Date post: | 01-Jun-2018 |
Category: |
Documents |
Upload: | airnetwork |
View: | 1,958 times |
Download: | 137 times |
of 30
8/9/2019 Manual ADVA FSP 150CC-825
1/30
Optical Networking
TM
Fiber Service Platform 150CCf-825
(FSP 150CCf-825)
FSP 150CCf-825 Release 2.1
Quick Start Guide80000003806 Rev 1.0 December 2008
8/9/2019 Manual ADVA FSP 150CC-825
2/30
Copyright 2001-2008 ADVA AG Optical Networking. All rights reserved.
All rights reserved. Hardware and software mentioned in this document includes software developed by
ADVA AG Optical Networking ("ADVA"), the Apache Software Foundation (http://www.apache.org), Te-
odor Danciu (http://jasperreports.sourceforge.net), and/or other open source software. Some software was
created using ORBacus for Java by Object-Oriented Concepts, Inc.
Trademarks
The terms ADVA, FSP, Etherjack and the Etherjack logo are trademarks or registered trademarks of ADVA
in the United States, Germany and/or other countries. All other company, product, or service mentioned in
this document may be trademarks or service marks of ADVA or their respective owner.
Patents
The content described in this document may be covered by patents or pending patent applications of ADVA.
The furnishing of this document does not give you any license to these patents.
Disclaimers
The content of this document could include technical inaccuracies or typographical errors, and is subject to
change at any time without notice. Reliance on this content is at the relying party's sole risk and will not
create any liability or obligation for ADVA. Any references in this document to non-ADVA publications
and/or non-ADVA Internet sites are provided for convenience only and do not in any manner serve as an
endorsement of those publications and/or Internet sites. The materials within those publications and/or In-
ternet sites are not part of the materials for any ADVA information, product or service, and use of those
publications and/or Internet sites is at your own risk.
THE CONTENT OF THIS DOCUMENT IS PROVIDED ''AS IS'' AND ANY EXPRESSED OR IMPLIED
WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MER-
CHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO
EVENT SHALL ADVA, ITS AFFILIATES, EMPLOYEES, OFFICERS OR ITS SUPPLIERS BE LIA-
BLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUEN-
TIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE
GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION)
HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT
LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY
OUT OF THE USE OF THIS DOCUMENT, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH
DAMAGE. THE SAME APPLIES FOR ANY HARDWARE OR SOFTWARE COVERED BY THIS
DOCUMENT, UNLESS A SIGNED AGREEMENT WITH ADVA OR THE APPLICABLE PRODUCT
LIABILITY LAW EXPRESSLY STATES OTHERWISE.
ADVA AG Optical NetworkingHeadquartersCampus MartinsriedFraunhoferstr. 9 A82152 Martinsried/MuenchenGermany
Phone+49(0)89-890665-848Fax +49(0)89-890665-22848www.advaoptical.com
8/9/2019 Manual ADVA FSP 150CC-825
3/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 1
Optical Networking
TM
FSP 150CCf-825 Quick Start Guide
1.1 Introduction
This document provides step by step procedures to help you locally provision the FSP
150CCf-825 Network Interface Device (NID) to a simple back-to-back configuration. When the
procedures in this document have been completed, the FSP 150CCs will be provisioned from
its default configuration to the following configuration (see Figure 1):
back-to-back FSP 150CCs on a desk-top (no wall or rack mounting)
FSP 150CC IP address provisioned
Minimum required system and WAN interface provisioning
New users, including new super user
VLAN-based WAN management tunnel with PPP layer 2 protocol, DHCP disabled andRIP V2 packets enabled
Management LAN port disabled at the SNE (Subtending Network Element)
LAN port(s) configured in Transparent EVC (Ethernet Virtual Circuit) mode
SNMP provisioned to enable remote alarm monitoring
Figure 1 Simple Back-to-Back Configuration Supported in This Document
LAN(s)LAN(s)
WAN
RIP Enabled
GNEFSP 150CC #1 SNEFSP 150CC #2
Management Tunnel
GNE = Gateway Network ElementSNE = Subtending Network Element
5
PSU1
Status
100-240VAC
PSU2
Status Critical
Major
Minor
Status
EtherjackTM
Management
RS-232
LAN
4
3
2
1
2 4 Access
Lk Rate Lk Rate Lk Rate
2
1
Active
Network FSP150CCf
211 3 5
PSU1
Status
100-240VAC
PSU2
Status Critical
Major
Minor
Status
EtherjackTM
Management
RS-232
LAN
4
3
2
1
2 4 Access
Lk Rate Lk Rate Lk Rate
2
1
Active
Network FSP150CCf
211 3
8/9/2019 Manual ADVA FSP 150CC-825
4/30
Page 2 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
All other features will utilize the system default configuration. If your desired configuration
varies from this basic configuration, then provisioning is required. If this is the case, refer to the
FSP 150CCf-825Installation and Operations Manualfor provisioning data and procedures.
