+ All Categories
Home > Documents > Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by...

Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by...

Date post: 26-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
16
Manila Metro Rail Systems LRT - MRT Status. Inc Operations, Proposals, Project Updates and Monorails Compiled by - Brad Peadon Philippine Railway Historical Society May 2017 - V3
Transcript
Page 1: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

Manila Metro Rail Systems LRT - MRT Status.

Inc Operations, Proposals, Project Updates and Monorails

Compiled by - Brad Peadon Philippine Railway Historical Society

May 2017 - V3

Page 2: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

© Information contained in this website and page may be used for research and publishing purposes provided acknowledgement is given to the author and the

‘Philippine Railway Historical Society’ . We take copyrite infringement seriously, even if you don’t.

For further details please feel free to email us at [email protected]

Compiling of this list would not be possible without the help of Aris M. Soriente, operators of the MRT, LRT and various members of the

Philippine Railway Historical Society. We thank all for their continued help in researching the current status and history of the various Philippine railways.

Hello, welcome to the 2017 LRT/MRT update, compiled by Brad Peadon for the ‘Philippine Railway Historical Society’. Brad has made every attempt to have the most up to date information possible, however, if you find any errors, or would like to provide an update/photos. You will be credited for your efforts. Please email me at any time: [email protected]

Regards Virls

Page 3: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

MANILA

ELEVATED LIGHT RAILWAY SYSTEMS

MAP.

Map Drawn By: Brian Young

Philippine Railway Railfan Group

REFERENCES: Philippine Railway Historical Society (PRHS)- Various Websites

• PRHS Homepage: http://philippine-railways.blogspot.com

• PRHS Blogsite: http://philippinerailwayhistoricalsociety.blogspot.com

• PRHS Database: http://prhsociety.wordpress.com

‘Philippine Railway Historical Society’ Facebook Groups and Page PhilippineRailways Yahoogroup (Operated by PRHS) Philippine Modelling Yahoogroup (Operated by PRHS) Railways Of The Philippines—Late Reg Carter

COPYWRITE Brad Peadon 2017 All rights reserved. This publication is produced by Brad Peadon for the ‘Philippine Railway Historical Society’. It is intended for personal research use of anyone interested and personal photocopying is permitted. Use of content within the publication for commercial or other publishing purposes can be granted by emailing the author ( [email protected] ) and including an appropriate credit in the final work.

Page 4: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by
Page 5: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

LRT Line 1 Website: www.lrta.gov.ph Depot: Baclaran Operations: Baclaran Station to Roosevelt Station. Timetable: Weekdays 05.00 - First train departs Baclaran station 21.30 - Last train departs Baclaran station. 22.00 - Last train departs Roosevelt station Weekends 05.00 - First train departs Baclaran station 21.00 - Last train departs Baclaran station. 21.30 - Last train departs Roosevelt station * Services are usually suspended during Holy Week. LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by Kinki Sharyo and Nippon Sharyo Ordered: 7 sets planned after line refurbishment. System Update: A combined station at North Avenue has still not become a reality. (April 2017) President Aquino announced during March 2012 that he wished the Cavite extension south be completed by 2015. As of April 2017 this extension was yet to be completed. Plans for a 6.2km branchline from Baclaran station to Ninoy Aquino International Airport was undergoing a feasibility study (2011). No further updates.

Note: Please note that the following fleetlists are as correct as possible at the dates shown. Some vehicles may be out of service from time to time to the maintenance reasons. While some may have since had a change in status, without this having been reported.

Page 6: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

Unit Update Status

1001 1/2017 In Service 1036 3/2017 In Service

1002 1/2017 Out Of Service - Cannibalized 1037 1/2017 OOS - Rizal Day Bomb Damage

1003 1/2017 In Service 1038 1/2017 OOS– Repairs To Water Leak

1004 3/2017 Out Of Service - Spare Parts Source 1039 1/2017 In Service

1005 1/2017 Out Of Service - Spare Parts Source 1040 3/2017 In Service

1006 1/2017 Cannibalized 1041 1/2017 Out Of Service - Spare Parts Source

1007 11/2011 Cannibalized 1042 3/2017 Out Of Service - Spare Parts Source

1008 3/2017 Out Of Service - Spare Parts Source 1043 1/2017 In Service

1009 3/2017 In Service 1044 4/2017 In Service. Released from refurbishment. 2/2017

