1 Tellus Holdings Ltd Project Updates Managing Director Duncan van der Merwe June 2015
Transcript
Page 1: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

1

Tellus Holdings Ltd

Project Updates

Managing Director Duncan van der Merwe

June 2015

Page 2: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

2

Strategy

Chandler Project, NT

Appendix

Sandy Ridge Project, WA

ClayVault Project, WA

Contents

1

4

2

3

Page 3: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

3

Tellus Holdings Ltd (“Tellus”) Summary

Company Public unlisted company (2009)

Strategy Project infrastructure developer

Developing a globally proven, dual revenue, business model – first in Asia

Mine underground rock salt and kaolinclay beds and export commodities

Fill the space left from mining with equipment, archives and waste

Projects Chandler salt project (build 2017)

Sandy Ridge kaolin project (build 2016)

ClayVault Class V waste JV operation

Market cap AUD 55 million (target A$320M Q4 2016)

1

Project and Office Locations

Share price and market cap

Company Summary

Page 4: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

4

Tellus’ Dual Revenue Strategy1

Page 5: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

5

309 M t JORC Measured1 Resource

NT Chandler Project

Halite salt (500 year mine)

Vo

lum

e: 5

08

k t

pa

salt

sal

es

WA Sandy Ridge Project

Kaolin clay(1,475 year mine)

1 Refer to Sandy Ridge JORC media release ( 20 June ’14) and Chandler JORC media release (1 July 14)

41 M t JORC Inferred1 Resource

Tellus’ Commodity Strategy1

Resources Our Industrial Minerals End Market UsesOur Strategy

Du

al r

eve

nu

e: c

om

mo

dit

y

Do

me

stic

an

d e

xpo

rt s

ale

s

Vo

lum

e: 2

8 k

tp

aka

olin

sal

es

Du

al r

eve

nu

e: c

om

mo

dit

y

Long term (25 + year), reliable supplier of high grade industrial minerals

Chlor‐alkali, soda ash, road de‐icing, food processing, animal feedstuffs, water treatment

Ceramics (tableware and glazes), paint, continuous filament glass-fibre and other uses

Do

me

stic

an

d e

xpo

rt s

ale

s

Page 6: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

6

Experienced Management Team and Consortium1

Experienced Board team Exp. mining/ BD team Experienced waste management team

Shell, NSW Minerals CouncilVIC Haz Waste Consult. Committee

BD Coffey Environmental, IBM

Head-AMP Capital Investors, CEO Tenix Infrast. & Lend Lease Capital

Philip GarlingNon Executive Chairman

Duncan van der MerweGroup MD

Ron Sifton NED

Noel DavisMD ClayVault WA

Robert CharterGM Sales and Marketing

Dr Nikki WilliamsNED

Mining –(Gencor -Billiton), waste & infrastructure (BOS, Nobles)

CFO Newalta(Canada’s largest salt cavern waste storage operator)

Ex WA Environmental Regulator, Managed only Class V waste facility

EPMS,Project manager - WA Kaolin

Mark ShepherdTellus RockVault NED

John CookTellus RockVault Chair

Mike IngramSandy Ridge Project Leader

Ex NSW Chief Mining Engineer, Ex MD Waste Service NSW

Ex MD Coffey WA, managed Australia’s only Class V waste facility

Wiltshire Geological, Schlumberger, Terra Search

Jaime LiveseyProject Administrator /Snr Geologist

Steve ReeceChandler Project leader

Managed UK salt / backfill mine for 15 years, Compass Minerals WinsfordRocksalt Mine

Project SPV

EPC O&M

Funders Insurers

Project Consortium – Tier 1 parties

Engineering

Highly experienced Board and Management team Proven track record developing salt/kaolin projects and heavily regulated storage projects

Linc Energy, Atlas Iron, Macquarie Roaring40s

Anton RohnerGroup CFO &Secretary

Page 7: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

7

Tellus’ Strategy - Health Safety and Environment1

• No reported Lost Time Injuries in 5 years

• Successfully passed 2 years of SAI Global audits

-AS 4801: OHS, ISO 9001: Quality and ISO 14001:

