1305

34th

Ave.

I-494 Ramp

160

0

405

American

995

215

210

270

65

170

145

800

155

11

5

7

70

2

0

24

th A

ve

American Blvd

130

850

40

290

6

03

01

00

74

5

3

75

97

5

24

th A

ve

.

I-494 Ramp

OS

R

Page 22: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 20

Table 5 Year 2012 No Build Peak Hour Capacity Analysis - Thursday Level of Service Results

Level of Service Intersection Thursday Peak

Lindau Lane/TH 77 Ramps/IKEA Way C Lindau Lane/22nd Avenue C Lindau Lane/24th Avenue B Killebrew Drive/TH 77 Ramps/20th Avenue B Killebrew Drive/22nd Avenue B Killebrew Drive/24th Avenue D 24th Avenue/I-494 Single-Point Interchange D 24th Avenue/82nd Street B American Boulevard/IKEA Driveway * A/B American Boulevard/Thunderbird Road B American Boulevard/24th Avenue D American Boulevard/28th Avenue A American Boulevard/34th Avenue C (B) 34th Avenue/I-494 North Ramps F (1) (D) 34th Avenue/I-494 South Ramps F (1) (D) 28th Avenue/82nd Street D Old Shakopee Road/86th Street B Old Shakopee Road/TH 77 East Ramp D

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. (1) Average vehicle delay of 80 seconds Note: Parentheses indicate LOS with assumed improvements listed below. As displayed in Table 5, operational problems are expected at the 34th Avenue/I-494 ramp intersections during the Thursday p.m. peak hour. Unacceptable vehicle delays and significant queues will develop with the existing interchange design, intersection geometrics and signal phasing/timing by year 2012. Currently, LRT operations have a significant impact on the operations of the 34th Avenue I-494 interchange, largely due to the delay created by the “all red” traffic phase with each LRT crossing. To address these operational problems during the Thursday p.m. peak hour, the “all red” traffic phase with each LRT train crossing needs to be converted to a northbound/southbound “green” phase. This modification to the LRT operations for year 2012 no build conditions will improve operations and eliminate any potential queuing problems at the freeway ramp intersections during the Thursday p.m. peak hour. As indicated by year 2030 operational problems discussed further in the report, this modification is only an interim solution until funding for major interchange improvements is identified.

Page 23: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 21

IV. YEAR 2012 BUILD CONDITIONS Future traffic operations analyses were conducted for the year 2012 build conditions. The land use, street network assumptions, and operations results are discussed in this section of the report. A. Assumed Land Use and Trip Generation Estimates The proposed Mall of America Phase II development consists of 1,907,691 square feet of retail/mixed use, 1250 hotel rooms, 300 residential condos, and 615,000 square feet of office (see Figure 11: Proposed Site Plan dated September 5, 2006). It is assumed that the proposed Phase II development will be completed by year 2011. Land use assumptions and trip generation for the adjacent developments (2012) and Phase II are displayed in the Appendix (Tables A-1 and A-2). Approximately 69 percent of the new development trips generated for the Saturday peak hour are associated with the proposed MOA Phase II development and 31 percent are associated with other adjacent land use developments. For the Thursday peak hour, 48 percent of the new development trips are associated with the proposed MOA Phase II development and 52 percent of the new development trips are associated with other adjacent land use developments. The following assumptions related to trip generation estimates were used in the analysis:

• Based on data provided by Bass Pro Shops representatives, the daily traffic estimated for a 300,000 square foot store is 10,000 and 20,000 vehicles per day on a weekday and Saturday, respectively. These daily trips are similar to data for a Cabela’s store of similar size. Using the peak hour factors for a Cabela’s store, trip generation estimates were developed for the weekday and Saturday peak hour conditions.

• Trip generation estimates for the retail use were developed using the existing MOA traffic counts and the plotted ITE retail center curve. Based on the plotted ITE curve for trips versus size, the trip generation rate decreases as the retail square footage increases, due to multi-use trips. Therefore, the multi-use reduction factors (36 and 47 percent for weekday and Saturday peak hour conditions, respectively) calculated through this exercise was applied to the Bass Pro Shops trip generation estimates.

• For the 6,000-seat performing arts center, trip generation estimates were not developed for a Saturday matinee. It is assumed that restrictions will be placed upon the performing arts center to eliminate matinee events from being scheduled during times that would impact Saturday peak conditions.

In addition, trip generation estimates were not developed for the weekday peak hour condition, since it is assumed that an event at the performing arts center would not generate trips entering/leaving the site during the 4:30 to 5:30 p.m. peak hour. A review of the Ordway Performing Arts Center schedule indicates a majority (only one show per month started at 2:00 p.m.) of the shows, concerts, operas started at 7:30 or 8:00 p.m. Therefore, it also assumed that an event at the performing arts center would have a 7:30 or 8:00 p.m. start time and would not generate trips entering the site during the weekday evening peak hour. If a visitor to the performing arts center chooses to arrive more than two hours prior to the performance, this trip would be considered a multi-use trip and would be accounted for in the retail use trip generation estimates.

Page 24: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 22

B. Trip Distribution The directional trip distribution for the site-generated trips is consistent with the Airport South AUAR and Bloomington Central Station Traffic Study. Figure 12 displays the regional directional distribution percentages for the site. A different trip distribution was used for the MAC expansion, consistent with the 2015 Terminal Expansion Project Minneapolis-Saint Paul International Airport Traffic Report. Approximately 10 percent of the airport expansion generated trips would travel on the northern segment of 34th Avenue (not in the study area), the remaining 90 percent would use the 34th Avenue interchange to access I-494. C. Assumed Roadway Improvements All roadway improvements included in the year 2012 no build analysis are assumed in the year 2012 build analysis. A significant improvement listed in the Bloomington Central Station Traffic Study is the modification of American Boulevard to a westbound one-way roadway between West Road and 34th Avenue. If this improvement is not constructed by year 2012, the intersection along 24th Avenue will operate with less delay and the intersection operations in the immediate Bloomington Central Station area will worsen. The intersection geometrics shown in the proposed site plan are assumed in the year 2012 build analysis. In addition, to the recommended signal phasing/timing modifications identified at the 34th Avenue/I494 North Ramps and South Ramps, the following improvements with optimized signal timing at all intersections were assumed: TH 77/I-494 CD Roadway

• Construct a new ramp from the TH 77/I-494 CD roadway to Thunderbird Road (see Figure 13)

D. Year 2012 Build Traffic Operations Analysis – Saturday To determine how well the existing and assumed roadway improvements will accommodate year 2012 build traffic forecasts (see Figures 14 and 15), an operations analysis was conducted for Saturday peak conditions (3:00 – 4:00 pm). Results of the analysis shown in Table 6 indicate that the intersections of Lindau Lane/TH 77 Ramps/IKEA Way, 24th Avenue/I-494 Single-Point Interchange, and American Boulevard/24th Avenue will operate at unacceptable levels of service during the Saturday peak hour.

Page 25: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

SITE PLANMALL OF AMERICA PHASE II TRAFFIC STUDYMall of America/City of Bloomington

Figure 11

Page 26: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

DIRECTIONAL DISTRIBUTIONMALL OF AMERICA PHASE II TRAFFIC STUDYMall of America/City of Bloomington

Figure 12

i i

Pac

f c

Rai

lroad

DONAL

RIVER

A.

L

27

73

74

75

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

ST.

.ST

S .TE.

RN

FE

DR.

AL BL

.VD

ON

IAG

D

AV

E.

AV

E.

AV

E.

VA

E.

AV

E.

AE

V. E.

AV

AE

.V AV

E.

AV

E.

AV

E.

AV

E.

CN

LI

TO

N

PO

RT K

OA

LA

ND

AN

LD

PK

AR

CO

LM

BS

UU

CH

IA

OC

G

OT

EL

LI

AV

E.

AV

E.

VE

.A A

VE

.B

LO

OM

ING

TO

N

ED

RC

A

McC

AT

YR

H

DO

ALD

N

HIT

AE

RG

E

TE

RM

INA

L

MA

ME

OR

IL

HIG

HW

AY

NYA

KEE

DR

.

LA

.

AV

E.

MEADOW VI EWD.R

AE

V.

S.

PK

Y.

W

ET

RO

M

ORTE

M

DR.

E.

E.

ST.

.ST

.ST

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

ST.

ST.

T.S

ST.

.ST

ST.

ST.

ST.

ST.

ST.

6 8 1/2

SKYLINE DR.

I R DGE R.R VER I CI

ST.

E.

E.

E.

E.

E.E.

81 ST.

82

83

.ST

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

CL

INT

ON

PO

RT

ND

LA

OA

KN

DL

A

PA

RK

MU

CO

LU

BS

CG

CH

IA

O

EL

LIO

T

BL

OO

MIN

GT

ON

AV

E.

AV

E.

AV

E.

VE

.A A

VE

.

AV

E.

E.

AV

AV

E.

AV

E.

AV

E.

AV

E.

VA

E.

AV

E.

AV

.E

AV

E.

AV

E.

EA

V.

S.

S. S. S. S

.

S.

S.

.S

S.

S.

S.

S.

S.

S.

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E. .

AV

E

S.

S.

S.

CR

ES

T

RD

.

R

D.

E. ST.

L

L

GENVIEW

A.

22

AE

V.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

E.

AV

FE

LL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

SPRINGSIDE

.LA

OD

LC

DR

EA

AV

E.

MEAD

WVE

O

IW

R.

D

16 17

VE

.A A

V.

E

92 1/2 ST.

39 1/2 ST.

PA

RK

RD.

.D

R

LO NG MEADOWCIR CLES

T.S

AV

E.

