    Managing with Measuresfor Performance Improvement

    Office of Quality Management

    Office of Research ServicesNational Institutes of Health

    October 2005

  • 8/11/2019 Managing Measures Training

    2/68

    2

    Session Outline :

    Background Overview Developing Measures Effectively

    Managing With Measures Service Group Examples

    Questions Session Evaluation

  • 8/11/2019 Managing Measures Training

    3/68

    3

    Background

    The President's Management Agenda, announced inthe summer of 2001, is an aggressive strategy forimproving the management of the Federalgovernment. It focuses on five areas of managementweakness across the government where

    improvements and the most progress can be made.

    Factual Example -The Federal government spends over $25 billion annually on ITsystems and services. Do these services improve efficiency orreduce costs? It is likely they do, but without measuring andcommunicating the results, how will anyone know?

    More information at www.whitehouse.gov/omb/budintegration/pma_index.html

  • 8/11/2019 Managing Measures Training

    4/68

    4

    OVERVIEW

  • 8/11/2019 Managing Measures Training

    5/68

    5

    Overview

    Organizations succeed when resources within aservice group work together to achieve a commongoal.

    This is also true for performance measurement whichincludes establishing operating strategies, definingprocesses that contribute to the strategies, andevaluating, using and communicating the results toimprove performance.

  • 8/11/2019 Managing Measures Training

    6/68

    6

    Overview (continued)

    Refine asneeded

    Iterations of Performance Measurement

    Organization value proposition &objectives

    Customer needs& requirements

    DetermineNew objective added

    Prioritizedrequirements

    Select

    Performancemeasures

    Develop/refine

    Measured results

    Collect &evaluate

    Results not used

    Requirement successfully met-shift focus

    New mandated requirement

    Target met- newstretch target set

  • 8/11/2019 Managing Measures Training

    7/687

    Overview (continued)

    Some of the leading methods that are helpful inimplementing and managing for performanceimprovement include:

    The Balanced Scorecard ( Performance ManagementPlan )

    Productivity Continuous Improvement

    Process Improvement

    These methods compliment each other and should beincorporated for performance improvement.

  • 8/11/2019 Managing Measures Training

    8/688

    Overview (continued)

    Balanced Scorecard ( Performance Management Plan ):

    A new management concept (1992) helps managers atall levels monitor results in their key areas:

    financial performance, customer knowledge, internal business processes, learning and growth.

    This allows the monitoring of present performance, butalso tries to capture information about how well the

    organization is positioned to perform well in the future.

  • 8/11/2019 Managing Measures Training

    9/689

    Overview (continued)

    Productivity:

    Productive business tend to succeed over lessproductive competitors because their costs are lower forthe same level of output. How can management

    act to increase productivity? Ensure that the overall direction of the organization is correct

    and clear. Ensure that communication is clear, thorough and open. If

    everyone is aligned, less time and energy is wasted. Detect problems early, and nip them in the bud. Ensure the group is not reacting to imaginary problems. Use

    process behavior charts to track key processes, to be abletell the difference between real changes in your environmentand processes, and normal variation.

  • 8/11/2019 Managing Measures Training

    10/6810

    Overview (continued)

    Productivity (continued ):

    Ensure the group is not reacting to imaginary problems. Useprocess behavior charts to track key processes, to be abletell the difference between real changes in your environmentand processes, and normal variation.

    Talk with staff for input. They usually know what isconstraining them from doing better work. Ask them, listen,and involve them in the solution.

    Systematically remove barriers to progress. Get rid of scrap.Get rid of rework. Reduce inspection as much as possible.

    Understand your real costs. What does a machine reallycost? Can a process be done better inside theorganization?

  • 8/11/2019 Managing Measures Training

    11/6811

    Overview (continued)

    Continuous Improvement (Kaizen):

    In contrast to the usual emphasis on revolutionary,innovative change on an occasional basis, continuousimprovement looks for uninterrupted, ongoingincremental change. In other words, there is alwaysroom for improvement and continuously trying tobecome better.

