Manual Supplement © 2014-2016 Fluke Corporation. All rights reserved.. Manual Title: 6135A/PMU Operators Supplement Issue: 3 Print Date: October 2013 Issue Date: 2/16 Revision/Date: Page Count: 5 This supplement contains information necessary to ensure the accuracy of the above manual. This manual is distributed as an electronic manual on the following CD-ROM: CD Title: 6135A/PMU CD Rev. & Date: 12/2013 CD PN: 3998490
Transcript

Manual Supplement

© 2014-2016 Fluke Corporation. All rights reserved..

Manual Title: 6135A/PMU Operators Supplement Issue: 3 Print Date: October 2013 Issue Date: 2/16 Revision/Date: Page Count: 5

This supplement contains information necessary to ensure the accuracy of the above manual. This manual is distributed as an electronic manual on the following CD-ROM:

CD Title: 6135A/PMU CD Rev. & Date: 12/2013 CD PN: 3998490

6135A/PMU Operators Manual Supplement

2/16 1

Change #1, 73 On page 1-11, replace Figure 1-3 with:

gtu179.eps

Figure 1-3. Calibration System Connections

Manual Supplement 6135A/PMU Operators

2 2/16

On page 2-5, under Install the PMUCal Software, change the last sentence in the Note:

From: Find and run the ClientInstaller.bat file. To: Double click on Launch.exe.

On page 2-6, replace Figure 2-1 with:

gtu044.jpg

Figure 2-1. Installation Destination Directory Screen

On page 2-6, under Configure Windows Firewall, replace steps 1 and 2 with:

1. Open the Windows Start Menu and type windows firewall in the search box.

2. Click Allow a Program or through Windows Firewall.

On page 2-19, replace the first paragraph directly under Install the Test Files, with:

When an update to the IEEE Standard for Synchrophasor Measurements for Power Systems C37.118.1 is imminent, Fluke will provide test procedures for both current release and the new pending standard. If more than one procedure set is available on the installation CD, the user can choose which to install. Other test procedure sets can be installed over the first but only one test procedure set can be active at any time.

Replace step 2 with:

2. Navigate to the location of the files.This will be in the Test Files folder of the Calibration System software installation CD.

6135A/PMU Operators Manual Supplement

2/16 3

On page 2-19, replace Figure 2-4 and the paragraph following the figure with:

gtu144.jpg

Figure 2-4. Test File Selection

After the folders have been created and tests installed, click “Close” to close the folder location settings dialog box. Follow the instructions in Chapter 4 to use the Startup menu to connect to the Server PC and a UUT.

On page 4-7, in Figure 4-3, change:

From: CURRENT INPUT

To: VOLTAGE INPUT

Manual Supplement 6135A/PMU Operators

4 2/16

On page 8-3, replace Figure 8-1 with:

gtu179.eps

Figure 8-1. System Connections

6135A/PMU Operators Manual Supplement

2/16 5

Change #2, 235 On page 9-6, replace step 6 with:

6. Calculate Delay from:

TaTcTb

TbDelay

2

Change #3, 261

On page 1-23, under Performance Specifications for C37.118.1 Tests, replace the first table with:

Performance Specifications for C37.118.1 Tests

Parameter TVE (%) FE (Hz) RFE (Hz/s)

Steady State 0.1 0.0005 0.001

Dynamic, Modulation 0.3 0.001 0.02

Dynamic, Ramp 0.1 0.0005 0.01