ST.79 1/2

90

OFFHCSIBLA.

AV

E.

.S S

.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

OSTP

.RD

CIR.CEDAR

71st

78 ht

th

th

th

th

dn

rd

4th

th5

h1

0t

1h

1t

12th

13th 14th

15th

16th

t17

h

18th

34th

81st

82nd

h A

VE

S.

26

t.

79tht79 h

08 th t80 h

n82 d

rd

th

th

87th. 87thE

st

18 st ST.

nd

rd

ht

nd

t4

h

5th

10th th

11 12th

13th

13th

14th

5h

1t

IT-B

RD

1t

8h

6th

1 17th

80th

nd

88th ST.

th

20th

21st

19th

18th

th th5t

1h S

T.

8 st T1 S .

th78

5th

th

88th

89 h ST.t

34

th

VE

. S

.A

HIL

LR

IDG

E

A

R

LEXANDERD.

American BLVD

L .A

89 th

28

th S

T. S

.

91 st ST.

S.

APPLETREE

SQUARE

RD

.

SH

AK

OP

EE

OLD

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

.D

R

LETE DRN E

ST.

DR

.CIT

YE

VI

WR

.D

DR

.

NT

ER

IN

AT

ION

AL

76 1/2 T.S

LI DAN UC

ED

AR

AV

E.

S.

rd

A RP T LAI OR .

TCM RD.

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT SNELLING

NATIONAL CEMETERY

FORT

SEL

ING

N

L

494494

494

5

13

5

77

77

5

1

1

35

35

1

35

28

BLOOMINGTON2000 POP. 85,172

H

N

N

ENEPI

DAKOTA

CU

NO

TY

NT

Y

CO

U

30

th A

VE

NO

RT

H

No

rth

15%

25%

25%

30%

2%

3%

Page 27: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

NO

RT

H or

hN

t

0055391September 2006

PROPOSED ROADWAY CONCEPTMALL OF AMERICA PHASE II TRAFFIC STUDYMall of America/City of Bloomington

Figure 13

Page 28: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 BUILD SATURDAY PEAK HOUR TRAFFIC VOLUMES (3:00 PM to 4:00 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 14

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AV

E. S

.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IK

EA

A

W

Y

NO

RT

H

Nort

h

300

15

295

45 90

45

IKE

A D

rive

way

American

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

70

1165

150

340

885

610

535

125

95

70

95

190

Lindau Ln

IKE

A W

ay

360

230

375

985

25

385

175

30

195

Lindau Ln

22nd A

ve

210

830

725

240

24th

Ave

. S

Lindau Ln

24th

Ave

80

5

20

345

15

55

565

375

60

82nd St.

185

1080

495

645

830

255

20th

Ave

.

Killebrew Dr.

125

380

45

350

475

80

725

25

435

1

60

25

75

22nd S

t.

Killebrew Dr.

35

160

120

540

280

170

265

165

30

120

170

130

24th

Ave

.

Killebrew Dr.

755

740

470

385

315

80

620

15

Thunderb

ird R

d

30

175

335

20

185

135

10

510

30

130

10

8

65

American Blvd

590

0

American Blvd

Park

inm

g R

ap

570

180

American

190

70

70

930

40

105

960

1320

155

105

1390

60

24th

Ave

American Blvd

Page 29: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 BUILD SATURDAY PEAK HOUR TRAFFIC VOLUMES (3:00 PM to 4:00 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 15

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

I

K

EA

W

AY

NO

RT

H

Nort

h

50

55

70

20

25

60

10

10

55

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

255

30

200

50

60

25

American Blvd

28th

Ave

American

170

40

15

290

350

135

10

510

60

34th

Ave

American Blvd

82nd St. 0

5

5

150

5

250

105

320 5

210

265

5

TH 77 Ramp

10

5

45

95

5

40

11

03

10

15

2

0

3

40

50

O

SR

86th St.

5

40

5

5

90

36

0

40

0

23

0

34

th A

ve

.

I-494 Ramp

125

0

405

4

35

33

0

30

0

39

0

34

th A

ve

.

I-494 Ramp

330

0

340

American

190

70

70

930

40

105

9

60

13

20

15

5

10

5

1

39

0

60

24

th A

ve

American Blvd

65

1665

35

725

5

03

07

0

76

0

2

20

15

45

24

th A

ve

.

I-494 Ramp

O

SR

Page 30: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 28

Table 6 Year 2012 Build Peak Hour Capacity Analysis - Saturday Level of Service Results

Level of Service Intersection Saturday Peak

Lindau Lane/TH 77 Ramps/IKEA Way F (D) Lindau Lane/22nd Avenue D Lindau Lane/24th Avenue D Killebrew Drive/TH 77 Ramps/20th Avenue C Killebrew Drive/22nd Avenue D Killebrew Drive/24th Avenue D 24th Avenue/I-494 Single-Point Interchange F (D) 24th Avenue/82nd Street B American Boulevard/IKEA Driveway * D/E (A/B) American Boulevard/Thunderbird Road F (B) American Boulevard/24th Avenue F (D) American Boulevard/28th Avenue A American Boulevard/34th Avenue B 34th Avenue/I-494 North Ramps D 34th Avenue/I-494 South Ramps D 28th Avenue/82nd Street D Old Shakopee Road/86th Street B Old Shakopee Road/TH 77 East Ramp B

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. Note: Parentheses indicate LOS with assumed improvements listed below. Queuing at all freeway ramp terminal intersections was reviewed and addressed for year 2012 build Saturday p.m. peak hour conditions. Based on the traffic analysis, queuing problems will develop (spillback to the freeway) at the intersections of Lindau Lane/TH 77 Ramps/IKEA Way and 24th Avenue/I-494 Single Point Interchange. With the improvements listed below, these queuing problems are eliminated. In order for all intersections to operate at acceptable levels of service during year 2012 build (Saturday) conditions, the following improvements shown in Figure 13 are needed: TH 77 CD Roadway

• Construct a new access to/from the TH 77 CD roadway to/from the existing MOA parking ramp (see Figure 13).

American Boulevard/24th Avenue

• Construct an additional southbound right-turn lane. Extend both turn lanes to the I-494 single-point interchange (see Figure 13).

Page 31: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 29

24th Avenue/I-494 Single-Point Interchange

• Construct an additional westbound left-turn lane (triple lefts) (see Figure 13). Killebrew Drive/20th Avenue

• Eliminate the “free” southbound right-turn lane • Construct dual right-turn lanes with overlap signal timing

The westbound triple left-turn lane improvement recommended for year 2012 build conditions is necessary for the heavy westbound to southbound movement during the Saturday peak hour. It is possible that some motorists may choose the alternate route using the 34th Avenue interchange and American Boulevard to the current Mall of America and proposed Phase II. In addition, wayfinding improvements may be proposed under a separate upcoming study. Therefore, a sensitivity analysis was completed to determine how many vehicles would need to use the alternate route to eliminate the westbound triple left-turn lane improvement. Based on the sensitivity analysis results, approximately 300 vehicles would need to divert to the 34th Avenue interchange. These additional vehicles would not create any new operational problems at the 34th Avenue interchange in its current configuration or with its proposed improvements during the Saturday peak hour. Additional Operations Analysis An additional analysis was conducted to determine how the key intersections would operate if a larger percentage of traffic would use American Boulevard to the west. The previous analysis assumes a three percent distribution to the west on American Boulevard. It was discussed that this value could be increased through the implementation of ITS measures. These motorists would still have a destination/origin on I-494 west, but they would access the freeway using American Boulevard to the Portland Avenue interchange. Based on existing traffic counts collected at the IKEA driveway and driveway across from Thunderbird Road, it was determined that more than 10 percent of the MOA and IKEA visitors currently leaving the future MOA 2 site travel west on American Boulevard. Therefore, a 10 percent distribution to the west on American Boulevard was assumed reasonable and used to determine operational impacts to area intersections for year 2012 build conditions. The rerouting of traffic does not include the proposed office and hotel uses that span across Lindau Lane or proposed uses constructed on the current MOA site. With a 10 percent distribution to the west, approximately 300 new trips during the Saturday peak hour would use American Boulevard to the west. Based on the analysis, all improvements recommended in the previous section are still needed even with the new assumed distribution to the west on American Boulevard. It is important to note that based on the analysis, it is not necessary to direct more traffic to use American Boulevard to the west to achieve acceptable intersection operations. However, any increase above the three percent distribution will provide benefits to the operations at American Boulevard/24th Avenue during Saturday peak hour conditions.

Page 32: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 30

E. Year 2012 Build Traffic Operations Analysis – Thursday To determine how well the existing and assumed roadway improvements listed above will accommodate year 2012 build traffic forecasts (see Figures 16 and 17), an operations analysis was conducted for Thursday peak conditions. This analysis assumes the additional improvements identified in the previous Saturday peak hour analysis. Although the 2012 build volumes for the Thursday peak hour does not require the westbound triple left-turn improvement at the 24th Avenue/I-494 Single-Point Interchange, it was assumed in the model since it is required for Saturday conditions. Results of the analysis shown in Table 7 indicate that the intersections of American Boulevard/IKEA Driveway, American Boulevard/Thunderbird Road and American Boulevard/24th Avenue will operate at unacceptable levels of service during the Thursday peak hour. Table 7 Year 2012 Build Peak Hour Capacity Analysis - Thursday Level of Service Results

Level of Service Intersection Thursday Peak

Lindau Lane/TH 77 Ramps/IKEA Way C Lindau Lane/22nd Avenue C Lindau Lane/24th Avenue B Killebrew Drive/TH 77 Ramps/20th Avenue C Killebrew Drive/22nd Avenue C Killebrew Drive/24th Avenue D 24th Avenue/I-494 Single-Point Interchange D 24th Avenue/82nd Street B American Boulevard/IKEA Driveway * E/F (1) (A/B) American Boulevard/Thunderbird Road F (1) (C) American Boulevard/24th Avenue F (2) (D) American Boulevard/28th Avenue A American Boulevard/34th Avenue C 34th Avenue/I-494 North Ramps D 34th Avenue/I-494 South Ramps D 28th Avenue/82nd Street D Old Shakopee Road/86th Street B Old Shakopee Road/TH 77 East Ramp B

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. (1) Poor intersection operations caused from vehicle queues from American Boulevard/24th Avenue (2) Average vehicle delay of 100 seconds Levels of service shown in parentheses assume the improvements listed below.