Environmental

• Three site visits by the NT Government Regulators

Page 8: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

8

Community and Stakeholder Engagement

Community consultation

Supporting jobs (WA TO’s)

Supporting jobs (NT TO’s)

Pot. buyers (pit-to port visits)Radio, TV, Newspaper, Online

NT Gov. & Regulator (site visits) TO meetings & site visits

Supporting local business (20+)

Chandler over 30 months engagementSandy Ridge over 18 months engagement

1

Page 9: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

9

1 Project Timetable

Activity Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Yr Yr Yr

3/15 6/15 9/15 12/15 3/16 6/16 9/16 12/16 3/17 6/17 6/18 6/19 6/20

San

dy

Rid

ge

Drilling (bulk, resource, water), Pilots (3 products)

Feasibility studies (PFS & BFS)

Approvals

Build stage 1 (storage) and 2 (kaolin)

Commercial negotiations: ECI, waste & kaolin sales

Ch

and

ler

Drilling (water, geotech), Pilots (dry & wet)

Bankable feasibility studies (FEL 3)

Approvals

Build stage 1 (storage surface) & 2 (decline, UG)

Commercial negotiations - ECI, waste and salt sales

PFS (FEL 2) BFS (FEL 3)

PER prep, MLA

9 months 3mo

Kaolin sales

Storage sales

EOI’s, MOU’s

Pilot

EIS prep, MLA

9 months 36 mo (total 45 mo)

Salt sales

Storage sales

9-12 months

9-1 2 months

Binding

EOI’s, MOU’s Binding

Drill

30 September 2015 key date

On track to get regulatory approvals to commence constructionSandy Ridge: Early kaolin sales and cash flowChandler: Early storage sales and cash flow

BFS (FEL 3)

Page 10: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

10

Tellus is pulling a Project Consortium together:1

Offtake only Equipment and services Project Financing

Australia

South East Asia

Japan, Korea, China

Sales partnership

Mine equipment, village, utility, vehicle supply contracts

ECI: Early contractor involvementEPC: Engineering & construction contracts

O&M: Operations and maintenance contracts

Project equity

Project debt

Trade export schemes

Advantages:• Maximum potential

for financial return& value add

• Prompt salesdeployment -accessto establishedcontacts,warehousing anddistribution

• Transparency, brandrecognition & accessto customers

• Involvement inproduct pricing

• Collaborativedecision makingover control of thebusiness

• Negotiated levels ofrisk & investment

Advantages:• Immediate sales• Low Tellus effort• Minimal investment

in sales network• Minimal riskDisadvantages:• Lowest return• No brand develop.• Lack of customer

access / intimacy• No value add

Preferred role

Page 11: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

11

1 Opportunity for Involvement Timetable

Activity June 15 Jul 15 Aug 15 Sep 15 Oct 15

Salt Product specification sheet (salt standard and premium)

Independent lab analysis report (1 – 2 kg samples available)

Kaolin Product specification sheet (fine - ceramic, paint)

Independent lab analysis report (1kg -1 ton samples available)

Commercial Due diligence, negotiations, non binding Heads of Agreement (HoA) 30 Aug

Binding HoA, appointment as Consortium partner 30 Sep

Early contractor & offtake involvement, binding detailed offtake agt

Scope Details Interest (Yes/ No)

Salt offtake only Volume, port, quality, term, price, timetable, bankability

Kaolin offtake only ‘’

Both salt and kaolin ‘’

Sales partnership Offtake partnership

Equipment supply Mine equipment, village, utility, vehicle supply contracts

Service supply ECI: Early contractor involvement

Service supply EPC: Engineering & construction contracts

Service supply O&M: Operations and maintenance contracts

Finance supply Finance (equity, debt, export finance)