For CLI provisioning and CLI command structure information, refer to the FSP 150CCf-825Etherjack OS (EOS) Command Line Interface Handbook.
Firmware Release Levels Supported in This Release
This version of the FSP 150CCf-825 Quick Start Guide is applicable to the FSP 150CCf-825software release 2.1. This version of FSP 150CCf-825 is compatible with the nVision Network
Management System software release 9.0 or greater.
Audience
The reader must have sufficient knowledge of the following when using this document: IP addressing
WAN facility provisioning requirements
LAN EVC provisioning requirements
fiber handling and cleaning procedures (if connecting fiber cables)
power handling and connection procedures (if connecting DC power)
Obtaining Technical Assistance
Product Maintenance Agreements and other customer assistance agreements are availablefor ADVA Optical Networking AG products through your ADVA Optical Networking distribution
channel. Technical support is available to warranty or maintenance contract customers who
need technical assistance with an ADVA Optical Networking product that is under warranty or
covered by a maintenance contract.
To display ADVA Optical Networkings Technical Support web site that includes all contact
information, go to ADVA Optical Networkings home page at http://www.advaoptical.comand select the Support button.
ADVA Optical Networkings service options include:
24 X 7 telephone support
Web-based support tools
On-site support
Technical training, both on-site and at ADVA facilities in Germany and the USA
Expedited repair service
Extended hardware warranty service
8/9/2019 Manual ADVA FSP 150CC-825
5/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 3
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
1.2 Physical Installation
The FSP 150CC installation requires that you establish WAN facility connections between your
local and remote sites, or between your local site and the telco. After your end-to-end
connection has been installed, you are ready to install the FSP 150CCf-825.
The FSP 150CCf-825 is designed for deployment in both customer premises and CO
locations. Wall mount and rack mount brackets, as well as power options, may be ordered
separately. Refer to the FSP 150CCf-825Installation and Operations Manualfor power andmounting ordering options.
1.2.1 Power Options and Wiring
The following provides power supply requirements as well as instructions for installing the
power and cabling for the FSP 150CCf-825. Refer to the FSP 150CCf-825Installation and
Operations Manualand the following information for determining PSU and/or power adaptercabling requirements for your site.
Power Requirements
The system is powered by dual AC and/or DC Power Supply Units (PSUs). PSUs can be of
similar type or mixed, and are hot swapable. It can be equipped with two AC modules, two DC
modules, or one of each. They are physically accessed at the front of the unit and source
connections are located on the front of each PSU module.
Optionally, a third possible power source, an external AC to 12 VDC power converter, may be
used. The 12 VDC power converter may be used alone, or mixed with AC and/or DC power
supply modules. It is physically connected at the rear of the unit. AC power converters may beordered separately for North American and international location.
If an external AC power converter and/or one PSU module fails - or its input source fails, the
remaining module continues to power the system without interruption to system function.
Note: The power supplies are not designed to operate in load-sharing mode.
AC Supply
The system operates with an AC source fused at 15A, with the voltage range specified in ANSI
specification C84.1-1989, Voltage Ratings (60 Hz) for Electric Power Systems Equipment,
Range B. The FSP 150CCf-825 can tolerate any frequency within the range of 60 (+/-3) Hz for
North American applications, and the range of 50 (+/-3) Hz for European applications. The
maximum power consumption from the 230 VAC supply is 40W.
DC Supply
The DC power connector is a 3-pin socket (Battery, Return, Frame Ground) which includes a
mated connector, providing protection against improper (reversed polarity) connection at the
NID. The maximum power consumption from the -48 VDC supply is 40W. External fuse rating
8/9/2019 Manual ADVA FSP 150CC-825
6/30
Page 4 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
is 5A.
The FSP 150CCf-825 operates properly when supplied with minimum and maximum operating
voltages for North American and International applications, as shown in Table 1-1.
External AC to 12 VDC Power Converter
The system also provides an optional AC to 12 VDC converter input on the rear panel,
externally fused at 15A. North American and International versions are available (see the FSP150CCf-825Installation and Operations Manual for converter options and part numbers).
Connect Cables and Apply Power
For all FSP 150CCf-825 installations, you will need the proper PSU, power cables and/or
power adapter for your site, and cabling related tools and supplies, as required by local
practices. For DC powered FSP 150CCf-825 power supply units, you will need the following
items for this procedure:
Screwdriver
Wire wrap tool
Wire cutters
Wire strippers
Volt meter
Fuse panel
Other power related tools and supplies as required by local practices
For optical cabling installation, you will need the following items for this procedure:
Optical Power Meter
Fiber Cleaner
Small Form-factor Plug-ables (SFPs), as required
If required, refer to the FSP 150CCf-825Installation and Operations Manualfor connectorand LED descriptions when performing the following procedure.
