+ All Categories
Home > Documents > MARKET RATES SYSTEM - Finance Department03. Earthwork (Excavation & Embankment) 27 to 33 04....

MARKET RATES SYSTEM - Finance Department03. Earthwork (Excavation & Embankment) 27 to 33 04....

Date post: 29-Jan-2020
Category:
Upload: others
View: 10 times
Download: 0 times
Share this document with a friend
162
MARKET RATES SYSTEM (MRS) BI-ANNUAL PERIOD (1 ST July, 2016 TO 31 ST December, 2016) GOVERNMENT OF THE PUNJAB FINANCE DEPARTMENT Prepared & Compiled by Haroon Tahir [email protected]
Transcript

MARKET RATES SYSTEM (MRS)

BI-ANNUAL PERIOD

(1ST July, 2016 TO 31ST December, 2016)

GOVERNMENT OF THE PUNJAB

FINANCE DEPARTMENT

Prepared & Compiled by Haroon Tahir

[email protected]

TABLE OF CONTENTS S.No. Chapter Page Nos

01. Carriage 3 to 23 02. Loading, Unloading & Stacking 24 to 26 03. Earthwork (Excavation & Embankment) 27 to 33 04. Dismantling (Demolition) 34 to 38 05. Mortar. 39 to 40 06. Concrete 41 to 50 07. Brickwork 51 to 56 08. Stone Masonry 57 to 59 09. Roofing 60 to 65 10. Flooring. 66 to 70 11. Surface Rendering 71 to 74 12. Wood Work 75 to 84 13. Painting & Varnishing. 85 to 90 14. Lining of Canals 91 to 92 15. Sheet Piling 93 to 94 16. Protection & Diversion Work 95 to 104 17. Outlets 105 to 106 18. Road & Road Structure 107 to 111 19. Plumbing, Sanitary Installation & Gas Fittings 112 to 117 20. Surface Drainage. 118 to 119 21. Sewerage 120 to 124 22. Sinking of Wells 125 to 127 23. Tubewell & Water Supply 128 to 139 24. Electric Installation 140 to 152 25. Iron Work 153 to 158 26. Miscellaneous 159 to 162

Chap-1 (Carriage) Page 3

1. CARRIAGENote: 1 The rates are applicable to carriage of material on pacca roads only.

For kacha roads an allowance of 25% extra shall be allowed for 2nd and subsequent mileage (Km) rates. Rateupto 1st mile (1st Km) is however common to both kacha and pacca roads.

Note: 2 For hilly areas 25% above the rates in the plain areas shall be allowed for total mileage (Km) covered.

Note: 3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:-

i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the rate given in the Composite Schedule of Rates.

ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the Composite Schedule of Rates.

The length measured shall not be the actual length, but the length of the form of consignment as actuallyreceived.

Note: 4 The term 'mile' (Km) whenever used is to mean statute mile (Km).

Note: 5 The rates include loading and unloading of material from the conveyance and stacking as directed.

Note: 6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on land.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite1 Carriage of 100 Cft. (2.83 cu.m) of all materials like stone 16.1

aggregate, spawl, kankar lime (unslaked), surkhi, etc. or150 Cft. (4.25 cu.m) of timber, by truck or by any othermeans owned by the contractor.

1st chain (1st 30 m) Chain 157.70 30M 157.702nd chain (2nd 30 m) " 29.05 30M 29.053rd to 10th chain (60 to 300 m) " 18.05 30M 18.051000 to 3000 ft. (300 to 900 m) 1000 ft. 177.25 300 M 177.25 1st Km Km 176.452nd Km Km 81.103rd Km Km 59.804th Km Km 39.855th Km Km 36.506th Km Km 35.757th Km Km 32.758th Km Km 32.359th Km Km 29.9010th Km Km 27.3511th Kms to 200Kms Km 19.60201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

Add 20% extra for the item "Recouping ofReserve Stock of stone for Flood ProtectionWork in Irrigation Department".

Chap-1 (Carriage) Page 4

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

2 Carriage of 5 tons of all material like coal, stone lime 16.1 Cement carried in containers other(unslaked), etc. B.G. Rail fastenings, points and crossing, than bags will be paid according toBridge Girders, pipes, sheets, Rail, M.S. bars, etc. etc. this item. The word "pipes" coversby truck or any other means owned by the contractor. G.I,C.I,R.C.C. and P.C.C.

1st chain (1st 30 m) Chain 157.70 30M 157.702nd chain (2nd 30 m) " 29.05 30M 29.053rd to 10th chain (60 to 300 m) " 18.05 30M 18.051000 to 3000 ft. (300 to 900 m) 1000 Ft. 177.25 300M 177.251st Km Km 176.452nd Km Km 81.103rd Km Km 59.804th Km Km 39.851st mile Mile 283.955th Km Km 36.502nd mile " 63.756th Km Km 35.753rd mile Mile 56.957th Km Km 32.754th mile 51.258th Km Km 32.355th mile 46.759th Km Km 29.906th mile 42.9010th Km Km 27.351 25.8011th Kms to 200Kms Km 19.60201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

3 Carriage of 100 maunds of fuel wood by truck 16.1or any other means owned by the contractor:

1st chain (1st 30 m) Chain 157.70 30 M 157.702nd chain (2nd 30 m) " 29.05 30 M 29.053rd to 10th chain (60 to 300 m) " 18.05 30 M 18.051000 to 3000 ft. (300 to 900 m) 1000 ft 177.25 300 M 177.251st Km Km 176.452nd Km Km 81.103rd Km Km 59.804th Km Km 39.851st mile Mile 283.955th Km Km 36.502nd mile " 63.756th Km Km 35.753rd mile " 56.957th Km Km 32.754th mile " 51.258th Km Km 32.355th mile " 46.759th Km Km 29.906th mile " 42.90

Chap-1 (Carriage) Page 5

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

10th Km Km 27.357th mile and subsequent miles " 25.8011th & subsequent Kms Km 19.60

4 Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm) ditto Reduce the rate by 33% in case ofor 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or carriage of 1000 Nos. tiles sizeany other means owned by the contractor :- 12"x6"x1¼" (300 x 150 x 30 mm).

1st chain (1st 30 m) Chain 157.70 30 M 157.702nd chain (2nd 30 m) " 29.05 30 M 29.053rd to 10th chain (60 to 300 m) " 18.05 30 M 18.051000 to 3000 ft. (300 to 900 m) 1000 Ft 177.25 300 M 177.251st Km Km 176.452nd Km Km 81.103rd Km Km 59.804th Km Km 39.851st mile Mile 283.955th Km Km 36.502nd mile " 63.756th Km Km 35.753rd mile " 56.957th Km Km 32.754th mile " 51.258th Km Km 32.355th mile " 46.759th Km Km 29.906th mile " 42.9010th Km Km 27.357th mile and subsequent miles " 25.8011th & subsequent Kms Km 19.60

5 Carriage of 100 cft. (2.83 cu.m) of all material like stone, 16.1 Material trolly to be supplied by theaggregate, spawl, kankar lime(unslaked), surkhi, etc. or Government and maintained and run150 cft. (4.25 cu.m) of timber, by means of material trolly. by the contractor.

1st chain (1st 30 m) Chain 157.70 30 M 157.702nd chain to 10th chain (2nd 30 m to 300 m) " 29.05 30 M 29.051000 to 3000 ft. (300 to 900 m) 1000 Ft. 177.25 300 M 177.251st Km Km 144.702nd Km Km 107.353rd Km Km 54.004th Km Km 40.851st mile Mile 232.905th Km Km 35.402nd mile 76.506th Km Km 33.953rd mile 64.307th Km Km 28.30 8th Km Km 27.90 9th Km Km 25.806th mile 42.9010th Km Km 23.607th mile and subsequent miles 25.8011th Kms to 200Kms Km 18.55201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

Chap-1 (Carriage) Page 6

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

6 Carriage of 5 tons of all material like coal, stone lime 16.1 Material trolly to be supplied by the(unslaked), etc. B.G. Rail fastening, points and crossing, Government and maintained and runBridge girders, pipes, sheets, Rail, M.S. bars, etc. etc. by by the contractor.means of material trolly.

1st chain (1st 30 m) Chain 157.70 30 M 157.702nd chain (2nd 30 m) " 29.05 30 M 29.051000 to 3000 ft. (300 to 900 m) 0/00 Ft. 177.25 300 M 177.251st Km Km 144.702nd Km Km 107.353rd Km Km 54.004th Km Km 40.85 5th Km Km 35.40 6th Km Km 33.953rd mile and subsequent miles 64.37th Km Km 28.304th mile 51.258th Km Km 27.90 9th Km Km 25.80 10th Km Km 23.60 q 11th Kms to 200Kms Km 18.55201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

7 Carriage of 100 maunds of fuel wood, by means of ditto Material trolly to be suppliedmaterial trolly. by the Government and

1st chain (1st 30 m) Chain 157.70 30 M 157.70 maintained and run by the2nd chain (2nd 30 m) " 29.05 30 M 29.05 contractor.1000 to 3000 ft. (300 to 900 m) 1000 Ft 177.25 300 M 177.251st Km Km 144.702nd Km Km 107.353rd Km Km 54.004th Km Km 40.851st mile Mile 232.905th Km Km 35.402nd mile " 76.506th Km Km 33.953rd mile subsequent miles " 64.307th Km Km 28.304th mile 51.258th Km Km 27.905th mile 46.759th Km Km 25.806th mile 42.9010th Km Km 23.607th mile and subsequent miles 25.8011th & subsequent Kms Km 18.55

8 Carriage of 1000 Nos. tiles 12"x6"x2" (300x150x50 mm), ditto Material trolly to be supplied by theby means of material trolly. Government and maintained and run

1st chain (1st 30 m) Chain 157.70 30 M 157.70 by the contractor.2nd chain (2nd 30 m) " 29.05 30 M 29.051000 to 3000 ft. (300 to 900 m) 0/00 Ft. 177.25 300 M 177.25

Chap-1 (Carriage) Page 7

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

1st Km Km 144.702nd Km Km 107.35 16.13rd Km Km 54.004th Km Km 40.851st mile Mile 232.905th Km Km 35.402nd mile " 76.506th Km Km 33.953rd mile subsequent miles " 64.307th Km Km 28.304th mile 51.258th. Km 27.905th mile 46.759th Km Km 25.806th mile 42.9010th Km Km 23.607th mile and subsequent miles 25.8011th & subsequent Kms Km 18.55

9 Carriage of 1000 No. bricks, 9"x4½"x3" ditto(225x113x75 mm) or 8"x4"x4" (200x100x100mm) (nominal)

1st chain (1st 30 m) Chain 129.21 30 M 129.212nd chain (2nd 30 m) " 27.60 30 M 27.603rd to 10th chain (60 to 300 m) " 14.81 30 M 14.811000 to 3000 ft. (300 to 900 m) 0/00 Ft. 145.12 300 M 145.121st Km Km 144.652nd Km Km 66.303rd Km Km 48.954th Km Km 32.901st mile Mile 232.755th Km Km 30.802nd mile " 52.256th Km Km 30.003rd mile " 48.207th Km Km 26.854th mile " 42.008th Km Km 26.505th mile " 38.309th Km Km 24.506th mile " 35.1510th Km Km 22.407th mile and subsequent miles " 21.1511th & subsequent Kms Km 15.95

10 Carriage of 1000 No. tiles 9"x4½"x1½" 16.1(225x113x38 mm).

1st chain (1st 30 m) Chain 77.98 30 M 77.982nd chain (2nd 30 m) " 14.35 30 M 14.35 16.13rd to 10th chain (60 to 300 m) " 8.85 30 M 8.85

Chap-1 (Carriage) Page 8

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 87.67 300 M 87.671st Km Km 87.302nd Km Km 40.153rd Km Km 29.604th Km Km 19.701st mile Mile 140.505th Km Km 17.902nd mile " 31.556th Km Km 17.603rd mile " 27.957th Km Km 16.204th mile " 25.358th Km Km 16.005th mile " 23.109th Km Km 14.806th mile " 21.2510th Km Km 13.607th mile and subsequent miles " 12.7511th & subsequent Kms Km 9.65

11 Carriage of 1 Cwt. (50 Kg) cement in bags. ditto

1st chain (1st 30 m) Chain 2.97 30 M 2.972nd chain (2nd 30 m) " 0.36 30 M 0.363rd to 10th chain (60 to 300 m) " 0.17 30 M 0.17

1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 1.75 300 M 1.75

1st Km Km 2.201st mile Mile 3.502nd Km Km 1.452nd mile " 1.003rd Km Km 0.603rd mile subsequent miles " 0.504th Km and subsequent kilometers. Km 0.35

12 Carriage of 100 Nos. empty cement bags including 16.1bundling.

1st 1000 (300 m) ft. 0/00 Ft. 43.48 300 M 43.481000 to 3000 (300 to 900 m) ft. " 5.41 300 M 5.41

1st Km Km 5.301st mile Mile 8.552nd Km Km 4.602nd mile to 6th mile Mile 1.953rd Km Km 2.157th mile and subsequent miles " 3.154th Km & subsequent Kms Km 1.75

13 Carriage of 100 (2.83 cu.m) cft. of Sarkanda or pilchi, frash ditto Previous lead of collection notor brushwood, by boat or road :- to be deducted from the next

Chap-1 (Carriage) Page 9

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

lead of carriage.

1st chain (1st 30 m) Chain 64.52 30 M 64.522nd chain (2nd 30 m) " 29.05 30 M 29.053rd to 10th chain (60 to 300 m) " 8.85 30 M 8.85

1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 72.82 300 M 72.82

1st Km Km 81.301st mile Mile 124.952nd Km Km 40.152nd mile " 89.153rd Km Km 29.603rd mile " 74.004th Km Km 19.704th mile " 53.855th Km Km 17.905th mile " 44.356th Km Km 17.606th mile 35.157th Km Km 16.207th mile and subsequent miles 21.158th Km Km 16.009th Km Km 14.8010th Km Km 13.6011th Km & subsequent Km 9.65

14 Carriage of light machinery weighing upto 3 tonne Ton Tonne dittoupto 1000 ft. (300 metre) 0/00 ft. 526.86 300 M 526.86Exceeding 1000 to 5000 ft (300 to 1500metre) 1000 ft. 127.65 " 127.65

1st Km Km 173.601st mile Mile 279.352nd Km Km 79.402nd mile " 50.403rd Km Km 52.103rd mile " 47.304th Km Km 32.304th mile " 37.705th Km Km 30.155th mile " 38.056th Km Km 28.906th mile " 29.157th Km Km 24.757th mile and subsequent miles " 20.208th Km Km 24.359th Km Km 23.55

Chap-1 (Carriage) Page 10

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

10th Km Km 18.3511th Km & susequent Km 14.75

15 Carriage of small consignments weighing upto 5 maunds 16.1 For consignment weighing 5 to 10(job rates) : maunds, rate be increased by 25%;

and for consignments weighing 10Consig- to 20 maunds, rate be increased by

Upto 1000 ft. (300 metre) ment/ 42.79 Consign- 42.79 100%.1000 ft. ment/

Exceeding 1000 to 3000 ft. (300 to 900 1000 ft. 29.34 300 M 29.34metre)

1st Km Consign- 27.201st mile Consign- 43.75 ment/ Km2nd Km ment/Mile 16.602nd mile and subsequent miles " 7.80 "3rd Km & subsequent " 5.20

16 Carriage of consignments job.

i) Cooly load for distance:- Each Each

a) Upto 5 Km Consignment 53.85 Consignmen 53.85b) Above 5 to 13 Km " 110.05 " 110.05

ii) Carriage of consignments odd jobs. Each Each a) Donkey load for distance upto 500 feet. Consignment 10.85 Consignmen 10.85b) Upto 1000 feet. " 16.45 " 16.45c) Upto ½ Mile/ 0.8 Km " 20.80 " 20.80d) Upto one Mile/ 1.6 Km " 26.00 " 26.00e) Upto three Miles/ 4.8 Km " 45.95 " 45.95f) Exceeding 3 Miles/ 16 km " 82.25 " 82.25

Each Eachiii) Cart load for a distance :- Consign- Consig-

ment nment a) upto 4 Miles/ 6.4 Km " 89.85 " 89.85b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km) " 163.55 " 163.55

iv) Camel load for a distance:-

a) upto 4 Miles/ 6.4 Km.) " 66.45 " 66.45b) exceeding 4 to 12 mills (6.4 Km to 19.2 Km) " 100.75 " 100.75

17 Hire charges of:- 1. This item will be allowed withprior concurrence of Superintending

i) truck (10 Ton Capacity) Per 3000.00 Per 3000.00 Engineer.day day 2. The rate includes pay of driver

Chap-1 (Carriage) Page 11

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

ii) tractor with trolly " 4352.00 " 1000.00 and cleaner only. The repairs shallbe the responsibility of the owner

iii) tractor without trolly " 4352.00 " 800.00 and the cost of lubrication, fuel,loading and unloading shall be paidby the borrower.

18 Carriage of bitumen, tar or other lubricants, in drums: 16.1

1st Km Per 28.951st mile Per 46.60 Tonne2nd Km Ton " 19.302nd mile " 7.453rd & subsequent Km " " 7.353rd mile 11.80

19 Carriage of Asbestos cement pipes BSS Class 'B" withcomet joint and rubber ring, including loading, unloadingand stacking (rate per 100 Rft. (30 m pipes):-

i) 3" (75 mm) i/d pipes:-1st chain (1st 30 m) Chain 6.20 30 M 6.202nd chain (2nd 30 m) " 1.15 30 M 1.153rd to 10th chain (60 to 300 m) " 0.70 30 M 0.701000 to 3000 ft. (300 to 900 m) 0/00 Ft. 7.00 300 M 7.001st Km Km 6.952nd Km Km 3.153rd Km Km 2.301st mile Mile 11.204th Km Km 1.552nd mile " 2.505th Km Km 1.403rd mile " 2.256th Km Km 1.354th mile " 2.007th Km Km 1.255th mile " 1.858th Km Km 1.206th mile " 1.709th Km Km 1.157th mile and subsequent miles " 1.0010th Km Km 1.05

11th Km & Susequent Km 1.00

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 8.15 30 M 8.152nd chain (2nd 30 m) " 1.50 30 M 1.503rd to 10th chain (60 to 300 m) " 0.95 30 M 0.95

Chap-1 (Carriage) Page 12

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

1000 to 9000 ft. (300 to 900 m) 0/00 Ft. 9.15 300 M 9.15

1st Km Km 9.151st mile Mile 14.702nd Km Km 4.152nd mile " 3.303rd Km Km 3.053rd mile " 2.954th Km Km 2.054th mile " 2.655th Km Km 1.855th mile " 2.406th Km Km 1.756th mile " 2.207th Km Km 1.657th mile and subsequent miles " 1.358th Km Km 1.609th Km Km 1.5010th Km Km 1.3511th Km & subsequent Km Km 1.30

iii) 6" (150 mm) i/d pipes:-

1st chain (1st 30 m) Chain 12.25 30 M 12.252nd chain (2nd 30 m) " 2.25 30 M 2.253rd to 10th chain (60 to 300 m) " 1.40 30 M 1.401000 to 9000 ft. (300 to 900 m) 0/00 Ft. 13.75 300 M 13.751st Km Km 13.702nd Km Km 6.303rd Km Km 4.601st mile Mile 22.054th Km Km 3.052nd mile " 4.955th Km Km 2.803rd mile " 4.406th Km Km 2.754th mile " 4.007th Km Km 2.555th mile " 3.658th Km Km 2.406th mile " 3.359th Km Km 2.307th mile and subsequent miles " 2.0010th Km Km 2.1011th Km & subsequent Km Km 1.75

iv) 8" (200 mm) i/d pipes:

1st chain (1st 30 m) Chain 20.70 30 M 20.702nd chain (2nd 30 m) " 3.80 30 M 3.80

Chap-1 (Carriage) Page 13

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

3rd to 10th chain (60 to 300 m) " 2.35 30 M 2.351000 to 3000 ft. (300 to 900 m) 0/00 Ft. 23.25 300 M 23.251st Km Km 23.152nd Km Km 10.903rd Km Km 7.951st mile Mile 37.254th Km Km 5.252nd mile " 8.355th Km Km 4.853rd mile " 7.506th Km Km 4.754th mile " 6.707th Km Km 4.305th mile " 6.158th Km Km 4.156th mile " 5.659th Km Km 3.757th mile and subsequent miles " 3.4010th Km Km 2.4511th Km & subsequent Km Km 1.70

v) 10" (250 mm) i/d pipes:-1st chain (1st 30 m) Chain 27.8 30 M 27.82nd chain (2nd 30 m) " 5.10 30 M 5.103rd to 10th chain (60 to 300 m) " 3.20 30 M 3.201000 to 3000 ft. (300 to 900 m) 0/00 Ft. 31.25 300 M 31.251st Km Km 31.152nd Km Km 14.203rd Km Km 10.451st mile Mile 50.104th Km Km 6.902nd mile " 11.255th Km Km 6.303rd mile " 10.056th Km Km 6.204th mile Mile 9.057th Km Km 5.905th mile " 8.258th Km Km 5.856th mile " 7.559th Km Km 5.407th mile and subsequent miles " 4.5510th Km Km 4.9511th Km & subsequent Kms Km 3.50

vi) 12" (300 mm) i/d pipes:1st chain (1st 30 m) Chain 36.15 30 M 36.152nd chain (2nd 30 m) " 6.65 30 M 6.653rd to 10th chain (60 to 300 m) " 4.15 30 M 4.151000 to 3000 ft. (300 to 900 m) 0/00 Ft. 40.65 300 M 40.65

Chap-1 (Carriage) Page 14

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

1st Km Km 40.502nd Km Km 19.453rd Km Km 13.954th Km Km 9.001st mile Mile 65.155th Km Km 8.202nd mile " 14.606th Km Km 8.053rd mile " 13.057th Km Km 7.354th mile " 11.758th Km Km 7.255th mile " 10.709th Km Km 6.706th mile " 9.8510th Km Km 6.157th mile and subsequent miles " 5.9011th Km & subsequent Kms Km 4.45

vii) 16" (400 mm) i/d pipes:-1st chain (1st 30 m) Chain 59.30 30 M 59.302nd chain (2nd 30 m) " 10.90 30 M 10.903rd to 10th chain (60 to 300 m) " 6.80 30 M 6.801000 to 3000 ft. (300 to 900 m) 0/00 Ft. 66.65 300 M 66.651st Km Km 66.352nd Km Km 30.703rd Km Km 22.451st mile Mile 106.754th Km Km 14.952nd mile " 23.955th Km Km 13.703rd mile " 21.406th Km Km 13.404th mile " 19.257th Km Km 12.305th mile " 17.558th Km Km 12.106th mile " 16.159th Km Km 11.207th mile and subsequent miles " 9.7010th Km Km 10.2511th Km & subsequent Kms Km 7.40

viii) 18" (450 mm) i/d pipes:-

1st chain (1st 30 m) Chain 76.20 30 M 76.202nd chain (2nd 30 m) " 14.05 30 M 14.053rd to 10th chain (60 to 300 m) " 8.70 30 M 8.701000 to 3000 ft. (300 to 900 m) 0/00 Ft. 85.65 300 M 85.65

Chap-1 (Carriage) Page 15

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

1st Km Km 85.252nd Km Km 39.153rd Km Km 28.901st mile Mile 137.154th Km Km 19.252nd mile " 30.805th Km Km 17.653rd mile " 27.506th Km Km 17.254th mile " 24.757th Km Km 15.855th mile " 22.608th Km Km 15.606th mile " 20.759th Km Km 14.457th mile and subsequent miles " 12.4510th Km Km 13.2511th Km & subsequent Kms Km 9.40

ix) 20" (500 mm) i/d pipes:-

1st chain (1st 30 m) Chain 80.85 30 M 80.852nd chain (2nd 30 m) " 14.90 30 M 14.903rd to 10th chain (60 to 300 m) " 9.25 30 M 9.251000 to 3000 ft. (300 to 900 m) 0/00 Ft. 90.90 300 M 90.901st Km Km 90.502nd Km Km 41.553rd Km Km 30.651st mile Mile 145.604th Km Km 20.452nd mile " 32.705th Km Km 18.703rd mile " 29.206th Km Km 18.304th mile " 26.257th Km Km 16.755th mile " 23.958th Km Km 16.556th mile " 22.009th Km Km 15.307th mile and subsequent miles " 13.2010th Km Km 14.0011th Km & subsequent Kms Km 10.15

x) 24" (600 mm) i/d pipes:-1st chain (1st 30 m) Chain 89.60 30 M 89.602nd chain (2nd 30 m) " 16.50 30 M 16.503rd to 10th chain (60 to 300 m) " 10.25 30 M 10.251000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 100.70 300 M 100.701st Km Km 100.25

Chap-1 (Carriage) Page 16

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

2nd Km Km 46.053rd Km Km 33.901st mile Mile 161.354th Km Km 23.102nd mile " 36.205th Km Km 20.703rd mile " 32.356th Km Km 20.254th mile Mile 29.107th Km Km 18.555th mile " 26.558th Km Km 18.306th mile " 24.409th Km Km 16.957th mile and subsequent miles " 14.6510th Km Km 15.5011th Km & subsequent Kms Km 11.05

20 Carriage of PVC pipes B.S.S. Class 'B' including loading,unloading and stacking (Rate per 1000 ft.) (300 metre) :-

i) 3" (75 mm) i/d pipes:-

1st chain (1st 30 m) Chain 12.20 30 M 12.202nd chain (2nd 30 m) " 2.25 30 M 2.253rd to 10th chain (60 to 300 m) " 1.40 30 M 1.401000 to 3000 ft. (300 to 900 m) 0/00 Ft. 13.70 300 M 13.701st Km Km 13.652nd Km Km 6.303rd Km Km 4.651st mile Mile 22.004th Km Km 3.102nd mile " 4.955th Km Km 2.803rd mile " 4.406th Km Km. 2.754th mile " 3.957th Km Km 2.505th mile Mile 3.608th Km Km 2.456th mile " 3.309th Km Km 2.257th mile and subsequent miles " 2.0010th Km Km 2.0511th Km & subsequent Kms Km 1.65

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 18.80 30 M 18.802nd chain (2nd 30 m) " 3.45 30 M 3.45

Chap-1 (Carriage) Page 17

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

3rd to 10th chain (60 to 300 m) " 2.15 30 M 2.151000 to 3000 ft. (300 to 900 m) 0/00 Ft. 21.15 300 M 21.151st Km Km 21.052nd Km Km 9.853rd Km Km 7.151st mile Mile 33.854th Km Km 4.652nd mile " 7.605th Km Km 4.303rd mile " 6.806th Km Km 4.204th mile " 6.107th Km Km 3.805th mile " 5.558th Km Km 3.756th mile " 5.109th Km Km 3.457th mile and subsequent miles " 3.0510th Km Km 3.1511th Km & subsequent Kms Km 2.70

iii) 5" (125 mm) i/d pipes:-

1st chain (1st 30 m) Chain 25.65 30 M 25.652nd chain (2nd 30 m) " 4.75 " 4.753rd to 10th chain (60 to 300 m) " 2.95 " 2.951000 to 3000 ft. (300 to 900 m) 0/00 Ft. 28.85 300 M 28.851st Km Km 28.702nd Km " 13.353rd Km " 9.851st mile Mile 46.204th Km " 6.602nd mile " 10.355th Km Km. 5.853rd mile " 9.256th Km " 5.754th mile Mile 8.357th Km " 5.255th mile " 7.608th Km 5.206th mile " 7.009th Km 4.807th mile and subsequent miles " 4.2010th Km 4.4011th Km & subsequent Kms 3.20

iv) 6" (150 mm) i/d pipes:

1st chain (1st 30 m) Chain 35.35 30 M 35.352nd chain (2nd 30 m) " 6.50 30 M 6.50

Chap-1 (Carriage) Page 18

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

3rd to 10th chain (60 to 300 m) " 4.05 30 M 4.051000 to 3000 ft. (300 to 300 m) 0/00 Ft. 39.75 300 M 39.751st Km. Km. 39.552nd Km Km. 18.203rd Km Km. 13.401st mile Mile 63.65 4th Km Km. 8.952nd mile " 14.305th Km Km. 8.203rd mile " 12.806th Km Km. 8.054th mile " 11.507th Km Km. 7.355th mile " 10.508th Km Km. 7.256th mile " 9.609th Km Km. 6.707th mile and subsequent miles " 5.8010th Km Km. 6.1511th Km & subsequent Kms Km. 4.40

v) 8" (200 mm) i/d pipes:-

1st chain (1st 30 m) Chain 62.00 30 M 62.002nd chain (2nd 30 m) " 11.40 30 M 11.403rd to 10th chain (60 to 300 m) " 7.10 30 M 7.101000 to 3000 ft. (300 to 900 m) 0/00 Ft. 69.70 300 M 69.701st Km Km 69.402nd Km Km 31.903rd Km Km 23.501st mile Mile 111.654th Km Km 15.702nd mile " 25.055th Km Km 14.353rd mile Mile 22.406th Km Km 14.054th mile " 20.157th Km Km 12.905th mile " 18.408th Km Km 12.706th mile " 16.859th Km Km 11.757th mile and subsequent miles " 10.1510th Km Km 10.7511th Km & subsequent Kms Km 7.65

vi) 10" (250 mm) i/d pipes:-1st chain (1st 30 m) Chain 96.15 30 M 96.152nd chain (2nd 30 m) " 17.70 30 M 17.70

Chap-1 (Carriage) Page 19

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

3rd to 10th chain (60 to 300 m) " 11.00 30 M 11.001000 to 3000 ft. (300 to 900 m) 0/00 Ft. 108.10 300 M 108.101st Km Km 107.602nd Km Km 49.453rd Km Km 36.451st mile Mile 173.154th Km Km 24.302nd mile " 38.855th Km Km 22.253rd mile " 34.756th Km Km 21.804th mile " 31.257th Km Km 19.955th mile " 28.508th Km Km 19.706th mile " 26.159th Km Km 18.207th mile and subsequent miles " 15.7010th Km Km 16.6511th Km & subsequent Kms Km 12.00

vii) 12" (300 mm) i/d pipes:-

1st chain (1st 30 m) Chain 135.35 30 M 135.352nd chain (2nd 30 m) " 24.95 30 M 24.953rd to 10th chain (60 to 300 m) " 15.50 30 M 15.501000 to 3000 ft. (300 to 900 m) 0/00 Ft. 152.15 300 M 152.151st Km Km 151.452nd Km Km 69.603rd Km Km 51.301st mile Mile 243.754th Km Km 34.202nd mile Mile 54.705th Km Km 31.353rd mile " 48.906th Km Km 30.704th mile " 44.007th Km Km 28.155th mile " 40.108th Km Km 27.756th mile " 36.859th Km Km 25.657th mile and subsequent miles " 22.1510th Km Km 23.4511th Km & subsequent Kms Km 16.85

viii) 14" (350 mm) i/d pipes:-1st chain (1st 30 m) Chain 176.20 30 M 176.202nd chain (2nd 30 m) " 32.45 30 M 32.45

Chap-1 (Carriage) Page 20

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

3rd to 10th chain (60 to 300 m) " 20.15 30 M 20.151000 to 3000 ft. (300 to 900 m) 0/00 Ft. 198.05 300 M 198.051st Km Km 197.152nd Km Km 90.603rd Km Km 66.801st mile Mile 317.254th Km Km 44.552nd mile " 71.255th Km Km 40.753rd mile " 63.656th Km Km 39.954th mile Mile 57.257th Km Km 36.605th mile " 52.208th Km Km 36.106th mile " 47.959th Km Km 33.357th mile and subsequent miles " 28.8010th Km Km 30.6011th Km & subsequent Kms Km 22.00

21 Carriage of PVC pipes B.S.S. Class 'D' including loading,unloading and stacking (Rates per 1000 ft.):-

i) 2" (50 mm) i/d pipes:-1st chain (1st 30 m) Chain 8.90 30 M 8.902nd chain (2nd 30 m) " 1.65 30 M 1.653rd to 10th chain (60 to 300 m) " 1.00 30 M 1.001000 to 3000 ft. (300 to 900 m) 0/00 Ft. 10.05 300 M 10.051st Km Km 9.952nd Km Km 4.603rd Km Km 3.401st mile Mile 16.054th Km Km 2.252nd mile " 3.605th Km Km 2.053rd mile " 3.206th Km Km 2.004th mile " 2.907th Km Km 1.855th mile " 2.658th Km Km 1.806th mile " 2.459th Km Km 1.707th mile and subsequent miles " 1.4510Km Km 1.5511th Km & subsequent Kms Km 1.15

ii) 2½" (63 mm) i/d pipes:-

Chap-1 (Carriage) Page 21

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

1st chain (1st 30 m) Chain 13.90 30 M 13.902nd chain (2nd 30 m) " 2.55 30 M 2.553rd to 10th chain (60 to 300 m) " 1.60 30 M 1.601000 to 3000 ft. (300 to 900 m) 0/00 Ft. 15.60 300 M 15.601st Km Km 15.552nd Km Km 7.153rd Km Km 5.301st mile Mile 25.004th Km Km 3.552nd mile " 5.605th Km Km 3.253rd mile " 5.006th Km Km 3.204th mile " 4.507th Km Km 2.905th mile " 4.108th Km Km 2.706th mile " 3.809th Km Km 2.557th mile and subsequent miles " 2.2510Km Km 2.3511th Km & subsequent Kms Km 1.75

iii) 3" (75 mm) i/d pipes:-1st chain (1st 30 m) Chain 19.25 30 M 19.252nd chain (2nd 30 m) " 3.55 30 M 3.553rd to 10th chain (60 to 300 m) " 2.20 30 M 2.201000 to 3000 ft. (300 to 900 m) 0/00 Ft. 21.60 300 M 21.601st Km Km 21.552nd Km Km 9.903rd Km Km 7.351st mile Mile 34.654th Km Km 4.902nd mile " 7.805th Km Km 4.453rd mile " 6.956th Km Km 4.404th mile " 6.257th Km Km 4.005th mile Mile 5.708th Km Km 3.956th mile " 5.259th Km Km 3.557th mile and subsequent miles " 3.1510th Km Km 3.2511th Km & subsequent Kms Km 2.45

iv) 4" (100 mm) i/d pipes:-1st chain (1st 30 m) Chain 31.85 30 M 31.85

Chap-1 (Carriage) Page 22

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

2nd chain (2nd 30 m) " 5.85 30 M 5.853rd to 10th chain (60 to 300 m) " 3.65 30 M 3.651000 to 3000 ft. (300 to 900 m) 0/00 Ft. 35.80 300 M 35.801st Km Km 35.652nd Km Km 16.353rd Km Km 12.051st mile Mile 57.354th Km Km 8.052nd mile " 12.855th Km Km 7.353rd mile " 11.506th Km Km 7.204th mile " 10.357th Km Km 6.705th mile " 9.458th Km Km 6.506th mile " 8.659th Km Km 6.007th mile and subsequent miles " 5.2010th Km Km 5.4511th Km & subsequent Kms Km 4.05

v) 5" (125 mm) i/d pipes:-

1st chain (1st 30 m) Chain 47.60 30 M 47.602nd chain (2nd 30 m) " 8.75 30 M 8.753rd to 10th chain (60 to 300 m) " 5.45 30 M 5.451000 to 3000 ft. (300 to 900 m) 0/00 Ft. 53.50 300 M 53.501st Km Km 53.252nd Km Km 24.503rd Km Km 18.051st mile Mile 85.704th Km Km 12.052nd mile " 19.255th Km Km 11.003rd mile " 17.206th Km Km 10.804th mile " 15.457th Km Km 9.905th mile " 14.108th Km Km 9.756th mile 12.959th Km Km 9.007th mile and subsequent miles 7.8010th Km Km 8.1511th Km & subsequent Kms Km 6.00

vi) 6" (150 mm) i/d pipes:-1st chain (1st 30 m) Chain 68.55 30 M 68.55

Chap-1 (Carriage) Page 23

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

2nd chain (2nd 30 m) " 12.65 30 M 12.653rd to 10th chain (60 to 300 m) " 7.85 30 M 7.851000 to 3000 ft. (300 to 900 m) 0/00 Ft. 77.05 300 M 77.051st Km Km 76.702nd Km Km 35.253rd Km Km 25.951st mile Mile 123.454th Km Km 17.302nd mile 27.705th Km Km 15.853rd mile 24.756th Km Km 15.554th mile 22.307th Km Km 14.255th mile 20.308th Km Km 14.056th mile 18.659th Km Km 12.957th mile and subsequent miles 11.2010th Km Km 11.8511th Km & subsequent Kms Km 8.60

22 Hand shunting loaded Railway wagons ortrucks:- a) upto ¼ mile / ¼ Km Each 259.40 Each 162.15b) upto ½ mile / ½ Km No 469.60 No 293.50c) upto ¾ mile / ¾ Km " 634.00 " 396.25d) upto 1 (1.6 Km) mile " 754.40 " 471.50e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 425.85 No/Km 266.15

23 Hand shunting empty Railway wagons or trucks.

a) upto ¼ mile / ¼ Km Each 150.45 Each 94.05b) upto ½ mile / ½ Km No. 249.30 No. 155.80c) upto ¾ mile / ¾ Km " 328.75 " 205.45d) upto 1 mile / 1 Km " 394.65 " 246.65e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 209.10 No/Km 130.70

Chap-2 (Loading/Unloading) Page 24

2. LOADING, UNLOADING & STACKING1 The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Loading or unloading into or from Railway wagons, lead 100 Cft. 533.30 cu.m 188.35 within one chain, (30m) shingle, sand, ballast, surkhi, ashes, kankar, brick bats, coal, lime or 1,000 Nos. tiles size12"x6"x2" (300x150x50 mm) or 9"x4½"x1½"(225x113x37mm) properly laid & stacked.

