NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
2
Objectives:• to provide a step forward in the technology capability of ATS
environmentally friendly systems:• integration of advanced technologies• full scale demonstrators
• to improve on the overall ATS impact on environment:• noise and emission reduction• fuel consumption
• to consolidate the European industry around a project of common European interest
Clean Sky
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
3
Widebody 2020
CO2 -30%NOx -30%
Noise -20dB
Narrowbody 2015
CO2 -20%NOx -20%
Noise -15dB
Regional 2020
CO2 -40%NOx -40%
Noise -20dB
Rotorcraft 2020
CO2 -30%NOx -60%
Noise -10dB
Corporate 2020
CO2 -30%NOx -30%
Noise -10dB
Products
Technology Evaluator
ActiveWing
New Aircraft Configurations
AdvancedAerodynamics(Low Drag &
Noise)
Low WeightStructures
NewPowerplants
InnovativeBlades & Rotors
New AircraftConfigurations
Advanced LP & HP System
Technology
New EngineConcepts
(i.e. Open Rotor)
Mission & Trajectory
Management
Aircraft Energy Management
CO2 ~12 to 20%Noise ~10dB
CO2 ~10 to 20%Noise ~10dB
CO2 ~26 to 40%NOx ~53 to 65%Noise ~10dB
CO2 ~15 to 20%NOx ~15 to 40%Noise ~15dB
CO2 ~10 to 15%Noise ~17dB
Whole LifeCycle
EnvironmentalImpact Analysis
CO2 ~10%Noise ~10dB
ITD Smart FixedWing Aircraft Green Regional Green
RotorcraftSustainable &Green Engines
Systems forGreen Operations Eco Design
Activities
Targets
Note: Targets shown represent the incremental impact of JTI
JTI JTI Clean SkyClean SkyTargetsTargets
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
4
Environmental ImpactEnvironmental ImpactEnvironmental Impact
Mul
tiple
of 2
005
Co2
em
issi
ons
Emissions reduction expected from existing technology programmes (FP-only option) (assuming an expected traffic growth of 4.25 %)
Additional CO2 reduction attributable to the JTI
Gap to ACARE target of 50% emissions reduction from a year 2000 base aircraft
No action
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
5
Green Rotorcraft
Green Engines
SMART Wing Aircraft
Systems for Green OperationEco-Design
Regional Air Transport
Integrated Technology Demonstrators (ITD)Integrated Technology Demonstrators (ITD)
ATS Model
2 years 3 years 3 years
First Definitionof ecology efficiency
Refined Definitionof ecology efficiency
2 years 3 years 3 years
First Definitionof ecology efficiency
Refined Definitionof ecology efficiency
Simulator Platform AC, ATM, AP (flight segment)
Technology Evaluator
Linked to Linked to ““SESARSESAR”” Joint UndertakingJoint Undertaking
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
6
JTI Time lineJTI Time lineJTI Time line
Proposal adopted by Commission, 13 June 2007Opinion from Parliament 23 NovemberAdoption by Council 20 December 2007
JU legally came into existence after publication in Official Journal on 4 February 2008
JTI TAKE OFF Forum, 5 Feb 2008, Brussels
Becomes fully operational upon establishment of all internal procedures and appointment of Executive Director
Timing TBC, definition of legal aspects by Commission currentlyongoing.
First calls for Proposal in course of ‘08 - start ’09 (TBC)Will be publicised via Clean Sky website, CORDIS (communication strategy)National dissemination via NS Representative Group
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
7
Clean Sky CompositionClean Sky CompositionClean Sky Composition
A Public-Private Partnership involving the Community represented by the Commission and the Aeronautical Stakeholders.A strong central team of ITD Leaders ensuring that the envisaged goals are reached at the end of the JTI.To broaden participation, Associates contribute for the full duration and co-drive strategic decisions. Associates have been identified (1st round), co-define technical work programme for JTI and commit themselves for a 7-year contribution in kind.Additional Calls for Associates possibleFurther, more specific tasks will be allocated to Partners via Calls for Proposals.
