March 28, 2014. Chuck Liebold Manager Interregional Planning. IPSAC WebEx. NCSP Next Steps. Next Steps. Maintain ongoing coordination efforts Continue advancing joint production database Coordinate cross border impact upgrades, interconnections, and transmission service - PowerPoint PPT Presentation
Popular Tags:
3
MARCH 28, 2014 Chuck Liebold Manager Interregional Planning IPSAC WebEx NCSP Next Steps
Transcript
Page 1: March 28, 2014

M A R C H 2 8 , 2 0 1 4

Chuck Liebold

Manager Interregional Planning

IPSAC WebEx

NCSP Next Steps

Page 2: March 28, 2014

Next Steps

• Maintain ongoing coordination efforts

– Continue advancing joint production database

– Coordinate cross border impact upgrades, interconnections, and transmission service

• Next JIPC planning cycle activities– IPSAC meeting to begin planning cycle – 3/28/2014

– Exchange and review of annual planning cycles

– Discussion of timing for updated power flow exchange

– Exchange regional plans and studies with potential interregional impacts and drivers – make material available to IPSAC consistent with CEII requirements

2

Page 3: March 28, 2014

Next Steps

• Process to consider and evaluate for potential Interregional Transmission Projects

– JIPC reviews regional plans

– Presentation of JIPC review of regional plans and discuss next steps with IPSAC

– Receive IPSAC input and comment

– JIPC identifies potential for interregional projects

3