+ All Categories
Home > Documents > MANAGING WASTE PAINT AS A COMMODITY

MANAGING WASTE PAINT AS A COMMODITY

Date post: 16-Jan-2016
Category:
Upload: amish
View: 44 times
Download: 0 times
Share this document with a friend
Description:
MANAGING WASTE PAINT AS A COMMODITY. Chittenden Solid Waste District (CSWD). CSWD Hazardous Waste Program. In 1990 CSWD opened its permanent hazardous waste collection facility which moved in 2003 to this new location. CSWD Hazardous Waste Program. - PowerPoint PPT Presentation
Popular Tags:
39
MANAGING MANAGING WASTE PAINT AS A WASTE PAINT AS A COMMODITY COMMODITY Chittenden Solid Waste Chittenden Solid Waste District (CSWD) District (CSWD)
Transcript
Page 1: MANAGING  WASTE PAINT AS A COMMODITY

MANAGING MANAGING WASTE PAINT AS A WASTE PAINT AS A

COMMODITYCOMMODITY

Chittenden Solid Waste Chittenden Solid Waste District (CSWD)District (CSWD)

Page 2: MANAGING  WASTE PAINT AS A COMMODITY
Page 3: MANAGING  WASTE PAINT AS A COMMODITY

In 1990 CSWD opened its permanent In 1990 CSWD opened its permanent hazardous waste collection facility which hazardous waste collection facility which moved in 2003 to this new locationmoved in 2003 to this new location

CSWD Hazardous Waste CSWD Hazardous Waste ProgramProgram

Page 4: MANAGING  WASTE PAINT AS A COMMODITY

CSWDCSWD Hazardous Waste Hazardous Waste ProgramProgram

In 1991 a mobile collection facility was In 1991 a mobile collection facility was added.added.

Page 5: MANAGING  WASTE PAINT AS A COMMODITY

PAINT IS THE LARGEST PAINT IS THE LARGEST WASTESTREAM IN CSWD WASTESTREAM IN CSWD

PROGRAMPROGRAM

% OF WASTESTREAM COLLECTED

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

2000 2001 2002 2003 2004

LATEXPAINT

OIL PAINT

Page 6: MANAGING  WASTE PAINT AS A COMMODITY

PAINT IS THE LARGEST PAINT IS THE LARGEST WASTESTREAM IN CSWD WASTESTREAM IN CSWD

PROGRAMPROGRAM IN 2004 CSWD COLLECTED IN 2004 CSWD COLLECTED

APPROXIMATELY 19,000 GALLONS OF APPROXIMATELY 19,000 GALLONS OF LATEX PAINT (38% OF THE HAZARDOUS LATEX PAINT (38% OF THE HAZARDOUS WASTE COLLECTION PROGRAM’S WASTE COLLECTION PROGRAM’S WASTESTREAM BY VOLUME)WASTESTREAM BY VOLUME)

COST FOR MANAGEMENT AND DISPOSAL COST FOR MANAGEMENT AND DISPOSAL OF LATEX PAINT IN FY04 WAS OF LATEX PAINT IN FY04 WAS APPROXIMATELY $33,000.APPROXIMATELY $33,000.

THE COST OF THE ENTIRE HAZARDOUS THE COST OF THE ENTIRE HAZARDOUS WASTE PROGRAM IN 2004 WAS $520,000.WASTE PROGRAM IN 2004 WAS $520,000.

Page 7: MANAGING  WASTE PAINT AS A COMMODITY

Latex Paint: % of collected waste vs. % of disposal costs

0%

10%

20%

30%

40%

50%

2000 2001 2002 2003 2004

% of waste stream

% of disposal cost

Page 8: MANAGING  WASTE PAINT AS A COMMODITY

OPTIONS FOR LATEX OPTIONS FOR LATEX PAINTPAINT

DON’T COLLECTDON’T COLLECT

COLLECTCOLLECT SWAP/REUSE SWAP/REUSE PROCESS/REUSE $0.68/gallon RECYCLE WITH VENDOR $1.86/gallonRECYCLE WITH VENDOR $1.86/gallon LANDFILL $3.00/gallonLANDFILL $3.00/gallon HAZARDOUS WASTE HAULER HAZARDOUS WASTE HAULER

$3.72/gallon$3.72/gallon

Page 9: MANAGING  WASTE PAINT AS A COMMODITY
Page 10: MANAGING  WASTE PAINT AS A COMMODITY
Page 11: MANAGING  WASTE PAINT AS A COMMODITY
Page 12: MANAGING  WASTE PAINT AS A COMMODITY
Page 13: MANAGING  WASTE PAINT AS A COMMODITY
Page 14: MANAGING  WASTE PAINT AS A COMMODITY
Page 15: MANAGING  WASTE PAINT AS A COMMODITY

LOCALLOCAL COLORCOLOR

In FY04 recycled 26% of latex paint In FY04 recycled 26% of latex paint waste stream into Local Color. waste stream into Local Color.

75% of the paint that is made has 75% of the paint that is made has been sold.been sold.

The net cost to produce Local Color The net cost to produce Local Color was approximately 68 cents per was approximately 68 cents per gallon.gallon.

If all the paint was sold Local Color If all the paint was sold Local Color wouldwould be profitablebe profitable..

