    MANAVGAT RIVER WATER AS A LIMITED

    BUT ALTERNATIVE WATER RESOURCE FORDOMESTIC USE IN MIDDLE EAST

    T.C

    GAZ UNIVERSITY

    Faculty of Engineering and ArchitectureDepartment of Civil Engineering ,

    Hydraulics Section

    BRAHM GRER

    MEHMET LGER

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    2/24

    INTRODUCTION

    MANAVGAT RIVER WATER SUPPLY PROJECT

    WATER EXPORT FROM MANAVGAT RIVER

    INDEX

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    3/24

    MANAVGAT RIVER

    Manavgat Riveroriginates from theeastern slopes of

    Western TaurusMountain (with anaverage flow of 156m3/s) and flows intoMediterranean Seaafter following about90 km distance to

    south.

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    4/24

    MANAVGAT RIVER WATER SUPPLYPROJECT

    500.000 m3/day

    147 Million US $

    Water Amount and

    Expected Cost

    Supply water both toTurkey and othercountries.

    Aim of The Project

    22.January 2000Completed

    April 1992Starting Date

    DS, 2001

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    5/24

    DS,2001

    The Plan and Flow Diagram of Manavgat River Water Supply Project

    DSI, 2001

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    6/24

    DS,2001

    Hydraulic Flow Diagram

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    7/24

    Water intake structure ofManavgat Dam is situated onapproximately 800 mdownstream of Manavgat

    Dam. Water taken from thelevel of + 8m is pumped upinto balancing and aeratingtank that is located

    approximately at the level of+ 68 m.s.l

    LGER, 2004

    Water intake Structure and Raw WaterPumping Structure

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    8/24

    Air Tanks

    DS2x50:100 mCapacity Of

    Air Tanks

    F 700 mmDiameter Of

    Pumping Pipes

    F 800 mmDiameter OfSuction Pipes

    7Number OfSuction Pipes

    2.15 mSuction Head

    DSILGER 2004

    DS,2000

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    9/24

    Raw Water Pumping Structure

    75 mTotalPumpingHead

    900 KwEffectivePower

    967 lt /secCapacity Of

    Pumps

    7 + 1Number OfPumps

    DS, 1998

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    10/24

    Pumping Mains

    Water taken from raw waterpumping mains is transferred

    to the balancing and aeratingtank by means of elevation line

    PEOuter Coating OfPipes

    Icoment Added

    Concrete

    Inner Coating Of

    Pipes

    Spiral Welded

    Steel Pipe

    Type Of Pipes

    1000 mLength Of Pipeline

    8,8 mmWall

    Thickness

    1200 mmDiameter Of

    Pipes

    2Number Of

    Pipes

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    11/24

    Balancing And Aerating Tank

    Pumping Mains

    Balancing Tank

    Aerating Tank

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    12/24

    Treatment Plant

    Components Of The Treatment Plant

    Rapid mixers and flocculation tanks

    Clarifiers

    Rapid sand filtration units

    Chlorination contact tank and clean water tank

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    13/24

    Mehmet lger 2004

    Clarifiers

    Rapid sand filtration unitsChlorination Tubes

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    14/24

    Gravity Mains

    DS, 2001

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    15/24

    Valve Control Chamber and Pumping Station

    Valve Control Chamber is

    designed to load 250 000m refined water and 250000 m raw water or 500000 m raw water

    simultaneously to twodifferent tanks. Also thereare totally 12 pumps withthe capacity of 1 m/sec,

    10 mains and 2 substitutesto pump water to the tanks

    Mehmet lger 2004

    LGER 2004

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    16/24

    Off-Shore Pipelines

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    17/24

    SPM (Single Point Mooring ) Structures

    DS

    Loading from SPM terminals to the tankers can be performedaccording to the following options,

    - From one SPM 250 000 m/day refined, from the other SPM 250 000m/day raw water,

    - From each pontoon, 250 000m/day raw water- From each pontoon, 125 000 m/day refined water and total 250 000m refined water

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    18/24

    RAW WATER ANALYSIS REPORT

    DS,2001

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    19/24

    Quality of the refined water conforms to all the specified requirements of DrinkingWater Quality Guide of TSE (Turkish Drinking Water Standard) and

    WHO (World Health Organization).

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    20/24

    CURRENT STATE OF THE PROJECT

    Project is ready to work and supplywater with its every unit.

    Also it has been in the scope of privatizationof Privatization High Council Decision dated23.02.2004.

    It was decided that privatization procedureswould be completed in 12 months.

    .

    www.oib.gov.tr

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    21/24

    PROJECT OF WATER EXPORT FROM

    MANAVGAT RIVERAnnual capacity of Manavgat River

    5x109 m

    Manavgat River Water SupplyProject

    180x106 m

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    22/24

    Water Sale To Israel And Alternatives Countries

    For Marketing Of Water from Manavgat RiverWater Supply Project

    Manavgat

    DS, 2001

  • 8/14/2019 Manavgat River Alternative Water Resource _prez Grer

    23/24

    CONCLUSON

    As a conclusion it can be stated that, for thewater scarcity problem of Middle East countries,

    Manavgat River Water Supply Project ofTurkey, can be viewed as an alternative butpartial solution.