1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com April 10, 2019 Robert Welch Project Manager City of Beverly Hills 345 Foothill Road Beverly Hills, CA 90210 Joseph DeMello Director, Construction Manager Westside Purple Line Extension Section 1 Los Angeles County Metropolitan Transportation Authority One Gateway Plaza, 17 th Floor Los Angeles, CA 90012 Subject: Segment 1 - Purple Line Extension Project ICM Weekly Report March 31, 2019 April 6, 2019 Dear Mr. Welch and Mr. DeMello, Environmental Intelligence, LLC (EI) has been retained by the City of Beverly Hills (COBH) and the Los Angeles County Metropolitan Transportation Authority (Metro) to serve as the independent compliance monitor (ICM) during construction of the Purple Line Extension Project. Monitoring is required to ensure construction is in compliance with (1) the Memorandum of Agreement (MOA) for Advance Utilities Relocation Phase of the Purple Line Extension Project Segment 1 Between the City of Beverly Hills and the Los Angeles Metropolitan Transportation Authority (City Agreement No. 452-14), and (2) the MOA for Contract C1045 of the Purple Line Extension Project Segment 1 Between the City of Beverly Hills and the Los Angeles County Metropolitan Transportation Authority (City Agreement No. 66-16). The following information summarizes the ICM monitoring activities that occurred at the Segment 1 site (La Cienega Station site) during the week of March 31, 2019 April 6, 2019. No construction activities were conducted on March 31. Construction activities during the week included excavating below deck, lagging, hauling equipment and materials into the Gale yard shaft, hauling dirt out of the Gale yard shaft, hauling spoils from the Gale yard, installing matting underground, and well work. EI ICMs were present on site during all construction activities and conducted routine noise measurements at selected noise monitoring locations as well as compliance checks in accordance with the MOAs and associated attachments, exhibits, traffic closure notifications, and traffic management plans. At the conclusion of each work shift, daily monitoring reports were prepared by the ICM. Any violations for that date were also prepared by the ICM then reviewed and submitted to the COBH and Metro by EI’s Project Manager. VIOLATION SUMMARY During the week, EI ICMs identified no violations during construction activities. Daily monitoring reports and photographs of construction activities are provided as Attachment A. Daily noise monitoring data are provided in Attachment B. CONCLUSION To date, 202 violations have been issued, 18 of which have been rescinded since the beginning of construction on the C1045 Contract for the Purple Line Extension Project Segment 1. Project construction
Transcript
  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    April 10, 2019

    Robert Welch

    Project Manager

    City of Beverly Hills

    345 Foothill Road

    Beverly Hills, CA 90210

    Joseph DeMello

    Director, Construction Manager

    Westside Purple Line Extension Section 1

    Los Angeles County Metropolitan Transportation Authority

    One Gateway Plaza, 17th Floor

    Los Angeles, CA 90012

    Subject: Segment 1 - Purple Line Extension Project ICM Weekly Report

    March 31, 2019 – April 6, 2019

    Dear Mr. Welch and Mr. DeMello,

    Environmental Intelligence, LLC (EI) has been retained by the City of Beverly Hills (COBH) and the Los

    Angeles County Metropolitan Transportation Authority (Metro) to serve as the independent compliance

    monitor (ICM) during construction of the Purple Line Extension Project. Monitoring is required to ensure

    construction is in compliance with (1) the Memorandum of Agreement (MOA) for Advance Utilities

    Relocation Phase of the Purple Line Extension Project – Segment 1 – Between the City of Beverly Hills

    and the Los Angeles Metropolitan Transportation Authority (City Agreement No. 452-14), and (2) the

    MOA for Contract C1045 of the Purple Line Extension Project – Segment 1 – Between the City of Beverly

    Hills and the Los Angeles County Metropolitan Transportation Authority (City Agreement No. 66-16). The

    following information summarizes the ICM monitoring activities that occurred at the Segment 1 site (La

    Cienega Station site) during the week of March 31, 2019 – April 6, 2019. No construction activities were

    conducted on March 31.

    Construction activities during the week included excavating below deck, lagging, hauling equipment and

    materials into the Gale yard shaft, hauling dirt out of the Gale yard shaft, hauling spoils from the Gale yard,

    installing matting underground, and well work. EI ICMs were present on site during all construction

    activities and conducted routine noise measurements at selected noise monitoring locations as well as

    compliance checks in accordance with the MOAs and associated attachments, exhibits, traffic closure

    notifications, and traffic management plans. At the conclusion of each work shift, daily monitoring reports

    were prepared by the ICM. Any violations for that date were also prepared by the ICM then reviewed and

    submitted to the COBH and Metro by EI’s Project Manager.

    VIOLATION SUMMARY

    During the week, EI ICMs identified no violations during construction activities. Daily monitoring reports

    and photographs of construction activities are provided as Attachment A. Daily noise monitoring data are

    provided in Attachment B.

    CONCLUSION

    To date, 202 violations have been issued, 18 of which have been rescinded since the beginning of

    construction on the C1045 Contract for the Purple Line Extension Project – Segment 1. Project construction

  • Robert Welch

    Joseph DeMello

    April 10, 2019

    Weekly_Report_Section_1_0331-0406_EI01_20190410

    activities are ongoing and EI ICMs continue to monitor all construction activities applicable to the MOAs

    on a daily basis.

    If you have any questions or comments regarding this letter, please contact me directly at 310.469.8989 or

    [email protected].

    Sincerely,

    ENVIRONMENTAL INTELLIGENCE, LLC

    Jeremiah George

    Project Manager

    Attachments: Attachment A: Daily Monitoring Reports

    Attachment B: Noise Monitoring Data Log

    cc: Valerie Mudegoren, City of Beverly Hills

    Nell Mardirosian, Los Angeles County Metropolitan Transportation Authority

    Michelle Marquez-Riley, Los Angeles County Metropolitan Transportation Authority

    Candace Lee, Los Angeles County Metropolitan Transportation Authority

    Brett Barnett, Psomas

    Bill Zein, Psomas

    Alex Kay, City of Beverly Hills

  • This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    1/15

    Attachment A Daily Monitoring Reports

    3/31/2019 - 4/6/2019

    Summaries (12)

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Monday, April 01, 2019

    Annamarie Hand

    La Cienega Station

    05:15:00 to 14:15:00

    Yes

    Contractors/ Subcontractors: STS, Century Sweeping, Rivera Trucking, MADD Trucking; Miranda Trucking

    Representatives On-Site: Alex Morales (STS); Lorena Vela (STS); Marvin Mai (Psomas); Ram Konanur (Metro); Howard Jordan (STS); Alex Kay (COBH); Howard Jordan (STS); Dale Gatica (STS); Lorena Vela (STS); Michelle Jones (Kleinfelder)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 05:15 hours to 14:15 hours on April 1st, 2019. EI ICM Annamarie Hand met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Annamarie Hand calibrated the sound meter to 94.00 dB.