    The principles of implementation are : human resources are the most important organizational

    assets processes should evolve by gradual improvement rather

    than radical changes,

    improvement should be based on statistical/quantitativeevaluation of process performance.

  • 8/11/2019 Managing Measures Training

    12/6812

    Overview (continued)

    Every activity, or work done, in an organization is partof a process ; many processes make up discreteservices.

    Activities

    Output

    InputIncludes resources such asstaff, equipment,information, forms, money

    Includes all steps taken toget a specific output

    Final goods or servicesfrom the process, forexample assessment of

    policies, spot inspections,software training

  • 8/11/2019 Managing Measures Training

    13/6813

    Overview (continued)

    Entersalesorder

    Approved

    for credit?

    Reject

    order

    Inventoryavailable?

    Back-order

    Fill order Stop

    Start

    No

    Yes

    Yes

    No

    Example: Order Process

  • 8/11/2019 Managing Measures Training

    14/6814

    Overview (continued)

    Processes should add value, i.e. accomplishsomething.

    Focusing and measuring areas within processesresults in more rapid, substantial improvements.

  • 8/11/2019 Managing Measures Training

    15/6815

    Overview (continued)

    Many processes are not optimal there is generallysome wasted effort, lost time, scrap,miscommunication, or re-work.

    These problems all have costs - some small, andsome great.

    Good News - Management practitioners have, overthe years, developed tools which can be used to

    measure and systematically improve processes andoverall operations.

  • 8/11/2019 Managing Measures Training

    16/6816

    The best tools stand the test of time and give a lot ofleverage over common problems.

    The most widely used management methods and toolsinclude:

    Quality Control Charts Pie charts Bar charts Run Charts Radar Charts

    Scatter Plots Histograms Pareto Charts Normal Test Plots Process Capability Calculations

    Control Charts (Process Behavior)

    Scattergram

    Classic Tools

    Other Quality Management Tools Relations Diagram Affinity Diagrams Brainstorms Building Consensus Cause and Effect Diagrams Flowcharts Force Field Diagrams Tree Diagrams

  • 8/11/2019 Managing Measures Training

    17/6817

    A Few Tools Highlighted

    Flowchart/process map

    Scattergram

  • 8/11/2019 Managing Measures Training

    18/6818

    Survey

    Scattergram

    A Few Tools Highlighted (continued)

  • 8/11/2019 Managing Measures Training

    19/6819

    Cause and Effect Diagram

    Scattergram

    A Few Tools Highlighted (continued)

  • 8/11/2019 Managing Measures Training

    20/6820

    Pareto Diagram

    Scattergram

    A Few Tools Highlighted (continued)

  • 8/11/2019 Managing Measures Training

    21/68

    21

    Process Behavior (or Control) Chart

    Scattergram

    A Few Tools Highlighted (continued)

  • 8/11/2019 Managing Measures Training

    22/68

    22

    DEVELOPING MEASURES EFFECTIVELY

  • 8/11/2019 Managing Measures Training

    23/68

    23

    Measures

    What is a Measure? A measure is a means of assessing performance in a

    particular area.

    Why Measure? Measures are at the heart of a good, customer-

    focused process management system, and anyactivity directed at continuous improvement.

  • 8/11/2019 Managing Measures Training

    24/68

    24

    Measures (continued)

    Measures help drive performance improvement.

    Measures help provide a basis for assessingefficiency and effectiveness of services.

  • 8/11/2019 Managing Measures Training

    25/68

    25

    Measures (continued)

    The Performance Management Plan (PMP) has been,

    and is a useful tool to plan and take the pulse of anorganization.

    The PMP assists organizations with :

    Effective organizational performancemeasurement

    Implementation of strategy

  • 8/11/2019 Managing Measures Training

    26/68

    26

    Measures (continued)

    The PMP focuses on documenting a groups valueproposition, main operating strategy, and objectives in

    four perspectives:

    Financial How do we add valuefor customers whilecontrolling costs ?

    Value Proposition

    Customer Who do we define as our

    customer? How do wecreate value for our

    customer? Internal Process To satisfy customers

    while meeting budgetaryconstraints, at what

    business processes must

    we excel?