2 Loading or unloading bricks into or from Railway wagonslaid and stacked, lead within one chain:-

a) Bricks 10" (250 mm) size. 1000 Nos. 666.60 1000 Nos. 666.60

b) Bricks 9" (225 mm) or smaller size. ditto 533.30 ditto 533.30

3 Loading or unloading into or from Railway wagons cement 100 Bags 666.60 100 Bags 666.60in bags (from inside or outside the godown) and stackingwithin one chain (30 m)

4 Loading or unloading into or from Railway wagons empty 100 Nos. 64.00 100 Nos. 64.00cement bags (from inside or outside the godown) andstacking.

5 Loading or unloading into or from Railway wagons (from 100 Mds. 399.95 100 Kg 10.70inside or outside the godown) and stacking, white lime in bags.

6 Loading or unloading into or from Railway wagons Per 319.95 Per 314.90Structural Steel, R.S. joists, broad, narrow or meter gauge Tonne Tonnerail and rail fastenings, etc.

7 Loading or unloading 45 gallon (204.57 Litres) drums full Each 40.00 Each 40.00into or from Railway wagons, lead upto one chain.

8 Loading or unloading packages of all sorts, upto one Cwt Each 20.00 Each 20.00 Except cement in jute or(50 Kg). paper bags.

9 Loading or unloading sleepers other than wooden,including stacking lead within one chain:-

a) Broad gauge sleepers 100 Nos. 1333.20 100 Nos. 1333.20

b) Metre gauge and narrow gauge sleepers. ditto 666.60 ditto 666.60

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

Chap-2 (Loading/Unloading) Page 25

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

10 Loading or unloading timber logs or timber for shuttering, Per 166.65 Per 164into or from Railway wagons of any gauge, including Ton Tonnestacking lead within one chain (30 m)

11 Loading or unloading bhoosa in Railway wagons lead upto 100 Mds. 1599.85 100 Kg 42.85150 ft. (45 m)

12 Loading or unloading timber scrap or wooden plugs, into or Per 266.65 Per 262.45from Railway wagons, and stacking within one chain lead. Ton Tonne

13 Loading or unloading pitching stone or spawl from Railway 100 Cft. 197.30 cu.m 69.70wagons of any gauge (including clearing 5 ft. (1500 mm)away from the rail).

14 Loading or unloading building stone (including clearing 5 ft. 100 Cft. 255.95 cu.m 90.40(1.5 m) away from rails).

15 Unloading oil, bitumen tar, etc.

a) Crude oil (to be pumped from tank wagon into tank). 1000 666.60 100 14.65Gallon litres

b) Crude oil (drained by gravity). 1000 666.60 100 14.65Gallon litres

c) Crude oil materials from railway wagons. 100 Cft. 85.35 cu.m 30.15

d) Fuel oil from tank into empty drums, including Per 237.00 Per 233.25stacking within one chain (30 m). Ton Tonne

e) Petrol (2 gallon tin) 100 Nos. 335.95 100 Nos. 335.95 The rate includes checkingand weighing the tins.

f) Kerosene oil (4 gallon tin) 100 Nos. 666.60 100 Nos. 666.6016 Removing and stacking within one chain

(30 m) lead:

a) Stone, spawl, brick bats, shingle, sand, lime, 100 Cft. 266.65 cu.m 94.20surkhi, ashes, kankar and coat, etc.

b) Bricks. 1000 Nos. 711.05 1000 Nos. 711.05

c) Broad gauge wooden sleepers. 100 Nos. 426.6 100 Nos. 426.6

d) Metre gauge or narrow gauge wooden sleepers. 100 Nos. 253.95 100 Nos. 253.95

e) Rails girders, pipes, cement etc. Per 118.50 Per 116.65Ton Tonne

Chap-2 (Loading/Unloading) Page 26

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

f) Bridge and crossing timbers, etc. 100 No. 1422.10 100 No. 1422.10

17 Loading into wagons girders, rails, permanent way Per 266.65 Per 262.45material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. including lead one chain (30 M) and stackinginside wagons.

18 Unloading from wagons girders, rails, permanent way Per 152.35 Per 149.95material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. lead upto one chain (30 m) but excludingstacking.

19 Loading into wagons wooden broad gauge sleepers, 100 Nos. 1066.55 100 Nos. 1066.55including one chain (30 m) lead and stacking,.

20 Unloading wooden broad gauge sleepers from wagons, 100 Nos. 507.90 100 Nos. 507.90including one chain (30 m) lead and stacking.

21 Loading metre gauge or narrow gauge wooden sleepers, 100 Nos. 533.30 100 Nos. 533.30including one chain (30 m) lead and stacking insidewagons.

22 Unloading metre gauge or narrow gauge wooden sleepers, 100 Nos. 280.65 100 Nos. 280.65including one chain (30 m) lead but excluding stacking.

23 Loading bridge and crossing timbers, including one chain 100 Nos. 2133.10 100 Nos. 2133.10(30 m) lead and stacking.

24 Unloading bridge and crossing timbers, including one 100 Nos. 1066.55 100 Nos. 1066.55chain (30 m) lead but excluding stacking.

25 Loading or unloading bitumen, asphalt or tar in drums, into Per 160.00 Per 157.45or from railway wagons, lead upto one chain (30 m). Ton Tonne

Chap-3 (Earthwork) Page 27

1 Special allowances for the hardness, wetness and slush:-The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of suchallowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and ofwhich dry bulk density is not less than 1.5, will be treated as hard.

2 Deduction for shrinkage from bank measurements:-The following allowances should be provided for material which is not rammed, or equally consolidated:-a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%

Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

1 Earthwork excavation undressed lead upto a single throw 171 to 17.5of Kassi, phaorah or shovel:-

a) In ashes, sand, soft soil or silt clearance. 1000 Cft. 1,999.80 -- cu.m 70.65 --b) In ordinary soil. 1000 Cft. 2,399.75 -- cu.m 84.75 --

2 Earthwork excavation in ashes, sand and soft soil or silt 1000 Cft. 2,933.05 -- cu.m 103.60 -- ditto

clearance, undressed lead upto 50 ft (15 metre).

3 Bed clearance and dressing slopes of drains to required ditto The rate is applicable where the earthsections including the removal of weeds, roots, etc. of the bed to be removed is of thedisposal of excavated materials within 50 ft. (15 metre) lead. type of ordinary soil. When it is silt ora) Excavated material undressed. 1000 Cft. 3,732.95 -- cu.m 131.85 -- 1 or 2 above, whichever is applicable.b) Excavated material dressed in the specified manner. 1000 Cft. 4,037.90 -- cu.m 142.60 -- the drains of each category.

4 Borrowpit excavation undressed lead upto 100 ft (30 metre).

a) Ordinary soil 1000 Cft. 3,732.95 -- cu.m 131.85 --b) Hard soil 1000 Cft. 4,586.20 -- cu.m 162.00 --

5 Earthowrk in ordinary soil for embankments lead upto 100 *411-1 to The rate includes hire charges of

ft. (30 m), including ploughing and mixing with blade grade 411-13 and machinery, cost of fuel, lubricants, payor disc harrow or other suitable equipment, and 301-1 & of driver and cleaner. The rate alsocompaction by mechanical means at optimum moisture 202-3 includes clearing and grubbingcontent and dressing to designed section, complete in all where necessary.respects:- i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. 4,074.15 4,651.40 cu.m 143.90 164.30ii) 90% maximum modified AASHO dry density. 1000 Cft. 4,074.15 4,562.80 cu.m 143.90 161.15iii) 85% maximum modified AASHO dry density. 1000 Cft. 4,074.15 4,474.20 cu.m 143.90 158.05

6 Regular excavation dressed. 1000 Cft. 2,749.20 -- cu.m 97.10 -- *411-2

7 Earthwork excavation in open cutting upto 5'-0" (1.5 m) 17.1 to depth for storm water channels, drains, sullage drains in 17.5open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

3. EARTHWORK (EXCAVATION & EMBANKMENT)

Chap-3 (Earthwork) Page 28

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead:- i) ordinary 1000 Cft. 4,674.40 4,751.65 cu.m 165.10 167.85ii) hard 1000 Cft. 5,527.65 5,604.90 cu.m 195.25 197.95 iii) very hard 1000 Cft. 6,434.20 6,511.50 cu.m 227.25 230.00iv) gravel & shingle 1000 Cft. 10,828.20 10,905.50 cu.m 382.45 385.20

8 Earthwork excavation in open cutting 5.01 ft. (1.5 m) to ditto

10.0 ft. (3.0 mm) depth for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 100 ft. (30 m) lead:- i) ordinary 1000 Cft. 5,087.30 5,241.00 cu.m 179.70 185.10ii) hard 1000 Cft. 5,940.55 6,094.25 cu.m 209.80 215.25iii) very hard 1000 Cft. 6,847.10 7,000.80 cu.m 241.85 247.25iv) gravel & shingle 1000 Cft. 11,774.40 11,928.10 cu.m 415.85 421.30

9 Excavation in shingle or gravel formation and rock, not 17.1 to 17.5

requiring blasting, undressed lead upto 100 ft (30 m). i) Dry 1000 Cft. 10,132.30 -- cu.m 357.85 --ii) Wet 1000 Cft. 11,732.15 -- cu.m 414.40 --iii) In flowing water 1000 Cft. 14,931.85 -- cu.m 527.40 --

10 Earthwork excavation in irrigation channels, drains, etc. to

designed section, grades and profiles, excavated material dittodisposed off and dressed within 50 ft. (15 m) lead:-

i) ordinary 1000 Cft. 4,287.35 -- cu.m 151.45 --ii) hard 1000 Cft. 5,140.60 -- cu.m 181.55 --iii) very hard 1000 Cft. 6,047.20 -- cu.m 213.60 --iv) gravel & shingle 1000 Cft. 10,707.85 -- cu.m 378.20 --

11 Excavation in rock dressed to designed section, grades and profiles, excavated material disposed off within 100 ft. (30 m) 17.1 to 17.5 Tools and plants shall be the liabilityand lift upto 5'-0" (1.5 m). of the contractor.a) Soft rock, slate, shale, schist laterite work, with pick and 1000 Cft. 10,237.90 -- cu.m 361.60 --

crow bar. b) Medium hard rock, requiring occasional blasting. 1000 Cft. 16,188.60 16,779.00 cu.m 571.80 592.65

12 a) Excavation in hard rock requiring blasting and disposal

of excavated material (blasted material) upto 50 ft. (15 17.1 to 17.5 1) Tools and plants required shall bem) lead, (including dressing and leveling to designed the liability of the Contractorsection,e tc. complete).

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 9,876.25 10,466.65 cu.m 348.85 369.70 excavated section is not dressed orii) Grade II 1000 Cft. 10,583.75 11,567.75 cu.m 373.80 408.55 levelled to designed section.iii) Grade III 1000 Cft. 12,654.85 13,835.65 cu.m 446.95 488.70iv) Grade IV 1000 Cft. 14,054.05 15,431.65 cu.m 496.40 545.05

Chap-3 (Earthwork) Page 29

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

v) Grade V 1000 Cft. 15,557.50 17,131.90 cu.m 549.50 605.10vi) Grade VI 1000 Cft. 16,690.10 18,461.30 cu.m 589.50 652.05

b) Excavation in hard rock requiring blasting, but blasting

prohibited, and disposal of excavated material within 50 17.1 to 17.5 1) Tools and plants required shall beft. (15 m) lead (including dressing and levelling to the liability of the contractor.designed section, etc. complete):-

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 19,752.50 20,933.30 cu.m 697.65 739.35 excavated section is not dressed orii) Grade II 1000 Cft. 21,167.50 23,135.50 cu.m 747.65 817.15 levelled to designed section.iii) Grade III 1000 Cft. 25,309.70 27,671.30 cu.m 893.95 977.35iv) Grade IV 1000 Cft. 28,108.10 30,863.30 cu.m 992.80 1090.10v) Grade V 1000 Cft. 31,115.05 34,263.85 cu.m 1099.00 1210.20vi) Grade VI 1000 Cft. 33,380.15 36,922.55 cu.m 1179.00 1304.10

13 Rehandling of earthwork:

a) Lead upto a single throw of Kassi, phaorah or shovel 1000 Cft. 1,333.20 -- cu.m 47.10 -- dittob) Upto a lead of 50 ft. (15 m). 1000 Cft. 1,866.50 -- cu.m 65.95 --

14 Rehandling of gravel work or excavated rock, 1000 Cft. 5,332.80 -- cu.m 188.35 -- 17.1 to 17.5

lead upto 50 ft.( 15 m)

15 Filling, watering and ramming earth under floors:- ditto

i) with surplus earth from foundation, etc. 1000 Cft. 2,698.10 -- cu.m 95.30 --ii) with new earth excavated from outside, 1000 Cft. 5,250.35 -- cu.m 185.45 --

lead upto one chain (30 m). 16 Extra for every 50 ft. (15 m) additional lead or part thereof :- This rate shall be applicable upto

1000 ft. total distance, including the i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 50.15 -- cu.m 1.75 -- lead covered in the item of earthworkii) for gravel, shingle or rock. 1000 Cft. 59.20 -- cu.m 2.10 --

17 Transportation of earth all types when the total distance, This rate will be paid inaddition to the

including the lead covered in the item of work, is more than rate of earthwork, without deducting1000 ft. (300 m) the lead covered in the item ofa) upto ¼ mile (400 m). 1000 Cft. 2,443.50 -- cu.m 86.30 -- earthworkb) for every 330 ft. (100 m) additional lead or part thereof,

beyond ¼ mile (400 m) upto one mile. (1.6 Km.) 1000 Cft. 33.00 -- cu.m 1.15 --c) for every ¼ mile (400 m) additional lead or part thereof,

beyond one mile (1.6 Km.) upto 5 mile (8 Km). 1000 Cft. 159.40 -- cu.m 5.65 --d) for every ½ mile (800 m) additional lead

or part thereof, beyond 5 miles (8 Km). 1000 Cft. 141.35 -- cu.m 5.00 --

18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5complete:- a) Ashes, sand, silt or soft soil. 1000 Cft. 174.85 -- cu.m 6.20 --b) Ordinary or hard soil. 1000 Cft. 341.20 -- cu.m 12.05 --c) Gravel work or soft rock not requiring 1000 Cft. 821.05 -- cu.m 29.00 --

blasting.

Chap-3 (Earthwork) Page 30

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

19 Dowel dressing. Per 159.95 -- Metre 5.25 -- ditto This rate is in addition to payment for

Chain dressed earhtwork.

20 a) Dressing slopes of banks or ground surface. 100Sft. 71.45 -- sq.m 7.70 -- ditto To be paid only when exclusively dressing is done and no earthwork is carried out in embankment or cutting.

b) Dressing of earthwork (done by machinery or otherwise 100Sft. 126.65 -- sq.m 13.65 -- i) The surface area dressed is to beand left undressed) to designed section. taken for measurement.

ii) The item is applicable where the dressing is done by the contractor other than the one who executed the

work.21 Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around 17.1 to 17.5structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) a) in sand, ashes or loose soil 1000 Cft. 4,820.65 -- cu.m 170.25 --b) in ordinary soil. 1000 Cft. 5,631.10 -- cu.m 198.90 --c) in hard soil or soft murum. 1000 Cft. 6,303.00 -- cu.m 222.60 --

22 Cutting hard rock such as granite, ballast, hard lime stone or 1000 Cft. 40,323.35 44,353.10 cu.m 1424.20 1566.55 17.1 to 17.5 Tools and plants required shall be thesand stone, etc. with chisels and hammers, for small liability of the contractor.foundations.

23 Extra for excavation requiring shoring. 1000 Cft. 683.75 942.50 cu.m 24.15 33.30 17.1 to 17.5 Composite rate includes materials,

i.e. plank, etc.24 Compaction of earthwork (soft, ordinary or hard soil) :- ditto

a) Mixing, moistening earth to optimum moisture content 1000 Cft. 646.10 -- cu.m 22.80 --

in layers for compaction, etc. complete.

b) Compaction by rolling with animal driven roller/hand rammed:

i) soft or sandy soil 1000 Cft. 799.90 -- cu.m 28.25 --

1) The rate does not include hireii) ordinary soil 1000 Cft. 933.25 -- cu.m 32.95 -- charges of the roller.

2) Roller to be 'supplied by iii) hard soil 1000 Cft. 1,066.55 -- cu.m 37.65 -- Government

iv) admixture of shingle 1000 Cft. 1,199.90 -- cu.m 42.40 --

c) Ramming earthwork (all types of soil). 1000 Cft. 799.90 -- cu.m 28.25 --

d) Ramming earhtwork behind retaining walls. 1000 Cft. 1,066.55 -- cu.m 37.65 --

25 Compaction of earthwork with power road roller, including 17.1 (a)

ploughing, mixing, moistening earth to optimum moisture *411-5 and The rate also includes hire charges of

Chap-3 (Earthwork) Page 31

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

content in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay of driver and cleaner, etc.

i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. -- 577.25 cu.m - 20.40

ii) 90% maximum modified AASHO dry density. 1000 Cft. -- 488.65 cu.m - 17.25

iiii) 85% maximum modified AASHO dry density. 1000 Cft. -- 400.05 cu.m - 14.15

26 Extra for wet earthwork. 1000 Cft. 1,866.50 -- cu.m 65.95 - 17.1 to 17.5 That will support a man's weight.

27 Extra for slush or Daldal including dewatering. 1000 Cft. 4,266.25 -- cu.m 150.70 - 17.1 to 17.5 That will not support a man's weight.

28 Extra for puddling. 1000 Cft. 3,364.70 -- cu.m 118.85 - ditto

29 Earthwork on small rain water drains, along canal banks, 100 Rft. 506.60 -- Metre 16.60 - dittoroads and plantation drains, dressed, etc. complete.

30 Filling and compacting soil, earth and boulders behind 1000 Cft. 4,799.50 -- cu.m 169.50 -- 17.1 to 17.5

retaining walls (including excavation of soil and lead upto 50 ft.( 15 m).

31 Dag bailing 3" (75 mm) deep. Per mile 2,049.05 -- Per 1273.50 -- ditto Dag bailing for layout of borrow pit, to

Km be done by contractors at their own cost.

32 Turfing slopes of banks or lawns with grass sods including 100Sft. 888.80 -- sq.m 95.65 -- dittoploughing, laying, setting and watering (Turf got from within a distance of 5 miles (8 Km.) and maintenance for 15 days).

33 Berm cutting:- 17.1 to 17.5

a) lead upto a single throw of Kassi, phaora or shovel 1000 Cft. 2,399.75 -- cu.m 84.75 --

(without dressing). b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 4,287.35 -- cu.m 151.45 --

34 Berm trimming both sides of channels:- 17.1 to 17.5

a) upto 3½ ft. (1.06 m) depth. Per Mile 6,256.80 -- Per Km. 3910.50 -- b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 8,783.70 -- Per Km. 5489.80 --c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 13,689.70 -- Per Km. 8556.05 --

35 Ploughing and levelling borrowpits. ditto Area ploughed to be measured.

i) upto 3 ft. (0.9 m) depth. Per Acre 1,333.20 -- Per Hect. 3294.40 --ii) above 3 ft. (0.9 m) depth. Per Acre 2,666.40 -- Per Hect. 6588.80 --

36 Making boundary or service roads, including dag-belling, ditto

leveling and dressing:

i) in unploughed land:

Chap-3 (Earthwork) Page 32

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 675.40 -- Metre 22.15 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 906.40 -- Metre 29.75 --

ii) in ploughed land:

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 696.65 -- Metre 22.85 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 927.65 -- Metre 30.45 --

37 Earthwork by boats, including hire of boats:- 17.1 to 17.5 For ordinary soil.

i) Digging and loading into boats, upto 50 ft. (15 m) lead. 1000 Cft. 3,999.60 -- cu.m 141.25 --ii) Carriage by boats upto 10 chains (300 m). 1000 Cft. 1,021.10 -- cu.m 36.05 --iii) Extra for every additional one chain (30 m) or part 1000 Cft. 107.90 -- cu.m 3.80 --

thereof beyond 10 chains (300 m). iv) Unloading earth from boats. 1000 Cft. 1,866.50 -- cu.m 65.95 --

38 Unloading earth from B.G. trucks and clearing 5 ft. (1.5 m) 1000 Cft. 1,599.85 -- cu.m 56.50 -- 17.1 to 17.5

from rail.

39 Earthwork by tramway, digging and loading in trucks, upto 50 1000 Cft. 3,732.95 -- cu.m 131.85 -- 17.1 to 17.5ft. (15 m) lead.

40 Unloading earth from B.G. trucks and spreading upto 1000 Cft. 2,999.70 -- cu.m 105.95 -- ditto

15 ft. (4.5 m) from rail.

41 Supplying clean and screened river or pit sand within 5 100Cft. 533.10 556.10 cu.m 188.30 196.40 ditto The rate incudes:-chains (150 m). i) removal of top crust of earth

over burden ii) royalty to the government or cost to the private owner.

42 Earthwork excavation in open cutting for sewers and 17.1 to 17.5 The rate does not include back fillingmanholes as shown in drawings including shuttering and **13.1 &13.4 after laying of sewer, which is payabletimbering, dressing to correct section and dimensions separately.according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-

If the timbering and shuttering is noti) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 1000 Cft. 4,349.40 4,732.55 cu.m 153.60 167.15 actually done at site, the compositeii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth 1000 Cft. 7,375.65 7,944.10 cu.m 260.50 280.60 rate may be reduced by Rs. 368.20,iii) above 15.0 ft. (4.5 m) depth 1000 Cft. 9,508.75 10,077.25 cu.m 335.85 355.95 579.60 and 579.60 respectively.

43 Earthwork excavation of trenches in open cutting for sewers 17.1 to 17.5 The rate does not include back filling

and manhole chambers, etc. below sub-soil water level to **13.3 & after laying of sewer, which is payablecorrect section and dimensions according to templates and 13.5 separately.levels, including shoring, timbering and shuttering of M.S. sheets on both sides of the trenches:

i) 0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL. 1000 Cft. 6,000.70 8,484.90 cu.m 211.95 299.70ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL. 1000 Cft. 7,501.85 10,554.10 cu.m 264.95 372.75iii) Exceeding 8 ft. (2.4 m) depth below SSWL. 1000 Cft. 11,252.80 14,474.35 cu.m 397.45 511.25

Chap-3 (Earthwork) Page 33

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

44 Excavation of trenches in all kinds of soil, except cutting 1000 Cft. 4,010.15 -- cu.m 141.65 -- 17.1 to 17.5 The rate does not include back filling

rock, for watersupply pipelines upto 5 ft. (1.5 m) depth **8.1 after laying of pipe line, which isfrom ground level, including trimming, dressing sides, payable separately.leveling the beds of trenches to correct grade and cutting pits for joints, etc. complete in all respects.

45 Cutting and removing trees within a distance of 100 ft. (30 m)

a) upto 2½ ft. (760 mm) girth. Each 779.45 -- Each 779.45 b) above 2½ ft. to 6 ft. (760 to 1800 mm) girth. Each 1,521.30 -- Each 1521.30

46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft. Each 999.90 -- Each 999.90

to 6 ft. (600 to 1800 mm) girth.

47 Jungle clearance and removing within 100 ft. (30 m).

a) light 1000 Sft. 133.30 -- sq.m 1.45 --b) thick 1000 Sft. 266.65 -- sq.m 2.85 --

48 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 100Sft. 64.00 -- sq.m 6.90 --

49 Ploughing 3 times. Per 541.60 -- Per Hect. 1338.35 --

Acre

50 Leveling, dressing and making lawns. 100Sft. 266.65 -- sq.m 28.70 --

51 Turfing lawns (excluding cost of turf). 100Sft. 231.00 -- sq.m 24.85 --

52 Earthwork in excavation of drains, irrigation channels through excavator / drag lines in all kind of soil and conditions(dry,wetslush,daldal and under water) including its disposal and preparation of working pad for operation of machinery.(Rates includes 100 ft lead) 1000 Cft. -- 1519.00 cu.m -- 53.65

* Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".** Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).

Chap-4 (Dismantling) Page 34

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

2 The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roofsupports such as beams and trusses.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Stone Work

1 Dismantling dry stone masonry. 100Cft. 453.30 cu.m 160.10 18.1

2 Dismantling stone masonry in mud mortar. 100Cft. 666.60 cu.m 235.45 ditto

3 Dismantling stone masonry in lime or cement mortar. 100Cft. 1,599.85 cu.m 565.05 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4thand subsequent floors respectively.

4 a) Dismantling dry stone or spawl pitching. 100Cft. 799.90 cu.m 282.55 ditto

b) Dismantling stone or spawl pitching (mud grouted). 100Cft. 1,013.25 cu.m 357.90 ditto

5 Dismantling stone or spawl pitching and apron in silted 100Cft. 1,333.20 cu.m 470.90 dittocondition.

6 Dismantling stone pitching, cement or lime grouted. 100Cft. 2,133.10 cu.m 753.40 ditto

7 Dismantling stone in crates:

a) wooden crates 100Cft. 1,066.55 cu.m 376.70

b) wire crates ditto 1,333.20 ditto 470.90

8 Dismantling stone ware drain including base concrete. 100Cft. 746.60 cu.m 263.70 ditto

Brick Work

9 100Cft. 266.65 cu.m 94.2 18.1

10 100Cft. 666.6 cu.m 235.45 ditto

11 100Cft. 453.3 cu.m 160.1 ditto

12 100Cft. 933.25 cu.m 329.6 18.1 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

13 100Cft. 2266.45 cu.m 800.5 ditto and subsequent floors respectivelyagainst item No. 12, 13, 14 & 15.

14 Dismantling cement block masonry. 100Cft. 1,999.80 cu.m 706.35 ditto

Dismantling brick work in mud mortar.

Dismantling brick work in lime or cement mortar.

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

4. DISMANTLING (DEMOLITION)

Dismantling mud/pise walling.

Dismantling sun dried brick masonry.

Dismantling dry brick masonry.

Chap-4 (Dismantling) Page 35

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

15 Dismantling Dhajji walling. 100Cft. 533.30 cu.m 188.35 ditto

Concrete

16 Dismantling mud concrete. 100Cft. 1,066.55 cu.m 376.70 ditto

17 Dismantling lime concrete. 100Cft. 1,466.50 cu.m 517.95 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

18 Dismantling lime or cement concrete, under water. 100Cft. 5,599.45 cu.m 1977.75 and subsequent floors respectivelyagainst item No. 17, 19 & 20.

19 a) Dismantling cement concrete plain 100Cft. 2,933.05 cu.m 1035.95 ditto1:4:8.

b) Dismantling cement concrete plain ditto 4,799.50 ditto 1695.201:3:6.

c) Dismantling cement concrete 1:2:4 ditto 5,866.10 ditto 2071.90plain.

d) Dismantling cement concrete with brick ditto 1,599.85 ditto 565.05aggregate.

e) Dismantling D.P.C. of cement concrete ditto 799.90 ditto 282.551½" thick (40 mm) and clearing the site.

20 Dismantling cement concrete reinforced, 100Cft. 9,599.05 cu.m 3390.40 ditto

separating reinforcement from concrete,cleaning and straightening the same.

Roofing

21 Dismantling sirki sarkanda or thatched 100Sft. 319.95 sq.m 34.45 18.1roofing, supported on battens or bellies.

22 a) Dismantling 1st class tile roofing. 100Sft. 799.90 sq.m 86.05 Add extra 13%, 32 and 51% onlabour rate only for 2nd, 3rd, 4th

b) Dismantling 2nd class tile roofing. 100Sft. 666.60 sq.m 71.75 ditto and subsequent floors respectivelyagainst items No. 22, 25, 26 and 28.

23 Dismantling from any height, asbestos sheets and ridge 100Sft. 417.10 sq.m 44.90 18.1coping.

24 a) Dismantling roof of wooden planks and battens, from 100Sft. 333.7 sq.m 35.9 dittoany height.

b) Dismantling wooden ceiling above 20' (6.0 m) height 100Sft. 1,321.05 sq.m 142.15 dittoin difficult position, including lifting with care andspecial scaffolding along live electric wires and withmachines underneath.

Chap-4 (Dismantling) Page 36

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

25 Dismantling jack arch roofing, including removal of joists. 100Sft. 1,066.55 sq.m 114.75 ditto

26 Dismantling R.B. roof complete with mud and plaster, 100Sft. 1,333.20 sq.m 143.45 dittoincluding separating reinforcement, cleaning andstraightening the same.

27 a) Stripping and stacking slate or tiles from the truss 100Sft. 666.60 sq.m 71.75roofing.

b) Stripping and stacking C.I. sheet roof. ditto 605.50 ditto 65.15

c) Extra for dismantling C.I. sheet roof above 20 ft. (6m) ditto 735.25 ditto 79.10in difficult position, including lifting with specialscaffolding along live electric wire with machineunderneath.

28 Dismantling slates or tiles including battens, purlins and 100Sft. 1,066.55 sq.m 114.75 18.1planking.

Flooring

29 Dismantling brick or flagged flooring without 100Sft. 453.30 sq.m 48.80 18.1 Add extra 13%, 32% and 51% onconcrete foundation. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectively30 Dismantling plank or wooden block flooring, 100Sft. 666.60 sq.m 71.75 ditto against items No. 29 and 30.

etc.

31 Disjoining R.C.C. pipes inside the trench and dismantling i) The rate does not include theand removing the pipes from the trench and stacking them cost of excavation and refilling ofoutside:- trench, or the demolition of any

masonry or brick work.a) 6" to 12" (150 to 300 mm) diameter Per Lft 16.70 Metre 54.80b) 13" to 24" (325 to 600 mm) diameter Per Lft 27.35 Metre 89.70 ii) Bends, elbows, sluice valves,c) 25" to 36" (625 to 900 mm) diameter ditto 31.95 ditto 104.80 etc. should not be paid for extra ifd) Above 36" (Above 900 mm) diameter ditto 45.60 ditto 149.55 fixed in the length of pipe line that

is being dismantled.

WOOD WORK32 a) Removing door with chowkat. Per 212.85 Per 212.85 18.1 Add extra 13%, 32% and 51% on

No. No. labour rates only for 2nd, 3rd, 4thb) Removing windows and sky lights with chowkat. ditto 164.45 ditto 164.45 and subsequent floors respectively

against items No. 32, 33, 34, 35 &36.

33 Removing ventilators and wooden sunshade, etc. Per No. 86.00 Per No. 86.00 ditto

34 a) Dismantling wooden beams upto 12' (3.65m) Per No. 166.65 Per No. 166.65 dittolength.

Chap-4 (Dismantling) Page 37

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

b) Dismantling wooden beams from 12.1' to 23' ditto 266.65 ditto 266.65(3.65 to 7.0 m) length.

35 a) Dismantling wooden partition Jaffry work etc. 100Sft. 297.95 sq.m 32.05 ditto

b) Dismantling wooden trusses. 100Kg 936.50 %Kg 936.50

36 Dismantling wooden palisade fencing. Per Lft. 23.65 Metre 77.55 ditto

I ron work

37 Dismantling iron work of trusses, sheds, water tanks, etc. 100Kg 902.90 %Kg 902.90 18.1 Add extra 13%, 32% and 51% onexcluding cutting of rivets. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectivelyagainst items No. 37 and 38.

38 Dismantling rolled steel beams or iron rails, etc. 100Kg 437.60 %Kg 437.60 ditto

39 Dismantling iron latrine. Per Unit/ 967.55 Per Unit/ 967.55 ditto2 Seats 2 Seats

40 Dismantling tees, bends or sluice valves upto 12" Each per 19.70 Each per 7.90 ditto(300 mm) bore. inch bore cm bore

41 a) Dismantling B.G. water column. Each 6,461.40 Each 6461.40 ditto

b) Dismantling M.G. or N.G. water column. Each 4,273.50 Each 4273.50 ditto

42 Dismantling all type of wire fencing, including rolling wire 100Lft. 453.30 Metre 14.85 18.1into bundles and collecting material.

Miscellaneous

43 Dismantling wire netting of tennis courts and frame work. 100Sft. 213.30 sq.m 22.95 18.1

44 Dismantling cloth ceiling and supporting timber. 100Sft. 399.95 sq.m 43.05 ditto

45 Dismantling and removing road metalling. 100Cft. 1,066.55 cu.m 376.70 ditto

46 Dismantling and removing road pavement, etc., including 100Cft. 1,423.85 cu.m 502.90 dittoscreening and stacking of byproducts upto one chain lead(30 metre).

47 Removing mud plaster from walls. 100Sft. 111.10 sq.m 11.95 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

48 Removing cement or lime plaster. 100Sft. 222.20 sq.m 23.90 ditto and subsequent floors against itemNo. 47, 48, 49, & 50 respectively

Chap-4 (Dismantling) Page 38

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

49 Scraping:- 18.1

a) White wash or colour wash. 100Sft. 133.30 sq.m 14.35

b) Ordinary distemper, oil bound distemper, ditto 399.95 ditto 43.05or paint of wall.

50 Dismantling glazed or encaustic tiles, etc. 100Sft. 1,135.20 sq.m 122.15 18.1

51 Scraping boulders. 100Cft. 1,866.50 cu.m 659.25 18.1

52 Cleaning lime or cement mortar of old stones 100Cft. 933.25 cu.m 329.60 18.1to be used in masonry.

Electric Wiring

53 Dismantling light, fan and call bell point Per 36.20 36.65 Per 36.20 36.65including casing and capping/strip open type, point pointand making good damaged surface (buildingportion).