    The North Gale Dr. closure was set up at 05:38 hours and included 4 additional sound barriers. Haul trucks arrived at 06:01 hours. The crane started at 06:55 hours. Sound panels were taken down at 09:47 hours.

    Work for the day included excavating below deck, lagging, hauling equipment into the Gale yard shaft, hauling dirt out of the Gale shaft and hauling of spoils from the Gale yard.

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Monday, April 01, 2019

    Daniel Chang

    La Cienega Station

    13:45:00 to 23:30:00

    Yes

    Contractors/Subcontractors: STS, PSOMAS

    Representatives On-Site: Bill Damalanta (STS); Alex Morales (STS); Richard Garcia (Metro); Marvin Mai (PSOMAS); Lorena Vella (STS)

    Work Location(s): North Gale Drive enclosure; Gale yard; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 13:45 hours to 23:30 hours on April 1st, 2019. EI ICM Daniel Chang met with STS superintendent Bill Damanlata, and to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

    Work for the day included hoisting and stockpiling soil in the Gale yard, load out of soil (60 loads), hoisting machinery and equipment into the Gale yard shaft, hoisting timber into the Gale shaft, installing matting underground, and excavation below deck. The construction street sweeper also cleaned the adjacent work areas surrounding the La Cienega and Gale yards at approximately 14:20 hours.

    The last haul truck left the site at 13:45 hours. The closure on North Gale Drive was removed at approximately 14:45 hours.

    http://www.enviro-intel.com/

  • This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    2/15

    Attachment A Daily Monitoring Reports

    3/31/2019 - 4/6/2019

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Tuesday, April 02, 2019

    Annamarie Hand

    La Cienega Station

    05:15:00 to 14:15:00

    Yes

    Contractors/ Subcontractors: STS, Century Sweeping, Rivera Trucking, MADD Trucking; Miranda Trucking

    Representatives On-Site: Alex Morales (STS); Lorena Vela (STS); Marvin Mai (Psomas); German Garcia (Metro); Howard Jordan (STS); Alex Kay (COBH); Howard Jordan (STS); Dale Gatica (STS); Lorena Vela (STS); Michelle Jones (Kleinfelder)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 05:15 hours to 14:15 hours on April 2nd, 2019. EI ICM Annamarie Hand met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Annamarie Hand calibrated the sound meter to 94.00 dB.

    The North Gale closure was set up at 05:40 hours and included 4 additional sound barriers. Haul trucks arrived at 06:18 hours. The crane started at 07:15 hours. Sound panels were taken down at 09:47 hours.

    Work for the day included excavating below deck, lagging, hauling equipment into the Gale yard shaft, hauling dirt out of the Gale shaft and hauling of spoils from the Gale yard.

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Tuesday, April 02, 2019

    Daniel Chang

    La Cienega Station

    14:00:00 to 23:30:00

    Yes

    Contractors/Subcontractors: STS, PSOMAS.

    Representatives On-Site: Bill Damalanta (STS); Richard Garcia (Metro); Marvin Mai (PSOMAS); Lorena Vella (STS).

    Work Location(s): North Gale Drive enclosure; Gale yard; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 14:00 hours to 23:30 hours on April 2nd, 2019. EI ICM Daniel Chang met with STS superintendent Bill Damanlata, and to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

    Work for the day included hoisting and stockpiling soil in the Gale yard, mucking, hoisting machinery and equipment into the Gale yard shaft, and excavation below deck. The construction street sweeper also cleaned the adjacent work areas surrounding the La Cienega and Gale yards at approximately 14:30 hours.

    The last haul truck left the site at 13:45 hours. The closure on North Gale Drive was removed at approximately 15:10 hours.

    http://www.enviro-intel.com/

  • This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    3/15

    Attachment A Daily Monitoring Reports

    3/31/2019 - 4/6/2019

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Wednesday, April 03, 2019

    Anna Sahl

    La Cienega Station

    05:30:00 to 13:00:00

    Yes

    Contractors/ Subcontractors: STS, Century Sweeping, Rivera Trucking

    Representatives On-Site: Alex Morales (STS); Lorena Vela (STS); Marvin Mai (Psomas); Howard Jordan (STS); German Garcia (Metro)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 05:30 hours to 13:00 hours on April 3, 2019. EI ICM Anna Sahl met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Anna Sahl calibrated the sound meter to 94.00 dB.

    The North Gale closure was set up at 05:40 hours and included 4 additional sound barriers. Haul trucks arrived at 06:01 hours. The crane started at 06:45 hours.

    Work for the day included excavating below deck, lagging below deck, hauling equipment into the Gale shaft, hauling dirt from the Gale yard shaft and soil hauling off site.

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Wednesday, April 03, 2019

    Annamarie Hand

    La Cienega Station

    13:45:00 to 23:30:00

    Yes

    Contractors/ Subcontractors: STS

    Representatives On-Site: Alex Morales (STS); Marvin Mai (Psomas); Richard Garcia (Metro); Howard Jordan (STS); Bill Dimalanta (STS); Lorena Vela (STS)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 13:45 hours to 23:30 hours on April 3rd 2019. EI ICM Annamarie Hand met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Annamarie Hand calibrated the sound meter to 94.00 dB.