    How do we enableourselves to grow and

    change, meeting ongoingcustomer needs

    Employee Learningand Growth

    Strategy

  • 8/11/2019 Managing Measures Training

    27/68

    27

    Steps to Develop and Manage with Measures

  • 8/11/2019 Managing Measures Training

    28/68

    28

    Steps to Develop and Manage with Measures

    1. Link Processes to Objectives

    Using the PMP framework, establish a clearunderstanding of your service groups purpose, orvalue, and your objectives. Update as necessary.

    Identify linkages between your processes (work thatis done) and defined objectives to increase thelikelihood that improved process results willcontribute to total service group accomplishments.

  • 8/11/2019 Managing Measures Training

    29/68

    29

    2. Identify and Select Performance Measures

    Within the objectives, identify what process is beingmeasured, where applicable, and the goals of eachprocess being measured.

    Decide how requirements will be met. Know the purpose of the results. Understand why the results matter. Measure that which is most important.

    Steps to Develop and Manage with Measures (continued)

    NOTE:Effective performance measuresreflect a strong customer focus.

  • 8/11/2019 Managing Measures Training

    30/68

    30

    3. Establish Baseline to Compare Future

    Performance

    Baselines are an essential element of performancemeasurement.

    If no baselines exist, select measures that willestablish the basis for comparing futureperformance, collect data about current processes,work output , and service group outcomes .

    Steps to Develop and Manage with Measures (continued)

  • 8/11/2019 Managing Measures Training

    31/68

    31

    4. Select Processes with the Greatest Impact

    Select those processes, tied to the objectives, withineach PMP perspective with the greatest operationalimpact.

    Remember to highlight areas that will allowmeasurement of key elements of your primarystrategy.

    Steps to Develop and Manage with Measures (continued)

  • 8/11/2019 Managing Measures Training

    32/68

    32

    5. Collect Data

    Address data collection during development ofmeasures.

    Decide the what, when, where, how and by whomof collecting the data and document it.

    Validate data. Review performance measures to verify they represent

    what they intend to gauge Are we measuring the right

    thing?

    Steps to Develop and Manage with Measures (continued)

  • 8/11/2019 Managing Measures Training

    33/68

    33

    Validate Data (example)

    Steps to Develop and Manage with Measures (continued)

    Internal Business ProcessRealize efficiencies in key areas Goals Measures

    Improve HR processes andautomate where cost effective

    Processes have beenautomated

    Decrease in processing time Increase in customer satisfaction

    Objective

  • 8/11/2019 Managing Measures Training

    34/68

    34

    5. Collect Data (continued)

    Document measures using any one of thesuggested forms on the next three slides:

    Steps to Develop and Manage with Measures (continued)

  • 8/11/2019 Managing Measures Training

    35/68

    35

    Simple Measurement Plan (simple tracking for each measure, can be done in MS Word or Excel)

    Description : What is the measure capturing

    The measure is: List the actual measure, e.g., number of, percentage of, etc.

    The target is: May be baseline, or projections computed against baseline Data Source: Where to get the data

    ResponsiblePerson/Component: Who, or which group will collect the data

    Frequency: How often will the data be collected, and reported on

    Process:

    Date Developed:

    Measure Type (input, output, efficiency, quality or outcome):

  • 8/11/2019 Managing Measures Training

    36/68

    36

    Data Collection Plan Template

    NOTE : actual template is blank; the content in each column describes what should be filled in.

    Methodology POC Source of Data Frequency TargetMethodology is asummary of how youplan to gather andanalyze the data.What steps need to

    to be taken to ensurethat the data isaccessible (e.g.,forms developed fordata collection,survey developedand approved foruse, databasedeveloped to analyzethe data)

    The personwith primaryresponsibilityfor datacollection and

    analysis

    Where the data willbe obtained (e.g.,ordering systems,budget systems,rate studies, hard

    copy forms, e-mails, phone calls,observations)

    How oftenthe measurewill becollected,analyzed,

    and reported(e.g., daily,weekly,monthly,quarterly,annually)

    The measure outcomeyou hope to attain.These should be setby service groupleaders in conjunction

    with theirdivision/office leadersbased on analysis ofdata. If the measureis being collected forthe first time,"baseline" is mostlikely the target asdata is not yetavailable for analysis.