54 Dismantling plug point and making good Per 31.00 31.45 Per 31.00 31.45damaged surface (building portion). point point

55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipes orconduit wiring, etc. of all sizes including making gooddamaged surface (building portion):-

i) on surface Per foot 6.60 6.70 P.Mtr 21.65 22.00ii) recessed in wall Per foot 14.40 14.55 P.Mtr 47.25 47.70

Chap-5 (Mortar) Page 39

Dry Material Required for Dry Material Required for 100 Cft. Wet (Ready) Mortar One Cum Wet (Ready) Mortar

S. No. Ratio of Mortar Cement Lime Cement Lime Sand (50 Kg) Putty Sand (50 Kg.) Putty Cum.

Bag Cft. Cft. Bag. Cum 1 2 3 4 5 6 7 81 Cement : Sand

1 : 2 33.48 82 11.83 0.821 : 3 23.11 85 8.16 0.851 : 4 18.37 90 6.49 0.901 : 5 14.70 90 5.19 0.901 : 6 13.61 100 4.81 1.001 : 7 11.68 100 4.12 1.001 : 8 10.21 100 3.61 1.00

2 Cement : Lime : Sand1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.901 : 1 : 7 10.70 13.1 92 3.78 0.13 0.921 : 1 : 8 9.39 11.5 92 3.32 0.12 0.921 : 1 : 9 8.52 10.44 94 3.00 0.10 0.941 : 1 : 10 7.67 9.4 94 2.71 0.09 0.941 : 2 : 8 9.19 22.5 90 3.25 0.23 0.901 : 2 : 9 8.16 20.0 90 2.88 0.20 0.901 : 2 : 10 7.67 18.8 94 2.71 0.19 0.941 : 2 : 12 6.39 15.66 94 2.26 0.16 0.941 : 3 : 12 6.26 23.0 92 2.21 0.23 0.921 : 3 : 14 5.47 20.1 94 1.93 0.20 0.941 : 3 : 16 4.82 17.7 94 1.70 0.18 0.941 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85

3 Lime : Sand1 : 2 43 86 0.43 0.861 : 3 31 93 0.31 0.93

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE5. MORTAR

Chap-5 (Mortar) Page 40

Dry Material Required for 100 Cft. Dry Material Required for Wet (Ready) Mortar one M3 Wet (Ready) Mortar

S. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi CinderNo. (Putty) (Putty)

Cft. Cft. Cft. Cft. Cft. M3 M3 M3 M3 M3

1 2 3 4 5 6 7 3 4 5 6 7

4 Mud 135 1.35

5 Lime : Surkhi2 : 3 49.00 - 73.5 - 0.49 - 0.74 -1 : 2 40.75 - 81.5 - 0.41 - 0.82 -1 : 3 30.30 - 91.0 - 0.30 - 0.91 -

6 Lime : Sand : Surkhi1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41

7 Lime : Cinder1 : 1 57.0 - 57.0 - 0.57 - - 0.57

Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft) masonry (including wastage): masonry ( including wastage) :

1 Brick Masonry :a) Mud Mortar 35.00 Cft 0.35 M3

b) Cement, Sand 25.00 Cft 0.25 M3

c) Cement, Lime (Putty) Sand 25.00 Cft 0.25 M3

d) Lime (Putty) Sand 25.00 Cft 0.25 M3

2 Stone Masonry :a) Random rubble, uncoursed

i) Foundation and Plinth 45.00 Cft 0.45 M3

ii) Superstructure 40.00 Cft 0.40 M3

iii) Coursed 35.00 Cft 0.35 M3

b) Ashlar Block in course or Scabled masonry 30.00 Cft 0.30 M3

c) Ashlar fine masonry 20.00 Cft 0.20 M3

(1) Cement 1 Cft. = 40.8233 KgNotes : (2) Unslaked lime 1.7 Cft. = 37.3242 Kg

(3) Slaked lime 2.5 Cft. = 37.3242 Kg

(4) Quick lime 40 Kg Will yield 2.6 Cft. lime putty.

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE5. MORTAR

Chap-6 (Concrete) Page 41

1.2.3.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud concrete in foundation including watering and ramming, 100Cft 2937.45 4956.45 cu.m 1037.50 1750.60 The stone ballast, crushed bajri,

using brick or stone ballast 1½" (40 mm) gauge. round shingle from nallah, or brick

ballast may be used according to

2 Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 100Cft 1999.80 3913.80 cu.m 706.35 1382.35 their comparative cheaper rates in

mm) gauge. various areas of the Province.

3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 20.1 -do-

50 mm) gauge, in foundation and plinth:-

(a) Ratio 1: 3: 6 100Cft 3867.60 14472.00 cu.m 1366.05 5111.50

(b) Ratio 1: 4: 8 ditto 3867.60 12363.60 " 1366.05 4366.80

(c) Ratio 1:5:10 ditto 3867.60 11244.60 " 1366.05 3971.60

(d) Ratio 1: 6:12 ditto 3867.60 10402.20 " 1366.05 3674.05

(e) Ratio 1: 6: 18 ditto 3867.60 9522.60 " 1366.05 3363.40

(f) Ratio 1: 7:20 ditto 3867.60 9117.90 " 1366.05 3220.45

4 Extra on item No. 3 above, for sedimentation tank or filter

beds of Public Health Engineering Works: The stone ballast, crushed bajri,

round shingle from nallah, or brick

(a) in bed 100Cft 1187.35 - cu.m 419.35 - ballast may be used according to

their comparative cheaper rates in

(b) on slope ditto 1754.95 - " 619.85 - various areas of the Province.

5 Cement concrete plain including placing, 20.1

compacting, finishing and curing

complete (including screening andwashing of stone aggregate):

6. CONCRETE

a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.

If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.Rates for all finished works include the removal of surplus debris, unused material and by products.

b) It shall be payable from the nearest approved quarry.

Subsequent carriage of crushed stone aggregate / bajri will be paid according to the following:

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

Chap-6 (Concrete) Page 42

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

(a) Ratio 1: 1:2 100Cft 5167.80 29066.40 cu.m 1825.25 10266.25

(b) Ratio 1: 1½: 1½ ditto 5167.80 28537.80 " 1825.25 10079.55

(c) Ratio 1: 1½: 3 ditto 5167.80 23502.60 " 1825.25 8301.10

(d) Ratio 1: 2: 3 ditto 5167.80 22426.20 " 1825.25 7920.95

(e) Ratio 1: 3: 3 ditto 5167.80 19938.60 " 1825.25 7042.30

(f) Ratio 1: 2: 4 100Cft 5167.80 20506.20 cu.m 1825.25 7242.80

(g) Ratio 1: 2: 6 ditto 5167.80 18390.60 " 1825.25 6495.55

(h) Ratio 1: 3: 6 ditto 5167.80 17704.20 " 1825.25 6253.10

(i) Ratio 1: 4: 8 ditto 5167.80 15679.80 " 1825.25 5538.10

6 Providing and laying reinforced cement concrete (including 20.4 1) The rate includes rendering floor

prestressed concrete), using coarse sand and screened surface smooth, and the plastering

graded and washed aggregate, in required shape and design, done for making up all surfaces

including forms, moulds, shuttering, lifting, compacting, after removing centring.

curing, rendering and finishing exposed surface, complete

(but excluding the cost of steel reinforcement, its fabrication 2) Plastering done under soffit of

and placing in position, etc.):- R.C.C. roof slab meant for human

habitation buildings shall be paid

(a) (i) Reinforced cement concrete in roof slab, beams, extra.

columns lintels, girders and other structural members laid in

situ or precast laid in position, or prestressed members cast 3) This item shall not be applicable

in situ, complete in all respects:- to factory made units.

(1) Type A (nominal mix 1:1:2) Per Cft 120.35 414.10 cu.m 4250.75 14626.00

(2) Type B (nominal mix 1: 1½: 3) ditto 120.35 359.20 " 4250.75 12686.95

(3) (c) Type C (nominal mix 1: 2: 4) ditto 120.35 329.7 " 4250.75 11645.00

(a)(ii) Reinforced cement concrete in slab of rafts / strip

foundation, base slab of column and retaining walls; etc and

other structural members other than those mentioned in

5(a) (i) above not requiring form work (i.e. horizental

shuttering) complete in all respects:-

(1) Type A (nominal mix 1: 1: 2) Per Cft 69.60 331.05 cu.m 2458.25 11692.70

(2) Type B (nominal mix 1: 1½: 3) ditto 69.60 271.25 " 2458.25 9580.55

(3) Type C (nominal mix 1: 2: 4) ditto 69.60 241.70 " 2458.25 8536.85

4) Composite rate shall be reduced by Rs: 5/50- P.Cft & Rs:12/- P.Cft if chenab sand and local sand respectively is used.

Chap-6 (Concrete) Page 43

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

(b) Precast reinforced cement concrete and prestressed

reinforced cement concrete in columns, beams, lintels, stair

cases, shelves, etc.

(1) Type A (nominal mix 1: 1: 2) Per Cft 90.35 371.75 cu.m 3191.15 13130.20

(2) Type B (nominal mix 1:1½: 3) ditto 90.35 316.45 " 3191.15 11177.00

(3) Type C (nominal mix 1: 2: 4) ditto 90.35 287.35 " 3191.15 10149.20

(c) Erecting and fixing in position, precast cement concrete

or stone slab in roofs or lintels, etc. lift unto 20 ft., (6m) Per Cft 40.85 49.80 cu.m 1442.80 1758.95

including all charges.

(d) Add extra labour for R.C. concrete in Per Cft 20.00 -- cu.m 706.40 -

2nd and subsequent storeys.

7 Providing and casting in situ bored reinforced concrete piles *851-1 Composite rate shall be reduced bywith type C concrete (nominal mix 1: 2: 4 ) , using 10% extra to Rs: 5/50 P.Cft & Rs:12/- P.Cft if chenab cement in dry mix, and course sand, including all labour and 851-10 sand and local sand respectively is used.material (except the cost of steel reinforcement and itslabour for bending and laying in position, etc. which will bepaid separately, including, screening & washing of shingleand curing:-i) 18 " (450 mm) dia pile Per Rft 757.40 1079.65 Metre 2484.25 3541.25ii) 20" (500 mm) dia pile Per Rft 878.65 1276.30 Metre 2881.95 4186.25iii) 22" (550 mm) dia pile Per Rft 1067.65 1533.9 Metre 3501.9 5031.2iv) 24" (600 mm) dia pile Per Rft 1306.80 1879.65 Metre 4286.30 6165.3

8 Fabrication of mild steel reinforcement bar cage for R.C.C. *851-5 The rate includes wastage, overlaps,

bored piles, including cutting, bending, laying in position, etc. but does not apply to the laps and

welding and fastening, including cost of binding wire and spiral reinforcement which are specifically

labour charges for binding of steel reinforcement (also shown in the structural / working drawings

includes removal of rust from the bars):- of piles as per lapping requirements

of design.

(a) plain bars Per Cwt. 1376.10 4840.00 100 kg 2708.85 9527.55

(b) deformed bars ditto 1376.10 5771.35 " 2708.85 11360.95

9 Fabrication of mild steel reinforcement for cement concrete, *851.5 The rate includes wastage, overlapsincluding cutting, bending, laying in position, making joints and chairs, etc.

Chap-6 (Concrete) Page 44

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

and fastenings, including cost of binding wire and labour

charges for binding of steel reinforcement (also includes

removal of rust from bars):-

(a) Plain bars Per Cwt. 354.75 3997.45 100 kg 698.35 7869.00

(b) Deformed bars (Grade-40) ditto 354.75 5003.95 ditto 698.35 9850.30

('c) Deformed bars (Grade-60) ditto 354.75 5234.95 ditto 698.35 10305.05

10 Precast cement concrete solid or face blocks (1:2:4), Per Cft 45.75 194.30 cu.m 1615.90 6862.70 20.2

including cost of templates.

11 Precast cement concrete hollow blocks (1: 2: 4) , including Per Cft 101.35 198.95 cu.m 3579.70 7026.90 20.2

cost of templates and constructing walls thereof.

12 Providing and fixing ornamental cement jali 2" (50 mm) thick Per Sft 28.40 53.50 sq.m 305.60 575.65 20.1 to

(1: 2: 4), without steel. 20.4

13 Extra labour for laying concrete plain or reinforced:

(a) above 20' (6 m) upto 40'(12 m) height 100Cft 2133.10 - cu.m 753.40 -

(b) for every additional 10'(3 m) height. 100Cft 1333.20 - cu.m 470.90 -

14 Extra labour for work of weirs, rail or road bridges, syphons, and 100Cft 533.30 - cu.m 188.35 -

concreting in superstructure

15 Making reinforced cement concrete spout, including fixing in Each 354.75 507.30 Each 354.75 507.30 20.4

position (2½' x 6" x5") (760 mmx150 mm x 125 mm)

16 Making holes upto 3"(75 mm) dia 18"(450 mm) depth in cement Per hole 851.40 - Each 851.40 - 20.1

concrete or stone masonry walls and repairing.

17 Extra labour for skipping concrete in wells. 100Cft 3168.00 - cu.m 1118.95 - 20.1

18 Nicking concrete surface:

(a) Cement concrete surface 100Sft 300.95 - sq.m 32.40 -

(b) Lime concrete surface ditto 99.30 - " 10.70 -

Chap-6 (Concrete) Page 45

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

19 Preparing, watering and ramming surface for laying concrete

(for Headworks only):-

(a) Horizontal floor 100Sft 301.85 - sq.m 32.50 -

(b) Glacis and crest ditto 434.30 - " 46.75 -

(c) Inverted filters ditto 141.90 - " 15.25 -

20 Fabrication of high tensile steel prestressing cables for 100 Kg. 4391.50 30550.10 100 Kg. 4391.50 30550.10 *811-1 The rate includes wastage in

prestressed (post tensioned) concrete, including assembling by to cutting and breakage in stressing,drawing the H.T. wire through metal spacer plate, inserting in helix 811-11 etc.core and taping or tying, sheathing in longitudinally welded metalcorrugated sheath, positioning , anchorage with male and femaleset of anchorage cone, forming ducts for transverse cable,stressing cables with jack at both ends as per stressing schedule,maintaining stressing record and supply the same in the approvedproforma to the Engineer-in-charge, making loop at blind end,including all materials required for it, grouting the cable ducts withcement, cutting projected ends and making good recesses, etc.,complete in all respects.

21 Fabrication of High Tensile steel reinforcement for prestressed 100kg 2626.45 27641.05 %kg 2626.45 27641.05 1) The rate includes wastage in

(pretension) concrete work, including inserting wire in moulds, cutting and breakage in stressing,etc.

providing M.S. shear bars, spacers and lift hooks, male and

female anchorage, tie down, struts, stressing cables, maintaining 2) Quantity of H. T. wire will form

stress record and supply the same in approved proforma to the basis of payment.

Engineer-in-charge, cutting wires and projecting ends and making 3) This item shall not be applicable

good recesses, etc., complete in all respects. to factory made units.

22 Lifting, transporting and placing precast prestressed concrete *811-1

B eam, Girder and other members (excluding battens) etc. in to

Position on the bridge to correct alignment and level, etc. 811-11

complete

i) Beam upto 50 ft. (15 m) length 100Cft 1667.80 cu.m 589.05

ii) Beam above 50 ft. (15m) upto 75 ft. (22.5m) length 100Cft 2375.30 cu.m 838.95

iii) Beam above 75ft. (22.5m) upto 100ft. (30m) length 100Cft 3184.10 cu.m 1124.60

iv) Beam above 100ft. (30m) upto 150ft.(45m) length 100Cft 4126.60 cu.m 1457.50v) Beam above 150ft. (45m) length 100Cft 5087.30 cu.m 1796.85

Chap-6 (Concrete) Page 46

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

23 Providing and laying foam concrete 3 inch (75 mm) thick, Per Sft. 27.95 66.20 sq.m. 300.75 712.30

using cement sand in the ratio of 1:2 and aluminium powder

at the rate of 0.2% of the cement, sand mix,

24 Providing and fixing 6 in(150 mm). wide curved sheet of

required shape fixed on face of the construction joint with G.I.

screw,1.5 in (40 mm) long to cover construction joints

vertically:-

i) aluminium sheet 1/16 in(1.5 mm) thick Per Rft. 13.75 90.65 Metre 45.10 297.35

ii) G.I. sheet, 18 SWG Per Rft. 14.05 74.25 Metre 46.10 243.55

25 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminium

strip on horizontal and vertical expansion joints in walls, columns,

ceilings and floors etc., including cost of clips/screws etc.,

complete in all respects:-

a) On interior surface (without mastic strip) Per Rft. 12.55 89.45 Metre 41.15 293.40

b) On exterior surface (with mastic strip) ditto 12.55 93.05 " 41.15 305.20

26 Providing and fixing 1/16" (1.5 mm) thick copper flashing on Per Sft. 14.25 102.00 Sq.m 153.35 1097.50

expansion joints complete in all respects.

27 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG. Per Rft. 4.65 60.85 Metre 15.25 199.60

stopper to expansion joint.

28 Providing embeding 10" (250 mm) wide ¼" (6 mm) thick Per Rft. 18.80 66.80 Metre 61.65 219.05

rubber water stopper in expansion joints of R.C.C. roof

slab complete in all respects.

29 Filling expansion joints with bitumen. sand & saw dust in Per Rft P.Metre/

ratio 1:2:2. per inch 3.35 14.90 Per 25 mm 11.00 48.85

width Width

30 Filling expansion joints with bitumen. Per Rft. 48.90 - Metre 160.40 -

Chap-6 (Concrete) Page 47

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

31 Laying asphaltic mixture in expansion joints. Per Rft. 46.65 - Metre 153.00 - Material to be paid on actuals.

32 Providing and fixing theremopore (foamed polythene)

sheet in horizontal and vertical expansion joints:

a) 1" (25 mm) thick thermopore sheet Per Sft. 5.70 11.20 Sq.m 61.35 120.50

b) 1½" (40 mm) thick thermopore sheet ditto 5.70 15.05 " 61.35 161.95

33 Providing and laying damp proof course of cement concrete

1:2: 4(using cement, sand and shingle), including bitumen

coating :-

(a) with one coat bitumen and one coat polythene sheet

500gauge

i) 1½" thick (40 mm) 100Sft 1330.35 4248.35 sq.m 143.15 457.10

ii) 2" thick (50 mm) 100Sft 1330.35 4808.10 sq.m 143.15 517.35

iii) 3" thick (75 mm) 100Sft 1380.50 6083.55 sq.m 148.55 654.60

(b) with 2 coats of bitumen:

i) 1½" thick (40 mm) 100Sft 1330.35 4473.55 sq.m 143.15 481.35

ii) 2" thick (50 mm) 100Sft 1330.35 5032.80 sq.m 143.15 541.55

iii) 3" thick (75 mm) 100Sft 1380.50 6308.20 sq.m 148.55 678.75

34 Providing and laying damp proof course with cement sand

plaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet

500 gauge :-

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 1255.10 2689.60 sq.m 135.05 289.40

b) ¾" thick (20 mm) 100Sft 1255.10 2978.95 sq.m 135.05 320.55

Chap-6 (Concrete) Page 48

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 1255.10 2784.00 sq.m 135.05 299.55

b) ¾ " thick (20mm) 100Sft 1255.10 3090.55 sq.m 135.05 332.55

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 1255.10 2939.65 sq.m 135.05 316.30

b) ¾ " thick (20 mm) 100Sft 1255.10 3373.80 sq.m 135.05 363.00

(b) with 2 coats of bitumen:-

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 1255.10 2797.90 sq.m 135.05 301.05

b) ¾" thick (20 mm) 100Sft 1255.10 3087.40 sq.m 135.05 332.20

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 1255.10 2893.25 sq.m 135.05 311.30

b) ¾ " thick (20 mm) 100Sft 1255.10 3199.80 sq.m 135.05 344.30

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 1255.10 3128.00 sq.m 135.05 336.55

b) ¾ " thick (20 mm) 100Sft 1255.10 3587.35 sq.m 135.05 386.00

35 Providing and laying vertical damp proof course with cement

sand plaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet

500 gauge:

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 1255.10 2610.10 sq.m 135.05 280.85

b) ¾" thick (20 mm) 100Sft 1255.10 2899.85 sq.m 135.05 312.00

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 1255.10 2704.90 sq.m 135.05 291.05

b) ¾ " thick (20 mm) 100Sft 1255.10 3011.45 sq.m 135.05 324.05

Chap-6 (Concrete) Page 49

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 1255.10 2939.65 sq.m 135.05 316.30

b) ¾ " thick (20 mm) 100Sft 1255.10 3399.00 sq.m 135.05 365.75

(b) with 2 coats of bitumen:-

i) Ratio 1: 4

a) ½" thick (13 mm) 100Sft 1255.10 2797.75 sq.m 135.05 301.05

b) ¾" thick (20 mm) 100Sft 1255.10 3087.40 sq.m 135.05 332.20

ii) Ratio 1:3

a) ½ " thick (13 mm) 100Sft 1255.10 2892.45 sq.m 135.05 311.25

b) ¾ " thick (20 mm) 100Sft 1255.10 3199.00 sq.m 135.05 344.20

iii) Ratio 1:2

a) ½ " thick (13 mm) 100Sft 1255.10 3127.30 sq.m 135.05 336.50

b) ¾ " thick (20 mm) 100Sft 1255.10 3586.50 sq.m 135.05 385.90

36 Grouting concrete between, the grooves of gates, including 100Cft 5907.00 - cu.m. 2086.35 -

shuttering.

37 Chiesel dressing concrete surface on sides of grooves. 100Sft 165.55 - sq.m 17.80 -

38 Laying and ramming dry ballast or kankar. 100Cft 2166.45 - cu.m 765.20 -

39 Hoisting and placing in position R.C.C. shelves. per No. 65.20 - per No. 65.20 -

40 Breaking brick ballast, screening and stacking:-

(a) 2"(50 mm) ring 100Cft. 1666.50 - cu.m 588.60 -

(b) 1½ "(40 mm) ring ditto 1866.50 - " 659.25 -

(c) 1" (25 mm) ring ditto 2166.45 - " 765.20 -

(d) Jhama ballast ¾"(20 mm) ring ditto 2499.75 - " 882.90 -

41 Supplying and fixing broken glasses on court yard walls, Per Rft 51.45 95.95 metre 168.75 314.70

including 1:3: 6 cement concrete coping.

Chap-6 (Concrete) Page 50

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

42 Crushing stone ballast by machine. 100Cft 1666.50 - cu.m. 588.60 - This does not include the charges

for working of crushers, but includes

manual labour for carriageof stone to

crusher within three chains (90 m)

and also stacking the product after

crushing within three chains (90 m).

43 Breaking stone ballast screened and stacked:-

(a) 2" ring (50 mm) 100Cft. 1866.50 - cu.m. 659.25 -

(b) 1½ " ring (40 mm) ditto 2166.45 - " 765.20 -

(c) 1" ring (25 mm) ditto 2499.75 - " 882.90 -

d) ½ " ring (13 mm) ditto 3333.00 - " 1177.20 -

(e)1/8" to ¼" ring (3 mm to 6 mm) ditto 5666.10 - " 2001.25 -

44 Screening and stacking stone ballast shingle or bajri, etc. 100Cft. 533.30 - cu.m. 188.35 -

45 Washing ballast, bajri or shingle. 100Cft. 533.30 - cu.m. 188.35 -

46 Erecting and carting sun shades of precast R.C. concrete

upto 5' x 2½' (1.50 m x 0.76 m) Each 288.55 - Each 288.55 -

Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"

chapter-7(Brickwork) Page 51

1 Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.2 The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Pacca brick work in mud mortar in buildings: 21.1 Masonry of boundary wall to beto considered as masonry other than

i) in foundation and plinth 100Cft. 2581.75 16061.05 cu.m 911.85 5672.75 21.4 building.ii) in ground floor ditto 3416.00 16895.30 ditto 1206.55 5967.40

The composite rate is to bereduced by 7% and 14%, if 2nd or3rd class bricks are used.

2 Add extra labour on item No. 1 for brick work in:-

i) first floor 100Cft. 683.75 -- cu.m 241.50 -ii) second floor ditto 1518.00 -- ditto 536.15 -iii) third floor ditto 2352.25 -- ditto 830.80 -iv) fourth & subsequent floors ditto 3754.10 -- ditto 1325.95 -

3 Pacca brick work in mud mortar other than building:- 21.1 to Same remarks as against21.4 item No. 1 above

i) upto 20 ft. (6.1 m) height 100Cft. 3519.90 16999.20 cu.m 1243.25 6004.10ii) extra labour for every 5 ft. (1.5 m) ditto 683.75 -- ditto 241.50 -

additional height, or part thereof.

4 Pacca brick work in foundation and plinth in:- ditto Same remarks as againstitem No. 1 above.

i) Cement, sand mortar:-

Ratio 1:2 100Cft. 3395.45 22115.45 cu.m 1199.20 7811.20Ratio 1:3 ditto 3395.45 20850.95 ditto 1199.20 7364.55Ratio 1:4 ditto 3395.45 20092.25 ditto 1199.20 7096.60Ratio 1:5 ditto 3395.45 19586.45 ditto 1199.20 6917.95Ratio 1:6 ditto 3395.45 19206.50 ditto 1199.20 6783.75Ratio 1:7 ditto 3395.45 18957.35 ditto 1199.20 6695.75Ratio 1:8 ditto 3395.45 18739.20 ditto 1199.20 6618.70

ii) lime, cement sand mortar:- 21.1 The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 3395.45 19485.45 cu.m 1199.20 6882.25Ratio 1:1:7 ditto 3395.45 19220.10 ditto 1199.20 6788.55Ratio 1:1:8 ditto 3395.45 19004.90 ditto 1199.20 6712.55Ratio 1:1:9 ditto 3395.45 18824.70 ditto 1199.20 6648.90Ratio 1:1:10 ditto 3395.45 18689.65 ditto 1199.20 6601.20

iii) lime, sand mortar 1:2 100Cft. 3395.45 18228.4 cu.m 1199.2 6438.25 ditto ditto

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

7. BRICK WORK

chapter-7(Brickwork) Page 52

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

5 Pacca brick work in ground floor:- ditto i) The composite rate is tobe reduced by 7% and 14%,

i) cement, sand mortar:- if 2nd or 3rd class bricks areused.

Ratio 1:2 100Cft. 4496.35 23216.35 cu.m 1588.10 8200.00 ii) Masonry of boundary wallRatio 1:3 ditto 4496.35 21951.85 ditto 1588.10 7753.40 to be considered as masonryRatio 1:4 ditto 4496.35 21193.15 ditto 1588.10 7485.40 other than building.Ratio 1:5 ditto 4496.35 20687.35 ditto 1588.10 7306.75Ratio 1:6 ditto 4496.35 20307.35 ditto 1588.10 7172.55Ratio 1:7 ditto 4496.35 20058.25 ditto 1588.10 7084.55Ratio 1:8 ditto 4496.35 19838.80 ditto 1588.10 7007.05

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 4496.35 20586.35 cu.m 1588.10 7271.10Ratio 1:1:7 ditto 4496.35 20323.65 ditto 1588.10 7178.30Ratio 1:1:8 ditto 4496.35 20105.80 ditto 1588.10 7101.35Ratio 1:1:9 ditto 4496.35 19925.60 ditto 1588.10 7037.70Ratio 1:1:10 ditto 4496.35 19790.95 ditto 1588.10 6990.15

iii) lime, sand mortar 1:2 100Cft. 4496.35 19329.25 cu.m 1588.10 6827.10 The rate of lime mortar also

includes grinding of mortar.

6 Add extra labour on item No. 5 for brickworkin:-

i) first floor 100Cft. 683.75 -- cu.m 241.50 -ii) second floor ditto 1518.00 -- ditto 536.15 -iii) third floor ditto 2352.25 -- ditto 830.80 -iv) fourth & subsequent floors ditto 3754.10 -- ditto 1325.95 -

7 Pacca brick work other than building upto 10ft. (3 m) 21.1 i) The composite rate is to beheight. to reduced by 7% and 14%, if 2nd or

21.5 3rd class bricks are used.i) cement, sand mortar:-

ii) Workshops, godowns,, bins,Ratio 1:2 100Cft. 3915.10 22635.10 cu.m 1382.80 7994.70 house type godowns, reservoirs,Ratio 1:3 ditto 3915.10 21370.60 ditto 1382.80 7548.10 filter beds, storage tanks, wells,Ratio 1:4 ditto 3915.10 20611.90 ditto 1382.80 7280.10 screening chambers, collectingRatio 1:5 ditto 3915.10 20106.10 ditto 1382.80 7101.50 tanks, manholes etc. are to beRatio 1:6 ditto 3915.10 19726.15 ditto 1382.80 6967.30 treated as masonry other thanRatio 1:7 ditto 3915.10 19477.00 ditto 1382.80 6879.30 buildings.Ratio 1:8 ditto 3915.10 19258.85 ditto 1382.80 6802.25

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 3915.10 20005.10 cu.m 1382.80 7065.80Ratio 1:1:7 ditto 3915.10 19739.75 ditto 1382.80 6972.10Ratio 1:1:8 ditto 3915.10 19524.60 ditto 1382.80 6896.10Ratio 1:1:9 ditto 3915.10 19344.30 ditto 1382.80 6832.40

chapter-7(Brickwork) Page 53

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

Ratio 1:1:10 ditto 3915.10 19209.30 ditto 1382.80 6784.75

iii) lime, sand mortar 1:2 100Cft. 3915.10 18748.05 cu.m 1382.80 6621.80 ditto

8 Add extra labour on item No. 7, for every 10ft.(3 m) 100Cft. 683.75 -- cu.m 241.50 -additional height, or part thereof.

9 Extra labour for arch work in brick masonry, including 100Cft. 1169.50 -- cu.m 413.05 - 21.5labour for centring and decentring.

10 Extra for pacca brick work in steining of wells or any other 100Cft. 752.40 1559.30 cu.m 265.75 550.75 21.1 The composite rate is to becircular masonry. to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.

11 Extra labour for profile and flared walls. 100Cft. 258.85 -- cu.m 91.45 -

12 Extra labour for pacca brick work in piers and abutment:-

i) from 10ft. to 20ft. (3 m to 6 m) height 100Cft. 338.85 -- cu.m 119.70 -ii) above 20 ft. (6 m) height. 100Cft. 683.75 -- cu.m 241.50 -

13 Extra for face work (half brick thick) using special bricks 100Cft. 2269.15 cu.m 801.45 This item is to be executed onlyinstead of first class bricks. under the written permission of

Superintending Engineer.

14 Reinforced brick work in lintel of openings, laid in 1:3 Per Cft. 111.75 288.55 cu.m 3946.70 10191.60cement mortar, including all labour, material, forms,moulds, lifting & shuttering, etc, (but excluding cost andlabour of steel reinforcement which shall be paid forseparately).

15 Extra for dressing or chamfering bricks for:-

a) special architectural bricks 100 Nos. 1987.10 - % Nos. 1987.10 -b) all other purposes ditto 993.55 - ditto 993.55 -

16 Perforated pacca brick walling half brick thick, in ground 21.1 The composite rate is to befloors:- to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100 Sft. 1705.35 5080.10 Sqm. 183.50 546.60

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 2253.60 6938.55 sq.m. 242.50 746.60Ratio 1:3 ditto 2253.60 6622.10 ditto 242.50 712.55Ratio 1:4 ditto 2253.60 6432.75 ditto 242.50 692.15Ratio 1:5 ditto 2253.60 6306.30 ditto 242.50 678.55Ratio 1:6 ditto 2253.60 6217.45 ditto 242.50 669.00Ratio 1:7 ditto 2253.60 6148.45 ditto 242.50 661.55

chapter-7(Brickwork) Page 54

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

Ratio 1:8 ditto 2253.60 6097.75 ditto 242.50 656.10

iii) lime, cement sand mortar The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Sft. 2253.60 6281.05 sq.m 242.50 675.85Ratio 1:1:7 100Sft. 2253.60 6213.60 sq.m 242.50 668.60Ratio 1:1:8 100Sft. 2253.60 6163.60 sq.m 242.50 663.20Ratio 1:1:9 100Sft. 2253.60 6115.15 sq.m 242.50 658.00Ratio 1:1:10 100Sft. 2253.60 6086.45 sq.m 242.50 654.90

iv) lime, sand mortar 1:2 100Sft. 2253.60 5964.25 sq.m 242.50 641.75 ditto

17 Add extra labour on item No. 16 for pacca brick work in:-

i) first floor 100Sft. 344.90 - sq.m 37.10 -ii) second floor ditto 756.00 - ditto 81.35 -iii) third floor ditto 1179.15 - ditto 126.90 -iv) fourth & subsequent floors ditto 1804.70 - ditto 194.20 -

18 Perforated pacca brick walling one brick thick, in ground 21.1 The composite rate is to befloor: to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100Sft. 2412.95 9152.60 sq.m 259.65 984.80

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 3384.35 12744.35 sq.m 364.15 1371.30Ratio 1:3 ditto 3384.35 12112.10 ditto 364.15 1303.25Ratio 1:4 ditto 3384.35 11732.75 ditto 364.15 1262.45Ratio 1:5 ditto 3384.35 11479.85 ditto 364.15 1235.25Ratio 1:6 ditto 3384.35 11302.20 ditto 364.15 1216.10Ratio 1:7 ditto 3384.35 11163.80 ditto 364.15 1201.25Ratio 1:8 ditto 3384.35 11056.30 ditto 364.15 1189.65

iii) lime, cement, sand mortar:- The rate of lime mortar alsoRatio 1:1:6 100Sft. 3384.35 11429.35 sq.m 364.15 1229.80 includes grinding of mortarRatio 1:1:7 ditto 3384.35 11293.45 ditto 364.15 1215.20Ratio 1:1:8 ditto 3384.35 11189.15 ditto 364.15 1203.95Ratio 1:1:9 ditto 3384.35 11099.00 ditto 364.15 1194.25Ratio 1:1:10 ditto 3384.35 11032.85 ditto 364.15 1187.15

iv) lime, sand mortar 1:2 100Sft. 3384.35 10799.60 sq.m 364.15 1162.05 ditto

19 Add extra labour on item No. 18 for perforated pacca brickwork in:-

i) first floor 100Sft. 512.80 -- sq.m 181.15 -ii) second floor ditto 1138.50 -- ditto 402.10 -iii) third floor ditto 1764.20 -- ditto 623.10 -iv) fourth & subsequent floors ditto 2815.60 -- ditto 994.45 -

chapter-7(Brickwork) Page 55

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

20 Fire brick masonry in fireclay mortar:- 21.1to

i) upto 20 ft. (6.10 m) height including all charges. Per Cft. 42.15 636.45 cu.m 1489.10 22478.50 21.2

ii) Extra for every 5 ft. (1.5 m) additional height, or part 100Cft. 683.75 -- ditto 241.50 - A&C No.I dated 2.9.1998thereof.

21 First class brick walling laid in 1:3 cement sand mortar,reinforced with 1" (25 mm) wide 18 gauge hoop iron:- 21.19

i) 4½" (113 mm) thick walling with hoop iron, bonding 6" 100Sft. 1871.75 9612.55 sq.m 201.40 1034.30(150 mm) apart.

ii) 4½" (113 mm) thick walling with hoop iron, bonding 100Sft. 1667.50 8954.95 sq.m 179.40 963.5512" (300 mm) apart.

iii) 3" (75 mm) thick walling with hoop iron, bonding 6" ditto 1482.35 7080.85 ditto 159.50 761.90(150 mm) apart.

iv) 3" (75 mm) thick walling with hoop iron, bonding 12" ditto 1185.90 6280.90 ditto 127.60 675.85(300 mm) apart.

