Revision No.01. PROCEDURE TITLE :PROJECT CONTROL. F/PCSB/P/PC/03/3 MANPOWER PROJECT :Bukit Banyan, Phase 3 Double Storey Semi-D 72 units PERIOD : FROM 1/09/2015 TO 15/09/2015 NO DESCRIPTION D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 TOTAL 1 Carpenter 30 31 28 27 27 28 12 10 0 20 24 25 22 22 23 # 628 2 Barbender 10 10 9 9 9 9 0 0 0 9 10 10 8 10 10 103 3 Concretor 7 7 0 0 0 7 0 0 0 0 0 7 0 0 7 28 4 Drainlayer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 Bricklayer 5 11 12 12 13 13 10 11 0 11 13 12 16 15 21 170 6 Metal Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 Aluminium Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 Glazer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Painter 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 Electrician 1 0 1 0 1 1 1 0 0 0 0 0 0 0 0 4 11 Plumber 0 0 5 0 0 0 0 0 0 0 0 0 0 5 0 10 12 Roof Plumber 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 Roof Tiler 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 4 14 Tiler 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 Parquet 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 Plasterer 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 5 17 Rendering 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 Septic Tank Worke 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 Plant Operator 5 5 4 2 3 6 5 6 0 2 5 6 5 4 7 # 125 20 Direct Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 Power Float 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22 Manhole 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 24 25 26 27 28 29 30 TOTAL 1077 Prepared By : Mohd Shauqi Amir B.Roslan Signatur : Designation : Site Supervisor Date : PARAMOUNT CONSTRUCTION SDN BHD
Transcript
Page 1: Manpower - September 2015

Controlled Document

Revision No.01.

PROCEDURE TITLE :PROJECT CONTROL. F/PCSB/P/PC/03/3

MANPOWERPROJECT :Bukit Banyan, Phase 3 Double Storey Semi-D 72 units PERIOD : FROM 1/09/2015 TO 15/09/2015

NO DESCRIPTION D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 TOTAL1 Carpenter 30 31 28 27 27 28 12 10 0 20 24 25 22 22 23### 6282 Barbender 10 10 9 9 9 9 0 0 0 9 10 10 8 10 10 1033 Concretor 7 7 0 0 0 7 0 0 0 0 0 7 0 0 7 284 Drainlayer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05 Bricklayer 5 11 12 12 13 13 10 11 0 11 13 12 16 15 21 1706 Metal Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07 Aluminium Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08 Glazer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09 Painter 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 Electrician 1 0 1 0 1 1 1 0 0 0 0 0 0 0 0 411 Plumber 0 0 5 0 0 0 0 0 0 0 0 0 0 5 0 1012 Roof Plumber 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 013 Roof Tiler 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 414 Tiler 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 015 Parquet 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 016 Plasterer 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 517 Rendering 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018 Septic Tank Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 019 Plant Operator 5 5 4 2 3 6 5 6 0 2 5 6 5 4 7### 12520 Direct Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 021 Power Float 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 022 Manhole 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02324252627282930

TOTAL 1077

Prepared By : Mohd Shauqi Amir B.Roslan Signature :Designation : Site Supervisor Date :

PARAMOUNT CONSTRUCTION SDN BHD

Page 2: Manpower - September 2015

Controlled Document

Revision No.01

PROCEDURE TITLE :PROJECT CONTROL. F/PCSB/P/PC/03/3(i)

MANPOWERPROJECT : Bukit Banyan, Phase 3 Double Storey Semi-D 72 units PERIOD : FROM 16/09/2015 TO 30/09/2015

NO DESCRIPTION D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31 TOTAL1 Carpenter 0 10 26 20 26 23 21 15 0 0 18 20 0 23 23 2252 Barbender 0 0 11 9 11 11 11 11 0 0 9 11 0 10 11 1053 Concretor 0 0 0 0 7 0 7 7 0 0 7 0 0 0 0 284 Drainlayer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05 Bricklayer 0 2 22 21 22 8 7 0 0 0 7 7 0 10 10 1166 Metal Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07 Aluminium Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08 Glazer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09 Painter 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 010 Electrician 0 0 5 4 0 1 1 0 0 0 0 4 0 1 1 1711 Plumber 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 112 Roof Plumber 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 013 Roof Tiler 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 014 Tiler 0 2 0 4 4 5 5 5 0 0 4 5 4 5 0 4315 Parquet 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 016 Plasterer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 017 Rendering 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018 Septic Tank Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 019 Plant Operator 0 0 5 4 3 2 4 4 0 0 2 2 0 4 4 3420 Direct Worker 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 021 Power Float 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 022 Manhole 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 023 Ceiling Worker 0 0 0 0 0 0 0 3 0 0 2 2 2 3 3 1524252627282930

TOTAL 584

Prepared By : Mohd Shauqi Amir B.Roslan Signature :Designation : Site Supervisor Date :