1010 1/2017 In Service 1045 1/2017 In Service

1011 1/2017 Out Of Service - Spare Parts Source 1046 3/2017 In Service

1012 1/2017 In Service 1047 1/2017 In Service Returned to service. 4/2017

1013 1/2017 Out Of Service - Spare Parts Source (Roosevelt Accident)

1048 3/2017 In Service

1014 1/2017 Out Of Service - Spare Parts Source (Roosevelt Accident)

1049 1/2017 In Service

1015 1/2017 In Service 1050 1/2017 In Service

1016 1/2017 In Service 1051 1/2017 In Service

1017 1/2017 In Service 1052 1/2017 In Service

1018 1/2017 In Service 1053 1/2017 Cannibalized

1019 1/2017 Accident Damage-Spare Parts 1054 1/2017 Cannibalized

1020 1/2017 In Service 1055 3/2017 In Service

1021 3/2017 In Service 1056 3/2017 In Service

1022 1/2017 In Service 1057 3/2017 In Service

1023 1/2017 In Service 1058 3/2017 In Service

1024 1/2017 In Service 1059 1/2017 In Service

1025 3/2017 In Service 1060 1/2017 In Service

1026 1/2017 In Service 1061 3/2017 In Service

1027 1/2017 Out Of Service - Spare Parts Source (Balintawak Accident)

1062 1/2017 Out Of Service - Spare Parts Source

1028 1/2017 In Service 1063 3/2017 In Service

1029 1/2017 In Service 1064 1/2017 In Service

1030 1/2017 In Service

1031 1/2017 In Service

1032 1/2017 OOS-Repairs To Water Leak

1033 1/2017 In Service

1034 1/2017 In Service

1035 1/2017 In Service

Page 7: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

Unit Noted Status Unit Noted Status

1101 1/2017 In Service 1115 03/2017 In Service

1102 1/2017 Out Of Service - Spare Parts Source 1116 1/2017 Out Of Service - Spare Parts Source

1103 1/2017 In Service 1117 1/2017 Out Of Service - Spare Parts Source

1104 1/2017 Out Of Service - Spare Parts Source 1118 1/2017 Out Of Service - Spare Parts Source

1105 1/2017 Out Of Service - Spare Parts Source 1119 1/2017 Out Of Service - Spare Parts Source

1106 1/2017 In Service 1120 1/2017 Out Of Service - Spare Parts Source

1107 1/2017 Out Of Service - Spare Parts Source 1121 1/2017 Out Of Service - Spare Parts Source

1108 1/2017 Out Of Service - Spare Parts Source 1122 1/2017 Out Of Service - Spare Parts Source

1109 1/2017 In Service 1123 1/2017 Out Of Service - Spare Parts Source

1110 1/2017 Out Of Service - Spare Parts Source 1124 1/2017 Out Of Service - Spare Parts Source

1111 3/2012 Out Of Service - Spare Parts Source 1125 1/2017 Out Of Service - Spare Parts Source

1112 3/2017 In Service 1126 1/2017 Out Of Service - Spare Parts Source

1113 3/2017 In Service 1127 1/2017 Out Of Service - Spare Parts Source

1114 3/2017 In Service 1128 1/2017 Out Of Service - Spare Parts Source

Unit Noted Status Unit Noted Status

1201 3/2017 Mock Up - Stored Baclaran 1225 03/2017 In Service

1201(2)

1/2017 In Service 1226 3/2012 In Service

1202 3/2012 In Service 1227 1/2017 In Service

1203 1/2017 In Service (Globe Advertising) 1228 1/2017 In Service

1204 1/2017 In Service (Globe Advertising) 1229 3/2017 In Service (DAZZ Advertising)

1205 1/2017 In Service 1230 3/2017 In Service (DAZZ Advertising)

1206 1/2017 In Service 1231 1/2017 In Service

1207 1/2017 In Service 1232 1/2017 In Service

1208 1/2017 In Service 1233 1/2017 In Service

1209 1/2017 In Service (Globe Advertising) 1234 1/2017 In Service

1210 1/2017 In Service (Globe Advertising) 1235 1/2017 In Service

1211 1/2017 In Service 1236 1/2017 Out Of Service - Spare Parts Source

1212 1/2017 In Service 1237 1/2017 In Service (Cherry Advertising)

1213 3/2017 In Service (SMART Advertising) 1238 1/2017 In Service (Cherry Advertising)

1214 3/2017 In Service (SMART Advertising) 1239 1/2017 In Service (Cherry Advertising)

1215 1/2017 In Service 1240 1/2017 In Service (Cherry Advertising)