22 Ghilafi work (1½ brick thick wall) 100Cft. 3438.20 10943.75 cu.m 1214.35 3865.35 21.18

23 Dry brick pitching 100Cft. 2085.60 15369.60 cu.m 736.65 5428.55 21.1

24 Sun dried bricks in mud mortar 100Cft. 2907.95 4439.75 cu.m 1027.10 1568.10 21.16

25 Pise wall (mud walling) 100Cft. 1679.05 -- cu.m 593.05 - 21.17

26 Eave brick moulded, weathered and throated with back 21.1 to 21.2brick or drip course cornice, in 1:3 cement mortar:-

i) 3" (75 mm) thick drip course cornice Rft. 21.25 53.10 Metre 69.70 174.15 correction vide A&C No.I ii) 4½" (113 mm) thick drip course cornice. ditto 24.10 109.75 ditto 79.05 360.00 dated 2.9.98iii) 4½" (113 mm) thick eave brick with back brick. ditto 16.70 129.45 ditto 54.80 424.60

27 Laying dressed or moulded brick cornices in 1:6 cement 21.1 to 21.2mortar, plastering or painting complete:-

i) 1 brick Rft. 24.10 41.10 Metre 79.05 134.80ii) 2 bricks ditto 35.45 87.35 ditto 116.30 286.50iii) 3 bricks ditto 47.30 133.25 ditto 155.15 437.05iv) 4 bricks ditto 59.55 186.05 ditto 195.30 610.25

28 Cleaning bricks dismantled from kacha pacca masonry 1,000 933.25 -- 1,000 933.25 -Nos Nos

29 Scraping bricks dismantled from pacca masonry 1,000 1759.80 -- 1,000 1759.80 -Nos Nos

30 Supplying and filling sand under floor; or plugging in wells. 100Cft. 222.20 1482.20 cu.m 78.50 523.50

chapter-7(Brickwork) Page 56

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

31 Providing and laying 2" (50 mm) thick and 15" (375 mm) Rft. 88.70 147.75 Metre 290.95 484.60projected tile band, laid in 1:2 cement sand mortar, withhoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"apart.

32 First class brick tiles clad by laying tiles in stretcher This item is to be executed onlycourse in cement sand mortar reinforced with 18 SWG under the written permission of thehoop iron strips bonding placed at 2.0' (600 mm) apart Superintending Engineer.horizontally, and at 1.0' (300 mm) interval vertically.

i) 1:3 100Sft. 1667.50 9564.05 sq.m 179.40 1029.10ii) 1:4 ditto 1667.50 9260.60 ditto 179.40 996.45

33 Chamfering sides of head regulators and masonry walls to Per Sft. 47.30 -- sq.m 508.95 -increase width.

34 Replacing kallar eaten bricks Each No. 36.20 44.45 Each 36.20 44.45

35 Repairing corners of bridges and other hydraulic masonry Each No. 236.50 316.35 Each 236.50 316.35works

36 Extra labour for drains of bath rooms, etc. Per Lft. 18.80 -- Metre 61.65

37 Maroo corners Each 120.40 -- Each 120.40 Payable in addition to brick workCorner Corner

38 % Sft 20502.90 23389.60 P.Sqm 2206.10 2516.70Providing and laying Fair Face Gutka, clading laid with 1:3 cement / red

chapter-8(Stone masonary) Page 57

1 The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means oftransport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.

2 The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of thestone or spawl carried.

3 Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl issupplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall formthe basis of laying.

4 Rates for all finished work include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Random, rubble masonry (uncoursed), in foundation and 22.10,plinth: 22.11

a) dry masonry 100 Cft. 3504.60 4308.60 cu.m 1237.85 1521.80b) in mud mortar 100 Cft. 4387.35 5442.45 cu.m 1549.60 1922.25c) in lime, sand mortar 1:2 100 Cft. 6689.10 9483.90 cu.m 2362.60 3349.70d) in cement, sand mortar

i) ratio 1:3 100 Cft. 6689.10 13750.35 cu.m 2362.60 4856.60ii) ratio 1:4 100 Cft. 6689.10 12612.30 cu.m 2362.60 4454.65

iii) ratio 1:6 100 Cft. 6689.10 11309.80 cu.m 2362.60 3994.60iv) ratio 1:8 100 Cft. 6689.10 10589.10 cu.m 2362.60 3740.05

2 Coursed rubble masonry hammer dressed, in foundation 22.8and plinth:

a) dry masonry 100 Cft. 4257.00 5061.00 cu.m 1503.55 1787.55b) in mud mortar 100 Cft. 6022.50 7077.60 cu.m 2127.15 2499.80c) in lime, sand mortar 1:2 100 Cft. 7426.65 9999.50 cu.m 2623.10 3531.80d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 7426.65 14080.65 cu.m 2623.10 4973.30ii) ratio 1:4 100 Cft. 7426.65 13069.05 cu.m 2623.10 4616.00

iii) ratio 1:6 100 Cft. 7426.65 11910.95 cu.m 2623.10 4206.95iv) ratio 1:8 100 Cft. 7426.65 11274.10 cu.m 2623.10 3982.00

3 Random rubble masonry (uncoursed) in 22.10ground floor or 20 ft.(6 m) height, building/otherthan building.

a) dry masonry 100 Cft. 3880.80 4684.80 cu.m 1370.70 1654.65b) in mud mortar 100 Cft. 5270.10 6325.20 cu.m 1861.40 2234.05

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

8. STONE MASONRY

chapter-8(Stone masonary) Page 58

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

c) in lime, sand mortar 1:2 100 Cft. 7238.55 10033.35 cu.m 2556.65 3543.80d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 7238.55 14299.80 cu.m 2556.65 5050.70ii) ratio 1:4 100 Cft. 7238.55 13161.75 cu.m 2556.65 4648.75

iii) ratio 1:6 100 Cft. 7238.55 11859.25 cu.m 2556.65 4188.70iv) ratio 1:8 100 Cft. 7238.55 11138.55 cu.m 2556.65 3934.15

4 Coursed rubble masonry hammer dressed, in ground floor 22.8or 20 ft. (6 m) height, building/other than building.

a) dry masonry 100 Cft. 4966.50 5770.50 cu.m 1754.15 2038.15b) in mud mortar 100 Cft. 7441.50 8485.45 cu.m 2628.35 2997.05c) in lime, sand mortar 1:2 100 Cft. 8324.25 10897.10 cu.m 2940.15 3848.85d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 8324.25 14978.25 cu.m 2940.15 5290.30ii) ratio 1:4 100 Cft. 8324.25 13966.65 cu.m 2940.15 4933.00

iii) ratio 1:6 100 Cft. 8324.25 12808.55 cu.m 2940.15 4524.00iv) ratio 1:8 100 Cft. 8324.25 12171.70 cu.m 2940.15 4299.05

5 Ashlar block in course or scabbled masonry (including 22.5dressing, etc.,) in ground floor or 20 ft. (6 m) height, &building/other than building. 22.6

a) in lime, sand mortar 1:2 100 Cft. 21576.70 24055.00 cu.m 7620.90 8496.25b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 21576.70 26899.55 cu.m 7620.90 9500.90ii) ratio 1:4 100 Cft. 21576.70 26140.85 cu.m 7620.90 9232.95

iii) ratio 1:6 100 Cft. 21576.70 25281.00 cu.m 7620.90 8929.25

6 Ashlar fine masonry (including dressing, etc.) in ground 22.3floor or 20 ft. 6 m) height, building/other than building. (A) to

(C) &a) in lime, sand mortar 1:2 100 Cft. 38262.20 40520.90 cu.m 13514.20 14312.00 22.4b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 38262.20 41943.15 cu.m 13514.20 14814.30ii) ratio 1:4 100 Cft. 38262.20 41563.35 cu.m 13514.20 14680.20

iii) ratio 1:6 100 Cft. 38262.20 41141.75 cu.m 13514.20 14531.25

7 Extra labour on items 3, 4, 5 & 6 above for work in:-

i) first floor 100 Cft. 960.70 - cu.m 339.30 -ii) second floor 100 Cft. 2108.85 - cu.m 744.85 -iii) third floor 100 Cft. 3283.65 - cu.m 1159.80 -iv) fourth floor 100 Cft. 5153.30 - cu.m 1820.15 -

8 Extra labour on items 3,4,5 & 6 above for every 5 ft.(1.5 m) 100 Cft. 834.25 - cu.m 294.65 -

additional height, other than building, or part thereof.

chapter-8(Stone masonary) Page 59

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

9 Extra labour for arch work in stone masonry, including 100 Cft. 2337.25 - cu.m 825.50 - 22.12centering and decentring, etc.

10 Extra labour for:- 22.7

a) coping and caps, etc. 100 Cft. 10834.55 - cu.m 3826.75 -b) cornice & string course 100 Rft. 10834.55 - Rm. 355.35 -

11 Dressing stones:- 22.2i) This rate of dressing shall be paid

a) hammer dressed 100 Sft. 4342.80 - sq.m 467.30 only when the supply of undressedb) rough tooled dressed 100 Sft. 8152.30 - sq.m 877.20 stone is made.c) chisel dressed 100 Sft. 9889.45 - sq.m 1064.10 ii) In case of masonry, dressing isd) fine dressed 100 Sft. 20122.10 - sq.m 2165.15 already included and this rate shall

not be added thereto.iii) Only dressed surface of stoneshall be measured.

12 Dhajji walling 5"x5" (125 mmx125 mm) thick deodar 100 Sft. 8619.75 14475.05 sq.m 927.50 1557.50 22.13framing with stone laid in 1:6 cement sand mortar, and 1:4cement sand plaster on both sides.

13 Providing and fixing stone blocks from 2 Cft. Per Cft. 402.90 432.90 cu.m 14230.45 15290.05(0.6 cu.m) to 6 Cft (0.17 cu.m). eachincluding lift upto 20 ft. (6 m)

14 Providing and fixing stone blocks, under 2 Per Cft. 226.85 259.85 cu.m 8012.35 9177.90Cft. (06 cu.m) each including lift upto 20 ft.(6 m)

chapter-9(Roofing) Page 60

Rates for all finished works include the removal of surplus debris unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 First class tile roofing, consisting of 4" (100 mm) earth 100Sft. 6089.70 11404.25 sq.m 655.25 1227.10 23.1 Add extra 13%, 32% & 51% onand 1" (25 mm) mud plaster with Gobri leeping over ½" (13 labour rates only or 6%, 15% & 23%mm) thick cement plaster 1:6 with 34 lbs. per %Sft or on composite rates for 2nd, 3rd, 4th1.72 Kg/sq.m hot bitumen coating sand blinded, provided & sub- sequent floors, respectively.over 2 layers of tiles 12"x6"x1¼" (300x150x30 mm) laid in1:6 cement mortar with ½" (13 mm) thick sand wichedlayer of 1:6 cement mortar, including 1:2 cement pointingunderside of tiles, complete, including curing, etc.

2 Second class tile roofing consisting of 4" (100 mm) earth 100Sft. 4725.60 8456.95 sq.m 508.50 909.95 23.2 dittoand 1" (25 mm) mud plaster with Gobri leeping over ½" (13mm) thick cement plaster 1:6 with 34 lbs. per %Sft or1.72 Kg/sq.m of hot bitumen coating sand blinded,provided over one layer of 12"x6"x2" (300x150x50 mm)tiles laid in 1:6 cement mortar, including 1:2 cementpointing underneath of tiles complete including curing, etc.

3 Covering mud roof with coal tar, and fine sand. 100Sft. 256.95 852.80 sq.m 27.65 91.75 23.1 to 23.2 ditto

4 Filling spaces in between:-

a) Wooden battens over beams, filled with 100Sft. 473.00 2704.55 sq.m 50.90 291.00 Add extra 13%, 32% & 51% ondeodar wood pieces (spacers). roof area labour rates only or 6%, 15% &

b) RCC battens, filled with CC block 1:3:6. -ditto- 903.55 1288.05 97.20 138.60 23% on composite rates for 2nd,c) Spaces filled with bricks. -ditto- 248.40 830.25 26.75 89.35 3rd, 4th & sub- sequent floors,

respectively.

5 Single layer of tiles 9"x4½"x1½" (225x113x40 mm) laid 100Sft. 1480.15 6002.90 sq.m 159.25 645.90 23.1 dittoover 4"(100 mm) earth and 1" (25 mm) mud plaster withoutBhoosa, grouted with cement sand 1:3 on top of RCC roofslab, provided with 34 lbs. per %Sft. or 1.72 Kg/Sq.mbitumen coating sand blinded.

6 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 to For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement 23.5 items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with 3" (75 mm) WORK be referred.earth and 1" (25 mm) plaster, soffits of arches cementplaster 1:6 and ½" (13 mm) thick. The rate also includes Add extra 13%, 32% & 51% onbitumen coating, centring, laying skew bricks in cement labour rates only or 6%, 15% & 23%mortar (1:3), and encasing exposed flanges of the joints on composite rates for 2nd, 3rd, 4thwith fine cement concrete 1:2:4 using stone aggregate:- & sub- sequent floors, respectively.

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

9. ROOFING

chapter-9(Roofing) Page 61

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

a) cement concrete in haunches 1:6:12. 100Sft. 6695.05 17414.95 sq.m 720.40 1873.85b) cement concrete in haunches 1:3:6. ditto 6695.05 18727.00 ditto 720.40 2015.05

7 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement to items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with ½" (13 mm) 23.5 WORK be referred.cement plaster 1:6 on top (except earth filling mud plasterand gobri) soffit of arches cement plastered. The rate also Add extra 13%, 32% & 51% onincludes bitumen coating, centring, laying skew bricks in labour rates only or 6%, 15% & 23%cement sand mortar (1:3), and encasing exposed flanges on composite rates for 2nd, 3rd, 4thof the joints with fine cement concrete 1:2:4 using stone & sub- sequent floors, respectively.aggregate:-

a) cement concrete in haunches 1:6:12. 100Sft. 5443.70 17048.50 sq.m 585.75 1834.40b) cement concrete in haunches 1:3:6. ditto 5443.70 17231.20 ditto 585.75 1854.10

8 Extra for vaulted jack arch roofing. 100Sft. 1203.85 sq.m 129.55 - ditto

9 Jack arch roofing of shingle and cement concrete 1:3:6, 100Sft. 7821.00 16022.30 sq.m 841.55 1724.00 23.3 ditto

4½" (113 mm) thick at crown, with ½" (13 mm) cement toplaster including cost of supplying, erecting and 23.5dismantling centring.

10 Earth filling over roof including watering, ramming with 1" 23.1 Add extra 13%, 32% & 51% on(25 mm) mud plaster finished, with gobri leeping: to labour rates only or 6%, 15% & 23%

23.3 on composite rates for 2nd, 3rd, 4tha) 3" (75 mm) thick earth filling and 1" (25 mm) mud 100Sft. 672.05 964.95 sq.m 72.30 103.85 & sub- sequent floors, respectively.

plaster

b) 4" (100 mm) thick earth filling and 1" (25mm) 100Sft. 881.65 1230.35 sq.m 94.85 132.40mud plaster

11 1/8" (3 mm) thick gobri leeping on roofs or floors. 100Sft. 87.90 101.80 sq.m 9.45 10.95 ditto ditto

12 Two coats of bitumen laid hot using 34 lbs. per %Sft, or 100Sft. 533.30 1671.25 sq.m 57.40 179.85 23.11.72 Kg per square metre over roof and blinded with sandat one Cft. per %Sft. (0.003 cu.m per sq.m)

13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts, 23.7 Add extra 13%, 32% & 51% onnuts, limpet and bitumen washers, wind ties, complete in labour rates only or 6%, 15% & 23%all respects without valleys and ridges:- on composite rates for 2nd, 3rd, 4th

& sub- sequent floors, respectively,a) 20 BWG 100Sft. 946 13303.35 sq.m 101.8 1431.45 on items 13 to 18.b) 22 BWG 100Sft. 946 11409.6 sq.m 101.8 1227.65c) 24 BWG 100Sft. 946 9280.65 sq.m 101.8 998.6

14 Khassi parnalas in cement, sand mortar 1:2, 12" (300 Rft. 67.55 90.05 Metre 221.55 295.35 23.10

chapter-9(Roofing) Page 62

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

mm) outside width finished smooth with a floating coat ofneat cement.

15 Khuras on roof 2'x2'x6" (600 x 600 x 150 mm) Each 254.75 439.30 Each Each 439.30 23.10

16 Bottom Khuras of brick masonry in cement mortar 1:6, Each 254.75 826.70 Each 254.75 826.70 23.104'x2'x4½" (1200x600x113 mm) over 3" (75 mm) cement concrete 1:4:8.

17 Plain galvanized iron sheets 22 SWG rain water down pipeincluding clamp and fixing in position.

a) 4" (100 mm) diameter down pipe Per Rft. 52.10 151.35 Metre 170.90 496.45b) 5" (125 mm) diameter down pipe Per Rft. 52.10 172.30 Metre 170.90 565.15

18 Plain galvanized iron sheet flashing, 22 gauge. Per Sft. 52.10 124.45 sq.m 560.60 1339.10 23.11

19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over Per Sft. 15.05 81.45 Sq.m 161.95 876.40roof expansion joint complete in all respects.

20 Cast iron rain water downpipe fixed in position, excluding Add extra 13%, 32% & 51% onheads and shoes, but including painting and clamps, etc:- labour rates only or 6%, 15% & 23%

on composite rates for 2nd, 3rd, 4tha) 4" dia (100 mm) cast iron down pipe. Per Rft. 47.30 209.90 Metre 155.15 688.45 & sub- sequent floors, respectively,b) 3" (75 mm) cast iron down pipe. Per Rft. 47.30 186.00 Metre 155.15 610.10 on items 19 to 24

21 Rain water down pipe cast iron head fixed in place, Each 195.45 502.60 Each 195.45 502.60including cost of clamp holdfast and painting.

22 Shoes, bends or offsets for cast iron rain water down pipe, Each 70.95 313.25 Each 70.95 313.25including fixing and painting.

23 Plain GI sheet iron spouts fixed in position, including Each 217.15 332.30 Each 217.15 332.30 23.10painting.

24 Laying ½" (13 mm) thick deodar ceiling complete, 100Sft. 5009.40 22203.70 sq.m 539.00 2389.10 26.1including sawing, planing and fixing.

25 Flat sheet roof with galvanized iron plain sheets, includingbattens, rolls, screws, clips etc. (Planking to be paid forseparately):-

a) 22 BWG sheets roofing 100Sft. 3029.40 15024.80 sq.m 325.95 1616.65 23.60b) 24 BWG sheets roofing 100Sft. 3029.40 13598.05 sq.m 325.95 1463.15

26 Asbestos cement corrugated sheet roofing including 100Sft. 2085.60 5992.20 sq.m 224.40 644.75 23.8

necessary overlaps, and GI hook bolts, nuts, screws,washers and bitumen washers, etc. (excluding valleys and

chapter-9(Roofing) Page 63

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

ridges, etc).

27 Extra labour for erection of GI sheets, flat sheet or 100Sft. 252.30 -- sq.m 27.15 - 23.6asbestos sheet roofing, above 20' (6.10 m) height indifficult position, including lifting with care and specialscaffolding along live electric wires.

28 Fixing asbestos cement sheet ridges and valleys ¼" Per Rft. 24.60 74.05 Metre 80.70 242.90 23.8(6 mm) thick.

29 Plain galvanized iron sheet ridging, including fixture, 23.6timber for ridge roll and ridge sheeting:-

a) 6" (150 mm) lap and 18" (450 mm) Per Rft. 65.15 431.70 Per Metre 213.70 1416.00overall, of 22 gauge G.I sheet ridging.

b) 9" (225 mm) lap and 24" (600 mm) Per Rft. 85.15 422.75 Per Metre 279.30 1386.60overall, of 24 gauge G.I sheet ridging.

c) 12" (300 mm) lap and 30" (750 mm) Per Rft. 85.15 483.30 Per Metre 279.30 1585.20overall, of 22 gauge G.I sheet ridging.

30 Plain 22 gauge G.I sheet gutter semi circular Per Rft. 42.55 155.50 Per Metre 139.55 510.05 23.118" (200 mm) dia meter.

31 Making masonry ventilators in cement, sand Each 946.00 1559.25 Each 946.00 1559.25mortar 1:4

32 Fixing water spouts or parnalas. Each 283.80 -- Each 283.80 - 23.10

33 Making drip course 2"x½" (50x13 mm) under RCC slab edges Per Rft. 12.20 13.55 Metre 40.00 44.45in outer opening, in cement, sand mortar 1:2.

34 Supplying and laying of twin G.I sheet 20 SWG duly Per Sft. 35.75 280.65 sq.m 384.65 3019.80painted with bitumen, with polythene film in between 300gauge, to provide a sliding joint under the bearing of thebeams, including 3" (75 mm) long, 3/8" (10 mm) dia bar toact as holdfast on wall and beam.

35 Providing and laying roof insulation, comprising of singlelayer of tiles 9"x4½"x1½" (225x113x40 mm) grouted withcement sand mortar 1:3 laid over 2" (50 mm) thick earth(including mud plaster) over thermopore sheet, overpolythene sheet 300 gauge over a layer of bitumen,complete in all respects:-

i) Thermopore sheet ½ " (13 mm) thick 100Sft. 2286.90 6921.65 sq.m 246.05 744.75ii) Thermopore sheet ¾ " (20 mm) thick 100Sft. 2286.90 7047.65 sq.m 246.05 758.35iii) Thermopore sheet 1" (25 mm) thick 100Sft. 2290.65 7177.40 sq.m 246.45 772.30

36 Providing and fixing AC rain water down pipe 4" (100 mm) Rft. 14.20 297.95 Metre 46.60 977.30

chapter-9(Roofing) Page 64

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

dia, with shoe, T-bend, clamp, etc.

37 Making jharries in existing brick masonry for providing Rate will be increased by 1.5 timerecesses for bearing of RCC roof slab, including repairing for stone masonry or plain; concrete;the damaged face:- and 2 times for reinforced cement

concrete.i) for slabs upto 6" (150 mm) thick Rft. 15.05 17.05 Metre 49.35 55.90ii) for slabs exceeding 6" to 12" (150 to 300 mm) thick. Rft. 25.90 29.50 Metre 84.95 96.75

38 Making recess in existing brick masonry for bearing of Rates will be increased by 1.5 timesbeam, girder, R.S. Joist, etc. including repairing damaged for stone masonry and plainface:- cement concrete and two times

for reinforced cement concrete.i) upto 1.0' (300 mm) height of girder or beam. Each 62.70 69.30 Each 62.70 69.30

ii) for every 6" (150 mm) additional height or part thereof. Each 30.10 33.25 Each 30.10 33.25

39 Hoisting RS. Beams and wooden beams and placing in Each 275.20 - Each 275.20 -position.

40 Hoisting and placing in position sahl ballies, over roof. Each 40.55 - Each 40.55 -

41 Hoisting precast R.C.C/prestressed concretebattens and placing in position.

a) 5' to 6' (1.50 to 1.83 m) long Each 39.30 - Each 39.30 -b) 6' to 7' (1.83 to 2.13 m) long Each 55.05 - Each 55.05 -c) 7' to 8' (2.13 to 2.44 m) long Each 68.80 - Each 68.80 -d) 8' to 9' (2.44 to 2.74 m) long Each 91.75 - Each 91.75 -e) above 9' (2.74 m) length Each 110.10 - Each 110.10 -

42 Hoisting and placing in position R.C. trough: Applicable only to roof trough(inverted tees & trough) for height of

a) upto 10' (3 m) in length Each 110.10 - Each 110.10 - 1st storey only.b) 10' to 11' (3 to 3.36 m) in length ditto 137.60 - ditto 137.60 -c) 11' to 12' (3.36 to 3.66 m) in length ditto 183.50 - ditto 183.50 -d) 12' to 13' (3.66 to 3.96 m) in length ditto 211.70 - ditto 211.70 -e) 13' to 14' (3.96 to 4.26 m) in length ditto 229.35 - ditto 229.35 -f) 14' to 15' (4.26 to 4.57 m) in length ditto 250.20 - ditto 250.20 -g) 15' to 16' (4.57 to 4.88 m) in length ditto 275.20 - ditto 275.20 -h) 16' to 17' (4.88 to 5.19 m) in length ditto 305.80 - ditto 305.80 -i) 17' to 18' (5.19 to 5.49 m) in length ditto 393.15 - ditto 393.15 -j) 18' to 19' (5.49 to 5.80 m) in length ditto 423.40 - ditto 423.40 -k) 19' to 20' (5.80 to 6.10 m) in length ditto 458.70 - ditto 458.70 -

43 Hoisting and placing in position R.C. inverted battens:-

i) upto 10' (3.05 m) span Each 85.45 - Each 85.45 -ii) from 10' to 12' (3.05 to 3.66 m) span ditto 189.95 - ditto 189.95 -iii) from 12' to 13' (3.66 to 3.96 m) span ditto 227.90 - ditto 227.90 -

chapter-9(Roofing) Page 65

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

iv) from 13' to 14' (3.96 to 4.26 m) span ditto 284.90 - ditto 284.90 -v) from 14' to 15' (4.26 to 4.57 m) span ditto 310.80 - ditto 310.80 -vi) from 15' to 16' (4.57 to 4.88 m) span ditto 341.90 - ditto 341.90 -vii) from 16' to 18' (4.88 to 5.49 m) span ditto 427.35 - ditto 427.35 -viii) from 18' to 20' (5.49 to 6.10 m) span ditto 683.75 - ditto 683.75 -

44 Reinforced cement concrete spout, including fixing in Each 378.40 653.45 Each 378.40 653.45position, with top and bottom Khurras.

45

a) 1" thick % Sft 346.50 5,512.50 P.Sqm 37.30 593.15 b) 1-1/2" thick % Sft 346.50 8,158.50 P.Sqm 37.30 877.85 c) 2" thick % Sft 346.50 10,552.50 P.Sqm 37.30 1,135.45

Providing and Laying Insulation material of Extruded Polystyrene XPS inRigid Insulation / Foam Board on roof or walls, Density 32-38Kg/M,compressive strength 250-400 kpa, R-value 5 per inch thickness and waterobsorbtion (1% by volume, cell structure clored cell) i/c cutting andplacing in position complete in all respect.

chapter-10(Flooring) Page 66

Rates for all finished works include the removal of surplus debris, unused material and byproducts

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Laying Murum flooring, consisting of 1"(25 mm) layer of 100 Sft. 2722.50 3991.85 sq.m 292.95 429.50fine powdery or flakey variety of Murum, laid over 6"(150mm) good hard layer of Murum spreaded over 9"(225 mm)thick sub-base comprising of hand packed rubble orbroken bricks properly watered and rammed, provided overwell rammed earth.

2 Earth flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 933.90 1212.90 sq.m 100.50 130.50 24.1layer of moistened earth, including ramming.

3 Providing, laying, watering and ramming brick ballast 1½" 100 Cft. 2135.75 4190.75 cum. 754.35 1480.15to 2"(40 mm to 50 mm) gauge mixed with 25% sand, forfloor foundation, complete in all respects.

4 Mud flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 1694.55 2129.70 sq.m 182.35 229.15 24.2layer of moistened earth and finished off with 1"(25 mm)mud plaster and gobri leeping.

5 Dry brick paving laid flat, sand grouted, including 100 Sft. 861.95 4402.45 sq.m 92.75 473.70 24.12

preparation of bed by watering, ramming and bringing thesame to proper camber, by ½"(13 mm) thick mud plaster.

6 Dry brick on edge paving, sand grouted, including 100 Sft. 1559.45 6834.55 sq.m 167.80 735.40 24.12preparation of bed by watering, ramming & bringing thesame to proper camber, by ½ "(13 mm) thick mud plaster.

7 Grouting 4½"(113 mm) dry brick work with cement mortar 100 Sft. 844.80 1355.10 sq.m 90.90 145.80ratio 1: 5

8 Flat brick flooring laid in 1:6 cement mortar, over a bed of 100 Sft. 1528.55 5940.95 sq.m 164.45 639.25 24.43/4" (20 mm) thick cement mortar, 1:6.

9 Brick on edge flooring, laid in 1:6 cement mortar, over a 100 Sft. 1,945.70 8,396.50 sq.m 209.35 903.45 24.4bed of ¾" (20 mm) thick cement mortar 1:6.

10 Brick tiles (12"x6"x2") (300x150x50mm) laid in 1:6 100 Sft. 1,910.70 4,135.50 sq.m 205.60 445.00 dittocement mortar, over a bed of ¾" (20 mm) thick cementmortar 1:6.

11 Brick ties (9"x4½"x1½")(225 mm x 113 mm x 40 mm) laid 100 Sft. 2,098.80 5,761.20 sq.m 225.85 619.90 24.4flat in 1:3 cement mortar, over a bed of 3/4"(20 mm) thickcement mortar 1:6.

12 Cement tiles (8"x8"x¾")(200 x 200 x 20 mm) laid flat in 100 Sft. 1,254.65 6,269.65 sq.m 135.00 674.60 24.71:2 cement mortar, over 3/4" (20 mm) thick bed of cement

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

10. FLOORING

chapter-10(Flooring) Page 67

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

mortar 1:2.

13 Cement concrete tiles laid in 1:2 cement mortar, over 24.83/4" (20 mm) thick bed of cement mortar 1:2:-

(a) 12"x12"x1" (300 x 300 x 25 mm) 100 Sft. 1,254.65 4,402.30 sq.m 135.00 473.70 (b) 9"x9"x¾" (225 x 225 x 20 mm) ditto 1,254.65 5,643.60 ditto 135.00 607.25 (c) 6"x6"x¾"(150 x 150 x 20 mm) ditto 1,254.65 8,089.60 ditto 135.00 870.45

14 Coloured cement tiles (8"x8"x¾")(200 x 200 x 20 mm) of 100 Sft. 1,254.65 6,299.15 sq.m 135.00 677.80 24.7

approved dark shade laid flat in 1:2 cement mortar, over ¾" (20 mm) bedding mortar of 1:2.

15 Providing and laying topping of cement concrete 1:2:4, 24.9 If glass or marble strips are usedincluding surface finishing and dividing in panels:- for panelling, it will be paid extra as

per item No. 41 or 42. (a) 1"(25 mm) thick 100 Sft. 1,343.10 2,606.90 sq.m 144.50 280.50 (b) 1¼"(30 mm) thick ditto 1,343.10 2,887.15 ditto 144.50 310.65 (c) 1½"(40 mm) thick ditto 1,711.05 3,535.40 ditto 184.10 380.40 (d) 1¾"(45 mm) thick ditto 1,711.05 3,828.85 ditto 184.10 412.00 (e) 2"(50 mm) thick ditto 2,079.00 4,544.20 ditto 223.70 488.95 (f) 2¼"(56 mm) thick ditto 2,145.65 4,871.95 ditto 230.85 524.20 (g) 2½"(62 mm) thick ditto 2,446.95 5,377.30 ditto 263.30 578.60 (h)2¾"(70 mm) thick ditto 2,446.95 5,745.65 ditto 263.30 618.25 (i) 3"(75 mm) thick ditto 2,446.95 6,071.65 ditto 263.30 653.30

16 Providing and laying conglomerate flooring (two coat work) 24.10 If glass or marble strips are used

with top layer of ½"(13mm) thick wearing surface, for panelling, it will be paid extra asconsisting of one part of cement and 2 parts of stone per item No. 41 or 42.chips passing 3/16"(6 mm) sieve, over bottom layer ofcement concrete 1:3:6, including surface finishing anddividing in panels:-

(a) 1½"(40 mm) thick 100 Sft. 1,992.85 3,768.25 sq.m 214.45 405.45 (b) 1¾"(45 mm) thick ditto 1,992.85 3,956.65 ditto 214.45 425.75 (c) 2"(50 mm) thick ditto 2,548.90 4,794.50 ditto 274.25 515.90

17 Add extra in cement concrete floor topping, if finished with 100 Sft. 473.00 995.05 sq.m 50.90 107.05pigment and polishing.

18 Extra labour for each storey above ground, for mosaic, 100 Sft 399.95 - sq.m 43.05 - On items 19-25 & 29-34conglomerate, tiles, stone and wooden floor.

19 Flag stone flooring in lime mortar 1:2, over ¾"(20 mm) 24.5bedding mortar, in platforms and floors, etc.

(a) 2"(50 mm) thick 100 Sft. 4,106.65 5,766.60 sq.m 441.90 620.50 (b) 3"(75 mm) thick ditto 4,106.65 6,027.00 ditto 441.90 648.50

chapter-10(Flooring) Page 68

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

20 Asphalt flooring , including preparation of proper base 24.10remelting, setting out, and finishing complete:-

(a) 1"(25 mm) thick topping 100 Sft. 1,709.40 11,770.85 sq.m 183.95 1266.55 (b) ½"(13 mm) thick topping ditto 1,338.50 6,483.90 ditto 144.00 697.65 (c) ¼"(6 mm) thick topping ditto 982.60 3,661.35 ditto 105.75 393.95

21 13/8"(35 mm) thick mosaic flooring, consisting of 3/8"(10 If glass or marble strips are usedmm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick flooring of 1:2:4 cement concreteincluding rubbing and polishing complete :-

(a) using grey cement 100 Sft. 6,069.35 8,765.85 sq.m 653.05 943.20 (b) using white cement ditto 6,069.35 9,002.80 ditto 653.05 968.70

22 1½"(40 mm) thick mosaic flooring, consisting of ½ "(13 If glass or marble strips are used

mm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick floor of 1:2:4 cement concrete,including rubbing and polishing complete with finishing :-

(a) using grey cement 100 Sft. 6,069.35 8,964.20 sq.m 653.05 964.55 (b) using white cement ditto 6,069.35 9,543.20 ditto 653.05 1026.85

23 Providing and laying floor of mosaic marble chips tiles 100 Sft. 3,486.50 7,646.30 sq.m 375.15 822.75 24.81"(25 mm) thick of approved quality and shade, laid inwhite cement and pigment, over ¾"(20 mm) thick beddingof cement sand mortar 1:2, including finishing andpolishing, complete.

24 Laying floor of approved white glazed tile ¼" (6 mm) thick 100 Sft. 4,517.70 11,112.90 sq.m 486.10 1195.75 24.7in white cement 1:2 over ¾" (20mm) thick cement mortar1:2, complete.

25 Laying floor of approved coloured glazed tiles ¼ "(6 mm) 100 Sft. 4,517.70 11,661.20 sq.m 486.10 1254.75 dittothick, laid in white cement and pigment on a bed of ¾"(20 mm) thick cement mortar 1:2.

26 Rubbing and polishing old grit/ mosaic floor, including 100 Sft. 1,273.80 1,407.50 sq.m 137.05 151.45 The composite rate will be reducedrepairing voids, uneven surface, complete in all respects. by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

27 Rubbing and polishing grit floor, including repairing voids, 100 Sft. 1,356.95 1,493.40 sq.m 146.00 160.70 The composite rate will be reduceduneven surface, complete in all respects by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

chapter-10(Flooring) Page 69

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

28 Cleaning and washing mosaic or marble floor with caustic 100 Sft. 180.85 226.35 sq.m 19.45 24.35 24.6soda mixture.

29 Shisham wood boarding or strip flooring 3/4" (20mm) thick 100 Sft. 3,762.00 38,362.25 sq.m 404.80 4127.80 24.13(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½ "x2"(40 x 50 mm),size placed at 12"(300 mm) centreto centre, including two coats of bitumen laid hot on thebase.

30 Deodar wood boarding or strip flooring 3/4" (20 mm) thick 100 Sft. 4,257.00 50,384.35 sq.m 458.05 5421.35 ditto(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½"x2"(40 x 50 mm) size , placed at 12"(300 mm) centre,to centre including two coats of bitumen laid hot on thebase.

31 Teak wood boarding or strip flooring ½" (13 mm) "thick 100 Sft. 3,619.00 49,589.15 sq.m 389.40 5335.80 ditto(sawn to required size) to tongued and grooved screwedon deodar wood battens 1½ " x2"(40 x 50 mm) size,placed at 12"(300 mm) centre to centre, including 2 coatsof bitumen laid hot on base.

32 Shisham wood block flooring 1"(25 mm) thick cut to 100 Sft. 3,923.70 40,976.35 sq.m 422.20 4409.05 24.13required size, fixed on a layer of asphalt bitumen laid onbase.

33 Teak wood block 1"(25 mm) thick cut to required size, 100 Sft. 3,619.00 79,387.70 sq.m 389.40 8542.10 dittofixed on a layer of asphalt bitumen laid on base.