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
8
JU – Membership and ParticipationJU JU –– MembershipMembership and Participationand Participation
Joint Undertaking Members:7-year commitment, contribution to JU resources
European CommissionITD LeadersAssociates
Participants in Clean Sky:Limited participation duration and scope
Partners via Calls for proposals
Subcontractors via Calls for Tender
Minimum 25% of JTI activities
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
9
ITD LeadersITD LeadersITD Leaders
SMART Fixed Wing:Airbus (F, D, UK, E) + SAAB (SE)
Green Regional AircraftAlenia Aeronautica (I) + EADS CASA (ES)
Green RotorcraftAgustaWestland (I, UK) + Eurocopter (F, D)
Green EnginesRolls-Royce (UK), Safran (F)
Systems for Green OperationThales (F) + Liebherr (D)
EcodesignDassault Aviation (F) + Fraunhofer Gesellschaft (D)
SAAB, EADS CASA and FhG were added in past months.
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
10
Selection of Associates - processSelectionSelection of Associates of Associates -- processprocess
Clean Sky presentation to stakeholders (from June ’06 onwards)Submission of Expressions of Interest by potential applicantsSubmission of applicationsSelection of applicants per ITD following clear criteriaConsolidation of Associates’ selection at JTI level
Commission involved as « active observer », ensuringtransparency and consistency of procedure
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
11
Selection of Associates - outcomeSelectionSelection of Associates of Associates -- outcomeoutcome
0 5 10 15 20 25
Belgium
Denmark
France
Germany
Greece
Ireland
Israel
Italy
Lithuania
Malta
Netherlands
Poland
Portugal
Romania
Spain
Sweden
Switzerland
UK
Applicant
Selected 98 Applications from 18 countries74 Candidates from 16 countries retained
Note:I, NL figures are result of applications of
clusters grouping multiple entities
Industry SME RE USuccessful applicants 22 18 17 14
Distribution
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
12
JU Member compositionJUJU Member compositionMember composition
Including the ITD Leaders, 16 countries are represented in 83 entities.22 of these are SMEs.
IndustrySMEREU
IndustrySMEREU
40%40%
22%22%
22%22%
17%17%
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
13
Intellectual Property RightsIntellectual Intellectual PropertyProperty RightsRights
Basic principles included in Regulations and Statutes.Detailed IPR handling will be covered in Stakeholder Agreement, set up between JU Members.Currently under elaboration in Clean Sky Support Action, will be cross-checked with DG TradeProvisions are binding for all direct or indirect assignees of Foreground.All IPR access to be communicated to JURelevant ITD Steering Committee to arbitrate
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
14
IPR UseIPRIPR UseUse
Within ITDs:Free access to Foreground and declared Background for research purposes.Access on fair and reasonable terms to declared Background for exploitation of own Foreground; can be denied if owner interest is affected.
Between ITDs:Access on fair and reasonable terms or free to Foreground for exploitation of own Foreground; can be denied if owner interest is affected.Special rules may apply for Technology Evaluator
Owners of Foreground will ensure its use
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
15
JU StructureJUJU StructureStructure
Governing Board
European Commission
ITD Steering Committees
ITD Participants
General Forum
Exec. Director
JTI NS Rep. Group
ACARETransport Prog. Committee
EXTERNAL BODIESEXTERNAL BODIES
JUJU
DecisionRecommendation
Main Governing body,Strategic Orientation.•Commission•12 ITD Leaders•6 Associate represent.
Main Governing body,Strategic Orientation.•Commission•12 ITD Leaders•6 Associate represent.
