Manila Water’s PPP Experience in Vietnam October 3, 2017 Hanoi
Transcript
Page 1: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

Manila Water’s PPP Experience in Vietnam

October 3, 2017

Hanoi

Page 2: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

2

PPP PROJECTS IN VIETNAMManila Water was able to reach the Vietnam Market, growing its portfolio of investments in the water sector through different public private partnership schemes

OUTPUT BASED CONTRACT AS A GOOD PPP FRAMEWORKThe 2008 performance-based leakage reduction and management services project for SAWACO Zone 1 HCMC proved that the output-based framework is a good and effective PPP mechanism

EQUITIZATION IS A CLEAR OPPORTUNITY FOR PPPThe Government’s equitization program is a clear opportunity for PPP, if done correctly

Key Messages

Page 3: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

3

PPP PROJECTS IN VIETNAMManila Water was able to reach the Vietnam Market, growing its portfolio of investments in the water sector through different public private partnership schemes

OUTPUT BASED CONTRACT AS A GOOD PPP FRAMEWORKThe 2008 performance-based leakage reduction and management services project for SAWACO Zone 1 HCMC proved that the output-based framework is a good and effective PPP mechanism

EQUITIZATION IS A CLEAR OPPORTUNITY FOR PPPThe Government’s equitization program is a clear opportunity for PPP, if done correctly

Key Messages

Page 4: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

4

MWC’s Existing Projects PPP Projects in Vietnam

Thu Duc Water B.O.O. Corp.

Pleiku WTP(30 MLD)

Saigon DankiaWTP

(30 MLD)

Tan Hiep 2 WTP(300 MLD)

Saigon Can ThoJSC

(30 MLD)

Gia Lai Province

Lam Dong Province

SAWACO, HCMC

Can Tho City

Bulk Water Supply:

49% ownership of TDW whichsupplies 300 MLD of cleanwater to Ho Chi Minh City andserves 2 million customers.

47.35% ownership of Kenh DongWater Supply JSC (KDW) whichsupplies over 150 MLD to TanHiep and Cu Chi District andserves 1.3 million customers

38% ownership of Saigon Water Infrastructure Corp;This is the company’s investment arm, having 4 othersubsidiaries focused in bulk water supply

Page 5: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

5

MWC’s Existing Projects PPP Projects in VietnamWater Distribution:

(Cu Chi Water)24.5% ownership of Cu Chi Water which startedto supply and distribute clean water to thewhole of Cu Chi District in Ho Chi Minh City,Vietnam.

HCMC/ Cu Chi PC

Saigon Water (Cu Chi)

Direct Water Distribution to 78,000 WSC

Gia Lai Water Supply

Investment

Saigon An KheWater JSC

Supply and Distribution for

Pleiku and Ayunpa

(22,000 WSC)

Supply and Distribution for An Khe (20,000

WSC)

38% ownership of Saigon Water Infrastructure Corp;This is the company’s investment arm, having 2 othersubsidiaries focused in water distribution

Pro

vin

cial

PC

Page 6: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

6

PPP PROJECTS IN VIETNAMManila Water was able to reach the Vietnam Market, growing its portfolio of investments in the water sector through different public private partnership schemes

OUTPUT BASED CONTRACT AS A GOOD PPP FRAMEWORKThe 2008 performance-based leakage reduction and management services project for SAWACO Zone 1 HCMC proved that the output-based framework is a good and effective PPP mechanism

EQUITIZATION IS A CLEAR OPPORTUNITY FOR PPPThe Government’s equitization program is a clear opportunity for PPP, if done correctly

Key Messages

Page 7: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

7

The SAWACO Zone 1 Project

Zone 1 – SAWACO

Performance Based Contract

Financing

Project Management and Monitoring

Saigon Water Corporation (SAWACO)

• Manages the water network system in HCMC

• Divided into 6 hydraulic zones

Zone 1 :

• 835 km of pipe network and 139K connections

• Covers 23 square kilometers

• Leakage Level at 60% before project implementation

Contract Deliverables:

• Started late 2008 and ended in 2014

• DMA Formation & Leakage Reduction – 4 years

• Maintenance Period – 1 year

Preliminary Works

• DMA Establishment

• System Expansion Works

• Emergency & Unforeseen Works

Leakage Reduction/Management

• Leak Detection

• Leak Repair

• DMA Control & Monitoring

FRAMEWORK

Page 8: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

8

Volume of Water Saved:121,621 m3/day(160,421 m3/day w/ pressure increase)

Water saved: 3x more than

the target

Result of the Performance-based NRW Reduction Project

0

20

40

60

80

100

120

No

v 20

08

Feb

200

9

May

200

9

Au

g 2

009

No

v 20

09

Feb

201

0

May

201

0

Au

g 2

010

No

v 20

10

Feb

201

1

May

201

1

Au

g 2

011

No

v 20

11

Feb

201

2

May

201

2

Au

g 2

012

No

v 20

11

Feb

201

3

May

201

3

Au

g 2

013

Contract Actual/Forecast

119 DMAs formed

The SAWACO Zone 1 Project

Page 9: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

Know and manage the stakeholders for the success of the project.

There is no one-size-fits-all solution; local settings require local approaches.

Key to effective management contract is contractor flexibility on project design and

implementation.

The SAWACO Zone 1 Project

Lessons learned

Page 10: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

Output based contract as a good PPP framework

Output based specification

• Specifying the project result as outputs allow innovation to take place

Performance measurement and incentives

• Linking performance to payment provides the service provider thevital incentive to deliver the required standards as defined in theoutput specification. Performance measurements reflects risktransferred to the private sector

Private sector management skills

• Infrastructure investments in the government will have access to new skills

Time to delivery savings

• Caused by a greater private incentive to generate revenue as soon as possible

Page 11: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

11

PPP PROJECTS IN VIETNAMManila Water was able to reach the Vietnam Market, growing its portfolio of investments in the water sector through different public private partnership schemes

OUTPUT BASED CONTRACT AS A GOOD PPP FRAMEWORKThe 2008 performance-based leakage reduction and management services project for SAWACO Zone 1 HCMC proved that the output-based framework is a good and effective PPP mechanism

Key Messages

EQUITIZATION IS A CLEAR OPPORTUNITY FOR PPPThe Government’s equitization program is a clear opportunity for PPP, if done correctly

Page 12: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

12

SOE Equitization as an avenue for PPP Vietnam launched the privatization program in 1992

Equitization is a process of transforming an SOE into a joint-stock company

The government continues to hold controlling role through investment management in some large SOEs ( in some special industries. E.g. Electricity, Oil and Gas, etc)

Equitization in Vietnam is considered as partial privatization

SOE

X% Ownership remains State

Owned

X% Ownership will be equitized/ privately owned

• Subject to full DD• Significant ownership control should be

given• Should take part in the management and

operations of the business

Source: Vietnam Equitization Process, Ministry of Finance

Page 13: Manila Water’s PPP Experience in Vietnam - UN ESCAP Water PPP Experience in... · 2 PPP PROJECTS IN VIETNAM Manila Water was able to reach the Vietnam Market, growing its portfolio

13

Towards the Future

Key to successful PPP are the following:

solid partnership and equal responsibility between the public and private sectors

clear legal, regulatory and policy framework

tariff setting mechanism are in place

observance of the contract

key Performance indicators and business efficiency measures are monitored

Equitization will be a good venue for PPP if both the government and the private sector are given responsibility to create value

The entry of international players will help boost PPP

PPP needs to have continuous success stories which should be replicated in other areas