34 Laying wooden paving of hard wood on edge in coal tar dittoand asphalt:- 100 Sft. sq.m

Per Inch per cm (a) Shisham wood thickness 2,336.40 25,502.15 thickness 251.40 2744.05 (b) Kikar wood ditto 2,336.40 14,130.65 ditto 251.40 1520.45

35 Tile skirting laid in 1:2 cement mortar, over ¾"(20 mm)thick cement mortar, 1:2 including cement washing andfilling joints complete:-

(a) cement tiles 100 Sft. 2,050.60 7,502.05 sq.m 220.65 807.20 (b) mosaic tiles ditto 3,344.55 10,726.35 ditto 359.85 1154.15

36 Providing grey cement skirting or dado 3/8"(10 mm) thickincluding rounding of corner and straight ening of top edgeand finishing to smooth surface afterplastering :-

(a) 1:2 cement, sand mortar 100 Sft. 2,493.20 3,146.80 sq.m 268.25 338.60

chapter-10(Flooring) Page 70

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

(b) 1:3 cement, sand mortar ditto 2,493.20 2,953.05 ditto 268.25 317.75 (c) Extra if skirting or dado is finished ditto 166.65 434.30 ditto 17.95 46.75 with pigment of any colour.

37 White glazed tile (6"x6"x¼") (6 mm) thick dado jointed in white 100 Sft. 5,560.50 12,155.70 sq.m 598.30 1307.95 24.7cement and laid over 1:2 cement sand mortar 3/4" (20mm)thick, including finishing.

38 Coloured glazed tile dado (6"x6"¼") (6mm) thick in pigment over 100 Sft. 5,560.50 12,686.70 sq.m 598.30 1365.10 ditto1:2 cement, sand mortar 3/4"(20mm) thick, including finishing.

39 Mosaic dado or skirting with one part of cement andmarble powder in the ratio of 3:1 and two parts of marblechips, laid over ½"(13 mm) thick cement plaster 1:3,including rubbing and polishing, complete with finishing:

(a) using grey cement: i) 3/8"(10 mm) thick 100 Sft. 7,293.00 8,705.10 sq.m 784.75 936.65 ii) ½"(13 mm) thick ditto 7,293.00 9,583.95 ditto 784.75 1031.25

(b) using white cement :

'i) 3/8"(10 mm) thick 100 Sft. 7,293.00 9,592.20 sq.m 784.75 1032.10 ii) ½"(13 mm) thick ditto 7,293.00 9,903.95 ditto 784.75 1065.65

40 Rubber flooring, consisting of 12"x12"x1/8" Per Sft. 17.50 80.40 sq.m 188.30 865.10 24.14 The cost of base for rubber flooring(300x300x3mm) rubber tiles, laid on firm foundation. is not included in the rate and is

payable separately.

41 Providing and fixing glass strip 5mm thick and 1½" Per Rft. - 4.20 Metre - 13.80 Labour for fixing already included in(40 mm) wide, for dividing the mosaic flooring into panels. items No. 15, 16, 21and 22 of this

Chapter.

42 Providing and fixing marble strip of any shade for dividingthe mosaic flooring into panels

a) s Size 1½" x 3/8" (40 x 10 mm) Per Rft. - 6.60 Metre - 21.65b) Size 1½" x ¼" (40 x 6 mm) ditto - 4.60 ditto - 15.10

43

a) 50-mm thick P.Sft 12.20 73.90 Sq.m 131.00 795.35 b) 60-mm thick P.Sft 12.20 84.00 Sq.m 131.00 903.80 c) 80-mm thick P.Sft 12.20 106.70 Sq.m 131.00 1,147.85

Providing and laying Tuff pavers, having 7000 PSI, crushing strengthof approved manufacturer, over 2" to 3" sand cushion i/c groutingwith sand in joints i/c finishing to require slope . complete in allrespect. (50% Grey / 50% Coloured)

chapter-11(Surface Rendering) Page 71

1 PLASTERING, POINTING, WHITE WASHING, COLOUR WASHING AND DISTEMPERING, ETC.2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud plaster on walls (excluding Gobri leeping) upto 20' 25.7(6.00 m) height:-

a) ½" (13 mm) thick 100 Sft. 396.70 475.15 sq.m 42.70 51.15b) 1" (25 mm) thick ditto 559.15 716.10 ditto 60.15 77.05

2 Mud plaster on floor or roof (excluding Gobri leeping):- ditto Add extra 13%, 32% and 51% above

the labour rates only or 6%, 15% &a) ½" (13 mm) thick 100 Sft. 358.00 436.45 sq.m 38.50 46.95 23% on the composite rates for 2nd,

3rd, 4th and subsequenct floors,b) 1" (25 mm) thick ditto 358.00 514.95 ditto 38.50 55.40 respectively.

3 Cement lime plaster 1:7:12 (cement, lime and sand) upto 25.1 to 25.620' (6.00 m) height.

a) ¼" (6 mm) thick 100 Sft. 1123.30 1297.20 sq.m 120.85 139.60

b) ½" (13 mm) thick ditto 1123.30 1470.95 ditto 120.85 158.25

4 Cement Neru plaster 1:2 (cement and sand) upto 20' ditto(6.00 m) height:-

a) ¼" (6 mm) thick 100 Sft. 1123.30 1587.35 sq.m 120.85 170.80b) ½" (13 mm) thick ditto 1123.30 1866.00 ditto 120.85 200.80

5 2" (50 mm) stucco cement plaster 1:2:4 (cement, sand 100 Sft. 2901.35 5743.20 sq.m 312.20 617.95 ditto

and shingle) upto 20' (6.00 m) height.

6 Providing and laying machine sprayed plaster ½" (13 mm) dittothick, using cement and chips zero gauge, over theexisting plastered and roughened surface, upto 20' (6.00m) height:-

i) ratio 1:1 100 Sft. 951.20 2682.80 sq.m 102.35 288.65ii) ratio 1:1½ ditto 951.20 2564.00 ditto 102.35 275.90iii) ratio 1:2 ditto 951.20 2495.60 ditto 102.35 268.55

7 Cement plaster 1:2 upto 20' (6.00 m) height:- 25.1to

a) 3/8" (10 mm) thick 100 Sft. 1123.30 1776.90 sq.m 120.85 191.20 25.6b) ½" (13 mm) thick ditto 1123.30 1971.10 ditto 120.85 212.10c) ¾" (20 mm) thick ditto 1407.10 2714.30 ditto 151.40 292.05

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

11. SURFACE RENDERING

chapter-11(Surface Rendering) Page 72

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

8 Cement plaster 1:3 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 1123.30 1583.15 sq.m 120.85 170.35b) ½" (13 mm) thick ditto 1123.30 1736.40 ditto 120.85 186.85c) ¾" (20 mm) thick ditto 1407.10 2326.75 ditto 151.40 250.35

9 Cement plaster 1:4 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 1123.30 1530.50 sq.m 120.85 164.70b) ½" (13 mm) thick ditto 1123.30 1641.70 ditto 120.85 176.65c) ¾" (20 mm) thick ditto 1407.10 2215.15 ditto 151.40 238.35

10 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. ditto i) This item shall be applicable toroof slabs only, upto 20' height. buildings meant for human

habitation only, such as buildingslike residences, offices,

a) 1:2 100 Sft. 1273.80 2057.60 sq.m 137.05 221.40 educational institutions andb) 1:3 ditto 1273.80 1863.20 ditto 137.05 200.50 hospitals, etc. It shall not bec) 1:4 ditto 1273.80 1810.55 ditto 137.05 194.80 admissible on godowns; bins;

agriculture, poultry and animalsheds; cycle stands; garrages; etc.ii) The thickness of the plaster willnot be more than 3/8" (10 mm)thick.

11 Cement plaster 1:5 upto 20' (6.00 mm) height:- 25.1 to 25.6

a) 3/8" (10 mm) thick 100 Sft. 1123.30 1485.10 sq.m 120.85 159.80b) ½" (13 mm) thick ditto 1123.30 1562.50 ditto 120.85 168.15c) ¾" (20 mm) thick ditto 1407.10 2130.70 ditto 151.40 229.25

12 Cement plaster 1:6 upto 20' (6.00 mm) dittoheight:-a) 3/8" (10 mm) thick 100 Sft. 1123.30 1420.30 sq.m 120.85 152.80b) ½" (13 mm) thick ditto 1123.30 1517.15 ditto 120.85 163.25c) ¾" (20 mm) thick ditto 1407.10 2001.10 ditto 151.40 215.30

13 Applying floating coat of cement 1/32" (0.8 mm) thick. 100 Sft. 640.20 899.40 sq.m 68.90 96.80 25.4 to 25.6

14 Lime pointing flush upto 20' (6.00 m) height including 100 Sft. 839.50 958.95 sq.m 90.35 103.20 25.8

raking joints, in lime, sand mortar 1:2.

15 Lime pointing struck joints on walls, upto 20' (6.00 m) 100 Sft. 1273.80 1393.25 sq.m 137.05 149.90 dittoheight, including raking joints in lime sand mortar 1:2.

16 Cement pointing flush upto 20' (6.00 m) heihgt:- ditto

a) ratio 1:2 100 Sft. 1123.30 1612.55 sq.m 120.85 173.50b) ratio 1:3 ditto 1123.30 1498.45 ditto 120.85 161.25

chapter-11(Surface Rendering) Page 73

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

17 Cement pointing 1:2 flush on floor. 100 Sft. 839.50 1328.75 sq.m 90.35 142.95 ditto

18 Cement pointing struck joints, on walls, upto20' (6.00 m) hiehgt:-

a) ratio 1:2 100 Sft. 1273.80 1763.05 sq.m 137.05 189.70b) ratio 1:3 ditto 1273.80 1648.90 ditto 137.05 177.40

19 Pointing flush on stone work, upto 20' (6.00 m) height. 25.8

a) in lime mortar 1:2 (lime, sand) 100 Sft. 1007.15 1166.70 sq.m 108.35 125.55b) in cement mortar 1:3 ditto 1007.15 1382.30 ditto 108.35 148.75c) on stone work raised:-

i) in lime mortar 1:2 100 Sft. 1875.70 2035.25 sq.m 201.85 219.00ii) in cement mortar 1:3 ditto 1875.70 2250.85 ditto 201.85 242.20

20 Raking and washing joints of stone masonry 100 Sft. 601.90 - sq.m 64.75 - ditto

(old work).

21 Raking and washing joints of brick masonry (old work). 100 Sft. 300.95 - sq.m 32.40 - ditto

22 Priming coat of chalk under distemper. 100 Sft. 113.50 121.15 sq.m 12.20 13.05 25.11

23 Distempering:- ditto

a) new surface:-i) one coat 100 Sft. 122.15 203.35 sq.m 13.15 21.90ii) two coats ditto 180.70 286.50 ditto 19.45 30.85iii) three coats ditto 239.25 369.65 ditto 25.75 39.75

b) old surface:- i) one coat 100 Sft. 112.00 168.55 sq.m 12.05 18.15ii) two coats ditto 180.70 237.30 ditto 19.45 25.55

24 Colour washing:- 25.10

a) new surface:- i) one coat 100 Sft. 104.25 132.90 sq.m 11.20 14.30ii) two coats ditto 156.35 198.25 ditto 16.80 21.35

b) old surface:-

i) one coat 100 Sft. 104.25 121.95 sq.m 11.20 13.10ii) two coats ditto 156.35 185.40 ditto 16.80 19.95

25 White washing:- 25.9

a) new surface:- i) one coat 100 Sft. 104.25 127.65 sq.m 11.20 13.75ii) two coats ditto 156.35 191.40 ditto 16.80 20.60

chapter-11(Surface Rendering) Page 74

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

iii) three coats ditto 202.45 249.15 ditto 21.80 26.80

b) old surface:- i) one coat 100 Sft. 104.25 121.80 sq.m 11.20 13.10ii) two coats ditto 156.35 185.55 ditto 16.80 19.95

26 Gobri leeping:- 25.7

a) on walls 100 Sft. 123.55 127.55 sq.m 13.30 13.70b) over roofs ditto 105.50 109.50 ditto 11.35 11.80

27 Striking joints of burnt bricks in lime or cement mortar. 100 Sft. 150.50 - sq.m 16.20 - 25.8 Payable with fresh masonry, when

the face of the work is not to be plastered/pointed.

28 Extra for lime, mud or cement plaster and pointing from 100 Sft. 205.55 - sq.m 22.10 -20' (6.00 m) and above for each additional 10' (3.00 m) height or part thereof.

29 Caulking joints of sleeper wall, with sand and coaltar. 100 Sft. 567.60 922.00 sq.m 61.05 99.20

30 Caulking joints of sleepers, withmud and chopped straw. 100 Sft. 567.60 595.30 sq.m 61.05 64.05

31 Extra cost of labour and material for red oxide pigment in 100 Sft. 188.10 288.60 sq.m 20.25 31.05

cement pointing to match with the colour of bricks.

32 Providing grooved cement sand plaster 1:3 over existingplastered and roughened surface upto 20' (6.00 m) height.

i) 3/8" (10 mm) thick 100 Sft. 1273.80 1733.60 sq.m 137.05 186.55ii) ½" (13 mm) thick ditto 1273.80 1886.90 ditto 137.05 203.05

33 Providing and fitting expanded metal edge bead for Rft. 8.95 38.55 Metre 29.35 126.45corners, with nails on both sides of edges.

34 Petty repairs to fire place.

i) Single Each 198.65 252.70 Each 198.65 252.70ii) Double Each 397.30 505.35 Each 397.30 505.35

Area above 100 Sft (10.76 sq.m)35 Petty repair to main rooms. Each 414.75 558.85 Each 414.75 558.85

Area upto 100 Sft (10.76 sq.m)36 Petty repair to small rooms. Each 207.35 279.40 Each 207.35 279.40

37 Petty repair to verandah. Each 414.75 529.95 Each 414.75 529.95The height will be taken from the

38 Extra labour for white washing, colour washing, priming coat 100 Sft. 17.35 - sq.m 1.85 - floor, roof or ground uderneath asand distempering, etc. from 20' (6.00 m) height and above, Per Per the case may be on the siderequiring scaffolding, for every additional 10' (3.00m) height coat coat towards which the work is to beor part thereof. done.

chapter-12(Wood Work) Page 75

1 No extra rate is to be paid for sawing as the rates are inclusive of these.2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Plain wood work sawn, wrought, planed and fixed 26.1inposition, including cost of nails and screws etc.

a) Deodar wood Per Cft. 662.10 4555.85 cu.m 23385.35 160912.60b) Shisham wood ditto 752.40 3128.65 ditto 26574.75 110503.90

2 Plain wood work for regulation karries or needles, etc. 26.1including sawing, planning, wroughting wood and providingand fixing steel parts of karries i.e. end strip and rods, etc.

a) Deodar wood Per Cft. 428.85 4353.10 cu.m 15147.00 153751.50b) Shisham wood ditto 428.85 2874.70 ditto 15147.00 101534.40

3 First class teak wood wrought joinery in doors and 26.1windows, etc. panelled, panelled and glazed or fully toglazed and fixed in position, including chowkat, holdfast, 26.3tower bolt, chocks, rubber stop, cleats/G.I. clamps, &chords with hooks, nails, screws, etc. complete 26.7(excluding sliding bolt and lock):-

i) 2" (50 mm) thick Per Sft. 114.45 1464.45 sq.m 1231.50 15757.50ii) 1¾" ( 45 mm) thick ditto 114.45 1367.40 ditto 1231.50 14713.20iii) 1½" (40 mm) thick ditto 114.45 1272.65 ditto 1231.50 13693.70

4 First class teak wood wrought joinery in wire gauze doors 26.8 i) This also includes the cost ofand windows with frames 22 SWG galvanized iron wire to wood required for extra thickness ofgauze 12x12 meshes to square inch, (5x5 meshes in cm2) 26.10 chowkat.including brass fittings, sash bars, etc. complete:- ii) If 24 SWG wire gauge is used,

the composite rate shall bea) teak wood framing 1¾" (45 mm) thick with wire gauze reduced by Rs.4.70 per sft. and

fixed in position:- Rs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 20.90 597.00 sq.m 224.90 6423.70

ii) with springs or spring hinges. ditto 20.90 600.70 ditto 224.90 6463.55

b) teak wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges. Per Sft. 20.90 550.75 sq.m 224.90 5926.05ii) with springs or spring hinges. ditto 20.90 554.95 ditto 224.90 5971.25

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

12. WOOD WORK

chapter-12(Wood Work) Page 76

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

c) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 37.6 186.35 sq.m 404.6 2005.15inch, (5x5 meshes per cm2) fixed to chowkat with ¾"(20 mm) teak wood strips and screws.

d) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 35.25 575.90 sq.m 379.30 6196.70inch (5x5 meshes per cm2) fixed with ½" (13 mm) stripon separate frame of teak wood 2"x2" (50x50 mm),for windows, etc.

5 P/F expanded metal ½" to ¾" (13 to 20 mm) mesh, 16 Per Sft. 47.05 295.95 sq.m 506.25 3184.40Guage, fixed to chowkat with 1" (25 mm) teak wood coverstrips and screw etc., complete.

6 Providing and fixing expanded metal ½" (13 mm) to ¾" Per Sft. 47.05 434.15 sq.m 506.25 4671.4520 mm), 16 gauge, fixed to chowkat with 1" (25 mm)covermoulding and screws, including teak wood frame 2"x2" (50 mm x 50 mm)

7 First class deodar wood wrought joinery in doors and 26.1 towindows, etc. panelled, or panelled or glazed, or fully 26.3 & 26.7glazed, fixed in position, including chowkat, holdfast, hinges, tower bolts, chocks, rubber stop, cleats/G.I. clamps, handles and chord with hooks, etc. complete (excluding sliding bolt or lock):-

a) 2" thick (50 mm) Per Sft. 111.45 1181.45 sq.m 1199.20 12712.40b) 1¾" thick (45 mm) ditto 111.45 1105.00 ditto 1199.20 11889.90c) 1½" thick (40 mm) ditto 111.45 1052.05 ditto 1199.20 11320.05

8 Deodar wood framed, braced and battened doors and 26.1, 26.2windows, complete with iron fittings and fixed in position, & 26.4including chowkats:-

a) 2¼" (56 mm) thick, with 1¼" (30 mm) Per Sft. 125.40 827.90 sq.m 1349.30 8908.20battens and 1" (25 mm) planks.

b) 1¾" (40 mm) thick with 1" (25 mm) ditto 115.75 714.25 ditto 1245.45 7685.35battens and ¾" (20 mm) planks.

9 1" (25 mm) thick battneded doors and windows fitted in Per Sft. 142.95 466.15 sq.m 1538.15 5015.75position, complete with iron fittings, without chowkats.

10 Deodar battened ledged and braced doors and windows 26.1, 26.22¼" (56 mm) thick (1¼" (30 mm) thick ledge braces and 26.4 to1" (25 mm) thick battens complete with iron fittings, Per Sft. 135.05 806.85 sq.m 1453.15 8681.70 26.6chowkats and fixed in position.

11 a) Deodar wood framed with braces and 22 SWG G.I. 26.1, 26.2 If 24 gauge G.I. sheet is used, the

sheet facing, including holdfast, wooden beadings, & 26.4 composite rate will be reduced byhinges, and locking arrangements as directed by the Re.4.70 per Sft. (Rs. Per 50.60

chapter-12(Wood Work) Page 77

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

Engineer incharge:- Sq.m) for G.I. facing on one sideand Rs.9.40 per Sft. (Rs.101.20

i) G.I. sheet facing on one side. Per Sft. 58.80 611.25 sq.m 632.70 6577.05 per Sq.m) for G.I. sheet facing onii) G.I. sheet facing on both sides. ditto 64.65 641.50 ditto 695.65 6902.55 both sides.

b) Partal wood framed with braces and 22 SWG G.I.sheet facing, including holdfast, wooden beadings, -ditto-hinges and locking arrangements, as directed by theEngineer-in-charge:-

i) G.I. sheet facing on one side. Per Sft. 58.80 250.30 sq.m 632.70 2693.25ii) G.I. sheet facing on both sides. ditto 64.65 280.55 ditto 695.65 3018.70

12 First class deodar wood wrought joinery work in wire 26.8 to i) This also includes the cost ofgauze doors and windows, with 22 SWG G.I. wire gauze, 26.10 wood required for extra thickness12x12 meshes per square inches (5x5 per cm2) including of chowkat.iron fittings etc. complete:-

ii) If 24 SWG wire gauze is useda) deodar wood framing 1¾" (45 mm) thick with wire the composite rate shall be

gauze fixed in position:- reduced by Rs.4.70 per sft orRs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 62.70 510.80 sq.m 674.65 5496.20ii) with springs or spring hinges. ditto 62.70 514.95 ditto 674.65 5540.85

b) deodar wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges Per Sft. 62.70 475.25 sq.m 674.65 5113.70ii) with springs or spring hinges ditto 62.70 477.65 ditto 674.65 5139.50

c) G.I. wire gauze 22 SWG, 12x12 meshes per squareinch, (5x5 in cm2) fixed to chowkat, with ¾" Per Sft. 47.05 170.85 sq.m 506.25 1838.35('20 mm) thick deodar wood strip and screws.

d) G.I. wire gauze 22 SWG 12x12 meshes per squareinch, (5x5 meshes in cm2) fixed to chowkat, with ½" Per Sft. 70.55 440.45 sq.m 759.10 4739.25(13 mm) strip on separate frame of deodar wood 2" x2" (50 mm x 50 mm).

13 Making and fixing trellis doors and windows of deodar Per Sft. 104.50 546.85 sq.m 1124.40 5884.10 26.1wood, complete. 26.2

14 Providing and fixing mild steel chowkat of doors, windows,C.window, etc. including holdfast, making and threadingholes for hinges, etc. complete:-

a) M.S. angle iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 25.05 134.45 sq.m 269.55 1446.70with M.S. flat 2"x ¼" (50 mm x 6 mm)

chapter-12(Wood Work) Page 78

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

b) M.S. tee iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 25.05 103.35 sq.m 269.55 1112.05with M.S. flat 2"x ¼" (50 mm x 6 mm)

15 Providing and fixing M.S. sheet hollow pressed frame ofdoors, windows, C. windows, etc. (chowkat only) of 20SWG welded with M.S. flat 6"x 1¼" x 1/8" (150mmx30mmx3mm) M.S. holdfast 9"x1"x1/8"(225mmx25mmx3mm) welded/screwed 4" (100 mm) longiron hinges, including filling chowkat with cement sandmortar 1:8 and embedding holdfast in cement concrete1:2:4, complete in all respects:

a) single rebate Per Sft. 38.80 116.60 sq.m 417.50 1254.60b) double rebate ditto 45.50 134.80 ditto 489.60 1450.45

16 Extra for providing and fixing iron double spring hinges, Per Sft. 3.60 31.65 sq.m 38.75 340.55 26.2with brass fittings (it shall include brass finger plate, 6" door area door area(150 mm) tower bolt).

17 Providing and fixing brass spring hinges to wire gauzed Each 75.25 227.65 Each 75.25 227.65doors.

18 Providing and fixing sliding bolt to doors:-

i) iron sliding bolt, 10" (250 mm) long Each 70.55 132.95 Each 70.55 132.95ii) iron sliding bolt, 12" (300 mm) long ditto 70.55 174.95 ditto 70.55 174.95iii) brass sliding bolt, 10" (250 mm) long ditto 70.55 173.75 ditto 70.55 173.75iv) brass sliding bolt, 12" (300 mm) long ditto 70.55 330.95 ditto 70.55 330.95

19 Extra for brass fittings to doors and windows, except forhinges, which shall be of iron:-

i) deodar wood panelled or panelled and Per Sft. 2.15 12.45 sq.m 23.15 133.95glazed or fully glazed.

ii) deodar wood wire gauzed shutters. ditto 2.15 9.95 ditto 23.15 107.05

20 Extra for providing and fixing approved quality rim lock Each 225.70 436.90 Each 225.70 436.90adjustable over the style surface.

21 Providing and fixing, approved quality mortice lock. Each 313.50 504.30 Each 313.50 504.30

22 Providing and fixing, expended metal ½" to ¾" (13 mm to20 mm) mesh 16 gauge.

a) fixed to chowkat with 1" (25 mm) thick deodar wood Per Sft. 47.05 258.70 sq.m 506.25 2783.60strip and screws, etc.

b) fixed with 1" (25 mm) cover moulding and screws, ditto 47.05 364.50 ditto 506.25 3922.00including deodar wood frame 2"x2" (50 x 50 mm)

chapter-12(Wood Work) Page 79

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

23 a) Providing and fixing deodar wood almirah 9" to 12" For hollow frame shutter with(225 mm to 300 mm) depth, including boxing with Per Sft. 150.50 1684.45 sq.m 1619.15 18124.80 commercial ply on one side, theback, shelves, shutter and brass fittings, etc. composite rate shall be reduced bycomplete. Rs.54.00 per Sft;or Rs.580.00

per Sqm and for hollow frameshutter with commercial ply onboth sides, the composite rateshall be reduced by Rs.22.80 perSft. or Rs.245.00 per Sq. metre.

b) Providing and fixing deodar wood almirah 9" to 12"(225 mm to 300 mm)depth with shelves, shutters, Per Sft. 112.85 624.05 sq.m 1214.35 6714.90brass fittings, etc., without boxing and back,complete.

24 Providing and fixng class room almirah consiting of 1" (25 Per Sft. 90.60 389.85 Sq.m 974.85 4194.90mm) thick solid flush shutter with deodar wood lipping ¼" (6 mm) thick all around (Approved Factory Manufactured) fixed in deodarwood frame 3"x1" (75mm x 25mm) including full hinges C.P. fittings with RCC (1:1½:3) shelves 1½" (40 mm) thickincluding 3 coats of painting.

25 Providing and fixing wooden box type wardrobe 22" (550 If hollow flush door leaves 1" thickmm) deep including ¾" (20 mm) thick boxing and shelves, (25 mm) with commercial plyhanger rods, hard board back drawers, brass fittings, 3 ply) on both sides of deodarlocking arrangements, handles, internal bolts, shoe rods, wood frame and partal woodetc. including three coats of enamel paint:- bracing and deodar wood lipping is

used, the composite rate will bei) Partal wood boxing and deodar wood reduced by Rs.13.00 per Sft. or

shelves and leaves, etc. Per Sft. 173.65 784.65 sq.m 1868.25 8442.60 Rs.140.00 per Sq. metre.

ii) Deodar wood boxing, and deodar wood ditto 169.60 1055.25 ditto 1824.75 11354.50shelves and leaves, etc.

26 Providing and fixing wardrobe 22" (550 mm) deepconsisting of RCC shelves 1½" (40 mm) thick including ½"thick vinboard boxing and back (one side ply) vinboard Per Sft. 67.35 643.05 Sq.m 724.75 6919.00shutter ¾" (20 mm) thick including deodar wood lipping ¼"(6 mm) on all edges, fixes including deodar wood frame3"x1" (75mm x 25mm) with hanger rod in centre positiondrawers at bottom and openable shutter on upper portionincluding full hinges C.P. fitting and painting 3 coatscomplete.

27 Providing and fixing chowkat for doors, windows and C.windows, including holdfast, etc.

a) Teak wood Per Sft. 33.45 500.20 Sq.m 359.80 5382.10b) Deodar wood ditto 20.90 389.90 ditto 224.90 4195.10

chapter-12(Wood Work) Page 80

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

c) Shisham wood ditto 25.10 184.30 ditto 269.85 1982.80

28 Making and fixing deodar wood planking in eave boards, 26.1etc. planed on both sides, rebated and fixed including 26.2nails and screws, bolts and brackets:-

a) 1" (25 mm) thick Sft. 37.60 357.15 sq.m 404.80 3842.75b) ¾" (20 mm) thick ditto 37.60 277.15 ditto 404.80 2982.30c) ½" (13 mm) thick ditto 37.60 197.55 ditto 404.80 2125.45

29 Making and fixing deodar wood shelves, including dittobrackets:-

i) 1" (25 mm) thick Sft. 37.60 357.15 sq.m 404.80 3842.75ii) 1½" (40 mm) thick ditto 37.60 516.75 ditto 404.80 5560.05iii) 2" (50 mm) thick ditto 37.60 676.35 ditto 404.80 7277.35

30 a) Making and fixing cleats for doors and windows, Each 45.15 136.95 Each 45.15 136.95 26.1 andincluding hinges and screws. 26.2

b) Making and fixing cleats with brass hooks for roof Each 60.20 106.60 Each 60.20 106.60ventilators.

c) Providing and fixing door stops of 1½" (40 mm) dia Each 6.25 59.40 Each 6.25 59.40rubber block.

d) Providing and fixing G.I. hook with clamps for doors. Each 2.00 10.90 Each 2.00 10.90

31 Hard wood railing of any shape and design, including dittobends and corners, fixed in position, including polishingcomplete as directed.

a) Shisham wood Per Rft. 172.90 331.05 Metre 567.20 1085.90b) Teak wood ditto 128.15 695.95 ditto 420.35 2282.65

32 Deodar wood dado or picture rail 3"x1½" (75x40 mm) as Per Rft. 64.05 269.45 Metre 210.15 883.85 26.1per approved design including moulding and fixed in place, 26.2cost of screws, nails, plugs, and painting complete.

33 Sawing wood by hand:-

a) Soft wood (deodar, kail or chir). 100Sft. 752.40 - sq.m 80.95 -b) Hard wood (shisham, kikar, teak or ditto 1003.20 - ditto 107.95 -

sahl).

34 Sawing wood by machine:

a) Soft wood 100Sft. 443.92 - sq.m 47.75 -b) Hard wood ditto 667.15 - ditto 71.80 -

chapter-12(Wood Work) Page 81

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

35 Making and fixing sun-shade of deodar wood including Per Sft. 52.65 434.35 sq.m 566.70 4673.75 26.1fixing brackets.

36 Making and fixing 1" (25 mm) thick kail or chir wooden dittonotice board with frame. Per Sft. 62.70 134.55 sq.m 674.65 1447.75

37 Making deodar punkha pole 10'x6"x6" Each 225.70 8678.50 Each 225.70 8678.50 ditto(3.0 m x 150 mm x 150 mm)

38 Dismantling and refixing eave boards. Per Rft. 16.10 -- Metre 52.90 --

39 Making wooden stair-cases complete 2' to 3' (600 to 900 Per Rft. 248.80 2708.60 Metre 816.15 8884.15 26.1mm) wide frame 1½" (40 mm) thick planks of deodarwood, including hand rails.

40 Providing and fixing partition, including frame work:-

a) Sheets on one side of framework:-

i) Hard board 100Sft. 1175.65 14398.30 sq.m 126.50 1549.25ii) Ply wood ¼" (6 mm) thick ditto 1175.65 15910.30 ditto 126.50 1711.95iii) Masonite ditto 1175.65 16162.30 ditto 126.50 1739.05

b) Sheets on both sides of frame work:-

i) Hard board 100Sft. 1410.75 16049.65 sq.m 151.80 1726.95ii) Ply wood ¼" (6 mm) thick ditto 1410.75 26391.00 ditto 151.80 2839.65iii) Masonite ditto 1410.75 19577.65 ditto 151.80 2106.55

41 Providing and fixing ceiling, including frame work:-

i) Hard board 100Sft. 2306.55 9893.20 sq.m 248.20 1064.50ii) Chip board ditto 2306.55 12533.20 ditto 248.20 1348.55iii) Ply wood ¼" (6 mm) thick ditto 2306.55 12413.20 ditto 248.20 1335.65iv) Masonite ditto 2306.55 11813.20 ditto 248.20 1271.10

42 Providing and fixing thermopore false ceiling, including In case of acousticwooden frame panelling, cost of M.S. clamps, making Thermopore sheet, theholes in walls and repairing damaged surface, complete in composite rate will beall respects:- increased by Rs.9.00 per Sft.

a) Deodar wood frame panelling:

i) ¾" (20 mm) thick 100Sft. 2582.70 10858.75 sq.m 277.90 1168.40ii) 1" (25 mm) thick ditto 2582.70 10934.60 ditto 277.90 1176.55

b) Partal wood frame panelling:

chapter-12(Wood Work) Page 82

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

i) ¾" (20 mm) thick 100Sft. 2582.70 6906.25 sq.m 277.90 743.10ii) 1" (25 mm) thick ditto 2582.70 7032.25 ditto 277.90 756.65

43 a) Fixing door, including chowkats. Each 354.75 - Each 354.75 -

b) Fixing windows, including chowkats. ditto 177.40 - ditto 177.40 -44 a) Glazing with panes (16 oz. to 18 oz.,) Per Sft. 26.85 61.00 sq.m 289.15 656.20 26.12

including cost of putty.

b) Glazing with panes (16 oz. to 18 oz.) Per Sft. 33.85 95.85 sq.m 364.30 1031.15using deodar wooden fillets and putty.

45 Glazing with panes (24 oz. to 26 oz.), using Per Sft. 50.40 110.25 sq.m 542.50 1186.40 26.12putty and deodar wooden fillets.

46 a) Cutting to required size and fixing glass Per Sft. 18.80 19.90 sq.m 202.40 214.40panes with putty

b) Cutting to required size and fixing glass panes with Per Sft. 28.20 50.20 sq.m 303.60 540.05wooden fillets and putty.

47 Glazing with plate glass 1/4" (6 mm) thick including the costof deodar wood fillets and putty:-

a) Glazing upto 8 sft (0.75 sq.m) Per Sft. 43.25 112.40 sq.m 465.50 1209.55

b) Glazing exceeding 8 Sft (0.75 sq.m) but not exceeding 24 sft Per Sft. 43.25 112.60 sq.m 465.50 1211.65(2.25 sq.m).

48 Providing and fixing 1½" (40 mm) thick deodar woodpanelled or panelled and glazed, doors and windows, withmild steel chowkat (frame), etc. complete in all respects(excluding sliding bolt or lock) with:-

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 160.80 747.40 sq.m 1730.10 8041.90i) (40 mmx 40 mmx 6mm) with M.S. flat

2"x¼" (50 mm x 6 mm)ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 160.80 704.95 sq.m 1730.10 7585.25

(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

49 Providing and fixing 1½" (40 mm) thick hollow flush doors Teak ply would be used under theand windows with commercial ply (3 ply) on both faces of written permission of thedeodar wood shutter frame 1¼" (30 mm) thick and partal superintending Engineer, and thewood braces at about 3" (75 mm) apart and deodar wood composite rate of using teak plylipping 1½"x3/8" (40 mmx10 mm) fixed with M.S. chowkat will be increased by Rs.20.00 per(frame) including chromium plated fittings, etc. complete Sft. ( 216.00 per Sq.m)in all respects (without sliding bolt or lock):-

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 111.45 598.10 sq.m 1199.40 6435.30(40 mmx40 mmx 6mm) with M.S. flat2"x¼" (50 mm x 6 mm)

chapter-12(Wood Work) Page 83

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 111.45 567.00 sq.m 1199.40 6100.90(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

50 Providing and fixing 1½" (40mm) thick solid flush door shutter It C.P. Finger plate and kick plate(Approved Factory Manufactured) with commercial ply (5 mm thick) are not provided/fixed theon both sides double pressed and deodar wood lipping Per Sft. 61.40 353.95 sq.m 660.90 3808.50 composite rate will be reduced by1½"x3/8" (40mm x 10mm) around shutter including Rs.15.20 per Sft.chromium plated fitting, iron hinges with aluminium kick Reduce composite rate by Rs.20.00 plate 22 SWG on both sides & finger plate complete in all per. Sq/ft or Rs.215 per sq.meter ifrespect. 3-mm commmercial ply is used

51 Providing and fixing panelled door of M.S. sheet, with Per Sft. 105.20 312.15 sq.m 1131.80 3358.80forged door leaves of M.S. sheet 22 SWG fitted in hollowframe chowkat 3"x4½" (75 mmx113 mm) made of M.S.sheet 18 SWG filled with plain cement concrete 1:3:6 etc.complete with all fittings and hammer painting, includingcarriage to site and fixing in position.

52 Providing and laying 24 SWG aluminum kick plate 4" (100 Per Rft. 22.55 36.35 Metre 74.05 119.20mm) high, fixed with screws 4" (100 mm) centre to centre,on bottom rail of flush doors only of commercial ply.