1216 3/2017 In Service 1241 1/2017 In Service

1217 1/2017 In Service 1242 1/2017 In Service

1218 1/2017 In Service 1243 1/2017 In Service (Cherry Advertising)

1219 1/2017 In Service 1244 1/2017 In Service (Cherry Advertising)

1220 1/2017 In Service 1245 1/2017 In Service

1221 1/2017 In Service 1246 1/2017 In Service

1222 1/2017 In Service 1247 1/2017 Out Of Service - Spare Parts Source

1223 1/2017 Repairs - Wheels 1248 1/2017 Out Of Service - Spare Parts Source

1224 1/2017 In Service

Page 8: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by
Page 9: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

LRT Line 2 Website www.lrta.gov.ph Depot: Santolan Operations: Recto Station to Santolan Station Timetable: Weekdays 05.00 - Operations commence 21.30 - Last train departs Santolan station. 22.00 - Last train departs Recto station Weekends 05.00 - Operations commence. 21.00 - Last train departs Recto station * Services are usually suspended during Holy Week. Fleet: 2000-2072 Built by Hyundai ROTEM of South Korea. 2003 System: Plans (2011) exist for a west extension to the Divisoria area (Delpan Street), however work has not commenced as of March 2012. Plans (2011) exist for a west extension to the Antipolo area (Cnr Sumulong and Marco Highways), however work has not commenced as of March 2012. Note: Please note that the following fleetlists are as correct as possible at the dates shown. Some vehicles may be out of service from time to time to the maintenance reasons. While some may have since had a change in status, without this having been reported.

LRT2 passing over the top of the MRT3 system at Cubao.

Page 10: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

Unit Update Status Unit Update Status

2001 3/2017 In Service 2037 3/2017 OOS, Cannibalized

2002 3/2017 In Service 2038 3/2017 OOS, Cannibalized

2003 3/2017 In Service 2039 3/2017 OOS, Cannibalized

2004 3/2017 In Service 2040 3/2017 OOS, Cannibalized

2005 3/2017 Awaiting Repair 2041 3/2017 Awaiting Repair

2006 3/2017 Awaiting Repair 2042 3/2017 Awaiting Repair

2007 3/2017 Awaiting Repair 2043 3/2017 Awaiting Repair

2008 3/2017 Awaiting Repair 2044 3/2017 Awaiting Repair

2009 3/2017 In Service 2045 3/2017 OOS, Cannibalized

2010 3/2017 In Service 2046 3/2017 OOS, Cannibalized

2011 3/2017 In Service 2047 3/2017 OOS, Cannibalized

2012 3/2017 In Service 2048 3/2017 OOS, Cannibalized

2013 3/2017 In Service 2049 3/2017 In Service

2014 3/2017 In Service 2050 3/2017 In Service

2015 3/2017 In Service 2051 3/2017 In Service

2016 3/2017 In Service 2052 3/2017 In Service

2017 3/2017 OOS, Cannibalized 2053 3/2017 Awaiting Repair

2018 3/2017 OOS, Cannibalized 2054 3/2017 Awaiting Repair

2019 3/2017 OOS, Cannibalized 2055 3/2017 Awaiting Repair

2020 3/2017 OOS, Cannibalized 2056 3/2017 Awaiting Repair

2021 3/2017 OOS, Cannibalized 2057 3/2017 In Service

2022 3/2017 OOS, Cannibalized 2058 3/2017 In Service

2023 3/2017 OOS, Cannibalized 2059 3/2017 In Service

2024 3/2017 OOS, Cannibalized 2060 3/2017 In Service

2025 3/2017 Awaiting Repair 2061 3/2017 In Service

2026 3/2017 Awaiting Repair 2062 3/2017 In Service

2027 3/2017 Awaiting Repair 2063 3/2017 In Service

2028 3/2017 Awaiting Repair 2064 3/2017 In Service

2029 3/2017 In Service 2065 3/2017 In Service

2030 3/2017 In Service 2066 3/2017 In Service

2031 3/2017 In Service 2067 3/2017 In Service

2032 3/2017 In Service 2068 3/2017 In Service

2033 3/2017 In Service 2069 3/2017 In Service

2034 3/2017 In Service 2070 3/2017 In Service

2035 3/2017 In Service 2071 3/2017 In Service

2036 3/2017 In Service 2072 3/2017 In Service

Set

1

1

1

1

2

2

2

2

3

3

3

3

4

4

4

4

5

5

5

5

6

6

6

6

7

7

7

7

8

8

8

8

9

9

9

9

Set

10

10

10

10

11

11

11

11

12

12

12

12

13

13

13

13

14

14

14

14

15

15

15

15

16

16

16

16

17

17

17

17

18

18

18

18

Page 11: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by
Page 12: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