Areas of opportunity

Page 12: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

12

Chandler Project

Page 13: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

13

Strategy - Salt Products2

Salt - Tellus’ competitive advantage▪ Strong position to meet Asian demand by

providing a guaranteed volume and quality▪ Darwin – closest port to Asian buyers▪ Large scale resource – easily scalable▪ Reliable supplier - not influenced by climate▪ Dual revenue business – gives buyers

confidence Project will be around in 25 years▪ Cross selling storage solutions (domestic)▪ Future supply from solar salt limited by getting

regulatory approvals for new operations inenvironmentally sensitive areas

Cyclone map

World: Forecast demand for salt by region, 2012 and 2018 (Mt) 1 World: Forecast demand for salt by end-use, 2012 and 2018 (Mt) 1

Tellus opportunity

Drilling salts used in the oil and gas

industry, salt fluxes used in the smelting and mining industry

To Shanghai : Darwin is ~4,100 km closer than Indian ports, ~5,900km closer than Mexican ports~13,300 km closer than Chilean ports

Page 14: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

14

Chandler Project – Pit to Port2

Dual revenue business model, proven internationally, Tellus first to market in Asia

Page 15: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

15

Chandler - SummaryMine life – 29 years (4 + 25 years), rolling terms

Production -salt500,000 tonnes per annum salt, Scale up on demand

Mining method Underground, room and pillar design, Continuous miner

Room dimensions240mL x 15mW x 4.5mH, 15m support pillar

Processing – Dry (crush, bag, ship), some wet

Management Core business - owner operator, Non core - contractor

Jobs - Build (280-350), operational (180), indirect (>540-720)

Historic spend: General area 41.5km (>$18.5M)Project area: 6.6km, 15 lines seismic (145km) – (A$6.5M)

Predevelopment - A$10 M

Capex – A$464 M

2

Dual revenue gives buyers high level of confidence that the Project will be a reliable producer over life of mine

Page 16: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

16

2 Chandler - From Exploration to Product Specification Sheet

First drilling program 1,937m Ercosplan - independent German salt experts confirmed viability

Quality assessment and quality control - 370 samples JORC Resource* (309 Million tonnes = 525 year mine life)

* Refer to Chandler – JORC (1 July 14) media releases– Tellus Website, Media) for further details, JORC Table 1, Proximate and Competent Person Statement prepared by Ercosplan (Germany)

Page 17: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

17

Chandler - From Exploration to Product Specification Sheet

Pilot demonstrates successful production of high grade salt (independent analysis confirms 98.3% NaCl)

Pilot demonstrates successful production of high grade salt

(independent analysis confirms 99.8% NaCl)

Dry salt processing pilot in Germany, feed grade 94.5% NaCl

Wet salt processing pilot project in USA, feed grade 89.5% NaCl

Wet process

NaCl In94.5%

Out98.3%

NaCl In89.5%

Out99.8%

98.3%89.5%

Optical sorter

Dry process

2

Page 18: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

18

Chandler - Logistics from Mine to Port2

Project locationCategory Detail – Salt Exports

Containers Bulk salt into 30t retainer with lid

Roads 120t road train along 31 km new haul road to siding

Railway siding 2.9km new Chandler siding next to Darwin to Adelaide line

Railway 7 salt trains / month (23 hours average time from mine to Darwin), closed loop salt train system

Darwin storageTellus transfer station (5 ha) next to Marine Supply Base

Shipping port Rotainer tipped into vessel, 7 Panamax’s per year (70,000t vessel), 2 weeks sail time (5,500km to Tokyo)

Destinationport

Japan, 20t bucket offloads ship into hopper and then into 20t truck which then drives to customer

Near existing infrastructure, no bottlenecks, Darwin is closest port to Asia

Page 19: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

19

Appendix:

Sandy Ridge Project

Page 20: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

20

Strategy - Kaolin Products3

World estimated production capacity by main countries (2013) Roskill

Kaolin - Tellus’ competitive advantage

▪ Strong position to meet Asian demand byproviding a guaranteed volume and quality

▪ Perth port – closer to Asian buyers (US, Brazil)▪ Large scale resource – easily scalable▪ Dual revenue business – gives buyers

confidence Project will be around in 25 years▪ Cross selling storage solutions (domestic)