    Work for the day included excavating below deck, lagging, hauling equipment into the Gale yard shaft, and hauling spoils from the Gale shaft.

    http://www.enviro-intel.com/

  • This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    4/15

    Attachment A Daily Monitoring Reports

    3/31/2019 - 4/6/2019

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Thursday, April 04, 2019

    Anna Sahl

    La Cienega Station

    05:30:00 to 14:00:00

    Yes

    Contractors/ Subcontractors: STS, Century Sweeping, Rivera Trucking

    Representatives On-Site: Alex Morales (STS); Lorena Vela (STS); Marvin Mai (Psomas); Howard Jordan (STS); German Garcia (Metro); Alex Kay (COBH)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 05:30 hours to 14:00 hours on April 4, 2019. EI ICM Anna Sahl met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Anna Sahl calibrated the sound meter to 94.00 dB.

    The North Gale closure was set up at 05:45 hours and included 4 additional sound barriers. Haul trucks arrived at 06:01 hours. The crane started at 06:50 hours.

    Work for the day included excavating below deck, lagging below deck, hauling equipment into the Gale yard shaft and haul trucks removing spoils from the Gale yard.

    No noise measurements were taken between 07:30 – 08:30 hours due to light rain.

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Thursday, April 04, 2019

    Annamarie Hand

    La Cienega Station

    13:45:00 to 23:30:00

    Yes

    Contractors/ Subcontractors: STS

    Representatives On-Site: Alex Morales (STS); Marvin Mai (Psomas); Richard Garcia (Metro); Bill Dimalanta (STS)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 13:45 hours to 23:30 hours on April 4th, 2019. EI ICM Annamarie Hand met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Annamarie Hand calibrated the sound meter to 94.00 dB.

    Work for the day included excavating below deck, lagging, hauling equipment into the Gale yard shaft, hauling spoils from the Gale shaft.

    Precipitation in the early evening precluded sound readings from being taken.

    http://www.enviro-intel.com/

  • This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    5/15

    Attachment A Daily Monitoring Reports

    3/31/2019 - 4/6/2019

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Friday, April 05, 2019

    Anna Sahl

    La Cienega Station

    05:30:00 to 14:00:00

    Yes

    Contractors/ Subcontractors: STS, Century Sweeping, Rivera Trucking

    Representatives On-Site: Alex Morales (STS); Lorena Vela (STS); Marvin Mai (Psomas); Howard Jordan (STS); German Garcia (Metro); Alex Kay (COBH)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 05:30 hours to 14:00 hours on April 5, 2019. EI ICM Anna Sahl met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Anna Sahl calibrated the sound meter to 94.00 dB.

    The North Gale closure was set up at 05:45 hours and included 4 additional sound barriers. Haul trucks arrived at 06:01 hours. The crane started at 06:50 hours.

    Work for the day included excavating below deck, lagging below deck, hauling equipment into the Gale yard shaft, hauling dirt from the shaft and haul trucks removing spoils from the yard.

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Friday, April 05, 2019

    Annamarie Hand

    La Cienega Station

    13:45:00 to 23:30:00

    Yes

    Contractors/ Subcontractors: STS

    Representatives On-Site: Alex Morales (STS); Marvin Mai (Psomas); Art Hernandez (Metro); Bill Dimalanta (STS)

    Work Location(s): Gale yard; N. Gale Dr. closure; below deck along Wilshire Blvd.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 13:45 hours to 23:30 hours on April 5th, 2019. EI ICM Annamarie Hand met with STS Foreman Alex Morales to discuss the day’s activities. At the beginning of the shift, ICM Annamarie Hand calibrated the sound meter to 94.00 dB.

    Work for the day included excavating below deck, lagging, hauling equipment into the Gale yard shaft, and hauling spoils from the Gale shaft.

    http://www.enviro-intel.com/

  • This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    6/15

    Attachment A Daily Monitoring Reports

    3/31/2019 - 4/6/2019

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Saturday, April 06, 2019

    Ben Rosenkoetter

    La Cienega Station

    04:30:00 to 17:00:00

    Yes

    Contractors/Subcontractors: STS, PSOMAS

    Representatives On-Site: Bill Damalanta (STS); Alex Morales (STS); Roger Vega (PSOMAS); German Garcia (Metro)

    Work Location(s): North Gale Drive enclosure; Gale yard; below deck along Wilshire Blvd; Wilshire Blvd west bound curb lane at La Cienega yard.

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 04:30 hours to 17:00 hours on April 6th, 2019. EI ICM Benjamin Rosenkoetter met with STS superintendent Alex Morales, and Metro Inspector German Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

    Work for the day included putting up lane closure on Wilshire, Road closure on Gale, equipment demobilization from the Gale yard and, decking panel replacement on Wilshire at La Cienega yard entrance.

    STS began installing Wilshire closure and corresponding signage at 04:45 hours. Crane operations within Gale yard began at 06:30 hours. Closure outside La Cienega yard began at 08:00 hours and removed at 12:00 hours. Road closure on Gale started at 10:00 and was removed at 10:45 hours.

    Date

    Monitor

    Location

    Time

    Compliant

    Summary

    Saturday, April 06, 2019

    Annamarie Hand

    La Cienega Station

    20:45:00 to 06:15:00

    Yes

    Contractors/ Subcontractors: STS

    Representatives On-Site: Marvin Mai (Psomas); Abdul Garfour (Metro); Bill Dimalanta (STS) Farzas Vakilitabar (Psomas)

    Work Location(s): Wilshire Blvd Eastbound Lane Closure from Hamilton to San Vicente

    The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 20:45 hours to 06:15 hours on April 6th, 2019. EI ICM Annamarie Hand met with PSOMAS Inspector Marvin Mai to discuss the night’s activities. At the beginning of the shift, ICM Annamarie Hand calibrated the sound meter to 94.00 dB.

    Work for the night included well work and the associated eastbound lane closure from Hamilton to San Vicente.

    http://www.enviro-intel.com/

  • This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    7/15

    Photos

    Photos (48)

    UID: 2985 Latitude: 34.0652957274533

    Date: Apr 01, 2019 Longitude: -118.373889933832

    Type:

    Notes

    Construction Activity Elevation: 42.0609092712402

    Photo shows haul trucks entering the Gale yard.

    UID: 2987 Latitude: 34.065281369102

    Date: Apr 01, 2019 Longitude: -118.374417046095

    Type: Construction Activity Elevation: 41.1857976913452

    Notes

    Photo shows soil loading operations.