Page 33: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 BUILD WEEKDAY PEAK HOUR TRAFFIC VOLUMES (4:30 P.M. TO 5:30 P.M.)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 16

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

h26t

IKE

AW

AY

NO

RT

H

Nort

h

490

15

500

25 15

20

IE

A D

ivay

Kr

ew

American Blvd

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

115

605

390

545

65

45

65

70

130

Lindau Ln

IKE

A W

ay

195

305

255

705

10

260

245

10

230

Lindau Ln

22nd A

ve

15

1 620 565

155

24th

Ave

. S

Lindau Ln

24th

Ave

345

450

80

82nd St.

110

1405

420

615

4

15

10

0

20

th A

ve

.

Killebrew Dr.

90

985

120

160

440

120

3

05

15

75

2

30

1

5

90

22

nd

St.

Killebrew Dr.

75

815

595

120

275

215

2

70

25

5

60

11

5

1

45

2

60

24

th A

ve

.

Killebrew Dr.

4

0

30

5

25

6

35

72

0

165

15

95

320

230

225

265

220

185

40

1100

110

T

hu

nd

erb

ird

Rd

30

380

170

30

3

75

65

American Blvd

20

400

105 9

5

1

0

6

15

410

0

American Blvd

Pk

na

ri

g R

am

p

445

13

0

American

995

215

210

835

65

175

6

60

97

0

15

5

11

5

1

05

0

2

0

24

th A

ve

American Blvd

Page 34: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2012 BUILD WEEKDAY PEAK HOUR TRAFFIC VOLUMES (4:30 P.M. TO 5:30 P.M.)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 17

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

BI

T-

RD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKA

EW

AY

NO

RT

H

Nort

h

55

75

120

20

170

50

15

10

55

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

1160

125

145

70

90

0 5

American Blvd

28th

Ave

American

390

60

80

350

505

155

20

1350

125

34th

Ave

American Blvd

82nd St. 0

0

5

210

10

375

295

800 5

370

310

5

TH 77 Ramp

35

10

240

140

10

65

225

825

10

40

365

80

O

SR

86th St.

10

40

5

990

765

500

190

34th

Ave.

I-494 Ramp

130

0

540

600

700

525

1305

34th

Ave.

I-494 Ramp

160

0

405

American

995

215

210

835

65

175

660

970

155

11

5

1

05

0

2

0

24

th A

ve

American Blvd

130

1305

40

530

6

03

01

00

10

20

4

25

15

00

24

th A

ve

.

I-494 Ramp

OS

R

Page 35: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 33

In order for all of the key intersections to operate at acceptable levels of service during the year 2012 build Thursday conditions, the following improvements will be needed: American Boulevard/24th Avenue

• Extend the southbound left most left-turn lane to 500 feet • Extend the eastbound left-turn lanes to 500 feet • Extend the westbound left-turn lanes to 500 feet • Construct an additional westbound right-turn lane to provide three westbound right-turn

lanes • The westbound approach should have four approach lanes that begin at 28th Avenue, two

of these lanes would be trap right-turn lanes at the intersection Additional Operations Analysis Similar to year 2012 Saturday build conditions, an additional analysis was conducted to determine how the key intersections would operate if a larger percentage of traffic would use American Boulevard to the west. With a 10 percent distribution to the west, approximately 250 new trips during the Thursday p.m. peak hour would use American Boulevard to the west. With the increase of traffic using American Boulevard to the west, the intersection delay at American Boulevard/24th Avenue will be reduced by approximately 35 seconds/vehicle. However, the following improvements will still be needed to achieve acceptable operations at the intersection of American Boulevard/24th Avenue during the Thursday p.m. peak hour: American Boulevard at 24th Avenue

• Extend the southbound left most left-turn lane to 500 feet • Extend the eastbound left-turn lanes to 500 feet

V. 2030 BUILD CONDITIONS Future traffic operations analyses were conducted for the year 2030 build conditions. The land use, street network assumptions, and operations results are discussed in this section of the report. A. Assumed Land Use Land use assumptions and trip generation for Phase II and adjacent developments are also included in the Appendix (Tables A-2 and A-3). Year 2030 build conditions includes additional adjacent developments and background growth beyond year 2012 to year 2030. Approximately 47 percent of the new development trips generated for the Saturday peak hour are associated with the MOA Phase II development and 53 percent are associated with other adjacent land use developments. For the Thursday peak hour, 25 percent of the new development trips are associated with the MOA Phase II development and 75 percent of the new development trips are associated with other adjacent land use developments.

Page 36: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 34

B. Assumed Roadway Improvements All roadway improvements included in the year 2012 no build and build analyses are assumed in the year 2030 build analysis. In addition, the following additional improvements with optimized signal timing were assumed: American Boulevard/34th Avenue (listed in the Bloomington Central Station Traffic Study)

• Eliminate the southbound free right-turn lane • Construct southbound dual right-turn lanes that extend from the I-494 South Ramps

24th Avenue/82nd Street

• On the north approach, convert the rightmost through lane into a trap right-turn lane. This improvement will create better lane utilization upstream at the single-point interchange.

Old Shakopee Road

• Reconstruction of Old Shakopee Road between Cedar Avenue and Killebrew Avenue C. Year 2030 Build Traffic Operations Analysis – Saturday To determine how well the existing and assumed roadway improvements will accommodate year 2030 build traffic forecasts (see attached Figures 18 and 19), an operations analysis was conducted for Saturday peak conditions. Results of the analysis shown in Table 8 indicate that all of the key intersections are expected to operate at acceptable levels of service for year 2030 build Saturday conditions, with the exception of the 24th Avenue/I-494 Single-Point Interchange. The 24th Avenue/I-494 Single-Point Interchange is expected to operate near the LOS D/E threshold with an average vehicle delay of 60 seconds.

Page 37: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2030 SATURDAY PEAK HOUR TRAFFIC VOLUMES (3:00 P.M. TO 4:00 P.M.)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 18

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AV

E. S

.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th

79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

KIE

AA

WY

NO

RT

H

Nort

h

350

15

350

45

90

45

IKE

A D

rive

way

American Blvd

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

355

195

1 725

410

24th

Ave

. S

Lindau Ln

24th

Ave

225

5

20

345

15

55

565

760

220

82nd St.

185

1260

495

860

830

255

20th

Ave

.

Killebrew Dr.

125

525

45

345

645

130

725

25

435

1

95

25

75

22nd S

t.

Killebrew Dr.

35

200

150

650

330

175

370

330

15

125

330

165

24th

Ave

.

Killebrew Dr.

70

1325

150

340

1040

610

560

125

95

65

95

190

Lindau Ln

IKE

A W

ay

770

135

1

360

390

375

985

30

385

175

30

195

Lindau Ln

22nd A

ve

455

555

315

80

980

20

Thunderb

ird R

d

130

225

335

20

240

135

20

535

115

American Blvd

130

10

865

590

0

American Blvd

kn

Par

ig R

am

p 570

180

American

245

90

95

1005

85

125

1055

1680

190

135

1725

60

24th

Ave

American Blvd

Page 38: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2030 SATURDAY PEAK HOUR TRAFFIC VOLUMES (3:00 P.M. TO 4:00 P.M.)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 19

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

KIE

AA

WY

NO

RT

H

Nort

h

55

70

125

1

45

60

65

10

10

100

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

345

170

185

115

6

5 0 5

American Blvd

28

th A

ve

American

330

55

30

5

30

39

5

31

0

3

0

7

55

1

00

34

th A

ve

American Blvd

82nd St. 0

5

5

340

5

245

2

80

39

0 5

21

0

3

30

5

TH 77 Ramp

15

5

110

95

5

40

11

04

95

15

2

0

5

15

13

0

O

SR

86th St.

5

55

120

5

90

36

0

42

5

33

0

34

th A

ve

.

I-494 Ramp

125

3

30

72

5

42

5

67

0

34

th A

ve

.

I-494 Ramp

330

510

American

245

90

95

1005

85

125

1

05

5

16

80

19

0

13

5

1

72

5

60

24

th A

ve

American Blvd

110

1860

60

1035

9

01

50

12

0

9

90

3

40

1

70

5

24

th A

ve

.