Table 1-1 Minimum and Maximum Operating Voltages
Nominal Voltage MinimumOperating Voltage
MaximumOperating Voltage
MinimumAbnormal Voltage
MaximumAbnormal Voltage
-48 -40.5 -57.0 0 -60.0
-60 -50 -72 0 -75
8/9/2019 Manual ADVA FSP 150CC-825
7/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 5
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Procedure
Mount the FSP 150CC to a Wall or Rack, as required
Step 1 For desktop or communications closet installations, go to the next step. Otherwise,mount the FSP 150CCs, as required. Mounting adapters are provided for mounting
to a wall, 19 rack or 23 rack. Refer to FSP 150CCf-825Installation andOperations Manualfor detailed procedures.
If additional FSP 150CCs are to be stacked above each other, are installed above heat
producing components, or are installed below heat sensitive components, some FSP
150CC variants require that heat deflector(s) are installed. Install air deflector(s) as
described in Table 2.
Insert SFPs, Run and Connect Power Cables
Step 2 Connect the ground cable, as required.
Step 3 If using optical WAN/LAN interfaces:Obtain the proper SFP (Small Form-factorPlug-able), and insert it/them into the optical port(s).
Step 4 Determine the next step.
DANGER Avoid the risk of electrical shock. Follow local procedures for working withelectrical power. High voltage may be present in the following tasks. Shut off the powerfrom the power source or turn off the circuit breakers before proceeding. Use properlyinsulated tools when working with power connections. Do not allow any metal objectsto connect across power terminals.
Table 2 Air Flow Requirements for the FSP 150CCf-825Air Flow Requirements
Multiple units may be stacked up to 5 rows high in an environmentally controlled
environment, such as a Central Office. A heat deflector should be installed between
every 5 rows of FSP 150CC NIDs. If it is necessary to install 5 rows of NIDs above other
heat producing components, it is recommended that a heat deflector is installed below
the NIDs. If it is necessary to install heat sensitive equipment above 5 rows of NIDs, it
is recommended that a heat deflector is installed above the NIDs.
Current Status Then
Does/will the FSP 150CCf-825 include a DC power
supply unit?
Continue with the next step.
Does/will the FSP 150CCf-825 NOTinclude a DC
power supply unit?Go to Step 17.
8/9/2019 Manual ADVA FSP 150CC-825
8/30
Page 6 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 5 Verify that the office DC power supply is set up to deliver the correct operating voltageto the FSP 150CCf-825 (between -40.5 and -72 VDC). Verify that the correct fuse or
breaker (5 A rating) is installed at the power supply source and that power is turned
off. Repeat for a second DC power supply source, if present.
Step 6 Using a volt meter, measure the voltages at the source power supply terminals. Verifythat no voltage is present. Repeat for a second DC power supply source, if present.
Step 7 Run the DC power cables (shipped with the power supply unit) from the FSP150CCf-825 to the office battery terminals. Dress the power cables. Repeat for a
second DC power supply unit, if present.
Step 8 Remove the blank PSU front panel, then insert the DC power supply unit into the frontpanel. Repeat for a second DC power supply unit, if present. If the second PSU slot
is unused, ensure that a blank PSU card is inserted into the slot. Tighten the thumb
screws on both PSU slots.
Step 9 Connect the green Frame Ground wires to the Frame Ground terminal. Repeat fora second DC power supply unit, if present.
Step 10 Connect the black Office Return wires to the RTN DC power supply terminals.Repeat for a second DC power supply unit, if present.
Step 11 Connect the red Office Battery wires to the BATT DC power supply terminals. Repeatfor a second DC power supply unit, if present.
Step 12 Verify that all power terminal connections are tight and that no strands of wire areshorting terminals together. Repeat for a second DC power supply unit, if present.
Step 13 Reconnect the office power source (reinstall fuses, reset breakers or turn on supply).
Repeat for a second DC power supply unit, if present.
Step 14 Use a volt meter to verify the A side power and ground at the power terminals. Ensurethat the voltage between BATT and RTN terminals measures between -40.5 and -72VDC. Repeat for a second DC power supply unit, if present.
Step 15 Using a volt meter, measure the voltage between RTN and FrameGNDterminals.Verify that 2 VDC or less is present. Repeat for a second DC power supply unit, if
present.
Step 16 Connect the power cables to FSP 150CCf-825 front connectors (red wire / connectorrelease tab oriented at the bottom). Repeat for a second DC power supply unit, if
present.
The power supply Status LED should illuminate green. During the power cycle, thefront panel Status LED will illuminate red for approximately 1 minute, then will change
to solid green.
8/9/2019 Manual ADVA FSP 150CC-825
9/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 7
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 17 Determine the next step.