    UID: 2984 Latitude: 34.0653598142881

    Date: Apr 01, 2019 Longitude: -118.37408516392

    Type: Construction Activity Elevation: 41.1856069564819

    Notes

    Photo shows haul truck operations.

    UID:

    Date:

    2989

    Apr 01, 2019

    Latitude:

    Longitude:

    34.065308

    -118.374268

    Type:

    Notes

    Construction Activity Elevation: - - -

    Photo shows STS using the crane to hoist soil from Gale shaft and stockpile for future removal.

    UID:

    Date:

    2988

    Apr 01, 2019

    Latitude:

    Longitude:

    34.065308

    -118.374168

    Type:

    Notes

    Construction Activity Elevation: - - -

    Photo shows STS removing the road closure on North Gale Drive.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    8/15

    UID: 2995 Latitude: 34.0655568706384

    Date: Apr 02, 2019 Longitude: -118.375295173189

    Type: General Elevation: 41.1860588367444

    Notes

    Photo shows view of the La Cienega yard taken during a sound reading at the north end of 112 N Hamilton.

    UID: 2994 Latitude: 34.0655395163994

    Date: Apr 02, 2019 Longitude: -118.375163094711

    Type: General Elevation: 41.8833427429199

    Notes

    Photo shows view of the La Cienega yard taken during a sound reading from 117 N Hamilton.

    UID: 2991 Latitude: 34.0654126006345

    Date: Apr 02, 2019 Longitude: -118.373827819833

    Type: Construction Activity Elevation: 41.5336494445801

    Notes

    Photo shows crews loading spoils into the haul truck.

    UID: 2993 Latitude: 34.0653238484377

    Date: Apr 02, 2019 Longitude: -118.374459514758

    Type: Construction Activity Elevation: 41.1865644454956

    Notes

    Photo shows crews preparing materials to be hoisted into the shaft.

    UID: 2990 Latitude: 34.0652842104739

    Date: Apr 02, 2019 Longitude: -118.374146796201

    Type: Construction Activity Elevation: 41.1863698959351

    Notes

    Photo shows haul trucks entering the Gale yard.

    UID: 2992 Latitude: 34.0647866616649

    Date: Apr 02, 2019 Longitude: -118.374713472393

    Type: Construction Activity Elevation: 41.1853227615356

    Notes

    Photo shows crane hoisting fuel tanks into the shaft and trucks hauling spoils from the shaft out of the yard.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    9/15

    UID:

    Date:

    2996

    Apr 02, 2019

    Latitude:

    Longitude:

    34.065205

    -118.374265

    Type:

    Notes

    Construction Activity Elevation: - - -

    Photo shows STS using the crane to hoist gas tanks out of the Gale shaft.

    UID:

    Date:

    2999

    Apr 02, 2019

    Latitude:

    Longitude:

    34.065174

    -118.374268

    Type:

    Notes

    Construction Activity Elevation: - - -

    Photo shows STS using the crane to hoist soil from the Gale yard shaft.

    UID:

    Date:

    2997

    Apr 02, 2019

    Latitude:

    Longitude:

    34.06525

    -118.374199

    Type:

    Notes

    Construction Activity Elevation: - - -

    Photo shows STS using a small street sweeper to clean the interior of the Gale yard.

    UID:

    Date:

    2998

    Apr 02, 2019

    Latitude:

    Longitude:

    34.06531

    -118.374162

    Type:

    Notes

    Construction Activity Elevation: - - -

    Photo shows STS picking up the road closure on North Gale Drive.

    UID: 3006 Latitude: 34.0655311608596

    Date: Apr 02, 2019 Longitude: -118.375168341963

    Type: General Elevation: 41.1858053207397

    Notes

    Photo shows obstructed view of the La Cienega yard at south end of 112 N Hamilton.

    UID: 3000 Latitude: 34.065

    Date: Apr 03, 2019 Longitude: -118.374

    Type: Construction Activity Elevation: 151

    Notes

    Photo shows haul trucks arriving at Gale yard.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    10/15

    UID: 3007 Latitude: 34.0655509338754

    Date: Apr 03, 2019 Longitude: -118.375249419947

    Type: General Elevation: 72.2631248026795

    Notes

    Photo shows sound reading with obstructed view of La Cienega yard from 113 N Hamilton.

    UID: 3003 Latitude: 34.0652598511223

    Date: Apr 03, 2019 Longitude: -118.37396736573

    Type: Construction Activity Elevation: 41.185131072998

    Notes

    Photo shows crane hoisting spoils from the shaft onto the muck pile.

    UID: 3001 Latitude: 34.065

    Date: Apr 03, 2019 Longitude: -118.374

    Type: Construction Activity Elevation: 150

    Notes

    Photo shows crew securing lagging material to be hauled by crane into the Gale yard shaft.

    UID: 3005 Latitude: 34.0656505607479

    Date: Apr 03, 2019 Longitude: -118.375191020183

    Type: General Elevation: 41.1855192184448

    Notes

    Photo shows view of the La Cienega yard from the north end of 112 N Hamilton.

    UID: 3004 Latitude: 34.0656533490192

    Date: Apr 03, 2019 Longitude: -118.375309152472

    Type: General Elevation: 41.1858491897583

    Notes

    Photo shows view of the La Cienega yard from 117 N Hamilton.

    UID: 3002 Latitude: 34.0652088787415

    Date: Apr 03, 2019 Longitude: -118.374603716157

    Type: Construction Activity Elevation: 41.9076461791992

    Notes

    Photo shows crane hoisting the muck bucket.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    11/15

    UID: 3009 Latitude: 34.065

    Date: Apr 04, 2019 Longitude: -118.374

    Type: Construction Activity Elevation: 150

    Notes

    Photo shows crane hauling material into the Gale yard shaft and haul trucks entering into the Gale yard.

    UID: 3010 Latitude: 34.065

    Date: Apr 04, 2019 Longitude: -118.374

    Type: Construction Activity Elevation: 149

    Notes

    Photo shows crane hauling spoils from the Gale yard shaft.