53 Providing and fitting curtain railing to doors and windows, Per Rft. 9.40 139.30 Metre 30.85 456.95comprising of TOSO-elite Japan made superior type ofrailing or equivalent, fixed over 4"x¾" (100mmx20mm)deodar wood strip, including painting.

54 Providing and fixing M.S. flat ½"x1/8" (13mm x 3mm) grill Per Sft. 54.30 178.90 sq.m 584.20 1925.15including ¾" x 1/8" (20 mmx3 mm) M.S. flat frame, inwindows of approved design, including painting threecoats, complete in all respects.

55 Providing and fixing G.I. wire gauze 22 SWG, 12x12 Per Sft. 19.15 62.40 sq.m 206.10 671.30 It 24 SWG wire gauze is used, themeshes per square inch, (5x5 meshes in cm2) fixed to composite rate shall be reduced bysteel window, complete with flat iron patti ½"x 1/8" (13 Rs.4.70 per Sft. or Rs.50.60 P.SQMmmx3 mm) and machine made screws.

56 Providing and fixing wooden moulding stopper 2½"x5/8"(63 x 16 mm) on door frame fitted with ply of approvedquality complete in all respects.

a) Teak wood moulding Per Sft. 23.50 112.10 sq.m 253.00 1206.20b) Deodar wood moulding ditto 23.50 73.10 ditto 253.00 786.30

57 Providing and fixing deodar wood dolly frame having Rate shall be paid as per surface 1½"x1½" (40 x 40 mm) vertical and horizontal double post area of dolly frame with 1½"x1½" (40 x 40 mm) full width of james braces at e-g 0.75' x (3.5' + (2 x 7))12" (300 mm) including filling of the spaces in between

chapter-12(Wood Work) Page 84

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

braces with 1:3:6 PCC fixing ply of approved qualityincluding holdfasts complete in all respects.

a) Teak wood ply Per Sft. 57.90 366.20 sq.m 622.75 3940.35b) With commercial ply ditto 57.90 360.05 ditto 622.75 3874.10

58 Providing and fixing ornamental wooden architrave 3" x (1½" tapered to ¼") all along the door frame complete in allrespect.

a) Teak wood architrave Per Sft. 10.60 69.80 sq.m 113.85 751.00b) Deodar wood architrave ditto 10.60 43.40 ditto 113.85 466.95

59 Providing and fixing Vin board cabinet 3/4" thick with

drawers 3"deep in 'Kitchen including termite proofing and polishing with synthetic enamel as specified, with handles hinges,screws etc., complete in all respects.

i) 1-1/2' deep,without back Per Sft 122.60 565.95 sq.m 1319.35 6089.80ii) 1-1/2' deep,with back Per Sft 122.60 617.55 sq.m 1319.35 6645.05iii) 2' deep,without back Per Sft 122.60 616.30 sq.m 1319.35 6631.15iv) 2' deep,with back Per Sft 122.60 667.90 sq.m 1319.35 7186.40

chapter-13(Painting & Var) Page 85

1 The rates include charges for scaffolding and other arrangements.

2 The rates for all finished works include the removal of surplus debris, unused material and by products

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 a) Cleaning painted wood work with oil and water. 100 Sft. 133.30 167.70 sq.m 14.35 18.05

b) Oiling woodwork with boiled linseed oil. 100 Sft. 88.90 136.80 sq.m 9.55 14.70 27.7

2 Brushing and scraping blisters of old paints from 100 Sft. 266.65 -- sq.m 28.70 - 27.3woodwork.

3 Scraping, brushing and removing old paint from metal 100 Sft. 1066.55 -- sq.m 114.75 - 27.9surface.

4 Painting old surfaces:- 27.127.3 &

a) Painting corrugated surfaces, patent roofing, etc. with 27.9oil paint.

i) first coat 100 Sft. 312.20 489.90 sq.m 33.60 52.70ii) each subsequent coat ditto 236.50 327.25 ditto 25.45 35.20

b) Painting sashes, fanlights, glazed or gauzed doorsand windows:-

i) first coat 100 Sft. 189.20 283.70 sq.m 20.35 30.55ii) each subsequent coat ditto 160.80 237.90 ditto 17.30 25.60

c) Painting doors and windows, any type:

i) first coat 100 Sft. 312.20 493.65 sq.m 33.60 53.10ii) each subsequent coat ditto 236.50 374.50 ditto 25.45 40.30

d) Painting guard bars, gates of iron bars, gratings,railing (including standards, braces etc.) and similaropen work:-i) first coat 100 Sft. 189.20 283.70 sq.m 20.35 30.55ii) each subsequent coat ditto 160.80 237.90 ditto 17.30 25.60

e) Painting fillets, framings, skirtings, pipes, gutters andsimilar linear work not exceeding 6" in girth:-

i) first coat 100 Lft. 160.80 255.30 Metre 5.30 8.35ii) each subsequent coat ditto 113.50 190.60 ditto 3.70 6.25

f) Painting small detached articles, not exceeding onesquare foot (Sq.m) of painted surface:-

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

13. PAINTING AND VARNISHING

chapter-13(Painting & Var) Page 86

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

i) first coat 100 Nos. 459.55 637.25 100 Nos. 459.55 637.25ii) each subsequent coat ditto 417.70 512.15 ditto 417.70 512.15

g) Painting small detached articles, exceeding onesquare foot (Sq.m) but not exceeding three squarefeet (Sq.m) of painted surface:-

i) first coat 100 Nos 1050.35 1579.85 100 Nos 1050.35 1579.85ii) each subsequent coat ditto 620.40 885.15 ditto 620.40 885.15

5 Painting new surface:- 27.127.2 &

a) Preparing surface and painting corrugated surface, 27.9patent roofing, etc.

i) priming coat. 100 Sft. 456.20 686.90 sq.m 49.10 73.90ii) each subsequent coat of paint. ditto 160.95 382.20 ditto 17.30 41.10

b) Preparing surface and painting sashes, fan light,glazed or gauzed doors and windows etc. any type(including edges):-

i) priming coat. 100 Sft. 193.15 352.90 sq.m 20.80 37.95ii) each subsequent coat of paint. ditto 136.20 261.75 ditto 14.65 28.15

c) Preparing surface and painting of doors and windowsany type (including edges):-

i) priming coat. 100 Sft. 456.20 683.15 sq.m 49.10 73.50ii) each subsequent coat of paint. ditto 160.95 382.20 ditto 17.30 41.15

d) Preparing surface and painting guard bars, gates ofiron bars, gratings, railing (including standards,braces, etc.) and in similar open work:-i) priming coat. 100 Sft. 301.40 439.10 sq.m 32.45 47.25ii) each subsequent coat of paint. ditto 136.20 261.75 ditto 14.65 28.15

e) Preparing surface and painting of fillets, framing,skirtings, pipes, gutters, and similar linear work notexceeding 6" (150 mm) girth:-

i) priming coat. 100 Lft. 241.25 345.45 Metre 7.90 11.35ii) each subsequent coat of paint. ditto 90.80 194.00 ditto 3.00 6.35

f) Preparing surface and painting of small detachedarticles, not exceeding one sq. ft. (Sq.m) of paintedsurface:-

i) priming coat. 100 Nos. 709.5 1260.75 100 Nos. 709.5 1260.75ii) each subsequent coat of paint. ditto 347.30 786.05 ditto 347.30 786.05

chapter-13(Painting & Var) Page 87

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

g) Preparing surface and painting of small detachedarticles, exceeding one Sft. but not exceeding 3 Sft.(Sq.m) of painted surface:-

i) priming coat. 100 Nos. 1983.30 2883.60 100 Nos. 1983.30 2883.60ii) each subsequent coat of paint. ditto 598.40 1385.15 ditto 598.40 1385.15

h) Extra for knotting and stopping to 100 Sft. 30.10 45.75 sq.m 3.25 4.90priming coat on new surface of wood.

6 Applying Khanki Mixture hot to barrage 27.10gates:-

i) first coat 100 Sft. 236.50 418.35 sq.m 25.45 45.00ii) second coat ditto 191.35 308.40 ditto 20.60 33.20

7 French polishing complete:- 27.6

a) on new work 100 Sft. 2315.65 2383.85 sq.m 249.15 256.50b) on old work ditto 1240.80 1277.35 ditto 133.50 137.45

8 Varnishing wood work, including cleaning and preparingsurface.

a) first coat 100 Sft. 189.20 322.70 sq.m 20.35 34.70b) second coat ditto 70.95 172.10 ditto 7.65 18.50c) third coat ditto 70.95 151.15 ditto 7.65 16.25

9 Bitumen coating to plastered or cement concrete surface:-

i) 20 lbs. per 100 Sft. (9.07 Kg per Sq.m) 100 Sft. 222.20 903.35 sq.m 23.90 97.20ii) 14 lbs. per 100 Sft. (6.35 Kg per Sq.m) ditto 213.30 562.75 ditto 22.95 60.55iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m) ditto 176.00 525.45 ditto 18.95 56.55

10 Writing letters or figures, per letter, per inch (25 mm) Per No. 9.45 10.10 Per No. 9.45 10.10 27.1

height.

11 Writing letters or figures at any surface with reflective paint Per Letter 9.45 9.85 Per Letter 9.45 9.85 27.1of approved quality and colour per letter per inch height. per inch per 25 mm

height height

12 Writing letters of figures on any surface with reflective tape ditto 10.85 11.75 ditto 10.85 11.75 dittoof approved quality and colour per letter per inch (25 mm)height.

13 Coaltar painting: 27.8to

a) first coat, laid hot 100 Sft. 198.65 729.10 sq.m 21.35 78.45 27.11b) second coat, laid hot ditto 120.40 459.15 ditto 12.95 49.40

chapter-13(Painting & Var) Page 88

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

14 Solignum painting:- 27.8

a) one coat, applied hot 100 Sft. 165.55 192.70 sq.m 17.80 20.75b) two coats, applied hot ditto 250.80 294.25 ditto 27.00 31.65

15 Creosote painting:- ditto

a) one coat, applied hot 100 Sft. 198.65 316.50 sq.m 21.35 34.05b) two coats, applied hot ditto 300.95 498.60 ditto 32.40 53.65

16 Burning off or rubbing down with pumice stone, old paint 100 Sft. 735.25 750.85 sq.m 79.10 80.80 27.3from wood work.

17 Removing with caustic soda, old paint from wood work. 100 Sft. 266.65 274.35 sq.m 28.70 29.50 ditto

18 Painting distance marks for white ground and black Each 47.30 54.20 Each 47.30 54.20 27.1lettering on both sides.

19 Painting two feet wide gauges, reading to 10th of a foot Per Rft. 94.60 107.95 per Metre 310.30 354.05 ditto(metre).

20 Painting sounding rods and other gauges, reading to 10th Per Lft. 47.30 51.45 per Metre 155.15 168.75 27.1of a foot (metre)

21 Painting leveling staves. Per Lft. 144.75 151.45 per Metre 474.80 496.70

22 a) Painting and lettering mile/Km stones, dittoon both sides:

i) one coat Each 101.35 149.20 Each 101.35 149.20ii) two coats ditto 177.40 254.20 ditto 177.40 254.20

b) Painting and lettering Furlong/½ Km 27.1stones, on both sides:-

i) one coat Each 13.50 19.20 Each 13.50 19.20ii) two coats ditto 23.65 33.55 ditto 23.65 33.55

c) Painting and lettering Sign posts:-

i) one coat Each 113.50 144.60 Each 113.50 144.60ii) two coats ditto 187.30 240.20 ditto 187.30 240.20

23 Removing paint or varnish from wall. 100 Sft. 533.30 - sq.m 57.40 - 27.12

24 Scraping from hydraulic gates:- 27.1

a) Khanki paint 100 Sft. 1066.55 - sq.m 114.75 -b) Aluminium paint ditto 1066.55 - ditto 114.75 -

chapter-13(Painting & Var) Page 89

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

25 Painting letters with shade. per letter 15.15 15.15 per letter 15.15 15.15 27.1per inch per 25 mmheight height

26 Scraping rust from old rail or girders. 100 Sft. 799.90 841.90 sq.m 86.05 90.60 27.927.10

27 Chiselling old paint from brick work. 100 Sft. 1066.55 1098.95 sq.m 114.75 118.25 27.12

28 Cleaning glasses with chalk and spirit, etc. 100 Sft. 888.80 904.20 sq.m 95.65 97.30

29 Cleaning and oiling rafter or rolled steel 100 Sft. 266.65 288.35 sq.m 28.70 31.05 27.9beams.

30 Cleaning and painting punkha poles, including fixing Each 188.10 196.20 Each 188.10 196.20 27.3hooks.

31 Preparing surface and painting with emulsion paint:- 27.12

a) first coat 100 Sft. 230.65 417.85 sq.m 24.80 44.95b) 2nd and each subsequent coat ditto 177.15 324.45 ditto 19.05 34.90

32 Preparing surface and painting with water proof coloured 27.12cement finish, like duracem, buxcem or other finishes withsimilar specifications, on walls, etc.

a) new surface:

i) 1st coat 100 Sft. 230.65 319.10 sq.m 24.80 34.35ii) 2nd and subsequent coat ditto 177.15 254.50 ditto 19.05 27.40

b) old surface:

i) 1st coat 100 Sft. 230.65 267.65 sq.m 24.80 28.80ii) 2nd and subsequent coat ditto 177.15 213.50 ditto 19.05 23.00

32A Providing and applying weather shield paint of approvedquality on external surface of building including preparation ofsurface, application of primer complete in all respect:

a) new surface:

i) 1st coat %sft 834.25 1309.20 sq.m 89.75 140.85ii) 2nd coat %sft 454.75 661.75 sq.m 48.95 71.20

b) old surface: %sft 454.75 661.75 sq.m 48.95 71.20

33 Painting traffic lane 5" (125 mm) wide, with road marking Per Rft. 1.40 2.30 Metre 4.65 7.60enamel.

chapter-13(Painting & Var) Page 90

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

34 Painting traffic lane 5" (125 mm) wide with reflective Per Rft. 1.60 9.85 Metre 5.25 32.30 AASHTO Rates shall be reduced by Rs.0.50clorinated rubber (CR) paint including glass beads comlpete M248-91 P.Rft or Rs.1.65 P.Mtr. in all respect. (2000) If glass beads are not used.

35 Repainting of ceiling fan (all sizes and types), including Per Job 53.75 87.35 Job 53.75 87.35painting of blades, canopy, suspension rod and regulator,with suitable enamel paint.

36 Repainting of iron poles with cross arms, with bitumen or Per Job 125.40 246.00 Job 125.40 246.00 other approved paint.

37 Repainting of pipes and specials of G.I., M.S. or conduit,etc., fixed for on surface electric wiring, with approvedpaint:

i) upto 40 mm (1½") dia Per Rft. 1.15 3.75 Metre 3.75 7.55ii) above 40 mm (1½") to 50 mm (2") dia ditto 2.30 4.30 ditto 7.50 14.05iii) above 50 mm (2") to 100 mm (4") dia ditto 3.80 6.80 ditto 12.55 22.35

38 Repainting main switches and branch distribution boards Per Job 24.85 73.10 Job 24.85 73.10of all sizes and types, with approved paint (complete set).

39 Extra labour for painting, varnishing, etc. from 20' (6.10 m) 100 Sft. 85.35 - sq.m 9.20 - The height will be taken from theheight and above, for every additional 10' (3.05 m) height, per coat floor, roof or ground underneath, asor part thereof, requiring scaffolding. the case may be on the side

towards which the work is to bedone.

chapter-14(Lining of canal) Page 91

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 The rates also include curing for specified period wherever necessary.3 Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Formation, dressing and preparing sub-grade:- 28.1 to 28.3

a) in bed 100Sft. 593.60 - sq.m 63.85 -b) on slope ditto 810.50 - ditto 87.20 -

2 Stabilized layer of cement, sand ratio 1:30, 2" (50 mm) 100Sft. 1378.10 1928.90 sq.m 148.30 207.55 dittothick on slope.

3 Cement plaster ½" (13 mm) thick ratio 1:10. ditto

a) in bed 100Sft. 1009.10 1282.35 sq.m 108.60 138.00b) on slope ditto 1244.75 1518.00 ditto 133.95 163.35

4 Cement plaster 3/8" (10 mm) thick ratio 1:3. ditto

a) in bed 100Sft. 1009.10 1494.20 sq.m 108.60 160.80b) on slope ditto 1244.75 1729.85 ditto 133.95 186.15

5 Cement plaster 1½" (40 mm) thick ratio 1:6. ditto

a) in bed 100Sft. 1244.75 2403.05 sq.m 133.95 258.55b) on slope ditto 1528.55 2686.85 ditto 164.45 289.10

6 Tile lining 12"x6"x2" (300x 150x50 mm) in 1:6 cement, 28.2 to 28.3 The rates are only for laying tilessand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 5733.75 16350.70 cu.m 2025.15 5775.05 payable separately.b) on slope ditto 6588.45 17205.40 ditto 2327.05 6076.95

7 Tile lining 12"x6"x2" (300x150x50 mm) in 28.2 to 28.3 The rates are only for laying tiles1:3 cement, sand mortar:- over 1/8" (3 mm) thick layer of 1:3

mortar. Items 1 to 5 above area) in bed 100Cft. 5733.75 17969.25 cu.m 2025.15 6346.75 payable separately.

b) on slope ditto 6588.45 18823.95 ditto 2327.05 6648.60

8 Brick lining 9"x4½"x3" (225x113x75 mm) in 1:6 cement, 28.2 The rates are only for laying brickssand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 5733.75 21570.70 cu.m 2025.15 7618.75 payable separately.b) on slope ditto 6588.45 22425.40 ditto 2327.05 7920.65

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

14. LINING OF CANALS

chapter-14(Lining of canal) Page 92

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

9 Brick lining 9"x4½"x3" (225x113x75 mm), in 1:3 cement, ditto The rates are only for layingsand mortar:- bricks over 1/8" (3 mm) thick

layer of 1:3 mortar. Items 1 toa) in bed 100Cft. 5733.75 23189.25 cu.m 2025.15 8190.45 5 above are payableb) on slope ditto 6588.45 24043.95 ditto 2327.05 8492.30 separately.

10 Cement concrete lining, using washed screened and 20.1, 28.1graded stone aggregate:- & 28.3

a) in bed:-

i) ratio 1:2:4 100Cft. 5167.80 20506.20 cu.m 1825.25 7242.80ii) ratio 1:3:6 ditto 5167.80 17704.20 ditto 1825.25 6253.10iii) ratio 1:4:8 ditto 5167.80 15679.80 ditto 1825.25 5538.10

b) on slope:-

i) ratio 1:2:4 100Cft. 5953.20 21291.60 cu.m 2102.65 7520.20 ii) ratio 1:3:6 ditto 5953.20 18489.60 ditto 2102.65 6530.55iii) ratio 1:4:8 ditto 5953.20 16465.20 ditto 2102.65 5815.50

chapter-15(Sheet piling) Page 93

Rates for all finished works include the removal of surplus debris, unused material and by products.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting Ransome and Larson piles. Per 150.50 - Per 150.50 - 29.1-cut cut 29.3

2 Cutting universal piles. Per cut 222.70 - Per cut 222.70 - ditto

3 Driving steel piles, 25' to 30'. (7.5 to 9.0 m) 100Sft. 3624.70 - sq.m 390.00 - ditto 1) The rate includes laying andremoving of track and also carriageof piles to machine, averagedistance of 3 chains (90 metre).

2) The rates are for the tacklegangs only supplied by thecontractor, Mechanical staffon-machines will be supplied byGovernment.

3) T-piles and adjustable junctionpiles will be counted as two piles.

4 Driving steel piles,more than 15' (4.6 m) and less than 25' 100Sft. 3474.25 - sq.m 373.85 - ditto ditto(7.5 m).

5 Driving steel piles, 15' (4.5 m) and under. 100Sft. 2571.35 - sq.m 276.70 - ditto ditto

6 Dolleying piles. Each 227.05 - Each 227.05 - ditto Upto 5' (1.5 m) dolleying.

7 Drilling holes in piles by hand. Each 20.70 - Each 20.70 - ditto

8 Raising and lowering machine. Per Ft. 3396.80 - Metre 11141.50 - ditto

9 Turning Machine, 90o . Per 5074.10 - Per 5074.10 - 29.1 toJob Job 29.3

10 Turning Machine, 135o . Per 6277.90 - Per 6277.90 - dittoJob Job

11 Turning Machine, 180o . Per 8548.30 - Per 8548.30 - 29.1 toJob Job 29.3

12 Travelling machine (light). Per 10100.65 - 30 M. 10100.65 - dittoChain

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

15. SHEET PILING

chapter-15(Sheet piling) Page 94

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

13 Loading and unloading piles. Ton 197.30 - Tonne 194.20 - ditto To be done by hand carts orramps, including cost of ropes.

14 Dismantling piling machine. Each 20798.35 - Each 20798.35 - ditto

15 Erecting piling machine. Each 23998.10 - Each 23998.10 - ditto

16 Carriage of piling machine under different conditions. per 4106.50 - 30 M 4106.50 - dittochain

chapter-16(Protec & Div) Page 95

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage

of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport isadopted. The supply and carriage to site of work of all other material required in the item, is included in thecomposite rates.

3 The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reductionfactor) of the stone, boulders, shingle or spawl carried.

4 Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only; or where such stone product is supplied, carried or handled by the contractor in which no laying is required,the actual stack measurement (without any reduction factor) shall from the basis of payment of supply orcarriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form thebasis of laying.

5 In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. withinone mile (1.6 Km.)

i) the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafterfrom the point of supply.

ii) if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collectedand measured at site of work and no extra carriage would be admissible in such cases.

iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the pointof supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges wouldbe arrived at, most economically. Extra carriage will be admissible from the place of supply of thematerial which will be considered its starting point. The demarcation of the place of supply will bepre-determined before calling the tenders.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting pilchi frash or sarkanda inlcuidng carriage within 100Cft. 1013.25 cu.m 357.80one mile.

2 Weaving matresses. 100Cft. 1919.80 cu.m 678.00

3 a) Supplying and filling jute bags 1.25 (o.o35 cum) Cft., Per 30.00 44.85 Per Baq 30.00 44.85 The rate does not include supply ofcapacity, with sand or earth, sewing and stacking, in Bag sand or earth for filling bags, whichdry. will be paid extra.

b) Supply and filling jute bags 1.25 (0.35 ccum) Cft. ditto 46.65 61.50 Per Baq 46.65 61.5 -ditto-capacity, with sand or earth, sewing and laying inposition, under water.

4.00 a) Supplying and filling jute bags 4 to 5 cft Per 71.80 125.25 Per 71.80 125.25 The rate does not include supply of(0.11 to 0.14 cum) capacity, with sand or earth, Bag Bag sand or earth for filling bags, whichsewing and stacking, in dry. will be paid extra.

b) Supply and filling new jute bags 4 to 5 cft (0.11 to ditto 102.55 156.00 ditto 102.55 156.00 -ditto-0.14 cu.m) capacity, with sand or earth, sewing andlaying in position, under water.

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

16. PROTECTION & DIVERSION WORKS

chapter-16(Protec & Div) Page 96

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

5 Carriage of jute bags 1.25 Cft. (0.035 cu m) capacity, filledwith sand or earth:-

a) 1st chain (30 m) 100 Nos 266.65 % Nos 266.65

b) 2nd to 4th chain (30 m to 120 m) Per chain 96.00 Per 30 m 96.00per 100 Per 100 Nos/

Nos

c) 5th and subsequent chains ditto 37.35 ditto 37.35(150 m and subsequent every 30 m)

6 Carriage of new jute bags 4 to 5 Cft.(0.11 to 0.14 cu.m) capacity, filled with sand or earth:-

a) 1st chain (Ist 30 metre) 100 Nos 1066.55 % Nos 1066.55

b) 2nd to 4th chain (60 m to 120 m) per chain 373.30 Per 30 m 373.30per 100Nos per %Nos

c) 5th and subsequent chains (150 m and ditto 144.00 ditto 144.00subsequent every 30 m)

7 Rolling matresses to river edge and floating,after unroling:-

a) area of matress upto 2,000 Sft. 100Sft. 599.95 sq.m 64.55( 186 sq.m)

b) area of matress 2,000 to 2,500 Sft. 100Sft. 999.90 sq.m 107.60

(186 sq.m to 232 sq.m)

c) area of matress over 2,500 Sft. ditto 1166.55 ditto 125.50(232 sq.m)

8 Sewing empty cement bags in sheets. 100 Nos 933.25 969.05 % Nos 933.25 969.05

9 Making compact round pilchi, frash or sarkanda round 100Cft. 1299.85 1403.05 cu.m 459.10 495.55 Measured in the shape of compactbundles of specified size for the work. round bundles and of size specified

for the work, before filling at site.

10 Launching the above and placing in position. 100Cft. 639.95 cu.m 226.00

chapter-16(Protec & Div) Page 97

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

11 Supply within 5 chains (150 m):-

a) Boulders 9" (225 mm) and above 100Cft. 1930.45 cu.m 681.75

b) Over size shingle 3" to 9"(75 to 225 mm) ditto 1290.55 ditto 455.75

c) Mixed graded shingle ditto 1530.50 ditto 540.50

12 Supplying Munj or Patha Trungers 6" (150 mm) mesh to hold Each 83.35 128.20 Each 83.35 128.23 Cft. (0.085 cu.m)

13 Providing and weaving G.I. wire netting for wire crates, withG.I. wire of approved size (including siding and partition tomake crate):-

a) 6" (150 mm) mesh

i) 15 SWG wire 100Sft. 993.30 1325.95 sq.m 106.90 142.65ii) 10 SWG wire ditto 1064.25 2144.25 ditto 114.50 230.70iii) 8 SWG wire ditto 1064.25 2757.70 ditto 114.50 296.75

b) 4" (100 mm) mesh

i) 15 SWG wire 100Sft. 1277.10 1777.15 sq.m 137.40 191.2ii) 10 SWG wire ditto 1419.00 3035.75 ditto 152.70 326.65iii) 8 SWG wire ditto 1419.00 3953.75 ditto 152.70 425.45

14 Providing and laying shingle on top of bund, including 100Cft. 666.60 996.60 cu.m 235.40 351.95handling of materials within three chains.

15 Supply and dumping at site, without boat, includinghandling of materials within three chains (90 m)

a) stone or boulder 100Cft. 1166.55 1628.55 cu.m 411.95 575.1 The rate includes supply of brickb) shingle or spawl ditto 1166.55 1496.55 ditto 411.95 528.5 bats to site of work.c) brick bats ditto 899.90 1955.90 ditto 317.85 690.85

16 Supply and dumping by boat, including loading into boat The rate includes supply of brickwithin three chains (90 m) lead, and hire charges of boat and bats to site of work.boatman.

a) stone or boulder 100Cft. 2097.50 2559.50 cu.m 740.85 904b) shingle or spawl ditto 2097.50 2427.50 ditto 740.85 857.40c) brick bats ditto 1830.85 2886.85 ditto 646.65 1019.65

17 Providing and filling brick bats in crates 100Cft. 1619.00 2675.00 cu.m 571.80 944.8 The rate includes supply of brick(excluding cost of crates). bats to site of work.

18 Supplying and filling bricks in crates and hand packing 100Cft. 1952.30 16712.30 cu.m 689.55 5902.8 The rate includes supply of bricks(excluding cost of crates). to site of work.

19 Supply and filling in wire crates, including sewing crates(excluding cost of crates):-

chapter-16(Protec & Div) Page 98

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

i) stone or boulder 100Cft. 2218.90 2680.90 cu.m 783.70 946.90ii) shingle or spawl ditto 2218.90 2548.90 ditto 783.70 900.30

20 Extra for anchoring boat, for dumping by boats or tipping 100Cft. 234.65 - cu.m 82.90 -crates.

21 Extra for tipping crates (in addition to anchoring boats). 100Cft. 1173.20 - cu.m 414.40 -

22 Pilchi reventment, including carriage upto one mile 100Sft. 666.60 1176.60 sq.m 71.75 126.6 30.1(1.6 km.)

23 Surface protection with pilchi matresses, carriage upto 100Sft. 1666.50 1717.50 sq.m 179.30 184.80 dittoone mile (1.6 Km).

24 Pilchi, sarkanda or frash pitching on slopes, including The cost of placing earth betweensupply of pilchi, sarkanda or frash within one mile, (1.6 km) 100Sft. 3972.25 5081.80 sq.m 427.40 546.80 rolls shall be paid separately, asalso supply and driving of pegs 1½' (460 mm) long earthwork.sharpened at one end and, tying with wire or Munj Ban(excluding cost of placing earth between rolls).

25 Constructing Groynes upto 5' (1.5 m) height, with single 100Sft. 1306.15 1409.35 sq.m 140.55 151.65 Measurement to be made of therow of wooden vertical stakes 7" to 12" (175 to 300 mm) area of elevation on one face only.dia, 1' (300 mm) apart, average lead one mile (1.6 km.)

26 Construction Groynes upto 10' (3.0 m) height, with double 100Sft. 2236.10 2358.50 sq.m 240.60 253.75row of wooden vertical stakes 7" to 12" (175 to 300 mm)dia, 2' (600 mm) apart, average lead one mile (1.6 Km).

27 Providing and laying stone pitching/filling, dry hand 100Cft. 1419.00 2148.00 cu.m 501.20 758.65packed, as filling behind retaining walls or in pitching andaprons.

28 Providing and laying stone pitching with hammer dressed 100Cft. 3692.70 4340.70 cu.m 1304.25 1533.15stones on surface, laid in courses.

29 Providing and laying stone pitching, for top layer only:-

a) one slope 100Cft. 3128.40 3776.40 cu.m 1104.95 1333.85b) on level ditto 2795.10 3443.10 ditto 987.25 1216.1

30 Providing and laying stone or spawl filling:-

a) on level 100Cft. 854.70 1154.70 cu.m 301.90 407.85

b) on slope ditto 1027.75 1327.75 ditto 363.00 468.95

chapter-16(Protec & Div) Page 99

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

31 Providing and laying stone pitching, hand packed, withsurface levelled off to the correct section and voids filled in1:8 cement, sand mortar, in floors of bridges along banksand in appons etc.

i) top layer on slope 100Cft. 4080.65 6810.90 cu.m 1441.30 2405.60ii) top layer on level ditto 3747.35 6477.60 ditto 1323.55 2287.90iii) stone pitching/filling on slope or on level ditto 2196.80 5008.05 ditto 775.90 1768.85

(other than top layer).

32 Grouting stone pitching or apron, etc. in:-

a) cement, sand mortar 1:3 100Sft. 1442.70 5611.65 sq.m 155.25 603.8b) cement, sand mortar 1:8 ditto 1216.05 3298.30 ditto 130.85 354.90

33 Sand grouting in stone apron, with high 100Sft. 483.80 1113.80 sq.m 52.05 119.85pressure hose.

34 Grouting stone filling or pitching, with bajri. 100Cft. 833.25 1985.25 cu.m 294.30 701.2

35 Removing stone and repitching hand packed, on slopes or 100Cft. 2956.00 - cu.m 1044.05 -level after making good damaged slope/portion.

36 Collecting and stacking boulders from nullah beds or loose 100Cft. 1066.55 - cu.m 376.70 -shale, or from any other site, within 3 chains (90 m) lead.

37 Levelling and dressing stone filling under blocks and 100Cft. 854.70 2006.70 cu.m 301.90 708.75grouting with shingle.

38 Grouting jharies between blocks with bajri. 100Cft. 854.70 1622.70 cu.m 301.90 573.15

39 Breaking stone into spawls and stacking 100Cft. 799.90 - cu.m 282.55 -

Canal and Roads

40 Fixing floating spurs, with material from canal plantationwithin one mile (1.6 Km) lead:-

a) upto 2.0' (600 mm) F.S. depth Each 27.50 - Each 27.50 -

b) above 2.0' to 3.0' (600 to 900 mm) F.S. depth ditto 30.90 - ditto 30.90 -

c) above 3.0' to 4.0' F.S. (900 mm to 1200mm) depth Each 41.20 - ditto 41.20 -

d) above 4.0' (1200 mm) F.S. depth ditto 103.05 - ditto 103.05 -

41 Staking and bushing from canal plantation, royalty to bepaid to Forest Department or cost to private owner, if andwhen required:-

chapter-16(Protec & Div) Page 100

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

a) i) Cutting and supply unsharpened pegs 3.5' (1.07 100 Nos 1333.20 1365.75 % Nos 1333.20 1365.75m) long, 3" to 6" (75 to 150 mm) dia, within one mile(1.6 Km) lead.

ii) Sharpening one end of 3.5' (1.07 m) long pegs, 3" 100 Nos 567.60 - 100 Nos 567.60 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150 100 Nos 842.70 - 100 Nos 842.70 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per Chain 66.65 97.85 Per 30 66.65 97.85incuding tying around the pegs). of One Metre

Row of one row

v) Cutting and supplying brush wood from canal ditto 938.50 1113.35 ditto 938.50 1113.35plantation or private owners, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

b) i) Cutting and supplying unsharpened pegs 4.0' 100 Nos 86.85 123.85 100 Nos 86.85 123.85(1.20 m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 4' (1.20 M) long pegs, 3" 100 Nos 567.60 - 100 Nos 567.60 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150 100 Nos 991.20 - 100 Nos 991.20 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per 66.65 Per 66.65 incuding tying around the pegs). Chain of 30 M of

one row one row

v) Cutting and supplying brush wood from canal ditto 2418.90 ditto 2418.90 plantation or private source, lead within one mile(1.6 Km). and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

c) i) Cutting and supplying unsharpened pegs 5.0' (1.5 100 Nos 108.60 154.95 100 Nos 108.60 154.95m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 5' (1.5 m) long pegs, 3" to 100 Nos 597.70 - 100 Nos 597.70 -6" (75 to 150 mm) dia.

chapter-16(Protec & Div) Page 101

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150 100 Nos 1135.20 - 100 Nos 1135.20 -mm) dia (driven 1.5' (450 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per 66.65 97.85 Per 66.65 97.85incuding tying around the pegs). Chain of 30 M

one row of one row

v) Cutting and supplying brush wood from canal Per chain 1128.60 1373.20 Per 30 M 1128.60 1373.20plantation or private source, lead within one mile of one row of one row(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Cutting and supplying unsharpened 100 Nos 2666.40 2722.00 100 Nos 2666.40 2722pegs 6.0' (1.8 m) long, 3" to 6" (75 to150 mm) dia, from canal plantation, leadwithin one mile (1.6 Km).

ii) Sharpening one end of 6' (1.8 m) long pegs, 3" to 100 Nos 711.20 - 100 Nos 711.20 -6" (75 to 150 mm) dia.

iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150 100 Nos 1362.25 - 100 Nos 1362.25 -mm) dia (driven 1.75' (530 mm) below the availablebed or ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per Per Chainincuding tying around the pegs). Chain of 66.65 97.85 of one row 66.65 97.85

one row

v) Cutting and supplying brush wood from canal ditto 2752.20 3049.25 ditto 2752.20 3049.25plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Cutting and supplying unsharpened pegs 6'-1" to 100 Nos 1999.80 2115.10 100 Nos 1999.80 2115.108.0' long (1.85 to 2.45 m), 4" to 8" (100 to 200 mm)dia, from canal plantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 6'-1" to 8.0' (1.85 to 2.45m) 100 Nos 908.15 - 100 Nos 908.15 -long pegs, 4" to 8" (100 to 200 mm) dia.

iii) Driving pegs 6'-1" to 8.0' (1.85 to 2.45 m) long, 3" 100 Nos 1502.40 - 100 Nos 1502.40 -to 6" (75 to 150 mm) dia driven 2' (600 mm) belowthe available bed or ground (average).

chapter-16(Protec & Div) Page 102

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

iv) Tying pegs with Munj, Patha ban (one line, Per chain 66.65 83.95 Per 30 M 66.65 83.95incuding tying around the pegs). of one row of one row

v) Cutting and supplying brush wood from canal Per 3128.40 3477.85 Per 30 M 3128.40 3477.85plantation or private source, lead within one mile Chain of of one row(1.6 Km) and wattling between stakes and intertwining one row(thickness of wattled brushwood 1.0' (300 mm)average).