To Shanghai : Perth is ~4,100 km closer than US ports, ~5,900km closer than Brazilian ports~13,300 km closer than Indian ports

Page 21: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

21

Sandy Ridge (SR) – Mine to Port3

Dual revenue business model, proven internationally, Tellus first to market in Asia

Page 22: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

22

Sandy Ridge - Project SummaryCategory Detail

Location ▪ 140km WNW Kalgoorlie

Business▪ Dual revenue business:

▪ Kaolin/ waste storage sales

JORC1 ▪ 41 Mt = 1,475 year mine

Life of Mine ▪ 1 yr build +25 yrs op’s

Acts▪ Mine under Mining Act

▪ Storage under Envir. Act

Mine ▪ Open cut

Predevel ▪ $7 m

Capex* ▪ $62 m

Jobs*▪ Build (40-90), operational (18),

indirect (54)

▪ Excludes O&M contractors

3 1 Refer to Sandy Ridge JORC ( 20 June ’14) and Chandler – JORC (1 July 14) media releases* FEL1 Scoping Study Assumptions (DCF Model v2 Mgt Case)

Dual revenue gives buyers high level of confidence that the Project will be a reliable producer over life of mine

Page 23: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

23

3 Sandy Ridge - From Exploration to Product Specification Sheet

First drilling program 1,864m2nd program - 43 aircore drill hole (JORC resource), 7 geotechnical

holes, 84 bulk sampling air core holes (gather 40 tonnes)

Quality Assessment and Quality Control - 915 samples JORC Resource* (41.3 Million tonnes=1,475 year mine life)

* Refer to Sandy Ridge Kaolin Project - JORC Inferred Resource (20th June 2014 – Tellus Website, Media) for furtherdetails, JORC Table 1, Proximate and Competent Person Statement prepared by Terra Search

Page 24: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

24Kaolin samples – 12 tonnes

40 tonnes kaolin clay refined to 12 tonnes product

3 Sandy Ridge - From Exploration to Product Specification Sheet

Ceramic clay

Simple benefaction pilot (40t ROM refined to 12 tonnes product)

Page 25: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

25

Sandy Ridge - Logistics from Mine to Port3

Project LocationCategory Detail – Kaolin Exports

Containers 1ton bulker bags into 20ft shipping containers

Roads 50 ton road train along 229 km haul road to Kalgoorlie

Railway siding Loaded onto train at existing Kalgoorlie siding

Railway 10 hours average time from Kalgoorlie to Perth, shipping container loaded onto regular freight train rolling stock

Perth storage Qube shipping container yard

Shipping port Container crane loads containers onto container vessel

1ton bulk bags can also be unpacked and loaded loose (8 at a time) into bulk vessel>2 weeks sail time to Tokyo (8,300km)

Destinationport

Japan, container crane offloads containers onto flat bed trucks which then drive to customer

Near existing infrastructure, next to major iron ore mine, no rail/port bottlenecks

Page 26: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

26

Appendix:

ClayVault Project

Page 27: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

27

ClayVault Joint Venture (WA) Australia’s only Class V intractable waste disposal facility

WA Governments Intractable Waste Disposal Facility (IWDF)

Maintenance area with firebreak

Surface has not been remediated due to ongoing subsidence test

Sandy RidgeProject

next door

Road to Kalgoorlie

2

Page 28: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

28

Important Notice and Disclaimer

Summary information

This presentation (Presentation) has been prepared by Tellus Holdings Ltd (ABN 97 138 119 829) (‘Tellus’) and is for information purposes only. This Presentation contains summary information

about Tellus and its subsidiaries and their activities current as at the date of this Presentation. The information in this Presentation is of general background and does not purport to be complete.

It should be read in conjunction with other periodic announcements on www.tellusholdings.com.au. The key information on detailed exploration target statements, mineral resource estimates, and

feasibility results can be found in Tellus’ publically released media announcements. Exploration target statements and mineral resources estimations are appended to comply with ASX guidelines

but investors are urged to read supporting information in full available on the company’s website, and available in their data room.