    UID: 3008 Latitude: 34.065

    Date: Apr 04, 2019 Longitude: -118.374

    Type: Construction Activity Elevation: 147

    Notes

    Photo shows loader in the Gale yard moving spoils.

    UID: 3012 Latitude: 34.0653380187481

    Date: Apr 04, 2019 Longitude: -118.376357752788

    Type: General Elevation: 41.1877470016479

    Notes

    Photo shows view from SW corner of Wilshire and La Cienega at 8500 Wilshire.

    UID: 3013 Latitude: 34.0656350936425

    Date: Apr 04, 2019 Longitude: -118.3752513778

    Type: General Elevation: 41.1859617233276

    Notes

    Photo shows view of the La Cienega yard from 117 N Hamilton.

    UID: 3014 Latitude: 34.0655683687721

    Date: Apr 04, 2019 Longitude: -118.375311550803

    Type: General Elevation: 41.1766541147232

    Notes

    Photo shows view of the La Cienega yard from the north end of 112 N Hamilton.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    12/15

    UID: 3011 Latitude: 34.0653820013167

    Date: Apr 04, 2019 Longitude: -118.374341814981

    Type: Construction Activity Elevation: 41.1858491897583

    Notes

    Photo shows loading operations for soil spoils removal.

    UID: 3016 Latitude: 34.065

    Date: Apr 05, 2019 Longitude: -118.375

    Type: Construction Activity Elevation: 146

    Notes

    Photo shows crane hauling spoils from the Gale yard shaft.

    UID: 3021 Latitude: 34.065

    Date: Apr 05, 2019 Longitude: -118.375

    Type: Construction Activity Elevation: 146

    Notes

    Photo shows crane hauling spoils from the Gale yard shaft and haul trucks exiting the yard onto Wilshire.

    UID: 3015 Latitude: 34.065

    Date: Apr 05, 2019 Longitude: -118.374

    Type: Construction Activity Elevation: 148

    Notes

    Photo shows haul trucks entering Gale yard and loading operations.

    UID: 3019 Latitude: 34.0656463565369

    Date: Apr 05, 2019 Longitude: -118.375228313291

    Type: General Elevation: 43.2206764221191

    Notes

    Photo shows obstructed view of the La Cienega yard from the south end of 112 N Hamilton.

    UID: 3020 Latitude: 34.0655882569725

    Date: Apr 05, 2019 Longitude: -118.375072815086

    Type: General Elevation: 82.1790740826464

    Notes

    Photo shows view of the La Cienega yard from 117 N Hamilton.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    13/15

    UID: 3018 Latitude: 34.0656595510588

    Date: Apr 05, 2019 Longitude: -118.375285259052

    Type: General Elevation: 41.1860609054472

    Notes

    Photo shows view of the La Cienega yard from the north end of 112 N Hamilton.

    UID: 3017 Latitude: 34.0652931579341

    Date: Apr 05, 2019 Longitude: -118.374201429662

    Type: Construction Activity Elevation: 41.1858549118042

    Notes

    Photo shows view of the crane hoisting excavated spoils from the shaft onto the muck pile.

    UID: 3022 Latitude: 34.0654580676275

    Date: Apr 05, 2019 Longitude: -118.373955223357

    Type: Construction Activity Elevation: 41.6397323608398

    Notes

    Photo shows view of dumpster being moved in the Gale yard.

    UID: 3024 Latitude: 34.064453

    Date: Apr 06, 2019 Longitude: -118.374268

    Type: General Elevation: 135

    Notes

    Photo shows contractor implementing the traffic control plan on Wilshire Blvd.

    UID: 3025 Latitude: 34.065018

    Date: Apr 06, 2019 Longitude: -118.375984

    Type: Construction Activity Elevation: 132

    Notes

    Photo shows contractor replacing a decking panel on Wilshire Blvd at the La Cienega yard entrance.

    UID: 3026 Latitude: 34.0655980564689

    Date: Apr 06, 2019 Longitude: -118.375262834563

    Type: General Elevation: 41.1859998693695

    Notes

    View of the La Cienega yard from the north end of 112 N Hamilton.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    14/15

    UID: 3029 Latitude: 34.0655199722747

    Date: Apr 06, 2019 Longitude: -118.37529310573

    Type: General Elevation: 41.185828208914

    Notes

    Photo shows obstructed view of the La Cienega yard from 113 N Hamilton.

    UID: 3032 Latitude: 34.064043087854

    Date: Apr 06, 2019 Longitude: -118.375333885591

    Type: General Elevation: 41.1885251998901

    Notes

    Photo shows obstructed view of the La Cienega yard from 209 S Hamilton.

    UID: 3027 Latitude: 34.0657889339275

    Date: Apr 06, 2019 Longitude: -118.375224186765

    Type: General Elevation: 42.8658180236816

    Notes

    Photo shows obstructed view of the La Cienega yard from the south end of 112 N Hamilton.

    UID: 3028 Latitude: 34.0650980265396

    Date: Apr 06, 2019 Longitude: -118.375239203421

    Type: General Elevation: 47.3388061523438

    Notes

    Photo shows the eastbound lane closure on Wilshire Blvd..

    UID: 3030 Latitude: 34.0656128943827

    Date: Apr 06, 2019 Longitude: -118.375202518267

    Type: General Elevation: 81.9451397338883

    Notes

    Photo shows view of the La Cienega yard from 117 N Hamilton.

    UID: 3031 Latitude: 34.0652273082134

    Date: Apr 06, 2019 Longitude: -118.376299746571

    Type: General Elevation: 41.9308242797852

    Notes

    Photo shows view from 8500 Wilshire of the La Cienega yard.

    http://www.enviro-intel.com/

  • Photos

    This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

    15/15

    UID: 3033 Latitude: 34.0646224213627

    Date: Apr 07, 2019 Longitude: -118.374194609591

    Type: General Elevation: 41.1867818832397

    Notes

    Photo shows eastbound lane closure on Wilshire at Gale.

    http://www.enviro-intel.com/

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Attachment B – Construction Noise Monitoring Results

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    April 1, 2019

    SLC-7 6:00 60 64 No Trucks are hauling out spoils from the yard.

    SLC-2 6:30 58.3 64 No Trucks are hauling out spoils from the yard.