Step 18 Run the AC power cable (shipped with the FSP 150CCf-825 power supply unit) fromthe FSP 150CCf-825 to the AC power outlet, externally fused at 15A. Dress the power
cables. Repeat for a second AC power supply unit, if present.Step 19 Remove the blank PSU front panel, then insert the AC power supply unit into the front
panel. Repeat for a second AC power supply unit, if present. If the second PSU slot
is unused, ensure that a blank PSU card is inserted into the slot. Tighten the thumb
screws on both PSU slots.
Step 20 Insert the power cable into the PSU front connector. Then insert the power cable intothe AC power outlet. Repeat for a second AC power supply unit, if present.The power supply Status LED should illuminate green. If AC power is the only power
source: During the power cycle, the front panel Status LED will illuminate red for
approximately 1 minute, then will change to solid green.
Step 21 Determine the next step.
Step 22 Connect the power adaptor cable to the power connector (PWR) located at the rearpanel, connect the power cord into the power adapter, then plug the AC adaptor to
an AC (120V or 240V) wall outlet, externally fused at 15A.If this is the only power source: During the power cycle, the front panel Status LED will
illuminate red for approximately 1 minute, then will change to solid green.
Step 23 Tie-off and secure all power cabling.
Current Status Then
Does/will the FSP 150CCf-825 include an AC power
supply unit at the front panel?
Continue with the next step.
Does/will the FSP 150CCf-825 NOTinclude an AC
power supply unit at the front panel, but a 12 VDC
rear connector power adapter will be used?
Go to Step 22.
Only DC power will be used in this installation? Go to Step 23.
Current Status Then
Will a rear accessible 12 VDC power adapter be
used?
Continue with the next step.
No rear accessible 12 VDC power adapter will be
used?Go to Step 23.
8/9/2019 Manual ADVA FSP 150CC-825
10/30
Page 8 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Run and Connect Metallic Cables
Step 24 Run the MGMT LAN port cable and metallic LAN port cables to the FSP 150CCf-825,as required. Temporarily secure the cables.
Step 25 Connect a LAN Cable to the MGMT LANport and connect the other end of the cableto your networking gear (PC, hub, switch, or router). From the factory, the default IP
address of the FSP 150CCf-825 is: 192.168.0.2/24.
Step 26 Determine the next step.
Step 27 For metallic WAN interface(s):Connect the WAN cable(s) to the designated WANport(s) using a Cat 5 LAN cable (RJ-45 connector). Otherwise, go to the next step.
Step 28 For metallic LAN interface(s):Connect the client Ethernet communicationsequipment (PC, hub, switch, or router) to the first designated client LANport using aCat 5 LAN cable (RJ-45 connector). Repeat for each additional client LAN port, as
required. Otherwise, go to the next step.
Step 29 Tie-off and secure all metallic cabling.
Step 30 Determine the next step.
Run and Connect Fiber Optic Cables
The following precautions should be applied when handling fiber optic cables:
DANGER Follow local safety procedures regarding fiber optic cables.Never look at the end of a fiber optic cable. Permanent eye damage or blindness canoccur. All optical connectors are shipped with protective caps. Ensure that protectivecaps are firmly in place before running any fiber optic cables.
Current Status Then
Are you only installing fiber optic WAN and LAN
cables, and no metallic cables are to be installed?Go to Step 36.
Are metallic WAN or LAN cable terminations
required for this FSP 150CCf-825?
Continue with the next step.
Current Status Then
Are only metallic cable terminations required for this
FSP 150CCf-825 and cabling is complete?Go to Step 36.
Are you installing any fiber optic cables? Continue with the next step.
8/9/2019 Manual ADVA FSP 150CC-825
11/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 9
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
DANGER Never handle exposed fiber optic cables with bare hands ortouch it to your body. A fiber fragment could enter the skin and be very difficult to detectand remove.
CAUTION Optical power performance is affected by dust. Clean all connectorsbefore performing measurements. Keep the ends of the fiber optic cables coveredwhen the cables are not in use. The need for cleaning can be minimized if covers arealways used when fibers are not used. Refer to local practices for fiber handling andcleaning procedures. Clean all connectors before performing measurements.
WARNING Prevent damage to fiber optic cables. Do not bend fiber optic cables to
a radius less than 50 mm.
WARNING To avoid damage to optical receivers, do not connect any fibers untilinstructed to do so. Always check optical levels before connecting fiber optic cables.
Step 31 Run the optical fiber cables to the FSP 150CCf-825. Do not connect the cable(s) tothe FSP 150CCf-825 connectors at this time. They will be connected later.
Step 32 Dress all fiber optic cables. Use local practices for protecting all cables andconnectors.
Step 33 Test the optical cables according to local practices.
Step 34 Measure the transmit and receive levels of the fiber optic cables and record them forfuture reference.
