MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP) Goulburn Murray Irrigation District
Transcript
Page 1: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER

ANZ INFRASTRUCTURE AND ENVIRONMENT

NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Goulburn Murray Irrigation District

Page 2: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

This Presentation

1. Background

2. Project objectives and drivers

3. Activities

4. Lessons

Page 3: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

The District

• 68,000 km2 in area

• 9,600 customers – most very small non commercial

• 6,300 km of channels – half small spur channels

• 24,000 outlets – most simple and inefficient

• 1,000’s of road crossings, regulators, culverts etc

• 3,000 GL taken for irrigation

– 2,100GL used– 900GL lost in distribution = 30%

Page 4: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Customer base: 9,600 properties

• 300 large commercial operators > 1,000ML/yr

• 750 medium commercial irrigators ~ 500ML/yr

• 3,000 small users < 100ML/yr

• 5,500 rural residential & domestic and stock

• Dairy - the major commercial force

• Mixed - annual crops - opportunistic

• Horticulture - niche in Central Goulburn

Page 5: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

GMID – Water Development History

1901 -Federation

1988 –Murray Darling Basin Commission

2. Management1. Development

1997 –MDB Agreement

3. Adjustment

2004/05 –National Water Initiative

2007 –National Plan for Water Security Water Act

1915 –River Murray Waters Agreement

Post-colonisation

Approximate drought period

1995 –MDB Cap on diversion

Page 6: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Adjustment Phase

Adjustment Phase

[Current Phase]

Commenced in 2000

Page 7: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Adjustment Phase – Elements

• 2000s Adjustment for Sustainability and Productivity

– Improving environmental flows – Water savings– Farm dams controls– National Water Initiative– Expanded trading – Unbundling entitlements– Tariff reform– Asset/service reconfiguration

and modernisation

Page 8: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

• Drought and water shortage– Expand (environmental, supply etc)

• No “NEW” water - in earlier development phase– Response was often to build infrastructure– Harvest and deliver more water– Issue new rights

• Approaching (or exceeding) sustainable limits required new approaches– Improved planning, water sharing, clear entitlements– Caps, markets, trade, sustainable use

Drivers for Adjustment (or water reform)

Page 9: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Objectives

• 3 program objectives

Productivity – the primary driver

Water supply for Melbourne

E-flows for the River Murray

Page 10: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Challenges with the distribution network

• Extensive spur channel supply system

• Long notice required for water orders

• Variable flow rates and channel height

• Low flow rates

• Manually operated farm outlets

• High water losses

• Risks of high costs to maintain into the future

• Difficult to achieve the size of property required to generate economies of scale

Page 11: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

NVIRP Project

• The Food Bowl Alliance driven by local business concerned at declining commercial viability of region

• NVIRP - $2 b investment in system modernisation

• Restore Food Bowl productivity

• Generate 425GL of water savings:

► 75GL to Melbourne► 75GL to irrigators► 275GL to environment

Page 12: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

NVIRP – Project (contd..)

• 2 main elements: $1bn each

► Backbone automation► Connections program

• Backbone

► Retract public system by 50% to major channels► Water super highway >20ML/day► Automation of control systems► Reduced outfalls and losses

Page 13: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Backbone Profile

Page 14: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Connections Program

• 5,500 customers on spur channels

• New connection from each farm to the backbone

• Multiple outlets/meters rationalised

• Connection assets privatised

• 3,000km of spur channels retrenched

• Water savings from:

► Closing leaky spur channels► More accurate meter outlets

Page 15: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

NVIRP - Decision framework

• Not just retrofit new assets to existing farms

• Transformation not standard funding model

• Fit for purpose / value for money / water savings

• Type of property: large commercial vs. lifestyle

• Size of realistic future demand

• Distance from backbone and cost

• Integration with other users

Page 16: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

NVIRP – decision Tree for Determining the Extent of the Modernized Backbone

Page 17: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Targeted investment approach

Page 18: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Channel automation

Page 19: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Metering upgrades

Page 20: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Channel lining

Page 21: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

NVIRP progress

Page 22: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

22

Source: ACIL Tasman report “Scope for Water Use Efficiency Savings as a Source of Water to meet increased Environmental Flows - Independent review”, March 2003

Page 23: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

LESSONS

Page 24: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

DATA

• Need good quality data?

• Yes but…

Page 25: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

DATA

• If we waited for good quality data…

• We wouldn’t have built NVIRP Project

• We started project planning in late 90s with incomplete data and developed a framework:

– For future pathway– Improving data collection (more importantly collecting

appropriate data)

Page 26: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

QUALITY PRODUCT AND CONTROL

• It is vital to install quality products that are certified under relevant standards

• We trialled a number of “non-standard” products in the 80s in trying to identify cost effective solutions.

• If we were to adopt “non-standard” products, we could have implemented some of the projects for a significantly cheaper capital cost BUT HIGHER WHOLE OF LIFE COST

• DO NOT COMPROMISE QUALITY FOR SHORT TERM GAIN

Page 27: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

WHOLE OF LIFE COST

• MAKE PROJECT DECISIONS BASED PROVEN WHOLE OF LIFE COSTS

• NOT CAPITAL COSTS

Page 28: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Value Engineering Workshop

Page 29: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Lessons Learnt- Pipeline

Source: Futureflow Alliance (Goulburn-Murray Water, Transfield, Jacobs SKM)

Page 30: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Lessons Learnt/Innovations – Customer Meters

Procurement strategy – Meter installation includes a number of pieces of hardware. Traditionally these have been purchased from a single supplier, who then delivers them as a package. FutureFlow purchased all items directly from the source and managed the logistics of delivering them to site for timely installation

Design alternate meter outlets – designed a suite of meter sizes and configurations to tailor each meter outlet to the flow rate requirements of individual customers

Developed new components – worked with suppliers to test and develop brand new products that were better suited to the application, therefore reducing costs

Integrated technology – allowed components from different suppliers to ‘talk to each other’ which enabled duplicate hardware such as batteries and solar panels to be eliminated

Trialled different construction approaches – to improve the speed and efficiency of each meter installation

Page 31: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Source: Futureflow Alliance (Goulburn-Murray Water, Transfield, Jacobs SKM)

Page 32: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Lessons Learnt- Automation

Changes to

• Construction and Installation methods $4,300

• Logistics, material and procurement $1,000

• Others - $600

• TOTAL - $5,900

Source: Futureflow Alliance (Goulburn-Murray Water, Transfield, Jacobs SKM)

Page 33: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Conjunctive Water Resource

• Conjunctive water resource management is critical to

optimal infrastructure sizing where both surface and ground

water sources available

Page 34: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Automation

• Optimal automation solution varies from project to project.

Alternatives such as partial automation, knowledgebase

driven systems are attractive for some projects (e.g. steeper

or undulating terrain, labour intensive systems, developing

countries etc.)

Page 35: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Lessons Learned (contd..)

• Clear vision and objectives – what are we trying to achieve?

• Early stakeholders involvement and engagement

• Good quality data is essential

• Holistic approach that includes the supply system and on-

farm system

• A sustainability based, strategic approach to investment

decisions

• Real gains are possible both off- and on-farm

Page 36: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)

Summary

• Biggest irrigation modernisation program in the

world

• Fundamental change in thinking

• Far reaching consequences for irrigators,

communities and the environment

• Significant benefits still to be realised on-farm

Page 37: MANI MANIVASAKAN PRINCIPAL ENGINEER, PRACTICE LEADER RURAL WATER ANZ INFRASTRUCTURE AND ENVIRONMENT NORTHERN VICTORIAN IRRIGATION RENEWALS PROJECT (NVIRP)