    SLC-2 7:00 64.4 69 No Trucks are hauling out spoils from the yard.

    SLC-7 8:00 61.3 71.7 No

    Trucks are hauling out spoils from the yard; crane is hoisting excavated

    spoils from the shaft onto the muck pile.

    SLC-7 8:30 68.5 71.7 No

    Trucks are hauling out spoils from the yard; crane is hoisting excavated

    spoils from the shaft onto the muck pile.

    Ambient noise: garbage trucks.

    SLC-7 9:00 64.8 71.9 No

    Trucks are hauling out spoils from the yard; crane is hoisting excavated

    spoils from the shaft onto the muck pile.

    SLC-2 9:31 62.7 71.8 No

    Trucks are hauling out spoils from the yard; crane is hoisting excavated

    spoils from the shaft onto the muck pile.

    SLC-7 10:00 61.7 71.6 No

    Trucks are hauling out spoils from the yard; crane is hoisting excavated

    spoils from the shaft onto the muck pile.

    SLC-7 10:30 63.5 71.6 No

    Trucks are hauling out spoils from the yard; crane is hoisting excavated

    spoils from the shaft onto the muck pile.

    SLC-2 11:00 62.5 71.9 No

    Trucks are hauling out spoils from the yard; crane is hoisting excavated

    spoils from the shaft onto the muck pile.

    SLC-2 11:30 69.3 71.7 No

    Trucks are hauling spoils from yard; crane is hoisting spoils onto the muck

    pile.

    Ambient noise: leaf blower.

    SLC-2 12:00 59.5 71.9 No

    Trucks are hauling out spoils from the yard; crane is hauling spoils from

    the shaft onto the muck pile.

    SLC-7 13:00 60.6 72.9 No Trucks are hauling out spoils from the yard.

    SLC-2 13:30 61.2 72.9 No Trucks are hauling out spoils from the yard.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-2 14:25 61.4 72.1 No Construction crane is operating.

    SLC-7 15:16 62 72.3 No

    Construction crane is operating. Primarily ambient noise reading. Sirens on

    Wilshire Boulevard at 15:27 hours.

    SLC-4/L-

    9 15:46 60.2 67 No

    Primarily ambient noise reading. Construction activity is negligible to

    ambient noise at this location.

    SLC-6/L-

    8 16:05 74.7 75.1 No

    Construction crane is operating. Most noise at this location from traffic on

    Wilshire Boulevard.

    SLC-1 16:24 62 66.6 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 60db of noise disturbance at this time and

    location.

    SLC-2 18:00 63.6 70 No

    Construction crane is operating. Minimal noise from construction;

    primarily ambient noise reading.

    SLC-1 18:20 62.2 65.5 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 60.8 dB of disturbance from ventilation fans.

    SLC-1 18:36 62.1 65.5 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 61.0 dB of noise disturbance at this time and

    location.

    SLC-2 19:44 61 71 No Construction crane is operating. Mostly underground construction work.

    SLC-7 20:16 61.8 68 No Construction crane is operating.

    SLC-1 21:00 63.3 65.1 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 61.5 dB of disturbance.

    SLC-1 21:29 62.7 65.1 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 61.3 dB of disturbance. Sirens on Wilshire

    Boulevard at 21:33 increased dB to 62.9.

    SLC-2 22:05 60.3 66 No Construction crane is operating.

    SLC-7 22:50 56.5 66 No Construction crane is operating.

    April 2, 2019

    SLC-2 6:00 56.3 64 No Gale closure is up. Crews are waiting for haul trucks to arrive.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-7 6:30 61.6 64 No Trucks are hauling out spoils from the yard.

    SLC-7 7:00 60.2 69 No

    Trucks are hauling out spoils from the yard; crane is raising the muck

    bucket.

    SLC-6/L-

    8 7:30 75.6 79 No

    Crane is hoisting equipment into the shaft. Trucks are hauling spoils out

    from the yard.

    SLC-4/L-

    9 8:00 62.4 67 No

    Crane is hoisting equipment into the shaft. Trucks are hauling spoils from

    the yard.

    SLC-7 8:30 62.1 71.7 No

    Crane is hoisting materials in and out of the shaft. Trucks are hauling

    spoils from the yard.

    SLC-7 9:00 63.5 71.8 No

    Crane is hoisting materials in and out of the shaft. Trucks are hauling

    spoils from the yard.

    SLC-7 9:31 64.4 71.8 No

    Crane is hoisting materials in and out of the shaft. Trucks are hauling

    spoils from the yard.

    SLC-2 10:00 61.6 71.6 No

    Crane is hoisting materials in and out of the shaft. Trucks are hauling

    spoils from the yard.

    SLC-2 11:00 67 71.9 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Ambient noise: delivery trucks.

    SLC-2 11:30 65.2 71.9 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 12:00 62.7 71.9 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Trucks are hauling spoils from the yard.

    SLC-7 13:00 62.6 72.9 No Crane is hoisting excavated spoils from the shaft.

    SLC-2 13:30 62.5 72.9 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Trucks are hauling spoils from the yard.

    SLC-7 14:30 61.6 72.1 No

    Construction crane is operating. Small street sweeper used in Gale yard to

    clean site.

    SLC-2 15:02 60.5 72.3 No Construction crane is operating.

    SLC-4/L-

    9 15:46 62.6 72.3 No

    Primarily ambient noise reading construction activity is negligible to

    ambient noise at this location.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-6/L-

    8 16:03 74.6 75.1 No

    Primarily ambient noise reading. Construction crane is audible but

    contributes significantly less to ambient noise in comparison to traffic on

    Wilshire Boulevard.

    SLC-1 16:24 63 66.6 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 61.7 dB of disturbance from ventilation fans.

    SLC-1 16:40 62.7 66.5 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 61.6 dB of disturbance from ventilation fans at

    this location and time.

    SLC-2 17:17 62.3 72.4 No Construction crane is operating.

    SLC-1 18:14 63 65.5 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 62 dB of noise disturbance from ventilation

    fans at this time and location.

    SLC-1 18:30 63.7 65.5 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 61.4 dB of noise disturbance from ventilation

    fans at this time and location.

    SLC-2 19:43 59.8 71 No Construction crane is operating.