I-494 Ramp

695

OS

R

Page 39: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 37

Table 8 Year 2030 Build Peak Hour Capacity Analysis – Saturday Level of Service Results

Level of Service Intersection Saturday Peak

Lindau Lane/TH 77 Ramps/IKEA Way C Lindau Lane/22nd Avenue D Lindau Lane/24th Avenue C Killebrew Drive/TH 77 Ramps/20th Avenue C Killebrew Drive/22nd Avenue D Killebrew Drive/24th Avenue D 24th Avenue/I-494 Single-Point Interchange E (1)

24th Avenue/82nd Street C American Boulevard/IKEA Driveway * A/B American Boulevard/Thunderbird Road C American Boulevard/24th Avenue D American Boulevard/28th Avenue B American Boulevard/34th Avenue C 34th Avenue/I-494 North Ramps D 34th Avenue/I-494 South Ramps C 28th Avenue/82nd Street D Old Shakopee Road/86th Street B Old Shakopee Road/TH 77 East Ramp B

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. (1) Average delay of 60 seconds The following improvements are not needed from a level of service perspective, but are recommended to improve overall operations and reduce queues: Killebrew Avenue at 22nd Avenue

• Add overlap signal phasing for the southbound right-turn movement Killebrew Avenue at 24th Avenue

• Extend the eastbound left-turn lanes to 400 feet Additional Operations Analysis Similar to year 2012 build conditions, an additional analysis was conducted to determine how the key intersections would operate if a larger percentage of traffic would use American Boulevard to the west. With a 10 percent distribution to the west, approximately 300 new trips during the Saturday peak hour would use American Boulevard to the west.

Page 40: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 38

With the increase of traffic using American Boulevard to the west, the 24th Avenue/I-494 Single-Point Interchange is expected to improve to LOS D during the Saturday peak hour. In addition to routing traffic to the west on American Boulevard, traffic traveling to the mall from the east on I-494 could be directed to 34th Avenue. This could also provide relief to the single-point interchange. D. Year 2030 Build Traffic Operations Analysis – Thursday To determine how well the existing and assumed roadway improvements will accommodate year 2030 build traffic forecasts (see attached Figures 20 and 21), an operations analysis was conducted for Thursday peak conditions. Results of the analysis shown in Table 9 indicate that nine intersections will operate at unacceptable levels of service during the Thursday peak hour. Table 9 Year 2030 Build Peak Hour Capacity Analysis – Thursday Level of Service Results

Level of Service Intersection Thursday Peak

Lindau Lane/TH 77 Ramps/IKEA Way C Lindau Lane/22nd Avenue D Lindau Lane/24th Avenue E (1)

Killebrew Drive/TH 77 Ramps/20th Avenue D Killebrew Drive/22nd Avenue C Killebrew Drive/24th Avenue E (D) 24th Avenue/I-494 Single-Point Interchange E (2)

24th Avenue/82nd Street D American Boulevard/IKEA Driveway * A/C American Boulevard/Thunderbird Road F (1)

American Boulevard/24th Avenue F (3)

American Boulevard/28th Avenue C American Boulevard/34th Avenue F (D) 34th Avenue/I-494 North Ramps F (D) 34th Avenue/I-494 South Ramps F (C) 28th Avenue/82nd Street F (D) Old Shakopee Road/86th Street C Old Shakopee Road/TH 77 East Ramp D

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. (1) Poor intersection operations caused from vehicle queues from American Boulevard/24th Avenue (2) Average vehicle delay of 60 seconds (3) Average vehicle delay of 260 seconds Note: Parentheses indicate LOS with assumed improvements listed below.

Page 41: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2030 WEEKDAY PEAK HOUR TRAFFIC VOLUMES (4:30 P.M. TO 5:30 P.M.)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 20

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

AW

AY

NO

RT

H

Nort

h

675

15

545

25

15

20

IE

A D

ivay

Kr

ew

American Blvd

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

= Side-Street Stop Control

115

720

390

565

65

45

6

5

70

130

Lindau Ln

IKE

A W

ay

195

625

255 705

10

260

245

15

230

Lindau Ln

22nd A

ve

350

1320 585

275

24th

Ave

. S

Lindau Ln

24th

Ave

345

765

220

82nd St.

110

2190

420

850

4

20

10

5

20

th A

ve

.

Killebrew Dr.

90

1735

120

160

640

155

3

05

15

75

2

55

1

5

90

22

nd

St.

Killebrew Dr.

180

1380

835

205

385

215

4

45

49

0

35

1

20

2

50

3

40

24

th A

ve

.

OSR

3

5

89

0

25

7

20

10

55

515

15

125

320

345

225

265

220

185

40

1425

110

Th

un

de

rbird

Rd

115

560

170

35

3

95

16

0

American Blvd

25

440

105 9

5

1

0

6

15

410

0

American Blvd

Pa

rkin

am

pg

R

445

13

0

Killebrew Dr.

20

th A

ve

American

1600

330

335

885

165

160

7

40

12

80

28

5

1

85

1

67

5

3

0

24

th A

ve

American Blvd

Page 42: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

0055391September 2006

YEAR 2030 WEEKDAY PEAK HOUR TRAFFIC VOLUMES (4:30 PM to 5:30 PM)MALL OF AMERICA PHASE II TRAFFIC STUDY Mall of America/City of Bloomington

Figure 21

i i

Pac

f c

aR

ilroa

d

DONAL

R VERI

LA

.

27

37

74

57

76

77

E.

E.

E.

E.

E.

E.

ST.

ST.

ST.

TS .

TS .

S .T

ST.E.

FERNDR.

AL BL

V.

D

ON

IAG

D

AV

E.

AV

E.

AV

E.

VE

A.

AV

E.

AE

V. .

AV

E

AE

.V

.A

VE

EA

V.

AV

E.

AV

.E

CLIN

TO

N

PO

TR

OA

K

LA

ND

AN

LD

PA

RK

CL

OB

SU

MU

CH

IO

CA

G

OT

EL

LI

AV

E.

AV

E. E

AV

.

AV

E.

BLO

OM

ING

TO

N

ER

CD

A

McC

AR

TH

Y

DO

NA

LD

HIT

AE

RG

E

T

IL

ER

MN

A MA

ME

OR

IL

GH

IH

WAY

YANKEE

D.

R

LA

.

.A

VE

ME DOWA VI EWD.R

AV

E.

.SPK

Y.

W

ET

RO

M

ORTE

M

DR.

AMERICAN BLVD

E.

E.

ST.

ST.

ST.

AVE. S.

E. OLD

KILLEBREW DR.

83

84

86

ST..ST

ST. ST.

.ST

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

ST.

86 1/2

SKYLINE DR.

IVER RIDGE CIR.R

ST.

E.

E.

E.

E.

E.E.

81 .ST

82

83

ST.

ST E.

ST.

ST.

ST.

ST.

ST.E. 39

92

INT

OC

LN

PO

RT

LA

ND

OA

NK

LA

D

PA

RK

MU

CO

LU

BS

CC

AG

HI

O

EL

LIO

T

BL

OO

MIN

GT

ON

EA

V.

A.

VE

AV

E.

VA

E.

AV

E.

VE

A.

AV

E.

E.

AV

AV

E.

V.

AE

.A

VE

AV

E.

AE

.V

AV

.E

VE

A.

AV

E.

AV

E.

S.

S. S. S.

.S S

.

S.

S.

S.

S.

S.

S.

S.

.S

E.

SH

AK

OPE

E

RD.

RD

..

AV

E

AV

E.

AV

E.

.S S

.

S.

CR

ET

S

D.

R

E. ST.

GLEV

W LA

NIE

.

22

AV

E.

RID

GE

RD

.R

IVE

R

88

AV

E.

AV

E.

ST.

.A

VE

LF

EL

LO

NG

OW

AV

E.

AV

E.PAR

K

RD.

PRNG

SE

S

I

ID.

LA

OLD

CE

DA

R.

AV

E

MEAD

OW

VIE

WR

.D

16 17

VE

.A A

V.

E

9 1/22 ST.

93 1/ 2 ST.

PA

RK

RD.D

.R

LO NGEADOW

MCIR CLES

TS .

AV

E.

TS .79 1/2

90

OFFHCSIBLA.

AV

E.

S.

S.

S. S.

.S

S.

S.

RIV

ER

V OLDE.

POST

.RD

CIR.E RC DA

7 t1s

78th

th

th

th

th

dn

dr

4th

th5 0

h1

t

1th

1

12th

13th 14th

15th

16th

th17 18th

34th

81st

82nd

AE

26th

V

. S

.

26th79tht79 h

80th 0th8

8 nd2

rd

th

th

t87 h. 87thE

st

81 STst .

nd

rd

ht

nd

t4

h

5th

10th

11th

12th

13th

31

th

th1

4

5h

1t

T-B

IRD

R

D

18

th

th1

6

17

th

t80 h

nd

8t ST.8 h

th

20

th

21

st

19

th

18

th

th th

15th

ST.

8 T1st S .

th78

5th

th

88th

89th ST.3

4th

A

VE

. S

.

HIL

LR

IDG

E

ALEXANDERRD.

LA.

89 ht

28th

S

T. S

.

91 st ST.

.S

P EAP L TREE

SQUARE

RD

.

SH

AK

OP

EE

LO

D

E.

24

thA

VE

.S

.

T

NO

RTH

WE

S

DR

.

LE DTEN R E

ST.

DR

.

YC

ITV

IEW

R.

D

DR

.

NT

IE

RN

AT

ION

AL

6 17 /2 ST.

DLIN AU

CE

DR

AA

VE

.S

.

rd

A RPORT LA.I

CMT

Gun ClubLake

Lake

Long Meadow Lake

Ri

ve

r

Mi n

neso

ta

Tr ailerCo urt

FORT

SNEL

ING

L

494494

5

13

5

77

77

5

1

1

35

35

1

35

28

H

NIN

ENEP

DAKOTA

CN

OU

TY Y

CO

UN

T

3t

E

.0

hA

V

2t

AV

E.

0h

22

ND

AV

E.

IKE

AW

AY

NO

RT

H

Nort

h

75

185

475

125

300

55

15

30

130

28th

St.

