    Stages of Development

    &Implementation of MIS

    Presented by

    Harshad More

  • 8/8/2019 Management Information System - HARSHAD MORE

    2/18

    Contents

    MIS.Objectives.

    Nolan stage model.

    ToolsSystem Analysis & Design.

    Implementation of MIS.

    Issues in Implementation.

    Problems in Implementation.

  • 8/8/2019 Management Information System - HARSHAD MORE

    3/18

    Management Information System

    A SystemIt combines human and computer based resources.

    To provide information to managers.

    To make timely and effective decisions. MIS USES

    Hardware and Software.

    Manual Procedures.Decision Models.

    A database.

  • 8/8/2019 Management Information System - HARSHAD MORE

    4/18

    Objectives

    To provide accurate informationTo provide timely information

    To provide the right information

    To provide this information in the right format

    To provide this information to the right people

  • 8/8/2019 Management Information System - HARSHAD MORE

    5/18

    Nolan Stage Model

    Initiation Stage-To meet basic organisational needs.

    Decentralised Control.

    Specific data processing activity.Improvement in productivity.

    Expansion stage-

    Realise the advantages of computer.

    Proliferation of applications.

    Users superficially enthusiastic about using data processing.

  • 8/8/2019 Management Information System - HARSHAD MORE

    6/18

    Contd

    Rapid growth of computer use throughout the organisation's functionalareas.

    Rapid growth of budgets.

    Formalisation Stage

    No reduction in computer use.

    To give direction to the computerisation.

    To apply cost-effective criteria.

    Integrate computerisation with overall goals and objectives.

  • 8/8/2019 Management Information System - HARSHAD MORE

    7/18

    Contd

    Maturity Stage-

    Alignment of information system to organisation goal and objectives.

    Establishment of control procedures.Linking of computerisation to the organisation plan and policies.

  • 8/8/2019 Management Information System - HARSHAD MORE

    8/18

    Tools

    Prototyping toolRough & Ready model input given by users.

    Powerful tool in designing, developing & implementing MIS.

    Satisfy user requirements in system.

  • 8/8/2019 Management Information System - HARSHAD MORE

    9/18

    Contd C

    ASE Tool-Combine Hardware &Software.

    Provide a soft engineering database.

    Regardless of the Operating System &Hardware.

    Develop system itself Design finalised.

    Perform the coding, compiling & Testing Sub system.

  • 8/8/2019 Management Information System - HARSHAD MORE

    10/18

    Requirement Gathering

    Interaction

    Quick Design

    Building Prototype

    Customer Evaluation

    Refining Prototype

    Engineering Product

    End

    Roger S Pressman

  • 8/8/2019 Management Information System - HARSHAD MORE

    11/18

    System Analysis

    To study existing systems within the organisation. Why System Analysis is carried out

    To prepare alternatives & cost benefit analysis.

    To assist the user in selecting the appropriate alternative.

    To prepare a frame work for the proposed solution.

    Problems-

    Non availability of use communication tools.

    Imprecise & verbose description of existing procedures.

    Overuse of jargon, both by users & MIS designers.

    Lack of a conceptual model of the system.

  • 8/8/2019 Management Information System - HARSHAD MORE

    12/18

    Contd

    Advantage of structured approach-Development in an orderly fashion.

    Improvement in communication between user & developer.

    Involvement of the user in all phases of design & development.

    Reduction in overall project cost.

    Development of easy to maintain systems.

  • 8/8/2019 Management Information System - HARSHAD MORE

    13/18

    System Design

    Development of new system to replace existing system.It helps to improve the profitability of the organisation.

    Design Process-

    Starts after the system analysis stage is completed. Before Implementation-

    Technical Feasibility.

    Economic Feasibility.Operational Feasibility.

  • 8/8/2019 Management Information System - HARSHAD MORE

    14/18

    Implementation of MIS

    Activities-Acquisition of hardware, software & operating system.

    Auditing system to ensure quality.

    Development & Testing.Reviews with actual users.

    Fine tuning of software to incorporate user needs.

  • 8/8/2019 Management Information System - HARSHAD MORE

    15/18

    Issues in Implementation

    Unfreezing-All entities in the existing system must be convinced and agreed.

    Change-

    Analysis design development & implementationIt is typically a period of confusion.

    Reduced state of efficiency.

    Coaching, counseling or psychological. Re-freezing-

    Become part of the organisation culture.

    Transitional state to a stable and productive state.

  • 8/8/2019 Management Information System - HARSHAD MORE

    16/18

    Problems in Implementation

    Problems due to users - Lacks ofCommitment, Motivation,

    Training

    Solution-

    Staff Training.

    User Training.

    Staff feedback session.

    Management commitment Sessions.

    Problems due to designer Resource limitation.

    Non-Availability of tools.

    limitation in system design.

    Solution-

    Improving technological inputs.

    Improving & reformatting design. Seeking alternative resources.

  • 8/8/2019 Management Information System - HARSHAD MORE

    17/18

    You must be capable of changing and

    rearranging your priorities so that your finalgoal can be achieved.