    Performance Objective: The Performance Objective from the PMP

    The performance measurefrom the PMP

    Performance Measure

    Available at http://oqm.ors.od.nih.gov/performance_mgmt.htm#templates

  • 8/11/2019 Managing Measures Training

    37/68

    37

    Measure Roadmap Template

    Measurement Inten t: What is the intent or purpose of the measure

    Measure : The Measure (from the PMP) ; How is the objective going to be measured?

    Strategic Objective : The objective (from the PMP) stated in terms of the desiredoutcome

    Measurement Definition/Formula :

    Frequency of Data Update :Monthly, Quarterly, Annually (How frequently will the data be updated?)

    Units of Measure :

    Notes/Assumptions : What should be known about the measure? e.g., Doesthe baseline data need to be gathered?Is the data retrieval dependent on outside s ources (vendors, ot herorganizations, surveys). Do new questionsMeasurement/Information : Data Elements and Sources : Where is the data located (e.g., a report?)

    Source For and Approach to Setting Targets : How has the target been established? Who will ultimately decide if the targets are right? Havetargets been met?

    Target Setting Responsibility :optional

    Accountability for Meeting Ta rget :optional

    Tracking/Reporting Responsibility : thesame person reponsible for the m easurecan track this

    Measure Availability :

    Target Availability :

    THE M EASURE ROADMAP

    FY06 FY07Target Baseline Year What year was thebaselineestablished? What isthe baseline value?

    FY05 Projected

    NOTE : actual template is blank; the content in each box describes what should be filled in.

    Available at http://oqm.ors.od.nih.gov/performance_mgmt.htm#templates

  • 8/11/2019 Managing Measures Training

    38/68

    38

    6. Analyze Documented Results

    Examine results in context of the objectives,environment, and external factors.

    After analyzing the performance data and

    information, interpret the information in order toascertain whether the objectives have been met,and if not, why not.

    In cases where the objectives are not being met,

    develop an action plan to correct this.

    E.g., If feedback indicates that fewer customers are utilizinga new service provided by your service group, note this andmake the necessary modifications to improve or tailor the

    service.

    Steps to Develop and Manage with Measures (continued)

  • 8/11/2019 Managing Measures Training

    39/68

    39

    7. Communicate Results

    Graphically display data, using process behavior,pie, and bar charts, or other form to summarizeperformance rather than narrative alone.

    Develop brief updates to share monthly among staff

    showing monthly progress.

    Steps to Develop and Manage with Measures (continued)

    Objective:

    Customer fiscal service

    Shows cost per customer

    Steps to Develop and Manage with Measures (continued)

  • 8/11/2019 Managing Measures Training

    40/68

    40

    Monthly error rate for sorting incoming mail, October 2003 to May 2005

    Shows process is predictable where the expectation is between 0% and .36% error ratefor any month (between 0 and 36 errors per 10,000 pieces of incoming mail).

    Note: Data gathered by random sampling .

    Steps to Develop and Manage with Measures (continued)

    7. Communicate Results (continued) : second example

  • 8/11/2019 Managing Measures Training

    41/68

    41

    Steps to Develop and Manage with Measures (continued)

    Objective:

    7. Communicate Results (continued) : third example

    B ildi X C f t i D il l f 4/2/2004 t 7/1/2004

  • 8/11/2019 Managing Measures Training

    42/68

    42

    Building X Cafeteria: Daily gross sales from 4/2/2004 to 7/1/2004

    4/2/2004

    7/1/2004

    Average Gross sales:$1170.The lower limit: $857The upper limit: $1484.