MRT Line 3 Website: http://www.dotcmrt3.gov.ph/ Depot: Trinoma Operations: North Avenue Station to EDSA Station Timetable: Weekdays Saturday Sunday/Holidays First Service 04.37 04.38 04.50 Last Service 22.40 22.40 22.40 Fleet: 001-073 Built by CKD (now part of Siemens AG) in the Czech Republic. 1999 Stored: 3101-3148 Built by Dalian Locomotive and Rolling Stock Corp, delivered from 2015 System Notes: 2006 - 48 U-Bahn cars from Vienna were arranged to expand network. Vehicles never eventuated. 2010 - Then President Arroyo announces that linking the MRT3 and LRT1 systems was a national priority. By 2017 it seemed unlikely. 2011 - Interest reported in leasing a number of vehicles from LRT1. (Unconfirmed, Has not occurred by 2017) 2014 - August 8th: Train overshoots platform at Taft and ends up on road. 003 placed out of service. 2015 - August, the first of 48 new vehicles arrive from China (Dalian Locomotive and Rolling Stock Corp). Still not in service at time of publishing.. Note: Please note that the following fleetlists are as correct as possible at the dates shown. Some vehicles may be out of service from time to time to the maintenance reasons. While some may have since had a change in status, without this having been reported.

Page 13: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

Update Status Unit Update Status

001 03/2017 In Service 038 03/2017 In Service

002 03/2017 In Service 039 03/2017 In Service

003 03/2017 OOS, Taft Accident 8-2014 040 03/2017 In Service

004 03/2017 In Service 041 03/2017 In Service

005 03/2017 In Service 042 03/2017 In Service

006 03/2017 In Service 043 03/2017 In Service

007 03/2017 In Service 044 03/2017 In Service

008 04/2017 In Service-Scheduled For Service 045 03/2017 In Service

009 03/2017 In Service 046 03/2017 In Service

010 03/2017 In Service 047 03/2017 In Service

011 03/2017 In Service 048 03/2017 In Service

012 03/2017 In Service 049 03/2017 In Service

013 03/2017 In Service 050 03/2017 In Service

014 03/2017 In Service 051 03/2017 In Service

015 03/2017 In Service 052 03/2017 In Service

016 03/2017 In Service 053 03/2017 In Service

017 03/2017 In Service 054 03/2017 In Service

018 03/2017 In Service 055 03/2017 In Service

019 03/2017 In Service 056 03/2017 In Service

020 03/2017 In Service 057 03/2017 In Service

021 03/2017 In Service 058 03/2017 In Service

022 03/2017 In Service 059 03/2017 In Service

023 03/2017 In Service 060 03/2017 In Service

024 03/2017 In Service 061 03/2017 In Service

025 03/2017 In Service 062 03/2017 In Service

026 03/2017 In Service 063 03/2017 In Service

027 03/2017 In Service-Scheduled For Service 064 03/2017 In Service

028 03/2017 In Service 065 03/2017 In Service

029 03/2017 In Service 066 03/2017 In Service

030 03/2017 In Service 067 03/2017 In Service

031 03/2017 In Service-Scheduled For Service 068 03/2017 In Service

032 03/2017 In Service 069 03/2017 In Service

033 03/2017 In Service 070 03/2017 In Service-Scheduled For Service

034 03/2017 In Service 071 03/2017 In Service

035 03/2017 In Service 072 03/2017 In Service

036 03/2017 In Service 073 03/2017 In Service-Scheduled For Service

037 03/2017 In Service

Page 14: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

Unit Update Status Unit Update Status

3101 4-2017 Stored, Await service entry. 3125 4-2017 Stored, Await service entry.

3102 4-2017 Stored, Await service entry. 3126 4-2017 Stored, Await service entry.

3103 4-2017 Stored, Await service entry. 3127 4-2017 Stored, Await service entry.

3104 4-2017 Stored, Await service entry. 3128 4-2017 Stored, Await service entry.

3105 4-2017 Stored, Await service entry. 3129 4-2017 Stored, Await service entry.

3106 4-2017 Stored, Await service entry. 3130 4-2017 Stored, Await service entry.

3107 4-2017 Stored, Await service entry. 3131 4-2017 Stored, Await service entry.

3108 4-2017 Stored, Await service entry. 3132 4-2017 Stored, Await service entry.