LEGEND

XX = P.M. Peak Hour

= Traffic Signal

1780

345

270

80

135 0

20

American

28th

Ave

American

880

110

130

6

65

61

0

50

5

7

0

2

39

5

1

40

34

th A

ve

American Blvd

82nd St. 0

0

5

455

10

370

9

90

117

0 5

36

5

4

10

5

OS

R

TH 77 Ramp

50

10

840

145

10

65

2

30

12

85

15

40

5

30

25

0

86th St.

10

65

230

9

90

77

5

86

5

19

5

34

th A

ve

.

I-494 Ramp

130 7

05

10

35

90

0

25

30

34

th A

ve

.

I-494 Ramp

160

745

American

1600

330

335

885

165

160

7

40

12

80

28

5

18

5

1

67

5

30

24

th A

ve

American Blvd

215

1450

65

900

1

00

13

51

70

17

80

8

65

16

05

24

th A

ve

.

I-494 Ramp

965

O

SR

Page 43: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 41

As shown in Table 9, four key intersections are expected to operate at unacceptable levels of service with the following recommended improvements. The combination of peak hour trips from redevelopment sites to the east and south with the proposed MOA 2 peak hour trips traveling through the 24th Avenue intersections exceed the capacity of their at-grade design. Killebrew Avenue at 24th Avenue

• Extend the westbound left-turn lanes to 500 feet • Extend the third westbound through lane back to the intersection of Old Shakopee

Road/28th Avenue 28th Avenue/82nd Street

• Construct an additional westbound left-turn lane American Boulevard/34th Avenue

• Eliminate the westbound free right-turn lane • Construct westbound dual right-turn lanes

34th Avenue/I-494 North Ramps and South Ramps (Figure 22)

• Reconstruct the interchange to include loops in the northwest and southwest quadrants. These improvements will eliminate two major traffic conflicts with LRT operations, the westbound to southbound movement, and the southbound to eastbound movement. Improvements at the 34th Avenue/I-494 Ramps are a result of increased traffic volumes due to background growth, adjacent developments, and LRT operations.

Additional Operations Analysis Similar to year 2030 Saturday build conditions, an additional analysis was conducted to determine how the key intersections would operate if a larger percentage of traffic would use American Boulevard to the west. With a 10 percent distribution to the west, approximately 250 new trips during the Thursday p.m. peak hour would use American Boulevard to the west. Based on the results in Table 10, three key intersections are expected to operate at unacceptable levels of service for year 2030 build Thursday p.m. peak hour conditions with the increased traffic using American Boulevard to the west.

Page 44: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

NO

RT

H or

hN

t

0055391September 2006

PROPOSED ROADWAY CONCEPT, I-494/34TH AVENUEMALL OF AMERICA PHASE II TRAFFIC STUDYMall of America/City of Bloomington

Figure 22

Page 45: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 43

Table 10 2030 Build Peak Hour Capacity Analysis – 10% Distribution to American West Level of Service Results

Level of Service Intersection Thursday Peak

Lindau Lane/TH 77 Ramps/IKEA Way C Lindau Lane/22nd Avenue C Lindau Lane/24th Avenue E (1)

Killebrew Drive/TH 77 Ramps/20th Avenue D Killebrew Drive/22nd Avenue C Killebrew Drive/24th Avenue D 24th Avenue/I-494 Single-Point Interchange D 24th Avenue/82nd Street D American Boulevard/IKEA Driveway * A/C American Boulevard/Thunderbird Road F (1)

American Boulevard/24th Avenue F (2)

American Boulevard/28th Avenue C American Boulevard/34th Avenue D 34th Avenue/I-494 North Ramps D 34th Avenue/I-494 South Ramps C 28th Avenue/82nd Street D Old Shakopee Road/86th Street C Old Shakopee Road/TH 77 East Ramp D

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. (1) Poor intersection operations caused from vehicle queues from American Boulevard/24th Avenue (2) Average vehicle delay of 220 seconds As previously stated, the combination of peak hour trips from redevelopment sites to the east and south with the proposed MOA 2 peak hour trips traveling through the 24th Avenue intersections exceed the capacity of their at-grade design during year 2030 build Thursday conditions. In order to improve operations to acceptable operations, the following comments are provided:

• Further review of the feasibility of a grade-separated intersection at American Boulevard/24th Avenue should be considered.

• Mn/DOT has recently selected a consultant for the Travel Demand Forecasting and

Concept Development project for the I-494/TH 77 corridors. Results of this study will provide forecast traffic volumes for the area from a regional perspective to compare with the local traffic model and future volumes developed for the MOA Phase II Traffic Study and supplemental analyses. This will allow us to determine whether adjustments could be made. In addition, a new connection from Thunderbird Road or areas east of 24th Avenue to the CD roadway will be considered as part of this study.

Page 46: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 44

• Based on the percent breakdown of traffic using the intersection of American Boulevard/24th Avenue during year 2030 build Thursday conditions, further review of the total amount of future development for the entire study area should be considered.

VI. OTHER ISSUES A. Site Plan Review As part of this study, SRF staff worked closely with the site design engineer to review and modify on-site intersection and roadway geometrics to provide the necessary lane configurations, turn lane lengths and intersection spacing to provide adequate on-site operations during peak hour conditions. To determine how well the on-site intersections will accommodate year 2030 build traffic forecasts, an operations analysis was conducted for Saturday peak hour conditions. Results of the analysis shown in Table 11 indicate that all key intersections on-site are expected to operate at acceptable levels of service for year 2030 build Saturday conditions. Table 11 Year 2030 Build Peak Hour Capacity Analysis - Saturday Internal Intersection Level of Service Results

Level of Service Intersection Saturday Peak

Northbound TH 77 CD Ramps/East Ramp Roundabout * A (1)

East Ramp Roadway/Nordstrom’s Access A IKEA Way/IKEA Driveway * A/B IKEA Way/North Ring Road * B/B Thunderbird Road/North Ring Road * A/D 22nd Avenue/Main Parking Access C 22nd Avenue/Large Vehicle Access * A/A

* Indicates an unsignalized intersection. The overall LOS is shown followed by the worst approach LOS. (1) Level of Service results are similar with both Synchro/SimTraffic and RODEL traffic models. In addition to the intersection operations analysis, on-site plan review comments are summarized below:

• Queuing at all adjacent intersections along American Boulevard and Lindau Lane was reviewed and addressed for future peak conditions. Intersection geometrics and lane configurations will accommodate future traffic forecasts. Heavy vehicle queues are not expected to develop from the adjacent intersections, backing on-site to block internal intersections.

Page 47: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 45

Based on the traffic simulation of year 2030 build conditions (Saturday), the southbound average queues on IKEA Way and 22nd Avenue at Lindau Lane are not expected to extend back into the first internal intersections to the north. In addition, the southbound 95th percentile queues on IKEA Way are not expected to extend back to the first internal intersection. However, the southbound 95th percentile queues on 22nd Avenue are expected to extend back to the first internal intersection during peak Saturday conditions.

Based on the traffic simulation of year 2030 build conditions (Saturday), the northbound average and 95th percentile queues at American Boulevard are not expected to spill back into the T-intersection to the south. However, the westbound right-turning vehicles may queue back onto the north ring road to the east. This queue will not impact the entering traffic at the T-intersection south of American Boulevard

• Queuing at all internal intersections was reviewed and addressed for future peak conditions. Intersection geometrics and lane configurations will accommodate future traffic forecasts. Heavy vehicle queues are not expected to develop from the internal intersections, backing into the adjacent American Boulevard and Lindau Lane intersections.

B. Impacts to IKEA Store With the proposed site plan dated September 5, 2006, operational impacts to the IKEA Store are minimal. The current layout locates the main parking ramp adjacent to 24th Avenue. As previously stated, access to the main parking ramp is provided along American Boulevard west of 24th Avenue and along the main internal roadway north of the Lindau Lane/22nd Avenue intersection. Therefore, the majority of the travel patterns for new trips will occur on the east side of the proposed MOA 2 site. This will allow the necessary capacity for IKEA Way to operate at acceptable levels of operation during Saturday peak conditions for IKEA customers. As previously stated, the southbound average and 95th percentile queues along IKEA Way are not expected to block the first internal intersection to the north. According to the proposed site plan, a smaller parking structure will be provided at the north end of IKEA Way. However, this parking area will mainly serve the office use at the north end of the site. Peak conditions for the office use are during the weekday evening period, which does not conflict with IKEA’s Saturday peak condition. Currently, IKEA has a separate full-access along American Boulevard, west of the American Boulevard/Thunderbird Road signalized access to MOA 2. As development of the MOA 2 site occurs, other options to attract IKEA customers to use this access during Saturday peak conditions should be considered.

Page 48: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 46

VII. CONCLUSIONS AND RECOMMENDATIONS The proposed Mall of America Phase II development consists of 1,907,691 square feet of retail/mixed use, 1250 hotel rooms, 300 residential condos, and 615,000 square feet of office assumed to be completed by year 2011. Based on this traffic analysis, the following conclusions and recommendations are offered for your consideration: A. Existing Conditions • Existing turning movement counts, geometrics, traffic controls, and LRT operations were all

collected in April and May of 2005. The Thursday p.m. peak hour turning movement counts that were collected were factored by 1.3 to replicate typical traffic volumes experienced during August. The Saturday peak hour turning movement counts were not factored because historical data indicated that the Saturday counted has similar traffic volumes compared to a typical Saturday peak that would occur in August.