    The process during this period was predictable and the group can expect theamount of sales to vary from between $857 to $1484, given no substantial changes,for example sudden menu change or sudden population increase or decrease.

    l d h

  • 8/11/2019 Managing Measures Training

    43/68

    43

    8. Integrate Measurement with ManagementProcesses

    The benefit of performance measurement comesfrom using data to take the appropriate actions toimprove performance.

    To remaining viable, demonstrate service groupvalue through results.

    Integrate results (input, activity, output) into planning,budgeting, and operating processes in the business.

    Steps to Develop and Manage with Measures (continued)

    S f S D l d M i h M

  • 8/11/2019 Managing Measures Training

    44/68

    44

    1. Link Processes to Objectives

    2. Identify and Select Performance Measures3. Establish Baseline to Compare Future Performance4. Select Processes with the Greatest Operational

    Impact5. Collect Data6. Analyze Results7. Communicate Results8. Integrate Measurement with Management

    Processes

    Summary of Steps to Develop and Manage with Measures:

  • 8/11/2019 Managing Measures Training

    45/68

    MANAGING WITH MEASURES:

    ADDITONAL EXAMPLES FOCUSING ONSTEPS 6 & 7

  • 8/11/2019 Managing Measures Training

    46/68

    CUSTOMER PERSPECTIVE

  • 8/11/2019 Managing Measures Training

    47/68

    47

    Objective and Measures Service Group: Procure and Deliver Animal Product

    C1b and C1d: These measures are used to drive performance towardsreaching an objective. By focusing on each of these measures, theworkforce will be taking actions that will satisfy their customers and raisethe customer satisfaction scores.

    Objective Measure

    C1b: Percentage ofprocurement ordersprocessed within 24 hours

    C1d: Number of complaints

    related to responsiveness ofprocurement services

    C1f: ORS CustomerScorecard rating for animalprocurement responsiveness

    C1: Increaseresponsiveness tocustomers' varying

    needs

    D t Sh t

  • 8/11/2019 Managing Measures Training

    48/68

    48

    Data Sheet

    Monthand Year

    Number of OrdersProcessed Within24 Hours

    TotalNumber ofOrdersProcessed

    Percentage ofOrders ProcessedWithin 24 Hours

    Oct FY03 714 1020 70%Nov FY03 763 1060 72%Dec FY03 686 915 75%

    Jan FY03 859 1074 80%Feb FY03 795 1169 68%Mar FY03 986 1429 69% Apr FY03 1098 1547 71%May FY03 825 1178 70%Jun FY03 1153 1406 82%Jul FY03 1068 1256 85%

    Aug FY03 1051 1330 79%Sep FY03 868 1058 82%Oct FY04 863 1015 85%Nov FY04 920 1045 88%

    Dec FY04 838 1010 83%

    AutomaticallyCalculated

  • 8/11/2019 Managing Measures Training

    49/68

    Output Measure:

    % of Procurements Processed within 24 hours (C1b)

    Run Chart (line graph) displays process performance over time

  • 8/11/2019 Managing Measures Training

    50/68

    50

    Run Chart (line graph) displays process performance over time

    50%

    60%

    70%

    80%

    90%

    100%

    O c t F Y 0 3

    N o v F

    Y 0 3 D e

    c F Y 0 3

    J a n F

    Y 0 3 F e

    b F Y 0 3

    M a r F

    Y 0 3 A p

    r F Y 0 3

    M a y F

    Y 0 3

    J u n e

    F Y 0 3

    J u l y

    F Y 0 3

    A u g F

    Y 0 3

    S e p t F Y 0 3

    O c t F Y 0 4

    N o v F

    Y 0 4 D e

    c F Y 0 4

    Month, Fiscal Year

    % P

    r o c e s s e

    d

    % procurement orders processed wi thin 24 hours

    Average = 77.27

    Percentage of procurement orders processed within 24 hours (C1b)

    WHAT DOES THIS SHOW? After a drop in February, there was a steady increase in the % of ordersprocessed in 24 hours. Investigating this phenomenon could unearth animprovement or process change that was instituted. Also, the average lineadded clarifies movement of the data away from the average.