Future performance

This Presentation contains certain “forward-looking statements”. Forward looking words such as, “expect”, “should”, “could ”, “may”, “plan”, “will”, “forecast”, “estimate”, “target” and other similar

expressions are intended to identify forward-looking statements within the meaning of securities laws of applicable jurisdictions. Indications of, and guidance on, future earnings and financial

position and performance are also forward-looking statements. Forward-looking statements, opinions and estimates provided in this Presentation are based on assumptions and contingencies

which are subject to change without notice, as are statements about market and industry trends, which are based on interpretations of current market conditions, and independent third party

expertise. Such forward-looking statements, opinions, and estimates are not guarantees of future performance.

Not an offer

This presentation does not constitute an offer, invitation, or recommendation to subscribe for or purchase any security and neither this presentation nor anything contained in it shall form the

basis of any contract or commitment.

Competent Person Statement – Chandler Project

The information in this presentation that relates to Mineral Resources - Chandler Project - is based on information compiled by ERCOSPLAN Ingenieurgesellschaft Geotechnik und Bergbau mbH

(‘ERCOSPLAN’). Jana Neubert is a senior geologist and employee of ERCOSPLAN and a member in good standing of the European Federation of Geologists registered as “European Geologist”

(Registration Number 1033). Ms Neubert has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she has

undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for the Reporting of Mineral Resources and Ore Reserves.

Dr Henry AM Rauche is a senior geologist and Managing Director & C.E.O. of ERCOSPLAN and a member in good standing of the European Federation of Geologists registered as "European

Geologist" (Registration Number 729). Dr Rauche has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has

undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of Mineral Resources and Ore Reserves.

Competent Person Statement – Sandy Ridge Project

The information in this presentation that relates to Mineral Resources - Sandy Ridge Project - is based on information compiled by Terra Search Pty Ltd. Mr Jenkins is Principal Geologist of Terra

Search and a Member of the Australian Institute of Geoscientists. Mr Jenkins has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and

to the activity which he has undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of Mineral Resources and Ore Reserves.

The information in this presentation that relates to exploration targets is based on information reviewed by Dr. Simon D. Beams, a full time employee of Terra Search Pty Ltd, geological

consultants employed by Tellus. Dr. Beams has BSc Honours and PhD degrees in geology. He is a Member of the Australasian Institute of Mining and Metallurgy (Member #107121) and a

Member of the Australian Institute of Geoscientists (Member #2689). Dr Beams has sufficient relevant experience in respect of the style of mineralisation, the type of deposit under consideration,

and the activity being undertaken to qualify as a Competent Person within the definition of the 2004 edition of the AusIMM’s “Australasian Code for Reporting of Exploration Results, Mineral

Resources, and Ore Reserves”.

Exploration Target

Any statement contained in this document as to exploration results or exploration targets has been made consistent with the requirements of the Australasian code for reporting of exploration

results, mineral resources, and ore reserves (‘JORC Code’). All statements as to exploration targets of Tellus salt and kaolin, and statements as to potential quality and grade are conceptual in

nature. There has been insufficient exploration undertaken to date to estimate a resource and identification of a resource will be totally dependent on the outcome of further exploration.

Page 29: Managing Director June 2015 - Tellus Holdings · June 2015. 2 Strategy Chandler Project, NT Appendix Sandy Ridge Project, WA ClayVault Project, WA Contents 1 4 2 3. 3 ... * FEL1 Scoping

29

Contact Details

Duncan van der Merwe

Group Managing DirectorE: [email protected]

A: Suite 2, Level 10, 151 Castlereagh StreetSydney, NSW, 2000

T: +61 2 8257 3395 F: +61 2 8233 6199

www.tellusholdings.com.au

Mike Ingram

Sandy Ridge Project leader and Process EngineerSalt and kaolin sales

E: [email protected]

M: +61 (0) 400 777 157