Step 35 Connect the optical interface cables to the appropriate WANand/or LANSFPconnectors on the front panel.
Verify WAN and LAN LED Indicators
Step 36 Observe the client LANLED(s) and refer to FSP 150CCf-825Installation andOperations Manualfor LED descriptions. If the LAN LED(s) indicate anything other
than the appropriate response for the current state, troubleshoot as necessary.
Step 37 Observe the WAN (Network)LEDand refer to FSP 150CCf-825Installation andOperations Manualfor LED descriptions. If the WAN LED(s) indicate anything otherthan the appropriate response for the current state, troubleshoot as necessary.
End of Procedure
8/9/2019 Manual ADVA FSP 150CC-825
12/30
Page 10 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
1.3 Provision the FSP 150CC
Perform the following procedure to provision the FSP 150CC. The following procedure will be
performed using the RS-232 serial console using CLI commands and ADVA Optical
Networkings eVision Web Browser Management Tool. Refer to Figure 2for an example of theconfiguration supported by the following procedure.
You will need the following items for this procedure:
DB-9 to RJ-45 converter (included in the FSP 150CC kit)
Category 5 LAN cable (with RJ-45 connectors) for Serial Port RS-232 connection(included in the FSP 150CC kit)
A communications program, like TeraTerm Pro Web (a free software terminalemulator for MS-Windows) or HyperTerminal (a standard Windows communications
utility)
Internet Explorer 5.0 or greater
Figure 2 Back-to-Back Configuration Supported in the Following Procedure
WAN
MGMT LAN Port
IP Address = 192.168.2.2
Subnet Mask = 255.255.255.0
GNEFSP 150CC #1
MGMT LAN Port
IP Address = 192.168.2.3
Subnet Mask = 255.255.255.0
eVision Workstation
IP Address = 192.168.2.5
Subnet Mask = 255.255.255.0
Default Gateway = 192.168.2.1
Static Route
Interface = WAN
IP Address = 0.0.0.0
Subnet Mask = 0.0.0.0
Management Tunnel
VLAN Based, VLAN ID = 100
Layer 2 Protocol = PPP
DHCP = disabled
RIP V2 Packets = enabled
SNEFSP 150CC #2
System
Proxy ARP = Disabled
Default Router = None
System
Proxy ARP = Enabled
Default Router = 192.168.2.1
GNE = Gateway Network Element
SNE = Subtending Network Element
5
PSU1
Status
100-240VAC
PSU2
Status Critical
Major
Minor
Status
EtherjackTM
Management
RS-232
LAN
4
3
2
1
2 4 Access
Lk Rate Lk Rate Lk Rate
2
1
Active
Network FSP150CCf
211 3 5
PSU1
Status
100-240VAC
PSU2
Status Critical
Major
Minor
Status
EtherjackTM
Management
RS-232
LAN
4
3
2
1
2 4 Access
Lk Rate Lk Rate Lk Rate
2
1
Active
Network FSP150CCf
211 3
8/9/2019 Manual ADVA FSP 150CC-825
13/30
8/9/2019 Manual ADVA FSP 150CC-825
14/30
Page 12 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 5 Observe the DHCP setting to determine the next step.
Step 6 Use the configure mgmttnl e1000-wan-1 commandfollowed by a carriage return.A next level prompt will appear. Then enter dhcp disablefollowed by a carriagereturn. For example:
Step 7 Enter show this followed by a carriage return to verify the changes.
Step 8 Enter exitto go back one level.
Step 9 Enter the IP address and subnet mask, by entering configure systemfollowed by acarriage return. A next level prompt will appear. Then enter ip-address .
--> show mgmttnl e1000-wan-1
Management Tunnel: e1000-wan-1
Tunnel Mode: None
Encapsulation: Ethernet
Tunnel VLAN ID: 4095
Tunnel S-Tag: Disabled
Tunnel S-Tag VLAN ID: 4095
IP Address: 0.0.0.0
Subnet Mask: 255.255.255.0
MAC Address: 00:0B:90:00:47:81
DHCP: Enabled
RIPv2: Disabled
ACL Inbound Filtering: Disabled
Current Status Then
Is the WANport DHCP status set to the desired
state of Disabled?Go to Step 9.
Does the WANport DHCP setting need to be
changed?
Continue with the next step.
--> configure mgmttnl e1000-wan-1
config:mgmttnl(e1000)--> dhcp disable
config:mgmttnl(e1000)-->
--> configure system
config:sys --> ip-address 192.168.2.3 255.255.255.0
config:sys -->
8/9/2019 Manual ADVA FSP 150CC-825
15/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 13
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 10 Verify the changes by entering show ipfollowed by a carriage return. TheManagement LAN port IP information displays:
WARNING Do not remove power while performing the next step. Removing powerwhile the operation in progress may corrupt the database.