    For more robust monitoring of the process, and better information about whenthe process is showing variation beyond what is expected, try using a processbehavior chart.

    Range 88 68 = 20

    88

    68

    Process Behavior Chart displays process performance over time

  • 8/11/2019 Managing Measures Training

    51/68

    51

    AVE=77.3%

    LCL=65.7%

    UCL= 88.9%

    % of orders processed within 24 hours

    Process Behavior Chart displays process performance over timeand makes it easy see both special and common cause variation ina process

    WHAT DOES THIS SHOW?Look at variation over time and show whether animmediate remedy is needed to modify the processor if the entire process should be redesigned.The process is in control, or predictable, but stepscan be taken to improve the process, so that evencommon cause variation is reduced for example,explore ways to increase order process efficiency.

    Analysis

  • 8/11/2019 Managing Measures Training

    52/68

    52

    Analysis

    The Process Behavior Chart (PBC) indicates theaverage percentage of procurement orders processedwithin 24 hours is 77.3%.

    The PBC indicates that you can expect between65.7 % and 88.9% of orders will be processed within24 hours each month unless there is a change to the

    process .

    Is our performance good enough? Are we meetingcustomer expectations? Refer to baselines andcalculated targets, as well as customer agreementsand satisfaction ratings.

  • 8/11/2019 Managing Measures Training

    53/68

    Bar Chart like pie charts are useful for comparing

  • 8/11/2019 Managing Measures Training

    54/68

    54

    Bar Chart like pie charts, are useful for comparingclasses or groups of data.

    7.64

    7.5

    7.23

    7.07

    7.71

    7.31

    6.92

    7.08

    6.17

    5.57

    4.86

    6.71

    4.86

    5.71

    5.71

    5.57

    6.14

    5.4

    1 2 3 4 5 6 7 8 9 10

    Handling of Problems

    Competence

    Convenience

    Responsiveness

    Availability

    Reliability

    Timeliness

    Quality

    Cost

    FY03 FY02

    N = 7

    N = 14

    Note: ORS Customer Scorecard graphs are provided in reports generated by theOffice of Quality Management (OQM)

    7.64

    7.5

    7.23

    7.07

    7.71

    7.31

    6.92

    7.08

    6.17

    5.57

    4.86

    6.71

    4.86

    5.71

    5.71

    5.57

    6.14

    5.4

    1 2 3 4 5 6 7 8 9 10

    Handling of Problems

    Competence

    Convenience

    Responsiveness

    Availability

    Reliability

    Timeliness

    Quality

    Cost FY03 N = 16 88% response rate

    FY02 N=14 78% response rate

  • 8/11/2019 Managing Measures Training

    55/68

    LEARNING AND GROWTH

  • 8/11/2019 Managing Measures Training

    56/68

    56

    Objectives and MeasuresService Group: Provide NIH Events Management Services

  • 8/11/2019 Managing Measures Training

    57/68

    Input Measure:Measure: Employee Satisfaction Survey Results (LG3e)

    i Ch d h l f d i i

  • 8/11/2019 Managing Measures Training

    58/68

    58

    90%

    10%

    87%

    13%

    Management Questions : 87% of DEMS staff understand how their jobcontributes to the mission, vision and values of DEMS

    Customer Orientation Questions : 90% of DEMS staff say DEMS services goals areaimed at meeting customer expectations

    Teamwork and Innovation Questions : 93% of DEMS staff feel they can serve customers in

    a timely fashion

    Pie Chart used to show classes or groups of data in proportion tothe whole data set.

    Employee/Staff Survey Results

    93%

    7%

    l

  • 8/11/2019 Managing Measures Training

    59/68

    59

    Analysis

    A high percentage of staff feel they understand theorganizations mission, the goals match customer expectations,and they can serve customers in a timely manner.

    Lower percentages on the charts should be addressed.

    Practical corrective actions should be employed to maintainand/or improve performance.

    The information serves as input to the overall service andprocesses provided by the group; improvement in learning andgrowth areas drives behavior to achieve objectives.