• Results of the existing traffic operations analysis indicate that the intersections of Lindau

Lane/TH 77 Ramps/IKEA Way and Killebrew Drive/22nd Avenue are currently operating at unacceptable levels of service during the Saturday peak hour. To improve operations at these intersections, the following improvements are recommended:

Lindau Lane/TH 77 Ramps/IKEA Way

o Eliminate access from northbound TH 77 to eastbound Lindau Lane o Remove concrete median on the west approach to allow southbound TH 77 traffic to

make an eastbound right-turn movement on Lindau Lane to the existing MOA near Nordstrom’s

Killebrew Drive/22nd Avenue

o Construct an additional eastbound left-turn lane to provide dual left-turn lanes B. Year 2012 No Build Conditions • The 2012 no build Saturday peak hour analysis assumes the recommended improvements

from the existing analysis, assumed roadway improvements listed in the Bloomington Central Station Traffic Study, and assumed roadway improvements listed in the Airport South CIP. Results of the analysis indicate that all key intersections will operate at acceptable levels of service during the Saturday peak hour.

Page 49: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 47

• The 2012 no build Thursday p.m. peak hour analysis assumes the recommended improvements from the existing analysis, assumed roadway improvements listed in the Bloomington Central Station Traffic Study, and assumed roadway improvements listed in the Airport South CIP. Results of the analysis indicate that all key intersections will operate at acceptable levels of service during the Thursday p.m. peak hour except the 34th Avenue/I-494 North and South ramp intersections. In order for these intersections to operate at acceptable levels of service, the following additional improvement is recommended:

34th Avenue/I-494 North Ramps and South Ramps

o Replace the existing “all-red” traffic phase with each LRT train crossing to a northbound/southbound “green” phase.

C. Year 2012 Build Conditions • Based on the 2012 build Saturday analysis, the following additional improvements are

needed for all intersections to operate at acceptable levels of service:

TH 77/I-494 CD Roadway

o Construct a new ramp from the TH 77/I-494 CD roadway to Thunderbird Road (see Figure 13)

TH 77 CD Roadway

o Construct a new access to/from the TH 77 CD roadway to/from the existing MOA parking ramp (see Figure 13).

American Boulevard/24th Avenue

o Construct an additional southbound right-turn lane. Extend both turn lanes to the I-494 single-point interchange (see Figure 13)

24th Avenue/I-494 Single-Point Interchange

o Construct an additional westbound left-turn lane (triple lefts) (see Figure 13).

Killebrew Drive/20th Avenue

o Eliminate the “free” southbound right-turn lane o Construct dual right-turn lanes with overlap signal timing

Page 50: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 48

• The westbound triple left-turn lane improvement recommended for year 2012 build conditions is necessary for the heavy westbound to southbound movement during the Saturday peak hour. It is possible that some motorists may choose the alternate route using the 34th Avenue interchange and American Boulevard to the current Mall of America and proposed Phase II. In addition, wayfinding improvements may be proposed under a separate upcoming study. Therefore, a sensitivity analysis was completed to determine how many vehicles would need to use the alternate route to eliminate the westbound triple left-turn lane improvement. Based on the sensitivity analysis results, approximately 300 vehicles would need to divert to the 34th Avenue interchange. These additional vehicles would not create any new operational problems at the 34th Avenue interchange in its current configuration or with its proposed improvements during the Saturday peak hour.

• An additional analysis was conducted to determine how the key intersections would operate

if a larger percentage of traffic would use American Boulevard to the west. With a 10 percent distribution to the west, approximately 300 new trips during the Saturday peak hour would use American Boulevard to the west. Based on the analysis, all improvements recommended in the previous section are still needed even with the new assumed distribution to the west on American Boulevard. It is important to note that based on the analysis, it is not necessary to direct more traffic to use American Boulevard to the west to achieve acceptable intersection operations. However, any increase above the three percent distribution will provide benefits to the operations at American Boulevard/24th Avenue during Saturday peak hour conditions.

• Based on the 2012 build Thursday analysis, the following additional improvements are

needed for all intersections to operate at acceptable levels of service:

American Boulevard/24th Avenue

o Extend the southbound left most left-turn lane to 500 feet o Extend the eastbound left-turn lanes to 500 feet o Extend the westbound left-turn lanes to 500 feet o Construct an additional westbound right-turn lane to provide three westbound right-

turn lanes o The westbound approach should have four approach lanes that begin at 28th Avenue,

two of these lanes would be trap right-turn lanes at the intersection • An additional analysis was conducted to determine how the key intersections would operate

if a larger percentage of traffic would use American Boulevard to the west. With a 10 percent distribution to the west, approximately 250 new trips during the Thursday p.m. peak hour would use American Boulevard to the west. Based on the analysis, the following improvements will still be needed to achieve acceptable operations at the intersection of American Boulevard/24th Avenue during the Thursday p.m. peak hour:

American Boulevard/24th Avenue

o Extend the southbound left most left-turn lane to 500 feet o Extend the eastbound left-turn lanes to 500 feet

Page 51: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 49

D. Year 2030 Build Conditions • The 2030 build Saturday peak hour analysis assumed all of the improvements from the 2012

build analyses. In addition, the following additional improvements were assumed:

American Boulevard/34th Avenue (listed in the Bloomington Central Station Traffic Study)

o Eliminate the southbound free right-turn lane o Construct southbound dual right-turn lanes that extend from the I-494 South Ramps

24th Avenue/82nd Street

o On the north approach, convert the right/through lane into a trap right-turn lane. This improvement will create better lane utilization upstream at the single-point interchange.

Old Shakopee Road

o Reconstruction of Old Shakopee Road between Cedar Avenue and Killebrew Avenue • Based on the 2030 build Saturday analysis, all of the key intersections are expected to

operate at acceptable levels of service, with the exception of the 24th Avenue/I-494 Single-Point Interchange (near the LOS D/E threshold). The following additional improvements are not needed from a level of service perspective, but are recommended to improve overall operations and reduce queues:

Killebrew Avenue at 22nd Avenue

o Add overlap signal phasing for the southbound right-turn movement Killebrew Avenue at 24th Avenue

o Extend the eastbound left-turn lanes to 400 feet

• An additional analysis was conducted to determine how the key intersections would operate if a larger percentage of traffic would use American Boulevard to the west. With a 10 percent distribution to the west, approximately 300 new trips during the Saturday peak hour would use American Boulevard to the west. With the increase of traffic using American Boulevard to the west, the 24th Avenue/I-494 Single-Point Interchange is expected to improve to LOS D during the Saturday peak hour. In addition to routing traffic to the west on American Boulevard, traffic traveling to the mall from the east on I-494 could be directed to 34th Avenue. This could also provide relief to the single-point interchange.

• The 2030 build Thursday p.m. peak hour analysis assumed all of the improvements from the

2030 build Saturday peak hour analysis. Based on the 2030 build Thursday analysis, four key intersections are expected to operate at unacceptable levels of service with the following recommended improvements:

Page 52: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 50

Killebrew Avenue at 24th Avenue

o Extend the westbound left-turn lanes to 500 feet o Extend the third westbound through lane back to the intersection of Old Shakopee

Road/28th Avenue

28th Avenue/82nd Street

o Construct an additional westbound left-turn lane

American Boulevard/34th Avenue

o Eliminate the westbound free right-turn lane o Construct westbound dual right-turn lanes

34th Avenue/I-494 North Ramps and South Ramps (Figure 22)

o Reconstruct the interchange to include loops in the northwest and southwest quadrants. These improvements will eliminate two major traffic conflicts with LRT operations, the westbound to southbound movement, and the southbound to eastbound movement. Improvements at the 34th Avenue/I-494 Ramps are a result of increased traffic volumes due to background growth, adjacent developments, and LRT operations.

• An additional analysis was conducted to determine how the key intersections would operate

if a larger percentage of traffic would use American Boulevard to the west. With a 10 percent distribution to the west, approximately 250 new trips during the Thursday p.m. peak hour would use American Boulevard to the west. With the increase of traffic using American Boulevard to the west, three key intersections are expected to operate at unacceptable levels of service for year 2030 build Thursday p.m. peak hour conditions.

• The combination of peak hour trips from redevelopment sites to the east and south with the

proposed MOA 2 peak hour trips traveling through the 24th Avenue intersections exceed the capacity of their at-grade design during year 2030 build Thursday conditions. In order to improve operations to acceptable operations, the following comments are provided:

o Further review of the feasibility of a grade-separated intersection at American

Boulevard/24th Avenue should be considered.

o Mn/DOT has recently selected a consultant for the Travel Demand Forecasting and Concept Development project for the I-494/TH 77 corridors. Results of this study will provide forecast traffic volumes for the area from a regional perspective to compare with the local traffic model and future volumes developed for the MOA Phase II Traffic Study and supplemental analyses. This will allow us to determine whether adjustments could be made. In addition, a new connection from Thunderbird Road or areas east of 24th Avenue to the CD roadway will be considered as part of this study.

Page 53: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 51

o Based on the percent breakdown of traffic using the intersection of American Boulevard/24th Avenue during year 2030 build Thursday conditions, further review of the total amount of future development for the entire study area should be considered.

E. Site Plan Review • As part of this study, SRF staff worked closely with the site design engineer to review and

modify on-site intersection and roadway geometrics to provide the necessary lane configurations, turn lane lengths and intersection spacing to provide adequate on-site operations during peak hour conditions. Results of the analysis indicate that all key intersections on-site are expected to operate at acceptable levels of service for year 2030 build Saturday conditions.

• Queuing at all adjacent intersections along American Boulevard and Lindau Lane was

reviewed and addressed for future peak conditions. Intersection geometrics and lane configurations will accommodate future traffic forecasts. Heavy vehicle queues are not expected to develop from the adjacent intersections, backing on-site to block internal intersections.

• Queuing at all internal intersections was reviewed and addressed for future peak conditions.