Step 11 Enter database savefollowed by a carriage return. The system will display a warningmessage and when complete, the CLI prompt will appear, as shown below:
Step 12 Enter logout followed by a carriage return.
The login prompt will appear
Step 13 Remove commissioning cables from the RS-232 port and the PC.
Establish Communications via eVision
Verify the local Management LAN port communication settings by accessing the FSP 150CCs
eVision Web Browser Management Tool. Perform the following steps:
Step 14 Change your PC IP address to successfully access the FSP 150CCs ManagementLAN port IP address.
Step 15 Use an Ethernet Category 5 LAN cable to connect your PC to the FSP 150CC
Management LAN port. Refer to the FSP 150CCf-825Installation and OperationsManualfor the Management LAN port connector location, if required.
Step 16 Activate an Internet Explorer web browser on your PC by double clicking on theshortcut icon.
Step 17 Enter the FSP 150CCs Management LAN port IP address in the web browseraddress field and enter return.A security alert window will appear
config:sys --> show ip
System IP Information:
IP Address:
Subnet Mask:
Default Gateway:
192.168.2.3
255.255.255.0
config:sys --> database save
Saving configuration. Do not power down the system.
config:sys -->
8/9/2019 Manual ADVA FSP 150CC-825
16/30
Page 14 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 18 Verify that the security certificate is valid. SelectYesto proceed.The FSP 150CC login window appears
Step 19 Enter the default User ID root and Password ChgMeNOW.
8/9/2019 Manual ADVA FSP 150CC-825
17/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 15
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 20 Select Login.The default security banner displays as shown in the following example
Note: If a login error appears, re-enter the user ID and password. Up to 3 login attemptswill be processed. On a failed third attempt, the web browser will redirect to a 401
error page (Unauthorized error). If this occurs, the login process must be
re-started by going back to the web browser home page and re-entering the FSP
150CC IP address (at Step 17).
Step 21 Select Continue.The eVision Web Browser Management Tool will display, as shown in the
following example (see the following eVision Web Browser Management Toolcomponents)
8/9/2019 Manual ADVA FSP 150CC-825
18/30
Page 16 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Provision the WAN Interface
Step 22 Expand nested items in the System Name entity by selecting the + next to theSystem Name entity in the menu tree (default is FSP150CCf-825).
Step 23 Enter a right mouse click on the WAN entity.A drop down menu displays
Title Bar
Menu Bar
Tool Bar
Menu Tree
Alarms WindowStatus Bar
View Tabs
Login Name
EntityView Area
SystemName
Secure Session Indicator
8/9/2019 Manual ADVA FSP 150CC-825
19/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 17
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 24 Select Edit Facility.The Edit Facility view displays
8/9/2019 Manual ADVA FSP 150CC-825
20/30
Page 18 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 25 Use the following WAN interface options (as applicable) to provision the WANinterface with the minimal WAN interface provisioning options required prior to setting
up WAN port communications (see Chapter 5 of the FSP 150CCf-825Installation
and Operations Manualfor WAN interface configuration options and rules):
Step 26 Select OK.The WAN Facility view displays the changes made
Step 27 Verify WAN changes made.
Edit WAN Management Tunnel
Step 28 Right-click on MGMT Tunnel [WAN] and select Edit Mgmt Tunnel.The Management Tunnel view displays
Table 1-2 Minimum WAN Interface Provisioning via CLI Commands
Command Description
WAN Port
adminstate Defines the WAN facility administrative state.
media Defines the WAN interface media type.
speed Defines the line rate of the Ethernet port and whether it is in half duplex or full duplex mode.
8/9/2019 Manual ADVA FSP 150CC-825
21/30
8/9/2019 Manual ADVA FSP 150CC-825
22/30
Page 20 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 43 Select OK.The new User information is displayed in the Users view
Step 44 Expand the Users tree.The new user is listed
Step 45 Select the new User name and view the new user information to verify new user entry.(The new user password is not displayed for security reasons.)
Step 46 Activate a new Internet Explorer web browser window on your PC by double clickingon the shortcut icon.
Step 47 Enter the FSP 150CCs Management LAN port IP address in the web browseraddress field and enter return.The Login Screen will appear
Step 48 Enter the new Super Users user name and password and select OK.
The eVision Web Browser Management Tool displays
Step 49 Expand the System Name, Administration and Users entities by selecting the + nextto each entity.
Step 50 Enter a right click on the root user and select Delete User. Then select OK.The default root user is removed from the menu tree
Step 51 If desired, enter other users by repeating Step 41through Step 45.
Provision SNMP, if Required
Step 52 If SNMP provisioning is not required, go to Step 59. Otherwise continue with the next
step to provision SNMP.