Page 16: MANAGING  WASTE PAINT AS A COMMODITY

Using public infrastructure

Page 17: MANAGING  WASTE PAINT AS A COMMODITY

Laurentide Paint Laurentide Paint Recycling PilotRecycling Pilot

Existing infrastructure to make Existing infrastructure to make paint according to specification paint according to specification

Close Proximity to LaurentideClose Proximity to Laurentide Excess paint that cannot be made Excess paint that cannot be made

into Local Color.into Local Color. Oil paint is acceptableOil paint is acceptable Higher end useHigher end use Cost effectiveCost effective

Page 18: MANAGING  WASTE PAINT AS A COMMODITY
Page 19: MANAGING  WASTE PAINT AS A COMMODITY
Page 20: MANAGING  WASTE PAINT AS A COMMODITY
Page 21: MANAGING  WASTE PAINT AS A COMMODITY
Page 22: MANAGING  WASTE PAINT AS A COMMODITY
Page 23: MANAGING  WASTE PAINT AS A COMMODITY

80 drums shipped 9/16/0480 drums shipped 9/16/0464 drums shipped 12/18/0464 drums shipped 12/18/04

Page 24: MANAGING  WASTE PAINT AS A COMMODITY

COST PER POUND TO COST PER POUND TO MANAGE LEFTOVER PAINTMANAGE LEFTOVER PAINT LATEX LANDFILLED LATEX LANDFILLED $3.00/gallon$3.00/gallon LATEX PAINT LAURENTIDE LATEX PAINT LAURENTIDE $1.80/gallon$1.80/gallon LATEX LOCAL COLORLATEX LOCAL COLOR

$0.56/gallon$0.56/gallon

OIL PAINT FUEL BLENDED OIL PAINT FUEL BLENDED $ 3.04/gallon$ 3.04/gallon OIL PAINT LAURENTIDEOIL PAINT LAURENTIDE $1.55/gallon$1.55/gallon

Estimated annual savings $17,713 with Estimated annual savings $17,713 with 15,250 gallons recycled15,250 gallons recycled

Page 25: MANAGING  WASTE PAINT AS A COMMODITY
Page 26: MANAGING  WASTE PAINT AS A COMMODITY
Page 27: MANAGING  WASTE PAINT AS A COMMODITY
Page 28: MANAGING  WASTE PAINT AS A COMMODITY
Page 29: MANAGING  WASTE PAINT AS A COMMODITY
Page 30: MANAGING  WASTE PAINT AS A COMMODITY
Page 31: MANAGING  WASTE PAINT AS A COMMODITY

Greater cooperation from traditional manufacturers

Page 32: MANAGING  WASTE PAINT AS A COMMODITY

Paint Product Stewardship

Continuing progress through a National MOU

Page 33: MANAGING  WASTE PAINT AS A COMMODITY

About Product Stewardship Institute, PSI Provides coordinated Partnership at

all levels of Govt. Federal State Local Agencies

National in Scope

PSI HQ In Boston

Page 34: MANAGING  WASTE PAINT AS A COMMODITY

Who is at the Paint Product Stewardship Table?

National Paint and Coatings Assoc. Manufacturers Retailers (Ace Hardware, Home

Depot…) Recycling Companies (US & Canada) US EPA States Locals

Page 35: MANAGING  WASTE PAINT AS A COMMODITY

Key Provisions of MOU

•Recognition of the problems posed by leftover paint and paint containers and the management burden on state and local governments.•Meet for two more years starting April 1, 2005.•Create a multi-stakeholder Steering Committee to guide the MOU implementation.•Work on 11 projects over the next 18 months to provide information as the basis for discussion of a nationally coordinated leftover paint management system.•Resume discussions on the issue of financing a nationally coordinated leftover paint management system, beginning October 1, 2006.•Decide whether financing will be needed to establish a nationally coordinated leftover paint management system.

Page 36: MANAGING  WASTE PAINT AS A COMMODITY

Decide whether a nationally coordinated procurement strategy for recycled products made from leftover paint will be needed.

Any nationally coordinated leftover paint management system that is determined to be needed will include: national waste reduction and management goals for

paint, including goals for source reduction, reuse, recycling, and the purchase of marketable, environmentally preferable, and economically viable products made from leftover paint.

It will also define roles and responsibilities, based on the principle of product stewardship, for all PPSI Participants, and include any necessary financing system.

Key Provisions of MOU, cont.

Page 37: MANAGING  WASTE PAINT AS A COMMODITY

Projects of the Paint MOU EDUCATION

1. Leftover Paint Management and Guidance for Consumers

2. Public Education Survey and Analysis

INFRASTRUCTURE 3. Paint Reuse Primer 4. National Infrastructure Model 5. National Infrastructure Cost Analysis

MARKETS 6. Market Development Strategy for PPSI 7. Recycled Paint Marketing Guide for Distributors 8. Recycled Paint Certification System

OTHER PROJECTS 9. Health/Safety/Environmental and Regulatory Issues 10. Financing System Research and Model Development 11. Lifecycle Balance of Costs and Benefits

Page 38: MANAGING  WASTE PAINT AS A COMMODITY

Still Seeking funding

Looking to governments and TSDs for funding Infrastructure projects 4 & 5

Looking to Industry and others for funding some other projects that are not yet fully funded.

Page 39: MANAGING  WASTE PAINT AS A COMMODITY

Questions???

Scott Cassel, Executive Director

Product Stewardship Institute, Inc.

137 Newbury Street, 7th Floor

Boston, MA 02116

617-236-4855  (ph) 

617-859-9889 (fax)

[email protected]

http://www.productstewardship.ushttp://www.productstewardship.us


Recommended