Intersection geometrics and lane configurations will accommodate future traffic forecasts. Heavy vehicle queues are not expected to develop from the internal intersections, backing into the adjacent American Boulevard and Lindau Lane intersections.

F. Impacts to IKEA Store • With the proposed site plan dated September 5, 2006, operational impacts to the IKEA Store

are minimal. The current layout locates the main parking ramp adjacent to 24th Avenue. As previously stated, access to the main parking ramp is provided along American Boulevard west of 24th Avenue and along the main internal roadway north of the Lindau Lane/22nd Avenue intersection. Therefore, the majority of the travel patterns for new trips will occur on the east side of the proposed MOA 2 site. This will allow the necessary capacity for IKEA Way to operate at acceptable levels of operation during Saturday peak conditions for IKEA customers.

• As previously stated, the southbound average and 95th percentile queues along IKEA Way

are not expected to block the first internal intersection to the north. According to the proposed site plan, a smaller parking structure will be provided at the north end of IKEA Way. However, this parking area will mainly serve the office use at the north end of the site. Peak conditions for the office use are during the weekday evening period, which does not conflict with IKEA’s Saturday peak condition.

• Currently, IKEA has a separate full-access along American Boulevard, west of the American

Boulevard/Thunderbird Road signalized access to MOA 2. As development of the MOA 2 site occurs, other options to attract IKEA customers to use this access during Saturday peak conditions should be considered.

Page 54: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Mall of America, Phase II September 6, 2006 Page 52

APPENDIX A

Detailed Trip Generation

Page 55: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Pag

e 1

of 1

Tab

le A

-1M

all o

f A

mer

ica

Ph

ase

II T

raff

ic S

tud

yA

dja

cen

t L

and

Use

Tri

p G

ener

atio

n

Adj

acen

t La

nd U

se D

evel

oped

by

Yea

r 20

12La

nd U

seD

aily

Dai

lyT

AZ

Loca

tion

Land

Use

Type

Trip

sIn

Out

InO

utT

rips

InO

ut

471

CS

E Q

uad

of O

ld S

hako

pee/

24th

Ave

Offi

ce71

015

0.43

4ks

f1,

827

229

3142

205

967

6

471

DS

outh

of O

ld S

hako

pee

just

Wes

t of C

erid

ian

Offi

ce71

038

8.65

ksf

3,79

448

967

8742

720

618

16

472

AR

PZ

Offi

ce71

079

.2ks

f1,

115

137

1928

139

644

3

472

DB

loom

ingt

on C

entra

l Sta

tion

(1)

Hea

lth P

artn

ers

Exp

ansi

on71

014

5ks

f1,

687

211

2939

190

312

2522

Blo

omin

gton

Cen

tral S

tatio

n (1

)2

resi

dent

ial t

ower

s22

027

5un

its1,

756

2710

710

557

1,66

982

54

Blo

omin

gton

Cen

tral S

tatio

n (1

)11

res

iden

tial t

ower

s22

082

8un

its5,

286

8032

131

717

15,

026

245

164

Ret

ail -

ass

ume

1 re

stau

rant

932

8.3

ksf

528

2523

2818

1,31

452

31R

etai

l - a

ssum

e m

ix81

49

ksf

399

64

1114

378

1013

Ret

ail -

ass

ume

mix

814

8.8

ksf

390

64

1013

370

912

Blo

omin

gton

Cen

tral S

tatio

n (1

)14

-sto

ry o

ffice

tow

er71

054

4.55

ksf

4,67

460

883

111

543

1,12

575

64Fl

ex r

etai

l81

427

.7ks

f1,

228

1811

3342

1,16

531

40

Blo

omin

gton

Cen

tral S

tatio

n (1

)H

otel

310

200

room

s1,

552

6541

5953

1,55

677

60R

esta

uran

ts93

25

ksf

318

1514

1711

792

3318

Ret

ail

814

1ks

f44

10

12

421

2

Blo

omin

gton

Cen

tral S

tatio

n (1

)9-

stor

y of

fice

bldg

710

245.

1ks

f2,

528

321

4457

279

516

4235

Blo

omin

gton

Cen

tral S

tatio

n (1

)Tr

ansi

t-orie

nted

ret

ail

814

150

ksf

6,64

897

6017

922

86,

306

170

216

MA

C T

erm

inal

Exp

ansi

on (

2)A

irpor

t--

6000

stal

ls12

,500

----

145

1,00

09,

000

145

315

Tota

l46

,274

2,33

585

81,

270

3,39

229

,937

1,02

71,

071

(1) R

etai

l lan

d us

es a

ssum

e a

50%

mul

ti-us

e re

duct

ion.

Offi

ce, r

esid

entia

l, an

d ho

tel l

and

uses

ass

ume

a 5%

LR

T r

educ

tion.

(2) T

rip G

ener

atio

n ba

sed

on d

ata

from

"20

15 T

erm

inal

Exp

ansi

on P

roje

ct M

inne

apol

is-S

t Pau

l Int

erna

tiona

l Airp

ort"

(Ju

ly 2

005)

.

Exi

stin

g La

nd U

se R

epla

ced

by Y

ear

2012

Land

Use

Dai

lyD

aily

TA

ZLo

catio

nLa

nd U

seTy

peT

rips

InO

utIn

Out

Trip

sIn

Out

471

CS

E Q

uad

of O

ld S

hako

pee/

24th

Ave

Apa

rtm

ents

220

92un

its70

310

3944

2446

631

26

471

DS

outh

of O

ld S

hako

pee

just

Wes

t of C

erid

ian

Sin

gle

Fam

ily H

ousi

ng21

023

units

269

619

1811

264

1714

472

DB

loom

ingt

on C

entra

l Sta

tion

Offi

ce (

Dyn

amic

s)71

025

9.12

2ks

f2,

777

354

4863

306

146

1211

Tota

l3,

749

370

106

125

341

877

6051

GR

AN

D T

OTA

L42

,525

1,96

575

11,

145

3,05

129

,060

966

1,02

0

Siz

e

Wee

kday

Sat

urda

yA

.M. P

eak

P.M

. Pea

kP

.M. P

eak

Wee

kday

Sat

urda

y

Siz

eA

.M. P

eak

P.M

. Pea

kP

.M. P

eak

H:\T

raffi

c\53

91\T

rip G

ener

atio

n\Tr

ip G

ener

atio

n Ta

ble.

xls

11/7

/200

5

Page 56: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Pag

e 1

of 1

Tabl

e A

-2M

all o

f Am

eric

a Ph

ase

II Tr

affic

Stu

dyLa

nd U

se T

rip G

ener

atio

n, Y

ear 2

012

Land

Use

Dai

lyD

aily

TAZ

Loca

tion

Land

Use

Type

Trip

sIn

Out

InO

utTr

ips

InO

ut

473

BM

OA

Pha

se II

(Met

Cen

ter S

ite)

Ret

ail/M

ixed

Use

(1)

820

1457

.691

ksf

15,5

9727

366

866

975

21,1

341,

138

1,28

3

Bas

s P

ro S

hops

(2)

820

300

ksf

6,40

011

126

301

339

10,6

0059

867

4

Per

form

ing

Arts

Cen

ter (3

)--

6000

seat

s2,

560

00

00

4,24

00

0

Hot

el (4

)31

013

25un

its5,

413

226

145

207

184

5,42

626

721

0

Offi

ce (5

)71

061

5ks

f6,

094

755

103

140

685

1,31

212

310

4

Res

iden

tial C

ondo

s (5)

230

300

units

1,58

220

9995

461,

531

6859

Tota

l37

,646

1,38

543

91,

609

2,22

944

,243

2,19

42,

330

(1) T

rip g

ener

atio

n ra

tes

wer

e ba

sed

on e

xist

ing

MO

A tr

affic

cou

nts.

(2

) Trip

gen

erat

ion

rate

s w

ere

base

d on

Bas

s P

ro S

hops

trip

gen

erat

ion

info

rmat

ion.

A 4

7 pe

rcen

t mul

ti-us

e re

duct

ion

was

ass

umed

for S

atur

day

trips

and

a 3

6 pe

rcen

t mul

ti-us

e re

duct

ion

was

ass

umed

for w

eekd

ay tr

ips.

(3) T

he p

erfo

rmin

g ar

ts c

ente

r is

assu

med

to h

ave

a re

stric

ted

sche

dule

, onl

y ge

nera

ting

trips

dur

ing

off-p

eak

hour

s.

(3) A

50

perc

ent m

ulti-

use

redu

ctio

n w

as a

ssum

ed fo

r hot

el la

nd u

se.

(4) A

10

perc

ent m

ulti-

use

redu

ctio

n w

as a

ssum

ed fo

r offi

ce a

nd re

side

ntia

l lan

d us

e.

Wee

kday

Sat

urda

y

Siz

eA

.M. P

eak

P.M

. Pea

kP

.M. P

eak

H:\T

raffi

c\53

91\A

dditi

onal

Ana

lysi

s 6_

01_0

6\Tr

ip G

ener

atio

n\Tr

ip G

ener

atio

n Ta

ble

9/6/

2006

Page 57: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Pag

e 1

of 2

Tabl

e A

-3M

all o

f Am

eric

a P

has

e II

Tra

ffic

Stu

dy

Ad

jace

nt L

and

Use

Tri

p G

ener

atio

n

Ad

jace

nt

Lan

d U

se D

evel

op

ed b

y Y

ear

2030

Land

Use

Dai

lyD

aily

TA

ZLo

catio

nLa

nd U

seT

ype

Trip

sIn

Out

InO

utT

rips

InO

ut

471

BS

E Q

uad

of O

ld S

hako

pee/

86th

St

Ligh

t Ind

ustr

ial

110

147.