  • 8/11/2019 Managing Measures Training

    60/68

    FINANCIAL PERSPECTIVE

    Financial Objective and Measures

  • 8/11/2019 Managing Measures Training

    61/68

    61

    Service Group: Provide Transportation and Parking Services

    F1: Minim ize the unit cost forproviding parking services oncampus

    F1. # vehicles stacked andoverall vehicles managed

    F2: Minimize the unit cost for satelliteparking facilities off campus

    F2. # parking spaces (usageversus space availability)

    F3: Minimize the unit cost forproviding shuttle services

    F3. # shuttle riders

    F4: Minimize the unit cost ofadministering and coordinatingalternative transportation

    F4. # transhare/carpool/vanpoolparticipants

    F5: Minimize the unit cost for issuingand tracking parking permits

    F5. # of permits

    F i n a n c

    i a l

    Objective Measure

  • 8/11/2019 Managing Measures Training

    62/68

    Input Measure:Minimize the unit cost for providing shuttle services (F3)

    Calculation Example

  • 8/11/2019 Managing Measures Training

    63/68

    63

    Calculation ExampleMinimize the unit cost for providing shuttle services (F3)

    Fiscal Year

    Operating BudgetShuttle Riders

    Budgeted Unit Cost% Change

    Fiscal Year

    Operating BudgetEmployee Shuttle Riders

    Budgeted Unit Cost% Change

    Fiscal Year

    Operating BudgetPatient Shuttle Riders

    Budgeted Unit Cost% Change

    $1,018,760 $1,101,300 $293,21731,836 40,246 9,882

    FY02 FY03 1st QTR FY04

    $3,395,868 $3,671,000 $977,389

    FY02 FY03 1st QTR FY04

    26.9% -13.5%

    830,423 707,628 217,876$4.09 $5.19 $4.49

    $2,377,108 $2,569,700 $684,172798,587 667,382 207,994$2.98 $3.85 $3.29

    FY02 FY03 1st QTR FY04

    29.4% -14.6%

    $32.00 $27.36 $29.67-14.5% 8.4%

    Note: Estimate that budget for patient shuttle is 30% of total budget for the discrete service; budgetto employee shuttles is 70% of budget for the discrete service.

    A l i E l

  • 8/11/2019 Managing Measures Training

    64/68

    64

    Analysis Example

    Determined the basic unit of service delivery number ofriders

    Counted the number of riders on shuttle this becomes thedenominator for the unit cost formula

    Determined the dollar resources expended in providing

    shuttle service this becomes the numerator of the unit costformula The ratio of numerator ($) divided by denominator (riders)

    yields cost per rider on the shuttles Use this and other data to reveal methods to maintain (or if

    possible lower) the unit cost example is to encouragemore riders - lowers unit cost ( reason: more riders for sameresources)

  • 8/11/2019 Managing Measures Training

    65/68

    Integrating Data into Business Management

  • 8/11/2019 Managing Measures Training

    66/68

    66

    Questions to integrate performance data intoBusiness Management:

    How can the performance data be used to improvebusiness decisions?

    Examine data for trends over time and across functions.What do the results mean? Do the results contribute togoals and objectives?

    Have the right measures been included in the PMP? Doesthe PMP reflect our priorities?

    Are the performance results helping the manager makebetter decisions? If not, notify the team or individuals thatare responsible about the data that is needed.

    If the performance results exceed the targets, how can theservice group take advantage of additional benefits toimprove service and reduce operating costs? Whatopportunities do the additional benefits make possible?

  • 8/11/2019 Managing Measures Training

    67/68

    67

    Questions to integrate performance data intoManagement (continued):

    What is the level of customer satisfaction? If the results fall short of the targets, what inhibited

    performance? Were the inhibitors technical ororganizational in nature?

    Source: Performance Based Management, P. Plunkett

  • 8/11/2019 Managing Measures Training

    68/68

    For more information on Performance Management in the Office of Research services:http://oqm.ors.od.nih.gov/performance_mgmt.htm

    AcknowledgmentsThis training was developed by the Office of Quality Management.