Legal representative of JU + supporting staff, day-to-day operations,
communication
Legal representative of JU + supporting staff, day-to-day operations,
communication
Consultative body, 1 representative per
participant
Consultative body, 1 representative per
participant Technical management,• ITD Leaders•Associates
Technical management,• ITD Leaders•Associates
Advisory BoardJTI scientific, technical, financial,
managerial matters
Advisory BoardJTI scientific, technical, financial,
managerial matters
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
16
JU Governing Board - membershipJU JU GoverningGoverning BoardBoard -- membershipmembership
European Commission
Founding members (ITD Leaders)
1 Associate partner rep. per platform
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
17
JU Governing Board - responsibilitiesJU JU GoverningGoverning BoardBoard -- responsibilitiesresponsibilities
Strategic orientation, progress reviewAdoption of accounts and platform budgetsAnnual reports from ITD Leaders and DirectorAction against ITD Leader and dispute settlementAdmission of new ITD Leaders and Associates2nd instance review of CfP and selectionsUpdating platform workplansAppointment/removal of JU DirectorDefining scope of authority of JU DirectorApproval of JU Communication/dissemination strategy
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
18
Commission’s Role in the Governing BoardCommissionCommission’’ss RoleRole in the in the GoverningGoverning BoardBoard
Executive Board votes with 2/3 majority, 1 vote/head, not weightedCommission has casting vote in case of conflict
E.g. split between the 12 ITD Leaders and the 6 Associates: Commission vote determines majority
Commission has veto right; non-exhaustive list of topics drawn up
Further capabilities:Budget retention pending approval of financial and technical reportsAudit capabilitiesSupported by panels of independent experts
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
19
JU Executive Directorresponsibilities
JU JU ExecutiveExecutive DirectorDirectorresponsibilitiesresponsibilities
ITD activities coordination and follow-up, T&F reportsIntegration and interface activitiesChairing SC of Tech Eval platform, co-chairing othersImplementing CfPs and CfTs, chairing 1st ins. arbitrationMonitor SME participationYearly financial reviews, prepare yearly budgetsJU techical/financial reports to GB and CommissionAttend Advisory groups meetingsJU Communication/dissemination activities
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
20
JU Directorate - functionsJU JU DirectorateDirectorate -- functionsfunctions
Financial mattersITD monitoringContractual/legal mattersPlanningSME contact, communication, reporting
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
21
ITD Steering Committees - participationITD ITD SteeringSteering CommitteesCommittees -- participationparticipation
Chairman – senior ITD representativeJU Director – Tech/manag matters, interface/integrationJU ITD responsible officerOther funding members, Associate partnersITD leaders/partners from other ITDs as appropriateCommission representative
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
22
ITD Steering Committees - responsibilitiesITD ITD SteeringSteering CommitteesCommittees -- responsibilitiesresponsibilities
Guiding technical functions of the ITD and decide on technical platform matters on behalf of JUDefine contents of CfPs and CfT in cooperation with JU DirectorateWork closely with PLs to ensure meeting of objectives
- SCs should meet frequently (every 2 months)- «shadow» SCs to start in advance of JU
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
23
General ForumGeneral ForumGeneral Forum
All members of JU – consultative body
Information on JU status, assess budgets, receive annualreportsMake recommendations, raise issues to JU Director on tech/man/financial matters
- GF should meet once a year (at least)
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
24
NS Representative GroupNS NS RepresentativeRepresentative GroupGroup
The National States Representative Group shall consist of one representative of each Member State and of each other country associated to the Framework Programme. It shall elect a chairman from among its members.The chairman of the National States Representatives Group shall have the right to attend meetings of the Governing Board as an observer.
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
25
Clean Sky – BudgetClean Clean SkySky –– BudgetBudget
SMART Fixed Wing 24 %Green rotorcraft 10 %Green regional aircraft 11 %Green engines 27 %Systems for green operation 19 %Eco design 7 %Technology evaluator 2 %
Running costs 3 %Total 1600
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
26
Financial SchemeFinancial SchemeFinancial Scheme
About 75% of the budget will go to the Members via Grant Contracts (not following Calls for Proposals)At least 25% of the budget will be dedicated to Partners via Calls for Proposals, enabling wider accession to Clean SkyAll participants receive Grant from JU
ITD Leaders commitment, to be fulfilled via Calls for Proposal€~100M
€800M
€~200M
€~200M
€~300M
ITD1 Partner
ITD2 Partner
ITD3 Partner
ITD4 Partner
ITD5 Partner
ITD6 Partner
ITD Leaders Contribution
Subcontracting
EC Contribution
ITD1 Assoc.
ITD2 Assoc.
ITD3 Assoc.
ITD4 Assoc.
ITD5 Assoc
ITD6 Assoc.
