+ All Categories
Home > Documents > Management of Spent Fuel at Shutdown Reactors in Germany...• Spent fuel will be stored in on-site...

Management of Spent Fuel at Shutdown Reactors in Germany...• Spent fuel will be stored in on-site...

Date post: 25-Apr-2020
Category:
Upload: others
View: 11 times
Download: 0 times
Share this document with a friend
9
Management of Spent Fuel at Shutdown Reactors in Germany Technical Meeting on the Management of Spent Fuel at Shutdown Reactor Sites, Including Those to be Shut Down Prematurely Vienna June 2018 Dr. Oliver Wallenfang - BGZ
Transcript

Management of Spent Fuel at Shutdown

Reactors in Germany Technical Meeting on the Management of Spent Fuel at Shutdown Reactor Sites,

Including Those to be Shut Down Prematurely

Vienna June 2018 Dr. Oliver Wallenfang - BGZ

EVT1701645/Wallenfang/June 11, 2018/Page 2

Contents • Reorganization of nuclear waste management in Germany

• Legal aspects

• NPP and storage facilities for SNF in germany

• How we achieve a self-sufficient storage operation

• Special issues of prematurely shut down NPP

• Management of damaged fuel

• Conclusions

EVT1701645/Wallenfang/June 11, 2018/Page 3

Legislator decided to reorganize nuclear waste management

Our mission:

safe & secure storage

Spent Fuel / Heat generating waste

Waste with negligible heat generation from NPP-operation and

dismantling

Repository

Utilities:

NPP operation

and dismantling

EVT1701645/Wallenfang/June 11, 2018/Page 4

NPP-Operator State-owned

operator BGZ

storage facilities

spent fuel / heat-generating waste

storage facilities

waste with negligible heat generation

January 01, 2019

January 01, 2020

• The existing storage licenses granted for the German utilities

will pass to BGZ and remain in force unchanged.

No need for BGZ to apply for new storage licenses

for radioactive waste

Legal aspects

EVT1701645/Wallenfang/June 11, 2018/Page 5

2011

2011 2022 2011

2022

2022

2015

2021

2011 2019

2021

2021 2017

2011

2011 2011

2011 2011

PWR

BWR

power reactor (shut down before 2005)

on site storage

off site storage

NPP and storage facilities for SNF in germany

year of shutdown

EVT1701645/Wallenfang/June 11, 2018/Page 6

today

NPP and storage

facilities operated by

utility

Operation of NPP

and storage facility

coupled

1

as of January 01, 2019

Storage facility operated

by state-owned BGZ

NPP operated by utility

as before

Service contracts

between utility and BGZ

after dismantling NPP

Self-sufficient

operation of storage

facility by BGZ

2 4

NPP BGZ NPP BGZ NPP BGZ

3

during dismantling

NPP

NPP under

dismantling by utility

Decoupling

operation of storage

facility from NPP

Service contracts

between utility and

BGZ

Security Fence

Step by step: How we achieve a self-sufficient storage operation

EVT1701645/Wallenfang/June 11, 2018/Page 7

Special issues of prematurely shut down NPP

• In 2011 eight NPP were shut down immediately after the fukushima

incident.

• The existing reports of subcriticality take a burn up credit for some fuel

assemblies.

• New reports were made for those fuel assemblies with partial loadings of

the casks (7 or 13 of 19 PWR / 48 to 51 of 52 BWR assemblies) prove

subcriticality.

• The first storage license with this issue was granted in 2016.

• All on-site storage facilities have the needed capacity for the additional

casks.

EVT1701645/Wallenfang/June 11, 2018/Page 8

BWR- and PWR-Quiver

Management of damaged fuel

bolted and welded lid

• GNS invented an integrated quiver system for

the transport and storage of damaged fuel with

the shape and the weight of german fuel

assemblies.

• The quiver and the fuel can be dried down to

1 g H2O/quiver.

• The system is gas-tight with a bolted and

welded lid.

• The quivers are licensed as a part of the casks

CASTOR® V/19 and CASTOR® V/52.

• The first casks with quivers will be stored in

2018.

GNS IQ © by GNS (www.gns.de)

Pictures provided by GNS

EVT1701645/Wallenfang/June 11, 2018/Page 9

Conclusions

• Spent fuel will be stored in on-site and off-site dry interim storage facilities

until final disposal.

• The facilities are operated by state-owned companies.

• There are technical solutions for the dry interim storage and for transport of

all spent fuel including the damaged fuel from german NPP.


Recommended