Step 53 Right click on the SNMP entity in the menu tree and select Add Community.The add community screen appears
Step 54 Enter the desired Community Name, select the desired Access Typeand thenselect Add.The new community information is displayed
Step 55 Right click on the SNMP entity in the menu tree and select Add Target Address.The add target address screen appears
Step 56 Select the desired Security Model and Credentials. Enter the desired IP Address and
port. Then select Add.
Step 57 Select the Target Addresses tab to verify the entry.
Step 58 Repeat Step 53through Step 57as required.
8/9/2019 Manual ADVA FSP 150CC-825
23/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 21
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Create Static Route (SNE only)
Step 59 Right click on the Communications entity in the menu tree and select Create Static
Route.The create static route screen appears
Step 60 For Route Type, select Interface, and for Interface, select Wan.
Step 61 For IP Address, enter 0.0.0.0.
Step 62 For IP Mask, enter 0.0.0.0.
Step 63 Select OK.The Static Route entry displays in the Static Routes tab
Provision LAN(s)
Step 64 Provision the LAN(s) by performing the procedure in Provision LAN(s) inTransparent EVC Mode, on Page 25.
Disable Local Management Port (SNE only)
Step 65 Right click on the Local Management Portand select Edit Facility.The edit Local Management Port screen appears
8/9/2019 Manual ADVA FSP 150CC-825
24/30
Page 22 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 66 Set the Administration State to Disabled.
Step 67 Select OK(communications will be dropped and the configuration will need to besaved using CLI, as described in the following steps).
Note: The browser will appear to stay busy after OK is selected because it isattempting to reach the IP address of the FSP 150CC whos Local
Management Port has just been disabled.
Step 68 Install the console cable between the FSP 150CC RS-232 Port and a PC using theRJ-45 cable and the DB-9 converter.
Step 69 From the PC, start a communications utility application, such as HyperTerminal withthe following COM port settings:
Note: The Serial Console Port supports only 9600 baud. Do not use Autobaud.
Step 70 Hit the Enter key and you will be prompted to enter a login and password. Thedefault login and password are root and ChgMeNOW, respectively. A warningbanner displays and the user is prompted to reply [Y|N]. Enter y and the serialconsole CLI prompt (-->) is displayed.
Step 71 Enter show interface mgmt-lan followed by a carriage return. The DHCP setting willdisplay, as shown below. Verify that the Administration State is set to Disabled.
COMM PortParameter
COMM PortSetting
Rate 9600 baud
Data Bits 8
Stop Bits 1
Parity No
Flow Control None
--> show interface mgmt-lan
Management Interface:
Administrative State:
Operational State:
MAC Address:
MTU:
Interface Speed:
Negotiated Speed:
DHCP:
RIPv2:
mgmt-lan
Disabled
Disabled
00:0B:90:00:08:31
1500
Auto
100 Mb Full Duplex
Disabled
Disabled
8/9/2019 Manual ADVA FSP 150CC-825
25/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 23
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
WARNING Do not remove power while performing the next step. Removing powerwhile the operation in progress may corrupt the database.
Step 72 Enter database savefollowed by a carriage return. The system will display a warningmessage and when complete, the CLI prompt will appear, as shown below:
Step 73 Enter logout followed by a carriage return.The login prompt will appear
Step 74 Remove any commissioning cables (Ethernet cable and/or console cable) from theFSP 150CC front panel connectors, as required.
Step 75 Verify that the WAN cable is connected to the FSP 150CC WAN port.
Perform the following at FSP 150CC #1 (GNE):
Provision the FSP 150CCs IP Address, WAN Interface, WAN Management Tunnel, New
Super User and SNMP
Step 76 Perform Step 1through Step 58.
Provision LAN(s)
Step 77 Provision the LAN(s) by performing the procedure in Provision LAN(s) inTransparent EVC Mode, on Page 25.
Enable Proxy ARP at the GNE
CAUTION Do not enable Proxy ARP if both units are connected to the same LANvia the Management LAN port. Otherwise, there will be multiple ARP responses for asingle ARP request for a remote reachable IP address from each NE/FSP 150CC in
the same LAN that has Proxy ARP enabled.
Step 78 Right-click on the System Name and select Edit Settings.The edit system settings screen appears
Step 79 Set Proxy ARP to Enabled.
Step 80 Select OK.
--> database save
Saving configuration. Do not power down the system.
-->
8/9/2019 Manual ADVA FSP 150CC-825
26/30
Page 24 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 81 Save the configuration in eVision by selecting File and thenSave Changes from themenu bar.
Verify Connectivity to the SNE
Step 82 Verify that the WAN cable is connected to the FSP 150CC WAN port.
Step 83 Observe the WAN LED(and in the case of SONET/SDH 1+1 protection, the WAN 2LED) on the front panel of each FSP 150CC. If the WAN LED(s) indicate anything
other than the appropriate response for the current state, troubleshoot the WAN
connections between FSP 150CC #1 and FSP 150CC #2 as necessary (refer to the
FSP 150CCInstallation and Operations Manualfor LED descriptions for each FSP150CC variant).