    SLC-7 20:35 61 68 No Construction crane is operating.

    SLC-1 21:09 62.2 65.1 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 61.7 dB of disturbance from ventilation fans.

    SLC-1 21:27 61 65.1 No

    Construction ventilation fans are audible but do not produce a noise

    exceedance. Approximately 60.2 dB of disturbance at this time and

    location.

    SLC-2 22:11 59 66 No Construction crane is operating.

    SLC-1 22:35 58.4 66 No Construction crane is operating.

    April 3, 2019

    SLC-7 6:03 57.9 64 No Haul trucks arrived at Gale yard and began hauling.

    SLC-2 6:23 58.6 64 No Haul trucks entering Gale yard.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-1 6:43 56.9 64.2 No

    Trucks hauling spoils out of Gale yard. Crane hauling spoils from below

    deck in Gale yard.

    SLC-7 7:09 58.3 69 No Crane hauling spoils from below deck in Gale yard.

    SLC-2 7:33 60.4 69 No

    Crane hauling equipment into Gale yard shaft. Lagging below deck on

    Wilshire Boulevard.

    SLC-6/L-

    8 8:02 75.8 79 No Crane hauling equipment into Gale yard shaft.

    SLC-1 8:24 60.8 68 No Crane hauling equipment into and out of Gale yard shaft.

    SLC-7 8:47 68.2 71.7 No

    Crew lagging below deck on Wilshire Boulevard. Crane hauling equipment

    into Gale yard shaft.

    SLC-1 9:07 63.5 67.2 No

    Venting from La Cienega station yard. Crew lagging below deck on

    Wilshire Boulevard. Garbage truck picking up trash on north Hamilton.

    SLC-9 9:26 63.4 69 No Venting at La Cienega station yard. Lagging below deck.

    SLC-7 9:50 66.8 71.8 No

    Delivery trucks of lagging material to Gale yard. Haul trucks moving

    spoils out of Gale yard. Crane hauling spoils out of Gale yard shaft.

    SLC-1 10:11 61.5 68.1 No

    Venting at la Cienega station yard. Lagging below deck on Wilshire

    Boulevard.

    SLC-7 10:30 68.5 71.6 No Crane hauling lagging material into Gale yard shaft.

    SLC-2 10:51 62.4 71.6 No Forklift unloading material and equipment in Gale yard.

    SLC-6/L-

    8 11:12 73.4 79 No

    Crane hauling equipment down into Gale yard shaft. Crew lagging below

    deck. Traffic on Wilshire Boulevard.

    SLC-1 11:33 61.9 65.7 No

    Venting occurring at La Cienega station yard. Crew lagging below deck.

    Crane hauling equipment into Gale yard shaft.

    SLC-2 12:07 62 71.9 No Crane hauling equipment into Gale yard shaft.

    SLC-7 12:32 65.8 71.9 No Crane hauling equipment into Gale yard shaft.

    SLC-2 13:07 60.4 72.9 No Excavating below the deck on Wilshire.

    SLC-2 13:30 59.1 72.1 No Excavating below the deck on Wilshire.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-7 14:00 62.1 72.9 No

    Crane is hoisting the muck bucket; crews are working on the timber mats

    in the yard.

    SLC-7 14:30 63.8 72.1 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile; crews

    are building the timber mats in the yard.

    SLC-2 15:00 61.1 72.3 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile; crews

    are building the timber mats in the yard.

    SLC-4/L-

    9 15:30 63.4 68 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile; crews

    are building the timber mats in the yard.

    SLC-1 16:00 63.7 66.6 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile; crews

    are building the timber mats in the yard.

    SLC-7 16:30 67 71.8 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile; crews

    are building the timber mats in the yard.

    Ambient noise: delivery truck; back up alarm.

    SLC-2 17:00 63.3 72.4 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile; crews

    are building the timber mats in the yard.

    SLC-4/L-

    9 17:30 62.3 66 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile; crews

    are building the timber mats in the yard.

    SLC-2 18:00 63.1 70 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-7 18:30 64.7 70 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 19:30 60.7 71 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-7 20:30 62.3 68 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-1 20:44 62.7 67.2 No Exhaust fan from the La Cienega yard.

    SLC-1 21:00 62.1 68.2 No Exhaust fan from the La Cienega yard.

    SLC-1 21:15 61.5 68.2 No Exhaust fan from the La Cienega yard.

    SLC-1 21:30 60.4 67.2 No Exhaust fan from the La Cienega yard.

    SLC-2 22:30 58.3 66 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    April 4, 2019

    SLC-7 6:00 60.4 64 No Haul trucks entering Gale yard, and exiting onto Wilshire Boulevard.

    SLC-2 6:16 57.5 64 No Haul trucks hauling spoils from Gale yard.

    SLC-1 6:36 57 64.2 No Venting at La Cienega station yard. Hauling at Gale yard.

    SLC-7 7:01 60.3 69 No Loader moving spoils in Gale yard.

    SLC-2 8:32 61.5 71.7 No

    Crane hauling equipment into Gale yard shaft. Crew lagging below deck.

    Haul trucks hauling spoils from Gale yard.

    SLC-1 8:52 61.1 68 No Crane hauling equipment into Gale yard shaft. Crew lagging below deck.

    SLC-9 9:12 63.4 69 No Venting occurring at La Cienega station yard.

    SLC-6/L-

    8 9:33 75.5 79 No

    Crane hauling spoils from Gale yard shaft. Heavy traffic on Wilshire

    Boulevard.

    SLC-7 10:00 64 71.6 No Crew lagging below deck. Forklift moving materials in Gale yard.

    SLC-1 10:19 60 68.1 No Crane hauling spoils from Gale yard shaft.

    SLC-2 10:38 60.9 71.6 No

    Crane hauling spoils from Gale yard shaft. Forklift moving materials in

    Gale yard.

    SLC-6/L-

    8 11:06 74.8 79 No

    Crane hauling spoils from Gale yard shaft. Haul trucks hauling spoils out

    of Gale yard onto Wilshire Boulevard. Heavy traffic on Wilshire

    Boulevard.

    SLC-9 11:26 61.3 70 No Venting at La Cienega station yard.