3109 4-2017 Stored, Await service entry. 3133 4-2017 Stored, Await service entry.

3110 4-2017 Stored, Await service entry. 3134 4-2017 Stored, Await service entry.

3111 4-2017 Stored, Await service entry. 3135 4-2017 Stored, Await service entry.

3112 4-2017 Stored, Await service entry. 3136 4-2017 Stored, Await service entry.

3113 4-2017 Stored, Await service entry. 3137 4-2017 Stored, Await service entry.

3114 4-2017 Stored, Await service entry. 3138 4-2017 Stored, Await service entry.

3115 4-2017 Stored, Await service entry. 3139 4-2017 Stored, Await service entry.

3116 4-2017 Stored, Await service entry. 3140 4-2017 Stored, Await service entry.

3117 4-2017 Stored, Await service entry. 3141 4-2017 Stored, Await service entry.

3118 4-2017 Stored, Await service entry. 3142 4-2017 Stored, Await service entry.

3119 4-2017 Stored, Await service entry. 3143 4-2017 Stored, Await service entry.

3120 4-2017 Stored, Await service entry. 3144 4-2017 Stored, Await service entry.

3121 4-2017 Stored, Await service entry. 3145 4-2017 Stored, Await service entry.

3122 4-2017 Stored, Await service entry. 3146 4-2017 Stored, Await service entry.

3123 4-2017 Stored, Await service entry. 3147 4-2017 Stored, Await service entry.

3124 4-2017 Stored, Await service entry. 3148 4-2017 Stored, Await service entry.

003 The result of failing to stop at Taft Station. After being retrieved from the street, 003 was taken back to the Trinoma depot, where it continues to sit at time of writing. Photo: Courtesy of the Inquirer Newspaper.

Page 15: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

MRT Line 7 Website: None Depot Location: Currently Unknown Operations: North Ave Station to San Jose del Monte Station Timetable: Not Operational Ordered: Reported to be as many as 108 vehicles, to run in 36 x 3-car formations. Hyundai-ROTEM winning the contract. System: 2010 - Project commenced by Arroyo government. 2012 - Project reported to be halted pending Aquino government review on affect to bus and jeepney drivers along route. 2017 - Early construction noted in April 2017.

CHANGES SINCE LAST UPDATE

LRT 1

For Repair To Spare Parts Source 1002, 1011, 1013, 1014

In Service To Spare Parts Source 1002, 1008, 1019,1026, 1041, 1042, 1047, 1062, 1104, 1108, 1110, 1111, 1236, 1247

For Repair To Cannibalized. 1006, 1006, 1054

In Service To Cannibalized 1053

Reserve To Spare Parts Source 1005

Reserve To In Service 1015

In Service To Repairs 1032, 1038

LRT 2

In Service To Await Repair Sets 2, 7, 11, 14

In Service To Cannibalized Sets 5, 6, 10, 12

MRT 3

In Service To Stored Accident Damage 003

Await Repairs To In Service 002, 013

Extended Operation Hours

Reduction In Weekend Services

Page 16: Manila Metro Rail Systems LRT - MRT Status. · 2017. 4. 26. · LRT1 Fleet: 1G 1000-1064 Built by BN ACEC 2G 1100-1128 Built by Hyundai Precision and Adtranz 3G 1200-1248 Built by

PHILIPPINE RAILWAY HISTORICAL SOCIETY

Since 1999

Website: Information, News, Photos & Forums. http://philippine-railways.blogspot.com

[email protected]

When in Australia, come to Sydney’s lineside Filipino store in beautiful downtown Narwee.

PROUDLY SUPPORTING

THE

PHILIPPINE RAILWAY HISTORICAL

SOCIETY.

CONTRIBUTIONS/ADDITIONS

These are always needed and would appreciate your sending them to [email protected]. We are also working on current and historic lists covering known information on PNR locomotives,

DMUs, and rollingstock, as well as the overhead railway operations. Your contributions will be acknowledged.

WEBSITES OF PHILIPPINE RAILFAN INTEREST. Philippine Railway Historical Society and Forums (PRHS) http://philippine-railways.blogspot.com Philippine Railway News & Historical Chat (PRHS) http://groups.yahoo.com/group/PhilippineRailways Philippine National Railways http://www.pnr.gov.ph/

LRT http://www.lrta.gov.ph/ MRT http://www.dotcmrt3.gov.ph/ Philippine Railway Advocacy Group http://philippinerailways.blogspot.com Modelling The Philippines (PRHS) http://groups.yahoo.com/group/Philippine_Modelling


Recommended