Step 84 Flush ARP cache on the PC by opening a DOS window (select Startand then Run),entering ARP -dand then selecting OK.
Step 85 Verify connectivity to FSP 150CC #2. Open an Internet Explorer web browser windowand enter the IP address of FSP 150CC #2. Logon using a valid user name and
password.
Step 86 Remove any commissioning cables (Ethernet cable and/or console cable) from theFSP 150CC front panel connectors, as required.
End of Procedure
8/9/2019 Manual ADVA FSP 150CC-825
27/30
80000003806 Rev 1.0 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL Page 25
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Provision LAN(s) in Transparent EVC Mode
This procedure can be used for provisioning one or more LAN in Transparent EVC mode using
the eVision web browser. It is recommended that you pre-determine the provisioning detailsand ensure that they meet the FSP 150CCs provisioning rules prior to making changes to a
LAN or placing an additional LAN into service. Ensure that CIR, EIR and C-Tag/S-Tag VLAN
ID-Priority tuple values will not conflict with another LAN/Flow that is in the Assigned state.
Refer to Chapter 5 of the FSP 150CCf-825Installation and Operations Manualto determinethe default values, value ranges and rules for each option in the following procedure.
Procedure
Step 1 Observe the current LAN Port Mode and EVC Mode. The status will be used in thefollowing steps.
WARNING Changing EVC Mode on a facility will drop alltraffic on the port,including Management Tunnel connectivity and Maintenance End Points.
Step 2 Determine the next step.
Step 3 Enter a right click on the LAN facility and select CO Mode (Connection-orientedMode).A warning screen appears, indicating selection of this option will cause a loss of all
traffic
eVision
Select Configuration view
Expand the System Name entity in the Menu Tree
Select the LAN facility in the Menu Tree
The LAN facility status window is displayed
Current Status Then
Is the current EVC Mode set to Transparent? Go to Step 8.
Is the LAN Port Mode set to Connection-oriented
and EVC Mode set to Flow VLAN?Go to Step 6.
Is the LAN Port Mode set to Connection-lessand
EVC Mode set to Flow VLAN?
Continue with the next step.
8/9/2019 Manual ADVA FSP 150CC-825
28/30
Page 26 Copyright 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
Step 4 Select OK.The EVC Mode changes to Transparent
Step 5 Go to Step 8.
Step 6 Enter a right click on the LAN facility and select CO Transparent(Connection-oriented Transparent mode).A warning screen appears, indicating selection of this option will cause a loss of all
traffic
Step 7 Select OK.The EVC Mode changes to Transparent
Step 8 Right click on the LAN facility in the Menu Tree and select Edit Facility.An edit Transparent LAN facility window appears
Figure 3 Edit Transparent LAN Facility View
8/9/2019 Manual ADVA FSP 150CC-825
29/30
8/9/2019 Manual ADVA FSP 150CC-825
30/30
FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008Optical Networking
TM
If C-Tag Control is set to None, only one LAN port may be used in the system.
Note 6: All C-Tag and S-Tag VLAN ID-Priority tuple values must not conflict on the WANport. (For example: A service with C-Tag PUSH 100-0, S-Tag PUSH 100-0 will
conflict with another service with the same C-Tag and S-Tag. A service with
C-Tag PUSH 100-0, S-Tag None will conflict with another service with C-Tag
None, S-Tag PUSH 100-0. A TLS service with C-Tag PUSH 100-0, S-Tag
NONE will conflict with a Flow with VLAN Member 100-0, C-Tag NONE and
S-Tag NONE.)
Note 7: If C-Tag or S-TagControl is set to None, C-Tag/ S-Tag VLAN ID and VLANPriority cannot be entered.
Step 10 Verify the changes.
Step 11 Observe the current LAN facility Assigned/Unassigned State: (The LAN facility
should still be selected in the menu tree.)
Step 12 Determine the next step.
Step 13 Place the LAN facility to the Assigned state.
Note: If you receive an error message indicating the CIR and/or EIR values exceedthe maximum allowed, and/or the C-Tag/S-Tag VLAN ID-Priority tuple values
conflict with existing ones, then one or more LAN values must be changed in
order to co-exist. These changes must be made by editing the LAN(s) prior toplacing this LAN to the Assigned state.
Step 14 Save the configuration in eVision by selecting Fileand thenSave Changes from themenu bar.
End of Procedure
Current Status Then
Is the current Assigned/Unassigned State set to
Enabled?Go to Step 14.
Is the current Assigned/Unassigned State set to
Disabled?
Continue with the next step.
eVision
Enter a right click on the LAN facility in the menu tree and select Assign
A confirmation window appears
Select OK
The LAN facility status window appears and the LAN Assigned/Unassigned State
is Enabled