    SLC-1 11:46 63.2 65.7 No Venting at La Cienega station yard.

    SLC-2 12:06 61.1 71.9 No Crane hauling spoils from Gale yard shaft.

    SLC-1 12:32 61.2 66 No Crane hauling spoils from Gale yard shaft. Crew lagging below deck.

    SLC-7 12:51 63 71.9 No

    Trucks hauling spoils from Gale yard. Crane hauling spoils from Gale yard

    shaft.

    SLC-6/L-

    8 13:17 73.8 79 No

    Trucks hauling spoils from Gale yard. Crane hauling spoils from Gale yard

    shaft. Traffic on Wilshire Boulevard.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-7 14:00 63 72.1 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Trucks are hauling spoils from the yard

    SLC-2 14:30 61.1 71.2 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-6/L-

    8 15:03 77.6 79 No Exhaust fan from the La Cienega yard.

    SLC-1 15:22 67.3 63.8 No Exhaust fan from the La Cienega yard.

    SLC-1 15:38 62.9 67.1 No Exhaust fan from the La Cienega yard.

    SLC-7 16:00 68 71.8 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Ambient noise: delivery truck, Porsche.

    SLC-2 16:30 66.5 72.1 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Ambient noise: delivery truck.

    SLC-4/L-

    9 17:00 65.9 66 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Ambient noise: idling van.

    SLC-2 17:30 63.3 72.4 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-7 18:02 65.1 70 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 20:17 59.1 68 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-7 21:00 64 67 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-7 21:30 64.2 67 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 22:00 57.3 66 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 22:30 57.7 67 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    April 5, 2019

    SLC-7 6:01 59.2 64 No Haul trucks hauling spoils from Gale yard.

    SLC-2 6:20 59.3 64 No Haul trucks hauling spoils from Gale yard.

    SLC-7 6:37 65.6 64 Yes

    Non-project related vehicle on north Gale with a loud backup alarm caused

    noise exceedance. Haul trucks hauling spoils from Gale yard.

    SLC-7 7:15 62.6 69 No Crane hauling equipment into Gale yard shaft.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-1 7:34 62.8 67.1 No Venting at La Cienega station yard.

    SLC-7 7:55 62.3 68 No Crane hauling spoils from Gale yard shaft.

    SLC-9 8:21 64.6 70 No Venting at La Cienega station yard.

    SLC-6/L-

    8 8:43 74.8 79 No

    Crane hauling spoils from Gale yard shaft. Haul trucks hauling spoils from

    Gale yard onto Wilshire Boulevard. Heavy traffic on Wilshire Boulevard.

    SLC-2 9:04 64.8 71.8 No Crane hauling spoils from Gale yard shaft.

    SLC-1 9:45 61.2 67.2 No Crane hauling spoils from Gale yard shaft.

    SLC-7 10:09 64 71.6 No

    Crane hauling spoils from Gale yard shaft. Haul trucks hauling spoils from

    Gale yard.

    SLC-1 10:33 63.8 68.1 No

    Venting at La Cienega station yard. Crane hauling spoils from Gale yard

    shaft.

    SLC-6/L-

    8 11:00 74.9 79 No

    Crane hauling spoils from Gale yard shaft. Haul trucks hauling spoils from

    Gale yard and exiting onto Wilshire Boulevard. Heavy traffic on Wilshire.

    SLC-2 11:19 67.8 71.9 No Crane hauling spoils from Gale yard shaft. Crew lagging below deck.

    SLC-7 12:16 62.1 71.9 No Crane hauling spoils from Gale yard shaft.

    SLC-6/L-

    8 12:38 74.3 79 No

    Haul trucks hauling spoils out of Gale yard. Heavy traffic on Wilshire

    Boulevard.

    SLC-9 13:02 62.9 71 No Venting at La Cienega station yard.

    SLC-1 13:25 63.2 65.8 No Venting from La Cienega station yard.

    SLC-7 14:00 62.7 72.1 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-5 15:01 66.2 71 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Note: project is inaudible from this receptor.

    SLC-1 15:30 63.6 67.3 No Exhaust fan from the La Cienega yard.

    SLC-1 15:45 61.9 67.2 No Exhaust fan from the La Cienega yard.

    SLC-1 16:00 63.4 66.6 No Exhaust fan from the La Cienega yard.

  • 1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

    Receptor

    ID

    Time of

    Measurement

    Measured

    Noise

    Level Leq

    (15-

    Minute)

    Applicable

    Noise

    Threshold

    Exceeded

    Threshold? Notes

    SLC-4/L-

    9 16:30 63.3 66.5 No

    Crane is hoisting excavated spoils from the shaft onto the muck pile.

    Ambient noise: delivery truck.

    SLC-7 17:00 63.2 72.4 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 17:30 63.6 72.4 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 18:00 62.4 70 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 18:31 62.4 70 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 19:30 61.4 71 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-7 20:30 62.6 68 No Crane is hoisting excavated spoils from the shaft onto the muck pile.

    SLC-2 21:30 59.9 67 No CAT is moving dumpster in the Gale yard.

    SLC-7 22:30 62.6 66 No

    Crews are cleaning the yard.

    Ambient noise: car stereo on blast.

    April 6, 2019

    SLC-7 5:24 56.5 59 No Wilshire closure installation underway. Crews arriving to site.

    SLC-1 6:15 51.2 64.2 No Ventilation within La Cienega ongoing.

    SLC-7 6:45 60.2 64 No STS using crane to move equipment into/out of excavation.

    SLC-1 8:12 63.5 68 No Ventilation within La Cienega yard is ongoing.

    SLC-3 8:50 62.7 63.6 No Swapping broken panel on Wilshire. Ventilation ongoing.

    SLC-2 10:32 63.6 71.6 No Crews demobilizing equipment from Gale yard.

    SLC-7 11:48 80.6 71.9 Yes

    Fire truck with sirens on passed by meter during this reading, causing

    exceedance.

    SLC-7 12:11 63.6 71.9 No Crews moving dumpsters within Gale yard.

    SLC-7 13:16 70.5 72.9 No STS crews leaving the site.

    SLC-1 14:26 63.8 66.5 No Ventilation within La Cienega yard ongoing.


Recommended