42 Staking with Bamboo from market and bushing from canalplantation or private source (royalty of brushwood to bepaid to Forest Department or cost to private owner, if andwhen required):-

a) i) Supplying Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 7200.00 - 100 Nos 7200.00 -long, 2½" to 5" (63 m to 125 mm) dia.

ii) Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5 100 Nos 794.65 - 100 Nos 794.65 -m) long Bomboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 1646.05 - 100 Nos 1646.05 -long 2½" to 5" (63 to 125 mm) dia, driven 2.5' (750mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Per 30 MMunj, Patha Ban, two lines, including tying around Chain of 100.00 148.95 of one 100.00 148.95the Bamboos. one row Row

v) Cutting and supplying brushwood from canal ditto 3837.90 4291.75 ditto 3837.90 4291.75plantation or private source, lead within one mile(1.6 Km), and wattling between stakes andintertwining (thickness of wattled brushwood 1.0' (300 mm) average).

b) i) Supplying Bamboos 10'-1" to 12.0' (3.07 to 3.66 100 Nos - 10800.00 100 Nos - 10800m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 10'-1" to 12.0' 100 Nos 908.15 - 100 Nos 908.15 -(3.07 to 3.66 m) long Bamboos, 2½" to5" (63 to 125 mm) dia.

iii) Driving Bamboos 10'-1" to 12.0' (3.07 to 3.66 m) 100 Nos 1786.20 - 100 Nos 1786.20 -long 2½" to 5" (63 to 125 mm) dia, driven 2.75' (840 mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 333.30 1142.00 of one Row 333.30 1142.00the Bamboos and third tie around the top end only. row

chapter-16(Protec & Div) Page 103

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

v) Cutting and supplying brushwood from canal ditto 4692.60 5269.20 ditto 4692.60 5269.20plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' ( 300 mm)average).

c) i) Supplying Bamboos 12'-1" to 14.0' (3.68 to 4.27 100 Nos - 11400.00 100 Nos - 11400.00m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 12'-1" to 14.0' (3.68 to 4.27 100 Nos 1021.70 - 100 Nos 1021.70 -m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 12'-1" to 14.0' (3.68 to 4.27 m) 100 Nos 2043.35 - 100 Nos 2043.35 -long 2½" to 5" dia, driven 3.5' (1.07 mm) below theavailable bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one row 333.30 1142.00 of one row 333.30 1142.00the Bamboos and third tie around the top end only.

v) Cutting and supplying brushwood from canal ditto 5547.30 6211.30 ditto 5547.30 6211.30plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Supplying Bamboos 14'-1" to 16.0' (4.30 to 4.90 m) 100 Nos - 12600.00 100 Nos - 12600.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 14'-1" to 16.0' (4.30 to 100 Nos 1135.20 - 100 Nos 1135.20 -4.90 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 14'-1" to 16.0' long (4.30 to 4.90m) 100 Nos 2270.40 - 100 Nos 2270.40 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 333.30 1142.00 of one 333.30 1142.00the Bamboos and third tie around the top end only. Row Row

v) Cutting and supplying brushwood from canal ditto 6390.10 7158.90 ditto 6390.10 7158.90plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Supplying Bamboos 16'-1" to 20' (4.9 to 6.10 m) 100 Nos - 13200.00 100 Nos - 13200.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 16'-1" to 20' (4.9 to 100 Nos 1362.25 - 100 Nos 1362.25 -6.10 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

chapter-16(Protec & Div) Page 104

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

iii) Driving Bamboos 16'-1" to 20' long (4.9 to 6.10 m) 100 Nos 2724.50 - 100 Nos 2724.50 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 333.30 1142.00 of one 333.30 1142.00the Bamboos and third tie around the top end only. row row

v) Cutting and supplying brushwood from canal ditto 8009.10 8987.45 ditto 8009.10 8987.45plantation or private source, lead within one mile (1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm) average).

43 Cutting and supplying brushwood from canal plantation or 100Cft. 333.30 403.05 cu.m 117.70 142.35 Royalty to be paid to the Forestfrom any other source, within one mile (1.6 Km). Department or cost to the private

owner, if and when required.

44 Filling brush wood only, thoroughly packed. 100Cft. 266.65 - cu.m 94.20 - Measured in compacted andpacked shape before filling.

45 Covering road 10' to 12' (3.00 to 3.65 m) wide, with 3" Per 639.95 - Per 639.95 -(75 mm) sarkanda or jungle upto one chain lead (30 m). Chain 30 M

46 a) Gachi pitching 1' (300 mm) thick. 100Sft. 3466.30 - Sq.m 373.00 -b) Gachi pitching done with silt clearance 100Sft. 2933.05 - Sq.m 315.60 -

and berm dressing.

chapter-17(Outlet) Page 105

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Earthwork for outlets, excavation refilling, ramming and 17.1 Includes consolidation of earth afterpuddling:- to refilling.

17.5a) channels, discharge upto 50 cusecs. Job 1111.00 - Job 1111.00 -

b) channels, discharge from 51 to 100 cusecs. Job 1466.50 - Job 1466.50 -

c) channels, discharge from 101 to 200 cusecs. Job 2222.00 - Job 2222.00 -

d) channels, discharge from 201 to 350 cusecs. Job 2999.70 - Job 2999.70 -

e) channels, discharge over 350 cusecs. Job 4444.00 - Job 4444.00 -

2 Dismantling outlets:- 18.1 These rates are for totaldismantlement and removal

a) old types, such as K.G.O's orifices, etc. Each 1111.00 - Each 1111.00 - of material. The rates do notinclude earth work for which

b) A.P.M. or O.F., "H" upto 2.0 ft. (600 mm) ditto 1666.50 - ditto 1666.50 - rates are given in item 1,above.

c) A.P.M. or O.F., "H" from 2.1 ft. to 3.0'. ditto 2222.00 - ditto 2222.00 -(630 mm to 900 mm)

d) A.P.M. or O.F., "H" above 3.0'. ditto 2777.50 - ditto 2777.50 -(900 mm)

e) Tail cluster bifurcation ditto 1666.50 - ditto 1666.50 -

f) Tail cluster trifurcation ditto 2222.00 - ditto 2222.00 -

g) Tail cluster quardification ditto 2777.50 - ditto 2777.50 -

3 Making temporary A.P.M. bricks block and fixing at site. Each 468.25 839.65 Each 468.25 839.65 21.1 & 21.2

4 Dismantling walls, taking out temporary Job 984.70 - Job 984.70 - 18.1, 21.1A.P.M. brick block, fixing iron block and & 21.2rebuilding dismantled walls.

5 Dismantling walls and fitting iron block of O.F. outlet. Each 984.70 - Each 984.70 - 18.1, 21.1

& 21.2

6 Constructing, watching and removing bund for outlet built 17.1in running water:- to

17.2

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

17. OUTLETS

chapter-17(Outlet) Page 106

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

a) upto 3.0' (0.300 m) depth Each 2666.40 - Each 2666.40 -b) above 3.0' (0.300 m) depth ditto 3599.65 - ditto 3599.65 -

7 Adjusting "B" of tail cluster by dismantling and rebuilding Each 533.95 1048.75 Each 533.95 1048.75 18.1, 21.1throat walls. & 21.2

8 Adjusting "Y" of an A.P.M. outlet, including dismantling Each 1042.80 1884.00 Each 1042.80 1884.00 ditto

and rebuilding.

9 Extra labour in fixing A.P.M. and O.F. outlet blocks, 21.1 & 21.2 Rates to be Rs. 4.00 less in caseincluding dressing of bricks:- of O.F. outlets, where there is no

O.F. iron block.a) for channel depth of 5.0'. (1.5 m) Each 1135.20 1277.40 Each 1135.20 1277.40b) for channel depth of 4.0'. (1.2 m) ditto 851.40 993.60 ditto 851.40 993.60c) for channel depth of 3.0'. (900 mm) ditto 681.10 823.30 ditto 681.10 823.30d) for channel depth of 2.0'. (600 mm) ditto 567.60 677.40 ditto 567.60 677.40e) for channel depth of less than 2.0'. (600 mm) ditto 454.10 531.50 ditto 454.10 531.50

10 Repairing damaged reducing collar of Hume pipe outlets. Each 468.25 681.25 Each 468.25 681.25

11 Laying iron pipes for outlets. Per Lft. 22.70 - Metre 74.50 - 21.1, 21.2& 17.1 to

17.5

12 Water allowance for constructing outlets or culverts, when Each 542.15 Each 542.15 At the discretion of thecanal water is not flowing. to to Engineer-in-charge depending upon

1111.00 1111.00 the distance and source of supply.

13 Hoisting and placing R.C. slab or stone in position on Each 389.20 - Each 389.20 -outlets or W.C. culverts.

14 Fixing pipe outlet, including back filling of earth and 17.1 to 17.5puddling:- & 21.1 to

21.2a) portion under bank. Rft. 101.40 110.90 Metre 332.75 363.85 b) portion under road, beyond bank. ditto 43.35 52.85 ditto 142.25 173.35

15 Removing pipe outlet, refilling earth and puddling. 17.1to

a) portion under bank. Rft. 88.90 - Metre 291.60 - 17.5b) portion under road, beyond bank. ditto 33.35 - ditto 109.35 -

16 Changing pipe outlets by removing one pipe and replacingit at the same site with another pipe complete with earthand puddling.

a) portion under bank. Rft. 121.15 130.60 Metre 397.40 428.5b) portion under road, beyond bank. ditto 60.55 70.05 ditto 198.70 229.8

chapter-18(R & Road Struc) Page 107

1 Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.3 The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Sub-base & base construction

1 Providing and laying sub-base course of brick on edge 100Cft. 3125.55 17178.75 cu.m 1103.95 6067.55 521-1 The nominal thickness of bricks 4½" (113 mm) thick, including compaction to required to shall be taken for the purpose ofcamber and grade. 521-6 measurement and payment.

2 Providing and laying sub-base course of brick aggregate, 100Cft. 2326.80 3800.40 cu.m 821.85 1342.30 501-1 To be used only when brickincluding compaction of sub-base course material to to aggregate is cheaper than stonerequired depth, camber, grade & density. 501-6 aggregate.

3 a) Providing and laying sub-base course of stone product dittoof approved quality and grade, including placing, mixing,spreading and compaction of sub-base material torequired depth, camber, grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all material to site of work except gravel and.aggregate.

i) Pit run or bed run gravel. 100Cft. 2326.8 2794.8 cu.m 821.85 987.1ii) Crushed stone aggregate. 100Cft. 2326.8 3478.8 cu.m 821.85 1228.7

(b) Subsequent carriage of gravel and crushed stone 100Cft. of 1) The carriage of the whole distanceaggregate consoli- to the site of work shall be

dated calculated on the basis of the ratessub-base of the actual means of transport

used in carriage, i.e. road and/or rail,as the case may be.

2) It shall be payable from thenearest approved quarry.3) The quantity of pit run or bed run gravel and crushed stone

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

18. ROAD & ROAD STRUCTURE

chapter-18(R & Road Struc) Page 108

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

aggregate for payment of carriage shall be taken as per actual loose volume but not more than 120 Cft.

4 a) Providing and laying base course of crushed stone 100Cft. 2703.00 5800.20 cu.m 954.70 2048.65 501-1aggregate of approved quality and grade, and supply and tospreading of stone screening, including placing, mixing, 501-6spreading and compaction of base course material torequired depth, camber and grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all materials to site of work except gravel and.aggregate.

b) Subsequent carriage of crushed stone aggregate. 100Cft. of 1) The carriage for the wholeconsole- distance to the site of work shall bedated calculated on the basis of the ratesbase of the actual means of transport

used in carriage, i.e. road and/orrail, as the case may be.

2) It shall be payable from thenearest approved quarry.

5 Providing and laying road edging of 3" (75 mm) wide and Per Rft. 7.50 35.85 Metre 24.70 117.65 552-1 to9" (225 mm) deep brick on end, complete in all respects. 552-5

Bituminous Work & Resurfacing.

6 Providing and laying bituminous priming coat, using 10 100Sft. 133.30 685.70 sq.m 14.35 73.80 601-1 tolbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg 601-6kerosene and 0.5 Kg binder per square metre.

7 Providing and laying bituminous tack coat, using 10 lbs. of 100Sft. 133.30 450.00 sq.m 14.35 48.40 611-1 tobitumen per 100 Sft (0.49 Kg of bitumen per sq.m.) 611-5

8 a) Providing surface treatment to roads, including supply 612-1 to

of bitumen and bajri/crushed stone aggregate of 612-6approved quality, including cleaning of road surface,heating and spraying bitumen, spreading bajri and rollingwith road roller (including its operation cost, fuel andhire charges, etc.) etc. complete including carriage of allmaterials to site of work except bajjri/crushed stone aggregate.

3) The quantity of crushed stone aggregatefor payment of carriage shall be taken asper actual loose volume but not more than122 Cft.

chapter-18(R & Road Struc) Page 109

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

1) 1st coat:-

i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25 100Sft. 119.70 1772.15 Sq.m 12.90 190.70mm) per 100 sq. feet or 1.96 Kg bitumen and 0.017cu.metre bajri per square metre..

ii) 35 lbs. bitumen, and 4.0 Cft. bajri of nominal size ¾" 100Sft. 119.70 1537.70 Sq.m 12.90 165.45(20 mm) per %Sft. or 1.72 Kg bitumen and 0.013 cu.metrebajri per sq.metre.

2) 2nd coat:-

i) 25 lbs. bitumen, and 2.75 Cft. bajri of nominal size ½" 100Sft. 92.10 1101.15 Sq.m 9.90 118.50(13 mm) per %sft or 1.23 Kg bitumen and 0.008 cu. metre bajri persq.metre.

ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 92.10 819.35 Sq.m 9.90 88.15(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metrebajri per sq. metre.

3) 3rd coat:-

14 lbs. bitumen, and 1.5 Cft. bajri of nominal size ¼" (6 100Sft. 63.00 626.45 sq.m 6.80 67.40mm) per %sft or 0.69 Kg bitumen and 0.005 cubic metre bajjri per sq.metre.

b) Subsequent carriage of crushed stone aggregate/bajri, 100Cft. cu.m 1) The carriage for the wholedistance to the site of work shall becalculated on the basis of the ratesof the actual means of transportused in carriage, i.e. road and/or rail,as the case may be.

2) It shal be payable from thenearest approved quarry.

chapter-18(R & Road Struc) Page 110

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

9 a) Resurfacing of road, including supply of bitumen and 612-1bajri/crushed stone aggregate of approved quality, toincluding cleaning of road surface, heating and spraying 612-6of bitumen, and spreading bajri/crushed stoneaggregate and rolling with road roller (including itsoperation cost, fuel and hire charges, etc.) complete,including carriage of all materials to site of work.

i) 22 lbs. bitumen, and 2.5 Cft. bajri of nominal size ½" 100Sft. 79.80 970.45 sq.m 8.60 104.40(13 mm) per %Sft. or 1.07 Kg bitumen and bajjri 0.007 cu.mper sq.m.

ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 79.80 879.05 sq.m 8.60 94.60(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006cu.metre bajri per sq.metre.

b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as againstitem 8(b) above.

10 a) Providing and laying plant premixed bituminous carpet, per inch per 25mm 641-1 toincluding compaction and finishing to required camber, grade thickness thickness 642-6and density. per 100Sft. per Sq.m (i) 3% Bitumen -do- 783.70 2380.35 -do- 84.35 256.20(ii) 3.5% Bitumen -do- 783.70 2573.75 -do- 84.35 277.05(iii) 4% Bitumen -do- 783.70 2767.20 -do- 84.35 297.85(iv) 4.5% Bitumen -do- 783.70 2960.60 -do- 84.35 318.70(v) 5% Bitumen -do- 783.70 3153.90 -do- 84.35 339.50(vi) 5.5% Bitumen -do- 783.70 3347.45 -do- 84.35 360.30(vii) 6% Bitumen -do- 783.70 3540.85 -do- 84.35 381.15b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as against item 8(b) above.

11 Scarifying old road surface including removal of debris within 100Sft. 222.20 - Sq.m 23.90 -1 chain (30 m).

Incidental Construction

12 Providing R.C.C. railing on bridges, as per standard drawing. Per Rft. 116.95 898.05 Metre 383.75 2946.35 901-1 The rate includes cost of steel, itsto fabrication, laying in position and

901-4 fastening, including cost of bindingwire and removal of rust from thebars, etc.

chapter-18(R & Road Struc) Page 111

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

13 Providing and fixing G.I. pipe railing, as per Per Rft. of 91.55 695.20 Metre 300.35 2280.80 dittostandard drawing. 3 rows of

Pipes

14 Providing and fixing steel bearings of standard quality and Each Set - 2400.00 Each set - 2400.00 911-1 totype at site of work. of one of one 911-6

end end

15 Providing and fixing rubber bearing pad at site Per - 18.00 cu.cm - 1.10 dittoof work. Cu. Inch

16 Providing and laying expansion joint of neoprine strip 4"x¼" Per Rft. 75.25 171.70 Metre 246.85 563.35 921-1 to(100 mmx 6 mm) and plastic bitumen. 921-4

17 Providing and fixing rain water outlet of A.C. pipe. Each 37.60 342.00 Each 37.60 342.00 931-1 to933-4

18 Providing and erection at site of work:- 941-1 to The rate is for complete item of941-5 work according to Standard design

i) R.C.C. mile/Km. stone Each 2245.00 4581.80 Each 2245.00 4581.80 including cement concreteii) R.C.C. furlong/½ Km. stone Each 109.65 338.75 Each 109.65 338.75 foundation block and paintingiii) R.C.C. boundary pillar. Each 212.25 578.25 Each 212.25 578.25 letters etc.iv) Sign post of M.S. plate 1/8" thick (3 mm)

a) Mandatory. Each 722.30 4457.65 Each 722.30 4457.65b) Warning/Direction/Informatory. Each 699.60 4194.45 Each 699.60 4194.45

19 Providing and laying dry brick pavement/soling in streets or 100Cft. 2851.55 16904.75 cu.m 1007.15 5970.75 The nominal thickness of bricks roads, etc. sand grounted, laid in proper camber, including ( 9" x 4-3/8"x 2-11/16") shall be taken preparation, watering, compaction of bed to proper camber, for the purpose of measurement and sand cushion. and payment.

chapter-19(PSI & GF) Page 112

1 Rates for all finished works include the removal of surplus debris, unused material & by products.2 The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of

Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,Vol II, 1966 (Public Health Works).

3 The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and fitting glazed earthen ware water closetEuropean type, excluding seat and cover:-

i) white Each 376.20 2,111.85 Each 376.20 2,111.85 ii) coloured Each 376.20 2,297.85 Each 376.20 2,297.85

2 Providing and fixing, double seat and cover only.

i) bakelite Each 3.90 333.90 Each 3.90 333.90 ii) plastic Each 3.90 231.90 Each 3.90 231.90

3 Providing and fitting glazed earthen ware water closet,squatter type (Orisa pattern), combined with foot rest.

i) white Each 271.45 1,185.75 Each 271.45 1,185.75 ii) coloured Each 271.45 1,389.75 Each 271.45 1,389.75

4 Providing and fitting white glazed earthen ware water closet, Each 271.45 2,023.45 Each 271.45 2,023.45 squartter type, with separate foot rest.

5 Providing and fitting water closet, squatter type of terrazzo Each 271.45 609.75 Each 271.45 609.75 concrete.

6 Providing and fitting glazed earthen ware wash hand basin56x40 cm (22"x16") including bracket set, waste pipe andwaste coupling, etc.i) white, with pedestal Each 354.75 2,460.75 Each 354.75 2,460.75 ii) coloured, with pedestal Each 354.75 2,646.75 Each 354.75 2,646.75 iii) white, without pedestal Each 313.10 1,717.10 Each 313.10 1,717.10 iv) coloured, without pedestal Each 313.10 1,765.10 Each 313.10 1,765.10

7 Providing and fixing stainless steel sink with drain board, size Each 313.10 4,405.15 Each 313.10 4,405.15 120x60 cm (48"x24") including bracket set, waste pipe andwaste coupling.

8 Providing and fitting terrazzo concrete sink 60x45 cm (24"x18") Each 313.10 1,105.25 Each 313.10 1,105.25 with drain board of mosaic, including bracket set, waste pipeand waste coupling.

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

19. PLUMBING, SANITARY INSTALLATION & GAS FITTINGS

chapter-19(PSI & GF) Page 113

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

9 Providing and fixing glazed earthen ware sink, includingbracket set, waste pipe and waste coupling:-

i) 60x45 cm (24"x18") Each 313.10 1,682.45 Each 313.10 1,682.45 ii) 37.5x45 cm (15"x18") Each 313.10 1,502.45 Each 313.10 1,502.45

10 Providing and fixing glazed earthen ware flat back urinal. Each 188.10 890.95 Each 188.10 890.95

11 Providing and fitting glazed earthen ware low down flushingcistern 13,63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

i) white Each 313.10 1,312.70 Each 313.10 1,312.70 ii) coloured Each 313.10 1,390.70 Each 313.10 1,390.70

12 Providing and fitting plastic made low down flushing cistern1363 litre (3 gallons) capacity, including bracket set, copperconnection, etc. complete.

i) white Each 313.10 1,150.70 Each 313.10 1,150.70 If rubber connection is used, theii) coloured Each 313.10 1,150.70 Each 313.10 1,150.70 composite rate will be reduced by

Rs. 12.50

13 Providing and fixing white enameled cast iron low down flushing Each 313.10 1,337.80 Each 313.10 1,337.80 cistern 13.63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

14 Providing and fixing cast iron high level flushing cisternincluding cost of bracket set, copper connection, etc.

i) 13.63 litres (3 gallons) capacity Each 331.90 2,454.60 Each 331.90 2,454.60 ii) 4.55 litres (1 gallon) capacity Each 331.90 1,614.60 Each 331.90 1,614.60

15 Providing and fixing, chromium plated soap dish. Each 18.80 190.85 Each 18.80 190.85

16 Providing and fitting, glazed earthen ware soap dish.

i) white Each 18.80 478.85 Each 18.80 478.85 ii) coloured Each 18.80 226.85 Each 18.80 226.85

17 Providing and fixing, chromium plated toilet paper holder. Each 25.10 410.40 Each 25.10 410.40

18 Providing and fixing, chromium plated towel rail:-

i) 60 cm (24") long, and 2 cm (¾") dia. Each 25.10 355.15 Each 25.10 355.15 ii) 50 cm (20") long, and 1.5 cm (½") dia. Each 25.10 295.15 Each 25.10 295.15

19 Providing and fixing looking glass 55x40 cm (22"x16") size, Each 47.05 379.15 Each 47.05 379.15and 5 mm thick, first quality.

chapter-19(PSI & GF) Page 114

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

20 Providing and fixing glass shelf 60x13 cm (24"x5"), with5mm thick glass:-

i) with chromium plated brackets and railing. Each 58.80 381.70 Each 58.80 381.70 ii) glass shelf only, without chromium plated brackets Each 37.60 83.20 Each 37.60 83.20

and railing.

21 Providing and fitting glazed earthen ware shelf 60x13 cm (24"x5"), with chromium plated bracket and railing:-

i) White Each 58.80 936.10 Each 58.80 936.10 ii) Coloured Each 58.80 1,068.10 Each 58.80 1,068.10

22 Providing and fitting:-

i) plastic soap dish Each 18.80 158.50 Each 18.80 158.50 ii) plastic toilet paper holder Each 25.10 223.20 Each 25.10 223.20 iii) plastic towel rail Each 25.10 247.20 Each 25.10 247.20 iv) plastic shelf 60x13 cm (24"x5") with bracket and railing. Each 25.10 428.80 Each 25.10 428.80

23 Providing and fixing chromium plated pillar-cock, heavy:-

i) 2 cm (¾") Each 25.10 541.10 Each 25.10 541.10 ii) 1.5 cm (½") Each 25.10 697.10 Each 25.10 697.10

24 Providing and fixing chromium plated stop cock, heavy:-

i) 2 cm (¾") Each 25.10 277.10 Each 25.10 277.10 ii) 1.5 cm (½") Each 25.10 181.10 Each 25.10 181.10

25 Providing and fixing underground stop cock 13 mm (½"), Each 36.90 491.30 Each 36.90 491.30 with chromium plated cover.

26 Providing and fixing chromium plated bib cock:-i) 2 cm (¾") Each 25.10 349.10 Each 25.10 349.10 ii) 1.5 cm (½") Each 25.10 331.10 Each 25.10 331.10

27 Providing and fixing chromium plated tee stop cock Each 25.10 451.10 Each 25.10 451.10 15mm (½").

28 Providing and fixing chromium plated shower rose:-

i) 1.5x10 cm (½"x4") Each 25.10 331.10 Each 25.10 331.10 ii) 2x15 cm (¾"x6") Each 25.10 409.10 Each 25.10 409.10

chapter-19(PSI & GF) Page 115

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

29 Providing and fixing, chromium plated mixing valve, for wash Each 31.35 1,555.35 Each 31.35 1,555.35 hand basin, sink or shower.

30 Providing and fixing gun metal peet/gate valve (screwed):- For brass peet/gate valve (screwed),the composite rates of items (i) to (v)

i) 30 mm (1¼") dia Each 37.60 439.60 Each 37.60 439.60 will be reduced by Rs. 66, 77, 95, 107ii) 40 mm(1½") dia Each 37.60 589.60 Each 37.60 589.60 and 120 respectively.iii) 50 mm(2") dia Each 37.60 817.60 Each 37.60 817.60 iv) 65 mm(2½") dia Each 37.60 1,285.60 Each 37.60 1,285.60 v) 80 mm(3") dia Each 37.60 1,897.60 Each 37.60 1,897.60

31 Providing and fitting, chromium plated or brass oxidised,swan neck cock 15 mm (½") dia.

i) single way Each 25.10 373.10 Each 25.10 373.10 ii) two way Each 37.60 637.60 Each 37.60 637.60 iii) three way Each 50.15 776.15 Each 50.15 776.15

32 Providing and fixing, union brass cock.

i) 13 mm (½") dia Each 25.10 145.10 Each 25.10 145.10 ii) 20 mm (¾") dia Each 25.10 229.10 Each 25.10 229.10

33 Providing and fixing, floor trap of cast iron, including concrete

chamber all round, and C.I. grating:-

i) 10x5 cm (4"x2") Each 75.25 395.30 Each 75.25 395.30 ii) 10x7.5 cm (4"x3") Each 75.25 395.30 Each 75.25 395.30

34 Providing and fitting "P" trap:-

i) 10 cm (4") of cast iron. Each 62.70 460.70 Each 62.70 460.70 ii) 10 cm (4") glazed. Each 62.70 130.70 Each 62.70 130.70

35 Providing and fitting 10 cm (4") gully trap, including cement Each 94.05 700.75 Each 94.05 700.75

concrete, cost of PVC grating 15x15 cm (6"x6") andmasonry chamber 30x30 cm (12"x12").

36 Providing and fitting, cast iron soil pipe with:-

i) lead caulked, yarn joint:-

a) 10 cm (4") i/d Per foot 31.80 229.00 Metre 104.30 751.05 b) 5 cm (2") i/d Per foot 12.70 97.15 Metre 41.70 318.60

ii) cement caulked joint:-

a) 10 cm (4") i/d Per foot 7.00 148.00 Metre 23.00 485.50 b) 5 cm (2") i/d Per foot 2.80 81.55 Metre 9.20 267.45

chapter-19(PSI & GF) Page 116

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

37 Providing and fitting, A.C. soil pipe with cement caulkedjoint, including all specials:-

i) 60 (2¼)" mm i/d Per foot 5.60 30.30 Metre 18.40 99.35 ii) 80 (3") mm i/d Per foot 6.25 71.15 Metre 20.40 233.40 iii) 100 (4") mm i/d Per foot 7.00 106.00 Metre 23.00 347.65 iv) 150 (6") mm i/d Per foot 9.35 131.90 Metre 30.65 432.55

38 Providing and fitting cast iron specials, such as tee bend, In case of plug type, the compositecollar, cross, etc. plain type:- rate shall be increased by Rs.2 per kg.

i) lead caulked joint Kg 25.85 154.15 Kg 25.85 154.15 ii) cement caulked joint Kg 15.75 114.65 Kg 15.75 114.65

39 Supply and fitting of cast iron manhole coverwith frame, etc. complete.

i) 30 cm (12") dia Each 37.60 193.60 Each 37.60 193.60 ii) 45 cm (18") dia Each 37.60 865.60 Each 37.60 865.60 iii) 60 cm (24") dia Each 61.25 1,465.25 Each 61.25 1,465.25

40 Providing and fitting R.C.C. pipe 10 cm (4") dia, including Per foot 15.90 63.90 Metre 52.15 209.60 laying and jointing in trenches.

41 Providing and fitting chromium plated or oxidised, gas cock 6'mm (¼"):-

i) single way Each 25.10 199.10 Each 25.10 199.10 ii) two way Each 37.60 301.60 Each 37.60 301.60 iii) three way Each 50.15 494.15 Each 50.15 494.15

42 Providing and fitting nipple or bush, 6 mm to Each 18.80 49.70 Each 18.80 49.70 10 mm (¼" to 3/8") i/d.

43 Providing and fixing, brass gas cock:-

a) 15 mm (½") dia Each 3.90 93.90 Each 3.90 93.90 b) 20 mm (¾") dia Each 142.50 105.90 Each 142.50 105.90

44 Providing and fixing brass stop cock/bib cock:-

a) 15 mm (½") dia Each 6.25 84.25 Each 6.25 84.25 b) 20 mm (¾") dia Each 6.25 126.25 Each 6.25 126.25

45 Hoisting and placing in position, precast R.C. latrine seats. Each 376.20 - Each 376.20 -

Replacement

1 Providing and fixing, chromium plated waste coupling:-

chapter-19(PSI & GF) Page 117

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

i) 3 cm (1¼") Each 37.60 121.60 Each 37.60 121.60 ii) 4 cm (1½") Each 37.60 127.60 Each 37.60 127.60

2 Providing and fixing rubber plug with chain:-

i) 3 cm (1¼") Each 1.50 48.30 Each 1.50 48.30 ii) 4 cm (1½") Each 1.50 55.50 Each 1.50 55.50

3 Providing and fixing, waste pipe of PVC:-

i) 3 cm (1¼") Each 18.80 45.20 Each 18.80 45.20 ii) 4 cm (1½") Each 18.80 51.20 Each 18.80 51.20

4 Providing and fixing, flushing bend of PVC.

i) 3 cm (1¼") Each 16.70 43.10 Each 16.70 43.10 ii) 4 cm (1½") Each 16.70 49.10 Each 16.70 49.10

5 Providing and fixing chromium plated bottle trap with wastepipe, etc. complete:-

i) 3 cm (1¼") i/d Each 37.60 553.60 Each 37.60 553.60 ii) 4 cm (1½") Each 37.60 673.60 Each 37.60 673.60

6 Providing and fixing, angle iron brackets for:-

i) wash hand basin and cistern Each 37.60 167.20 Each 37.60 167.20 ii) sinks Each 37.60 184.00 Each 37.60 184.00

7 Providing and fixing 1.5 cm (½") dia connection, includingcheck nuts, etc.:-

i) plastic rubber connection Each 15.05 47.45 Each 15.05 47.45 ii) copper connection Each 15.05 85.85 Each 15.05 85.85

8 Providing and fixing brass ball float valve:-

i) 1.5 cm (½") dia Each 31.35 235.35 Each 31.35 235.35 ii) 2.0 cm (¾") dia Each 31.35 301.35 Each 31.35 301.35 iii) 2.5 cm (1") dia Each 31.35 361.35 Each 31.35 361.35 iv) 3 cm (1¼") dia Each 31.35 391.35 Each 31.35 391.35 v) 4.0 cm (1½") dia Each 31.35 547.35 Each 31.35 547.35 vi) 5 cm (2") dia Each 31.35 925.35 Each 31.35 925.35

chapter-20(Surface Drainage) Page 118

1. Specification No. correspond to Book of Specification (B & R Department ) Vol. 11, 1966 (public Health Works).

2. Rates for all finished works include the removal of surplus debris, unused material and by products.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Tega formed of pacca bricks on end, laid in and over 17.1cement sand mortar projecting to a height of not morethan 6" (150 mm) top of drain along the property sidewhere required, laid to lines, grades, slopes and shapeaccording to the Engineer's drawing:-

a) 3" thick (75 mm)

i) ratio 1:3 100Rft 1,075.15 4,295.95 Metre 35.25 140.90 ii) ratio 1:5 ditto 1,075.15 4,098.70 ditto 35.25 134.45

B) 4½" thick (113 mm)

i) ratio 1:3 100Rft 1,612.50 6,253.35 ditto 52.90 205.10 ii) ratio 1:5 ditto 1,612.50 5,955.05 ditto 52.90 195.35

2 Pacca flat brick 3" (75 mm ) thick, laid in reimbursement, 17.1in cement, sand mortar, on sides of drains and in otherworks where required. All joints to be completely filledand struck flush:-

a) ratio 1:3 100Sft. 1,584.80 6,071.35 Sqm. 170.50 653.30 b) ratio 1:5 ditto 1,584.80 5,755.55 ditto 170.50 619.30 c) ratio 1:6 ditto 1,584.80 5,666.70 ditto 170.50 609.75

3 Pacca brick on edge, laid in reimbursement, in cement, 17.1sand mortar, on sides of drains and on other works whererequired. All joints to be completely filled and struckflush:-

a) ratio 1:3 100Sft. 2,246.65 9,010.75 Sqm. 241.75 969.55 b) ratio 1:5 ditto 2,246.65 8,504.35 ditto 241.75 915.05 c) ratio 1:6 ditto 2,246.65 8,378.25 ditto 241.75 901.50

4 Pacca flat brick, Herring bond pitching in cement, sand 17.2mortar, laid to lines, grades, shapes and slopes as perEngineer's drawing:-

a) ratio 1:3 100Sft. 1,528.55 6,015.10 Sqm. 164.45 647.25 b) ratio 1:5 ditto 1528.55 5699.3 ditto 164.45 613.25 c) ratio 1:6 ditto 1528.55 5610.5 ditto 164.45 603.7

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

20. SURFACE DRAINAGE

chapter-20(Surface Drainage) Page 119

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

5 Pacca brick on edge, Herring bond pitching in cement, 17.2sand mortar, laid to lines, grades, shapes and slopes asper Engineer's drawing:-

a) ratio 1:3 100Sft. 2,372.30 9,136.45 Sqm. 255.25 983.10 b) ratio 1:5 ditto 2,372.30 8,630.00 ditto 255.25 928.60 c) ratio 1:6 ditto 2,372.30 8,503.95 ditto 255.25 915.00

6 Constructing Punjab Standard Drains. of cement concrete1:2 ½ :5, with cement concrete bedding ratio 1:6:12, 17.1complete, laid to lines, grades, slopes and shapes,rendering exposed surface of concrete with 1:1 cement,sand mortar, ¼" (6 mm) thick, as per Engineer's drawing(excluding excavation):-

a) Type I Per Rft 36.50 96.65 Metre 119.65 317.00 b) Type II ditto 72.95 178.70 ditto 239.30 586.15 c) Type III ditto 96.35 233.30 ditto 316.05 765.20 d) Type IV ditto 114.90 278.20 ditto 376.80 912.50 e) Type V ditto 152.00 379.35 ditto 498.55 1,244.30 f) Type VI ditto 174.90 434.85 ditto 573.60 1,426.35 g) Type VII ditto 193.85 479.15 ditto 635.80 1,571.55 h) Type VIII ditto 216.50 538.15 ditto 710.10 1,765.05 i) Type IX ditto 290.75 761.75 ditto 953.65 2,498.50 j) Type X ditto 319.30 834.90 ditto 1,047.35 2,738.50 k) Type XI ditto 356.70 928.45 ditto 1,169.95 3,045.40 l) Type XII ditto 380.25 985.20 ditto 1,247.25 3,231.50