In Kind Annual evaluation
In Kind Annual evaluation
In CashAnnual installments
In CashAnnual installments
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
27
Financial FlowFinancial FlowFinancial Flow
Exec. Director
EXTERNAL BODIESEXTERNAL BODIES
JUJU
Grant agreements
(1 per ITD)
CFP Grant Agreement
Following Calls for Proposal
Industry cash contribution to JU administrative costs
European Commission
Cash contribution to JU running costs
Cash contribution to JU operational costs
Subcontracts followingCalls for Tender
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
28
Finalisation of
JU Financial Regulation and Implementationrules (IR)
JU Staff Regulation and IR
JU Internal procedures and IR
JU Governing Board procedures
ITD contracts
CSSA deliverables
Nomination of Executive Director
Sequence of events towards full operation
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
29
CfP Process and Competitive SelectionCfPCfP Process and Competitive SelectionProcess and Competitive Selection
Proposals will be selected according to open and transparent competitive procedures
Open criteria agreed by the Governing Board
The selection will be done with the assistance of independent experts
CfPs will contain clear details of the assessment criteria that will be defined to select the best proposals having regard to all relevant factors.
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
30
CfP Proposed steps in the selection processCfPCfP Proposed steps in the selection processProposed steps in the selection process
Preparation of Call for Proposals by a MemberFollowing the Annual Implementation Plan where CfPs are identified, the relevant Member of an ITD prepares an outline proposal with a first draft of specification and evaluation of associated cost (for internal reference).The Member proposes a CfP Manager, who will:
Prepares the detailed specificationProposes the appropriate Internal/ITD Experts (minimum 2) and External/Independent Experts (minimum 2) from a general list provided by EC to the JU.Negotiates, together with a JU representative, with the applicants following the ranking listPresents the negotiation results to the Steering Committee.
2
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
31
CfP Proposed steps in the selection processCfPCfP Proposed steps in the selection processProposed steps in the selection process
Advertising CfPsClean Sky JU’s own web site www.cleansky.euwith pointers in CORDIS, Transport web site, ASD websites, etcThe Director informs the National States Representative Group (NCPs activation via NSRG)The Call text should include all necessary information on the contractual arrangements (with reference for confidential information if appropriate)
4. All responses are submitted to the JU
4/7
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
32
CfP Proposed steps in the selection processCfPCfP Proposed steps in the selection processProposed steps in the selection process
Negotiation PhaseThe CfP Manager together with a JU representative begins the negotiation with the top-ranked applicantConfidential details may be disclosed under a confidentiality agreement in order to finalise a contractIf the agreement is not reached, the negotiation continues with the next applicant in the ranking listThe results of the negotiation will be communicated to the ITD Steering Committee.
6/7
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
33
CfP Proposed steps in the selection processCfPCfP Proposed steps in the selection processProposed steps in the selection process
Grant Agreement
The selected candidate(s) will sign the Partner Grant Agreement and become a Partner of the Clean Sky JU
7/7
All the process should be quick and flexible in order to operate efficiently and perform the demonstrations within the 7 year time frame.
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
34
CfP - Some GuidelinesCfPCfP -- Some GuidelinesSome Guidelines
A Member cannot apply to CfP proposed by another Member of the same ITD A Member may apply to CfP proposed by another Member of another ITD, provided the global share on JU does not exceeds 50% for ITD Leaders or 25% for Associates and provided it does not participate in writing the specificationA Partner may apply to CfP proposed by a Member of the same ITD, provided it does not participate in writing the specificationA Partner may apply to CfP proposed by a Member of another ITD.50/25/25 % distribution between ITD Leaders / Associates / Partners computed on individual contribution
NCP meeting – 11 June 2008 - BrusselsMarco BRUSATI – Clean Sky Goals and Organisation
35
ContactsContactsEuropean Commission DG Research-H.3 Aeronautics
Rue du Champ de Mars (CDMA 4/167)B - 1049 BrusselsTel./ Fax: +32 2 29 50477/ 66757 E-mail: [email protected]
Clean Sky Web pagehttp://www.cleansky.eu
Specific assistance for SMEAeroSME (http://www.aerosme.com)SCRATCH (http://www.aero-scratch.net)
Specific information on F.P.7http://www.cordis.luhttp://ec.europa.eu/research/