541

ksf

1,00

075

106

4228

810

11

471

CS

E Q

uad

of O

ld S

hako

pee/

24th

Ave

Offi

ce71

015

0.43

4ks

f1,

827

229

3142

205

967

6O

ffice

710

935.

669

ksf

7,46

398

713

519

293

545

844

38

471

DS

outh

of O

ld S

hako

pee

just

Wes

t of C

erid

ian

Offi

ce71

038

8.65

ksf

3,79

448

967

8742

720

618

16

471

ES

E Q

uad

of A

mer

ican

Blv

d/34

th A

veC

ondo

s23

074

units

497

734

3115

696

3529

Con

dos

230

115

units

723

1048

4522

844

4135

471

FN

E Q

uad

of A

mer

ican

Blv

d/34

th A

veA

part

men

ts22

011

5un

its84

212

4853

2864

733

33A

part

men

ts22

036

4un

its2,

338

3614

614

276

2,60

184

84O

ffice

710

419.

3ks

f4,

023

520

7193

455

220

2017

472

AR

PZ

Offi

ce71

079

.2ks

f1,

115

137

1928

139

644

3

472

BE

ast o

f RP

Z ju

st N

orth

of A

mer

ican

Blv

dO

ffice

710

503.

884

ksf

4,63

460

282

109

534

259

2420

472

CN

W Q

uad

of A

mer

ican

Blv

d/34

th A

veO

ffice

710

410.

844

ksf

3,96

051

170

9244

721

620

17R

etai

l (1)

814

20ks

f44

313

824

3042

021

27A

part

men

ts22

037

5un

its2,

404

3715

014

678

2,68

886

86

472

DB

loom

ingt

on C

entr

al S

tatio

n (1

)H

ealth

Par

tner

s E

xpan

sion

710

145

ksf

1,68

721

129

3919

031

225

22

Blo

omin

gton

Cen

tral

Sta

tion

(1)

2 re

side

ntia

l tow

ers

220

275

units

1,75

627

107

105

571,

669

8254

Blo

omin

gton

Cen

tral

Sta

tion

(1)

11 r

esid

entia

l tow

ers

220

828

units

5,28

680

321

317

171

5,02

624

516

4R

etai

l - a

ssum

e 1

rest

aura

nt93

28.

3ks

f52

825

2328

181,

314

5231

Ret

ail -

ass

ume

mix

814

9ks

f39

96

411

1437

810

13R

etai

l - a

ssum

e m

ix81

48.

8ks

f39

06

410

1337

09

12

Blo

omin

gton

Cen

tral

Sta

tion

(1)

14-s

tory

offi

ce to

wer

710

544.

55ks

f4,

674

608

8311

154

31,

125

7564

Fle

x re

tail

814

27.7

ksf

1,22

818

1133

421,

165

3140

Blo

omin

gton

Cen

tral

Sta

tion

(1)

Hot

el31

020

0ro

oms

1,55

265

4159

531,

556

7760

Res

taur

ants

932

5ks

f31

815

1417

1179

233

18R

etai

l81

41

ksf

441

01

242

12

Blo

omin

gton

Cen

tral

Sta

tion

(1)

Offi

ce (

4 bl

dgs)

710

546.

3ks

f4,

685

610

8311

254

51,

128

7564

Fle

x R

etai

l81

44.

7ks

f20

83

26

719

86

7

Blo

omin

gton

Cen

tral

Sta

tion

(1)

Offi

ce71

048

9.4

ksf

4,30

555

976

101

494

1,01

272

62F

lex

Ret

ail

814

10.6

ksf

470

74

1316

446

1215

Blo

omin

gton

Cen

tral

Sta

tion

(1)

9-st

ory

offic

e bl

dg71

024

5.1

ksf

2,52

832

144

5727

951

642

35

Blo

omin

gton

Cen

tral

Sta

tion

(1)

Tra

nsit-

orie

nted

ret

ail

814

150

ksf

6,64

897

6017

922

86,

306

170

216

LRT

Par

k-an

d-R

ide (

2)09

310

48sp

aces

2,63

031

739

8240

065

849

56

472

FA

djoi

ning

Lan

ds (

3)O

ffice

710

546.

941

ksf

4,68

961

183

112

545

265

2521

Ret

ail

820

273.

471

ksf

12,4

0716

610

655

560

116

,544

822

765

Wee

kday

Sat

urda

y

Siz

eA

.M. P

eak

P.M

. Pea

kP

.M. P

eak

H:\T

raffi

c\53

91\T

rip G

ener

atio

n\T

rip G

ener

atio

n T

able

.xls

11/7

/200

5

Page 58: MALL OF AMERICA PHASE II TRAFFIC STUDYMall of America, Phase II September 6, 2006 Page 1 I. INTRODUCTION This report contains the traffic study results for the proposed second phase

Pag

e 2

of 2

Tabl

e A

-3M

all o

f Am

eric

a P

has

e II

Tra

ffic

Stu

dy

Ad

jace

nt L

and

Use

Tri

p G

ener

atio

n

Ad

jace

nt

Lan

d U

se D

evel

op

ed b

y Y

ear

2030

Land

Use

Dai

lyD

aily

TA

ZLo

catio

nLa

nd U

seT

ype

Trip

sIn

Out

InO

utT

rips

InO

ut

Wee

kday

Sat

urda

y

Siz

eA

.M. P

eak

P.M

. Pea

kP

.M. P

eak

472

GA

rea

just

nor

th o

f Adj

oini

ng L

ands

Offi

ce71

084

2.06

1ks

f6,

882

908

124

174

848

415

4034

473

AA

rea

just

nor

th o

f MO

A P

hase

IIH

otel

310

550

room

s4,

549

206

132

172

153

4,99

621

516

9H

otel

310

550

room

s4,

549

206

132

172

153

4,99

621

516

9

473

CA

rea

just

sou

th o

f MO

AH

otel

310

430

room

s3,

475

152

9713

411

93,

842

169

132

MA

C T

erm

inal

Exp

ansi

on (

4)A

irpor

t--

6000

stal

ls12

,500

----

145

1,00

09,

000

145

315

To

tal

123,

451

8,89

02,

537

3,83

49,

937

73,7

743,

144

2,96

3(1

) Ret

ail l

and

uses

ass

ume

a 50

% m

ulti-

use

redu

ctio

n. O

ffice

, res

iden

tial,

and

hote

l lan

d us

es a

ssum

e a

5% L

RT

red

uctio

n.(2

) Pea

k ho

ur tr

ip g

ener

atio

n ra

tes

are

base

d on

exi

stin

g pa

rk-a

nd-r

ide

traf

fic c

ount

s. 1

048

addi

tiona

l par

king

sta

lls a

re a

ssum

ed, a

tota

l of 1

575.

(3) R

etai

l and

Offi

ce la

nd u

ses

assu

me

a 5%

mul

ti-us

e re

duct

ion.

(4

) Trip

Gen

erat

ion

base

d on

dat

a fr

om "

2015

Ter

min

al E

xpan

sion

Pro

ject

Min

neap

olis

-St P

aul I

nter

natio

nal A

irpor

t" (

July

200

5).

Exi

stin

g L

and

Use

Rep

lace

d b

y Y

ear

2030

Land

Use

Dai

lyD

aily

TA

ZLo

catio

nLa

nd U

seT

ype

Trip

sIn

Out

InO

utT

rips

InO

ut

471

CS

E Q

uad

of O

ld S

hako

pee/

24th

Ave

Apa

rtm

ents

220

92un

its70

310

3944

2446

631

26

471

DS

outh

of O

ld S

hako

pee

just

Wes

t of C

erid

ian

Sin

gle

Fam

ily H

ousi

ng21

023

units

269

619

1811

264

1714

472

BE

ast o

f RP

Z ju

st N

orth

of A

mer

ican

Blv

d (3)

Offi

ce71

046

5.85

ksf

4,36

224

122

19

472

CN

W Q

uad

of A

mer

ican

Blv

d/34

th A

ve (

3)A

irpor

t Par

k n

Go

??13

36sp

aces

668

668

2525

472

DB

loom

ingt

on C

entr

al S

tatio

n (3)

Indu

stria

l (D

ynam

ics)

110

259.

122

ksf

1,83

415

19

1413

838

317

19

472

GA

rea

just

nor

th o

f Adj

oini

ng L

ands

Offi

ce71

051

1.11

1ks

f4,

685

609

8311

154

126

224

21

473

AA

rea

just

nor

th o

f MO

A P

hase

IIH

otel

310

478

room

s3,

905

173

111

149

133

4,30

418

714

7H

otel

310

263

room

s1,

981

8353

8273

2,23

610

482

473

CA

rea

just

sou

th o

f MO

AH

otel

310

207

room

s1,

479

6139

6557

1,69

782

65

To

tal

19,8

871,

802

452

586

1,48

510

,522

510

418

(3) W

eekd

ay a

.m. a

nd p

.m. p

eak

hour

trip

gen

erat

ion

rate

s ar

e ba

sed

on e

xist

ing

traf

fic c

ount

s an

d ob

serv

atio

ns.

GR

AN

D T

OTA

L10

3,56

57,

088

2,08

53,

248

8,45

263

,252

2,63

42,

545

708

509

102

99

Siz

e

Wee

kday

Sat

urda

yA

.M. P

eak

P.M

. Pea

kP

.M. P

eak

H:\T

raffi

c\53

91\T

rip G

ener

atio

n\T

rip G

ener

atio

n T

able

.xls

11/7

/200

5


Recommended