7 Laying R.C.C hume pipes in position, including jointing:-a) 6" to 12" (150 mm to 300 mm ) dia Per Lft. 68.40 71.90 Metre 224.25 235.90 b) 12" to 24" (300 mm to 600 mm) dia ditto 108.35 115.45 ditto 355.45 378.70 c) 24" to 36" (600 mm to 900 mm) dia ditto 136.75 147.40 ditto 448.55 483.55

chapter-21(Sewerage) Page 120

1 Specification No. correspond to Book of Specification of B&R Department Vol. II, 1966 (Public Health Works).2 Rate for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and laying R.C.C. pipe, moulded with cement Chapter - 8concrete 1:1½:3, with spigot socket or collar joint, etc. including cost of reinforcement, conforming to B.S. 5911:Part I: 1981, Class "L" including carriage of pipe fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing, cutting pipes wherenecessary, finishing and testing, etc., complete.

i) 100 mm (4") i/d Rft. 18.20 86.35 Metre 59.70 283.25ii) 150 mm (6") i/d Rft. 21.95 130.30 Metre 72.00 427.40iii) 225 mm (9:) i/d Rft. 42.50 334.15 Metre 139.40 1096.00

2 Providing and laying non-reinforced concrete pipe, dittomoulded with cement concrete 1:1½:3, conforming toASTM Specification C-14-73, Class 2, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing, cutting pipe wherenecessary, finishing and testing, etc. complete.i) 100 mm (4") i/d Rft. 13.65 53.85 Metre 44.75 176.65ii) 150 mm (6") i/d Rft. 16.45 72.45 Metre 53.95 237.65iii) 200 mm (8") i/d Rft. 26.40 98.15 Metre 86.60 321.95iv) 225 mm (9:) i/d wall thickness 1 inch (25 mm) Rft. 28.35 117.30 Metre 93.00 384.75v) 250 mm (10") i/d Rft. 28.80 128.70 Metre 94.45 422.15

3 Providing and laying R.C.C. pipe sewers, moulded with dittocement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class II. Wall B, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc., complete.

i) 310 mm (12") i/d Rft. 43.35 402.05 Metre 142.20 1318.70ii) 380 mm (15") i/d Rft. 54.40 493.55 Metre 178.45 1618.85iii) 460 mm (18") i/d Rft. 65.50 539.10 Metre 214.85 1768.25iv) 530 mm (21":) i/d Rft. 81.90 689.00 Metre 268.65 2259.90v) 610 mm (24") i/d Rft. 94.35 822.90 Metre 309.45 2699.10vi) 690 mm (27") i/d Rft. 139.90 1138.35 Metre 458.85 3733.80vii) 760 mm (30") i/d Rft. 167.80 1221.85 Metre 550.40 4007.65viii) 840 mm (33") i/d Rft. 209.00 1427.60 Metre 685.50 4682.55ix) 910 mm (36") i/d Rft. 257.15 1909.65 Metre 843.45 6263.65x) 1070 mm (42") i/d Rft. 334.6 2475.8 Metre 1097.5 8120.6xi) 1220 mm (48") i/d Rft. 630.55 3309.3 Metre 2068.2 10854.5xii 1370 mm (54") i/d Rft. 871.4 4150.4 Metre 2858.2 13613.3xiii) 1520 mm (60") i/d Rft. 1108.8 4752.1 Metre 3636.85 15586.9xiv) 1680 mm (66") i/d Rft. 1738.9 5746.55 Metre 5703.6 18848.7xv) 1830 mm (72") i/d Rft. 2158.55 6530.50 Metre 7080.05 21420.05

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

21. SEWERAGE

chapter-21(Sewerage) Page 121

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

4 Providing and laying R.C.C. pipe sewers, moulded with Chapter-8cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class III, Wall B, including carriage of pipes fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing with rubber ring, cutting pipeswhere necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 43.35 498.65 Metre 142.10 1635.55ii) 380 mm (15") i/d Rft. 54.40 613.20 Metre 178.45 2011.30iii) 460 mm (18") i/d Rft. 65.50 763.35 Metre 214.80 2503.80iv) 530 mm (21":) i/d Rft. 81.90 930.70 Metre 268.70 3052.70v) 610 mm (24") i/d Rft. 94.35 1082.20 Metre 309.45 3549.60vi) 690 mm (27") i/d Rft. 139.90 1290.55 Metre 458.90 4233.00vii) 760 mm (30") i/d Rft. 167.80 1558.45 Metre 550.35 5111.70viii) 840 mm (33") i/d Rft. 209.00 1744.40 Metre 685.50 5721.65ix) 910 mm (36") i/d Rft. 257.15 2276.20 Metre 843.50 7465.95x) 1070 mm (42") i/d Rft. 334.60 2934.50 Metre 1097.45 9625.15xi) 1220 mm (48") i/d Rft. 640.30 3636.95 Metre 2100.20 11929.20xii 1370 mm (54") i/d Rft. 885.05 4587.35 Metre 2902.90 15046.50xiii) 1520 mm (60") i/d Rft. 1125.80 5652.40 Metre 3692.70 18539.85xiv) 1680 mm (66") i/d Rft. 1766.20 7378.25 Metre 5793.10 24200.65xv) 1830 mm (72") i/d Rft. 2192.65 9139.50 Metre 7191.85 29977.55

5 Providing and laying R.C.C. pipe sewers, moulded with Chapter - 8cement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class IV, Wall B, including carriageof pipes from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 43.35 589.30 Metre 142.10 1932.90ii) 380 mm (15") i/d Rft. 54.40 737.20 Metre 178.45 2417.95iii) 460 mm (18") i/d Rft. 65.50 885.05 Metre 214.80 2903.00iv) 530 mm (21":) i/d Rft. 81.90 1037.05 Metre 268.70 3401.60v) 610 mm (24") i/d Rft. 94.35 1224.65 Metre 309.45 4016.90vi) 690 mm (27") i/d Rft. 139.90 1581.45 Metre 458.90 5187.20vii) 760 mm (30") i/d Rft. 167.80 1825.55 Metre 550.35 5987.90viii) 840 mm (33") i/d Rft. 209.00 2043.05 Metre 685.50 6701.20ix) 910 mm (36") i/d Rft. 257.15 2816.40 Metre 843.50 9237.80x) 1070 mm (42") i/d Rft. 334.60 3456.90 Metre 1097.45 11338.65xi) 1220 mm (48") i/d Rft. 640.30 4337.45 Metre 2099.95 14226.95xii) 1370 mm (54") i/d Rft. 885.05 5638.15 Metre 2903.10 18492.95xiii) 1520 mm (60") i/d Rft. 1125.80 7094.95 Metre 3692.70 23271.45xiv) 1680 mm (66") i/d Rft. 1766.20 9337.25 Metre 5793.10 30626.20xv) 1830 mm (72") i/d Rft. 2192.65 11098.55 Metre 7191.85 36403.15

chapter-21(Sewerage) Page 122

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

6 Lowering of sub-soil water table, by installation of tubewells 1) This rate shall be payable, inalong sewer line and pumping out water, for excavation in addition to the item of excavationopen cutting below sub-soil water level, concreting, curing, below SSWL for sewers andlaying and jointing pipes, filling haunches, etc. till the manholes under Chapter,completion of sewer line, including disposal of pumped out EARTHWORKwater:- 2) The grant of these rates shall be

Rft of Metre of subject to Superintending Engineer's1) 0-1 ft. (0 to 310 mm) below SSWL laid sewer - 270.75 laid sewer - 888 approval.2) 0-2 ft. (0 to 610 mm) below SSWL ditto - 506 ditto - 1659.73) 0-3 ft. (0 to 910 mm) below SSWL ditto - 873.15 ditto - 2864 3) The rate includes cost of4) 0-4 ft. (0 to 1220 mm) below SSWL ditto - 1267.65 ditto - 4157.9 providing pumps, POL and all5) 0-5 ft. (0 to 1520 mm) below SSWL ditto - 1779.2 ditto - 5835.7 operation charges at the site6) 0-6 ft. (0 to 1830 mm) below SSWL ditto - 2200.1 ditto - 7216.25 of work, etc.7) 0-7 ft. (0 to 2170 mm) below SSWL ditto - 2630.70 ditto - 8628.658) 0-8 ft. (0 to 2480 mm) below SSWL ditto - 3020.40 ditto - 9906.959) 0-9 ft. (0 to 2790 mm) below SSWL ditto - 3255.70 ditto - 10678.6510) 0-10 ft. (0 to 3100 mm) below SSWL ditto - 3757.70 ditto - 12325.2511) 0-11 ft. (0 to 3410 mm) below SSWL ditto - 4184.65 ditto - 13725.7012) 0-12 ft. (0 to 3720 mm) below SSWL ditto - 4643.50 ditto - 15230.70

7 Constructing gully grating chamber, 12"x12", ( 300x300 16.2 Pipe connection to be paidmm) complete in all respects: separately.

a) with C.I. gully trap, weighing 81 lbs. (36.75 Kg.) frame Each 761.25 3186.65 Each 761.25 3186.65

hinged safety type.

b) concrete Gully trap. ditto 761.25 2961.65 ditto 761.25 2961.65

8 Constructing standard gully grating chamber, 3'x2½' Each 2288.75 8790.15 Each 2288.75 8790.15 ditto Pipe connection to be paid(900x750 mm), with chinaware trap as per PHED Drawing separately.STD/PD No. 3 of 1977, complete in all respects.

9 Extra for making and finishing benching floor work in 100Sft. 941.50 1479.35 Sq.m 101.30 159.20 14.4manhole chamber, with 1/8" (3 mm) thick cement finish.

10 Restoration of brick pavement on edge, over laid service 100Sft. 1377.75 3310.15 Sq.m 148.25 356.15 13.1line, with 2" (50 mm) sand cushion under soling.

11 Restoration of flat brick pavement sand grouted, over 2" 100Sft. 835.55 2197.25 Sq.m 89.90 236.45 13.1(50 mm) thick dry sand cushion, under soling on laidservice line.

12 Restoration of metalled road, on laid service line, including 13.1compaction:-

a) Carpetted road, with 2" (50 mm) carpet and 10" (250 100Sft. 2207.25 6689.75 Sq.m 237.50 719.80mm) depth of stone metal for sub-base and base.

b) Carpeted road, with 1½" (38 mm) carpet and 6" (150 100Sft. 1564.10 4907.65 Sq.m 168.30 528.05mm) depth of stone metal, for sub-base and base.

c) Black Topped Road with two coats of surfacing & 10" 100Sft. 858.20 3354.20 Sq.m 92.35 360.90(250 mm) depth of stone metal, for sub base & base.

chapter-21(Sewerage) Page 123

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle 14.7iron step, in manhole chambers, including carriage and Each 80.85 222.35 Each 80.85 222.35setting the same in work to correct lines and levels.

14 Fixing manhole frame and cover in R.C.C. slab including Per 214.30 - Per 214.30 - dittocarriage to site. set set

15 Providing and fixing 3" (75 mm) thick R.C.C. manhole Per 140.45 2973.80 Per 140.45 2973.80 dittocover, 22" (550 mm) dia, with tee shaped C.I. frame of 20" set set(500 mm) clear i/d (frame weighing 37.324 Kg. or onemaund) as per Standard Drawing STD/PD No. 5, of 1977,complete in all respects.

15-A Providing and fixing 6" thick R.C.C. manhole Per 301.80 4208.60 Per 301.80 4208.60cover with tee shaped C.I. frame of 22" I/d (frame set setweighing 37.324 Kg. or one maund as per StandardDrawing STD/PD No. 6, of 1977, complete in all respect.

16 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 270.35 2382.35 Per 270.35 2382.35 dittocover for 22" as per standard drawing STD/PD No. 6 of set set1977, complete in all respects.

17 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 224.85 3660.85 Per 224.85 3660.85 dittocover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" set set(550 mm) i/d as per standard drawing STD/PD No. 7 of1977, complete in all respects.

18 Desilting of disposal work collecting tank, including 100Cft. 761.85 816.10 cum 269.10 288.25 16.2removal of sludge within 3 chains (90 metre).

19 Providing and installing, C.I. ventilating shaft painted with 14.6bituminous paint with foundation bolts, as per PHEDStandard Drawing STD/PD No. 4 of 1977, complete in allrespects (except concrete foundation block):-

a) 6" (150 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 213.70 2674.30 %kg 420.60 5264.35ii) 24 ft. (7.30 metre) long ditto 237.40 2704.90 ditto 467.35 5324.60iii) 30 ft. (9.15 metre) long ditto 256.40 2722.20 ditto 504.75 5358.65iv) 36 ft. (11 metre) long ditto 268.30 2734.40 ditto 528.15 5382.70

b) 9" (225 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 190.10 2646.95 %kg 374.15 5210.55ii) 24 ft. (7.30 metre) long ditto 204.85 2661.10 ditto 403.20 5238.35iii) 30 ft. (9.15 metre) long ditto 219.30 2675.35 ditto 431.75 5266.50iv) 36 ft. (11 metre) long ditto 264.00 2719.90 ditto 519.70 5354.10

chapter-21(Sewerage) Page 124

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

c) 12" (300 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 169.05 2626.65 %kg 332.75 5170.55ii) 24 ft. (7.30 metre) long ditto 217.35 2671.95 ditto 427.80 5259.80iii) 30 ft. (9.15 metre) long ditto 253.55 2707.45 ditto 499.10 5329.65

20 Silt clearing 10' (3.00 m) dia wells, andremoval of slush outside the compound:-

a) upto 10' (3.00 m) depth of slush Per well 5923.50 - Per well 5923.50 -b) beyond 10' (3.00 m) depth of slush Per well 11761.20 - Per well 11761.20 -

chapter-22(Sinking of Wells) Page 125

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 Well curbs to be laid at spring level or as deep as possible.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Excavation of well in dry upto 20'(6 metre) below groundlevel, and disposal of soil within one chain (30 metre)

a) in ordinary soil or sand :- 1000 Cft. cu.m

i) from 0' to 5' (o to 1.5 m) depth ditto 3962.25 - ditto 139.95 -ii) from 5.1' to 10' (1.5 to 3.0 metre) depth ditto 4138.25 - ditto 146.15 -iii) from 10.1' to 15' (3.0 to 4.5 metre) depth ditto 4655.55 - ditto 164.45 -iv) from 15.1' to 20' (4.5 metre to 6.0 metre) depth ditto 5343.45 - ditto 188.75 -

b) in hard soil

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 4826.20 - cu.m 170.45 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 5044.85 - ditto 178.20 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 5514.10 - ditto 194.75 -iv) from 15.1' to 20'(4.5 to 6.0 metre) depth ditto 6202.05 - ditto 219.05 -

c) in hard strata, such as shingle, gravel, etc.

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 10409.65 - cu.m 367.65 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 10782.90 - ditto 380.85 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 11241.55 - ditto 397.05 -iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth ditto 12068.15 - ditto 426.25 -

2 Dry sinking of well, including loading, and removingexcavated material within one chain (30 m):-

a) in ordinary soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 21331.20 - cu.m 753.40ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 26664.00 - ditto 941.75iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 31996.80 - ditto 1130.15iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 37329.60 - ditto 1318.50v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 42662.40 - ditto 1506.85vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 47995.20 - ditto 1695.20vii) from 40.1'to 45'(12.0 to 13.5 m) depth ditto 53328.00 - ditto 1883.55viii) from 45'(13.5 Sm) to any depth ditto 58660.80 - ditto 2071.90

b) in hard soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 29330.40 - cu.m 1035.95 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 34663.20 - ditto 1224.30 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 39996.00 - ditto 1412.65 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 45328.80 - ditto 1601.00 -v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 50661.60 - ditto 1789.35 -

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

22. SINKING OF WELLS

chapter-22(Sinking of Wells) Page 126

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 55994.40 - ditto 1977.70 -vii) from 40.1' to 45'(12.0 to 13.5 m) depth ditto 61327.20 - ditto 2166.10 -viii) from 45'(13.5 m) to any depth ditto 66660.00 - ditto 2354.45 -

c) in hard strata, such as shingle, gravel, etc.

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 39996.00 - cu.m 1412.65 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 45328.80 - ditto 1601.00 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 50661.60 - ditto 1789.35 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 51328.20 - ditto 1812.90 -v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 61327.20 - ditto 2166.10 -vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 66660.00 - ditto 2354.45 -vii)from 40.1' to 45'(12.0 to 13.5 m) depth ditto 71992.80 - ditto 2542.80 -viii) from 45'-1" (13.5 m) to any depth ditto 77325.60 - ditto 2731.15 -

3 Wet sinking of well in ordinary soil (value of C upto 5), for *841-1 The outer dimensions of the curbdepths below spring level, including charges of machinery, to shall form basis of payment.shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. 32378.80 - cu.m 1143.60 -ii) above 10' to 20'(3.0 to 6.0 m) depth ditto 68805.00 - ditto 2430.20 -iii) above 20' to 30'(6.0 to 9.0 m) depth ditto 84683.10 - ditto 2991.00 -iv) above 30' to 40'(9.0 to 12.0 m) depth ditto 110088.00 - ditto 3888.30 -v) above 40' to 50'(12.0 to 15.0 m) depth ditto 122320.00 - ditto 4320.35 -vi) above 50' to 60'(15.0 to 18.0 m) depth ditto 137610.00 - ditto 4860.40 -vii) above 60' to 70'(18.0 to 21.0 m) depth ditto 141138.45 - ditto 4985.00 -viii) above 70' to 80'(21.0 to 24.0 m) depth ditto 144852.65 - ditto 5116.20 -ix) above 80'(24.0 m) to any depth ditto 157268.55 - ditto 5554.75 -

4 Wet sinking of well in cohesive soil (value of Cmore than *841-1 The outer dimensions of the curb5), for depths below spring level, including charges of to shall form basis of payment.machinery shoring, kentledge and removal of excavated 841-9spoil within one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 44330.25 cu.m - 1565.75ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 55412.80 ditto - 1957.20iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 66495.35 ditto - 2348.60iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 88660.45 ditto - 3131.50v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 102300.55 ditto - 3613.25vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 110825.55 ditto - 3914.35vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 120900.65 ditto - 4270.20viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 125462.90 ditto - 4431.35ix) above 80'(24.0 m) to any depth ditto - 132990.70 ditto - 4697.25

5 Wet sinking of well in shingle, or gravel, etc, for depths *841-1 The outer dimensions of the curbbelow spring level, including charges of machinery, to shall form basis of payment.

chapter-22(Sinking of Wells) Page 127

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m) :-i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 60450.30 cu.m - 2135.10ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 73883.70 ditto - 2609.55iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 88660.45 ditto - 3131.50iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 120900.65 ditto - 4270.20v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 132990.70 ditto - 4697.25vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 147767.45 ditto - 5219.15vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 154640.35 ditto - 5461.90viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 158322.25 ditto - 5591.95ix) above 80'(24.0 m) to any depth ditto - 174987.75 ditto - 6180.55

6 Making and fixing in position, kiker wood well curb. Per Cft. 907.50 2354.35 cu.m 32052.90 83156.40

7 Laying well curb in position only. Each 300.95 - Each 300.95 -

8 Providing, making and laying R.C.C. well curb in position, *841-1 1) If concrete mixer is supplied byusing coarse sand, including all kinds of form, moulds, to Government, all charges includingcuring, shuttering, rendering and finishing the exposed 841-9 depreciation will be recovered fromsurface, (including screening and washing of aggregate :- the contractor.

2) The rate does not include cost ofa) Ratio 1:1½:3 Per Cft. 197.75 421.75 cu.m 6984.05 14896.55 steel reinforcement and its labour forb) ratio 1:2:4 ditto 197.75 392.45 ditto 6984.05 13860.70 bending, which is payable, separately.

9 Providing and fixing structural steel for cutting 100Kg 709.50 9822.60 100Kg 709.50 9822.60 841-1 toedge. 841-9

10 Making and removing false masonry on well. 100Cft. 6440.05 20904.05 cu.m 2274.65 7383.30 21.1 to The rate includes dismantling of false21.5 & 18.1 masonry, scraping bricks obtained

from dismantling and credit ofbyproducts.

* Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".

chapter-23(Tubewell) Page 128

1 Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Boring for tubewell in all types of soil except shingle and Chap. 2rock, from ground level to 100 ft. (30 m) depth, includingsinking and withdrawing of casing pipe, complete:-

a) 3" (75 mm) i/d Per Rft. 57.65 Per Metre 189.10b) 4" (100 mm) i/d of bore 78.65 of bore 258.05c) 5" (125 mm) i/d ditto 142.55 ditto 467.60d) 6" (150 mm) i/d ditto 216.75 ditto 710.85e) 8" (200 mm) i/d ditto 282.40 ditto 926.20f) 10" (250 mm) i/d ditto 357.10 ditto 1171.25g) 12" (300 mm) i/d ditto 387.35 ditto 1270.55h) 15" (375 mm) i/d ditto 582.85 ditto 1911.80i) 18" (450 mm) i/d ditto 618.40 ditto 2028.30

2 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 100.1 ft. to 200 ft.(30 to 60 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

a) 5" (125 mm) i/d Per Rft. 239.90 Per Metre 786.95b) 6" (150 mm) i/d of bore 337.70 of bore 1107.70c) 8" (200 mm) i/d ditto 382.75 ditto 1255.40d) 10" (250 mm) i/d ditto 437.55 ditto 1435.20e) 12" (300 mm) i/d ditto 475.50 ditto 1559.65f) 15" (375 mm) i/d ditto 684.00 ditto 2243.55g) 18" (450 mm) i/d ditto 719.50 ditto 2360.00

3 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 200.1 ft. to 300 ft. (60to 90 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-a) 5" (125 mm) i/d Per Rft. 335.25 Per Metre 1099.55b) 6" (150 mm) i/d of bore 432.40 of bore 1418.30c) 8" (200 mm) i/d ditto 482.50 ditto 1582.55d) 10" (250 mm) i/d ditto 544.00 ditto 1784.25e) 12" (300 mm) i/d ditto 575.50 ditto 1887.55

f) 15" (375 mm) i/d ditto 751.50 ditto 2464.90g) 18" (450 mm) i/d ditto 788.25 ditto 2585.40

4 Boring for tubewell in all types of soil except shingle, Chap. 2gravel & rock, from a depth of 300.1 ft. to 400 ft.(90 to 120 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

a) 8" (200 mm) i/d Rft of bore 582.85 Per Metre 1911.75

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

23. TUBEWELL AND WATER SUPPLY

chapter-23(Tubewell) Page 129

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

b) 10" (250 mm) i/d ditto 651.00 of bore 2135.30c) 12" (300 mm) i/d ditto 684.35 ditto 2244.70d) 15" (375 mm) i/d ditto 919.30 ditto 3015.35e) 18" (450 mm) i/d ditto 923.05 ditto 3027.50

5 Direct Rotary/Reverse Rotary drilling of bore for tubewells, dittoin all types of soil except shingle, gravel and rock:-

a) from ground level to 250 ft. (75 m) below ground level:-

Per Rft. Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 445.80 of bore 1462.20 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 641.10 ditto 2102.85 Above 2 cusec discharge

b) exceeding 250 ft. (75 m) depth below ground level:-

Rft Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 445.80 of bore 1462.20 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 641.10 ditto 2102.85 Above 2 cusec discharge

6 Boring for tubewell in shingle, gravel and rock, including ditto Location and depth of shingle,sinking and withdrawing of casing pipe:- gravel or rock is to be determined

from the bore log.a) from ground level to 200 ft. (60 m) below ground level:-

Per Rft. Per Metre

i) 12" to 18" (300 to 450 mm) i/d of bore 1005.40 of bore 3297.65 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 1359.75 ditto 4459.95 Above 2 cusec discharge

b) exceeding 200 ft. (60 m) depth belowground level:-

i) 12" to 18" (300 to 450 mm) i/d ditto 1005.40 ditto 3297.65 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 1359.75 ditto 4459.95 Above 2 cusec discharge

7 Providing strong substantially built box of deodar wood Job for 696.10 13689.70 Job for 696.10 13689.70 ditto4'x2½'x9" (1200x750x225 mm), with compartments, lock compl- compl-and locking arrangement, for preserving samples of strata ete bore ete borefrom bore hole.

8 Furnishing sample of water from bore hole. Per Set 118.80 170.70 Per Set 118.80 170.70 Chap. 2

of 2 of 2bottles bottles

9 Providing and installing, brass strainer in tubewell bore ditto Cost/labour of jointing both ends ishole, including sockets, special sockets, studs, etc. included in the rate.complete:-

a) 2" i/d, 5/32" (50 mm i/d 4 mm) thick Per Rft. 27.95 773.45 Per Metre 91.70 2536.95b) 3" i/d, 5/32" (75 mm i/d 4 mm) thick Per Rft. 27.95 1133.60 Per Metre 91.70 3718.25

chapter-23(Tubewell) Page 130

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

c) 4" i/d, 3/16" (100 mm i/d 5 mm) thick Per Rft. 37.30 1420.15 Per Metre 122.25 4658.00d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 42.25 1673.95 Per Metre 138.60 5490.55e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 46.60 1793.80 Per Metre 152.85 5883.65f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 54.70 2149.45 Per Metre 179.35 7050.10g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 66.80 2767.40 Per Metre 219.10 9077.10h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 66.80 2823.05 Per Metre 219.10 9259.60i) 10" i/d, 3/16" (250 mm i/d 5 mm) thick Per Rft. 75.45 2908.35 Per Metre 247.50 9539.45j) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 75.45 3680.10 Per Metre 247.50 12070.75k) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 76.70 4188.50 Per Metre 251.55 13738.25l) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 88.25 5159.75 Per Metre 289.45 16923.95m) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 88.25 5863.25 Per Metre 289.45 19231.45n) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 104.40 6476.85 Per Metre 342.45 21244.10o) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 105.65 7436.75 Per Metre 346.50 24392.55

10 Providing and installing M.S. Bail plug in tubewell bore In the case of increase or decreasehole: in the length of Bail plug, the rates

will be increased or decreased asa) 2" i/d, 1.5 ft. (50 mm i/d 450 mm) long. Each 128.25 593.40 Each 128.25 593.40 per rates given in serial No. 14 ofb) 3" i/d, 1.5 ft. (75 mm i/d 450 mm) long. Each 128.25 783.35 Each 128.25 783.35 this chapter for the respectivec) 4" i/d, 2 ft. (100 mm i/d 600 mm) long. Each 214.10 1502.10 Each 214.10 1502.10 diameter.d) 5" i/d, 2 ft. (125 mm i/d 600 mm) long. Each 214.10 1886.30 Each 214.10 1886.30e) 6" i/d, 2 ft. (150 mm i/d 600 mm) long. Each 289.05 2382.25 Each 289.05 2382.25f) 7" i/d, 2 ft. (175 mm i/d 600 mm) long. Each 289.05 2759.95 Each 289.05 2759.95g) 8" i/d, 2 ft. (200 mm i/d 600 mm) long Each 356.25 3061.80 Each 356.25 3061.80h) 9" i/d, 2 ft. (225 mm i/d 600 mm) long Each 356.25 3394.40 Each 356.25 3394.40i) 10" i/d, 2 ft. (250 mm i/d 600 mm) long Each 356.25 4331.95 Each 356.25 4331.95j) 12" i/d, 2 ft. (300 mm i/d 600 mm) long Each 427.55 5208.55 Each 427.55 5208.55k) 15" i/d, 2 ft. (375 mm i/d 600 mm) long Each 427.55 6405.70 Each 427.55 6405.70l) 18" i/d, 2 ft. (450 mm i/d 600 mm) long Each 514.25 7304.20 Each 514.25 7304.20m) 20" i/d, 2 ft. (500 mm i/d 600 mm) long Each 559.30 8102.25 Each 559.30 8102.25n) 22" i/d, 2 ft. (550 mm i/d 600 mm) long Each 559.30 8910.70 Each 559.30 8910.70

11 Providing and installing, P.V.C. strainer B.S.S. Class 'B', Chap. 2in tubewell bore hole, including sockets and solvents, etc.complete:-

a) 3" i/d (75 mm) Per Rft. 20.65 121.45 Per Metre 67.70 398.30b) 4" i/d (100 mm) Per Rft. 23.55 178.35 Per Metre 77.20 584.95c) 5" i/d (125 mm) Per Rft. 24.95 240.95 Per Metre 81.85 790.35d) 6" i/d (150 mm) Per Rft. 29.25 317.25 Per Metre 96.00 1040.60e) 8" i/d (200 mm) Per Rft. 39.90 759.90 Per Metre 130.80 2492.40f) 10" i/d (250 mm) Per Rft. 40.85 1132.85 Per Metre 133.95 3715.70g) 12" i/d (300 mm) Per Rft. 40.85 1516.85 Per Metre 133.95 4975.20

12 Providing and installing P.V.C. strainer B.S.S. Class `D' ,in tubewell bore hole, including sockets and solvent, etc.complete:-

a) 1¼" i/d (30 mm) Per Rft. 14.45 54.05 Per Metre 47.35 177.2

chapter-23(Tubewell) Page 131

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

b) 1½" i/d (40 mm) Per Rft. 14.75 60.35 Per Metre 48.45 198c) 2" i/d (50 mm) Per Rft. 14.90 91.70 Per Metre 48.90 300.8d) 3" i/d (75 mm) Per Rft. 20.65 186.25 Per Metre 67.75 610.9e) 4" i/d (100 mm) Per Rft. 23.45 292.25 Per Metre 77.00 958.65f) 5" i/d (125 mm) Per Rft. 24.95 426.95 Per Metre 81.85 1400.4g) 6" i/d (150 mm) Per Rft. 45.30 615.30 Per Metre 148.65 2018.25

13 Providing and installing P.V.C. Bail/End plug, in tubewellbore hole:-

i) B.S.S. Class `B'

a) 3" i/d (75 mm) Each 10.50 63.30 Each 10.50 63.30b) 4" i/d (100 mm) Each 11.80 83.80 Each 11.80 83.80c) 5" i/d (125 mm) Each 12.85 124.45 Each 12.85 124.45d) 6" i/d (150 mm) Each 16.75 181.15 Each 16.75 181.15e) 8" i/d (200 mm) Each 19.90 353.50 Each 19.90 353.50f) 10" i/d (250 mm) Each 21.00 489.00 Each 21.00 489.00g) 12" i/d (300 mm) Each 24.45 660.45 Each 24.45 660.45h) 14" i/d (350 mm) Each 24.45 684.45 Each 24.45 684.45

ii) B.S.S. Class `D'

a) 1¼" i/d (30 mm) Each 7.15 34.75 Each 7.15 34.75b) 1½" i/d (40 mm) Each 7.55 48.35 Each 7.55 48.35c) 2" i/d (50 mm) Each 7.85 67.85 Each 7.85 67.85d) 3" i/d (75 mm) Each 10.50 90.90 Each 10.50 90.90e) 4" i/d (100 mm) Each 11.80 118.60 Each 11.80 118.60f) 5" i/d (125 mm) Each 12.85 166.45 Each 12.85 166.45g) 6" i/d (150 mm) Each 16.75 217.15 Each 16.75 217.15

14 Providing and installing M.S. blind pipe socketed/welded Chap.joint, M.S. reducer (where necessary), in tubewell bore 2hole, including jointing/welding with strainer, etc.complete:-

a) 2" i/d, 1/8" (50 mm i/d 3 mm) thick Per Rft. 77.30 258.20 Per Metre 253.55 846.95b) 3" i/d, 1/8" (75 mm i/d 3 mm) thick Per Rft. 77.30 337.10 Per Metre 253.55 1105.70c) 4" i/d, 1/8" (100 mm i/d 3 mm) thick Per Rft. 96.70 442.05 Per Metre 317.20 1449.90d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 96.70 784.90 Per Metre 317.20 2574.50e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 138.00 951.60 Per Metre 452.65 3121.25f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 138.00 1087.20 Per Metre 452.65 3566.00g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 161.05 1338.45 Per Metre 528.25 4390.15h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 161.05 1512.25 Per Metre 528.25 4960.20i) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 161.05 1933.45 Per Metre 528.25 6341.70j) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 193.30 2278.30 Per Metre 634.00 7472.80k) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 193.30 2799.55 Per Metre 634.00 9182.50l) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 236.65 3477.00 Per Metre 776.20 11404.55m) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 255.05 3855.45 Per Metre 836.55 12645.80n) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 255.05 4215.45 Per Metre 836.55 13826.75

chapter-23(Tubewell) Page 132

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

15 Providing and installing P.V.C. blind pipe, B.S.S. Class ditto`B', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 3" i/d (75 mm) Per Rft. 27.15 127.05 Per Metre 89.00 416.65b) 4" i/d (100 mm) Per Rft. 30.70 181.45 Per Metre 100.75 595.20c) 5" i/d (125 mm) Per Rft. 32.15 241.85 Per Metre 105.45 793.25d) 6" i/d (150 mm) Per Rft. 38.60 332.00 Per Metre 125.15 1087.50e) 8" i/d (200 mm) Per Rft. 51.30 503.10 Per Metre 168.30 1650.20f) 10" i/d (250 mm) Per Rft. 53.55 755.55 Per Metre 175.65 2478.20g) 12" i/d (300 mm) Per Rft. 63.95 1043.15 Per Metre 209.70 3421.45h) 14" i/d (350 mm) Per Rft. 60.85 1232.65 Per Metre 199.55 4043.05

16 Providing and installing P.V.C. blind pipe, B.S.S. Class`D', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 1¼" i/d (30 mm) Per Rft. 17.05 52.15 Per Metre 56.00 171.10b) 1½" i/d (40 mm) Per Rft. 17.40 63.30 Per Metre 57.05 207.60c) 2" i/d (50 mm) Per Rft. 18.45 88.65 Per Metre 60.55 290.80d) 3" i/d (75 mm) Per Rft. 23.35 178.15 Per Metre 76.65 584.40e) 4" i/d (100 mm) Per Rft. 30.70 288.10 Per Metre 100.75 945.05f) 5" i/d (125 mm) Per Rft. 32.15 418.25 Per Metre 105.45 1371.85g) 6" i/d (150 mm) Per Rft. 39.40 595.60 Per Metre 129.20 1953.50

17 Testing and developing of tubewell of size 6" (150 mm) Compressor, accessories along withi/d and above continuously. working staff, to be supplied by

Government.i) upto 1.5 cs. discharge Per 786.15 Per 786.15

Hour Hourii) above 1.5 cs. discharge ditto 953.10 ditto 953.10

18 Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3 Per Cft. 31.50 108.35 cu.m 1112.55 3826.90 The rate includes wastage, etc.mm), around tubewell in bore hole.

19 Laying cutting, jointing, testing and disinfecting cast iron Chap. 1) Pipes to be supplied bypipe line in trenches, with spigot and socket caulked lead 2 Government.joints, including cost of materials, such as lead, yarn, etc. 2) Providing and installing specialscomplete in all respects:- and valves is not included in the

rate, which is payable separately.

a) 3" (75 mm) i/d Per Rft. 53.05 Per Metre 173.95b) 4" (100 mm) i/d Per Rft. 65.75 Per Metre 215.60c) 5" (125 mm) i/d Per Rft. 82.60 Per Metre 270.85d) 6" (150 mm) i/d Per Rft. 97.40 Per Metre 319.45e) 8" (200 mm) i/d Per Rft. 117.10 Per Metre 384.05f) 10" (250 mm) i/d Per Rft. 177.15 Per Metre 581.10g) 12" (300 mm) i/d Per Rft. 208.00 Per Metre 682.15h) 15" (375 mm) i/d Per Rft. 268.20 Per Metre 879.65

chapter-23(Tubewell) Page 133

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

i) 18" (450 mm) i/d Per Rft. 353.15 Per Metre 1158.40

20 Laying, cutting, jointing, testing and disinfecting cast iron ditto 1) Pipes to be supplied bypipe line in trenches, with flanged and flanged joints, Government.complete in all respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 23.95 Per Metre 78.50 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 26.50 Per Metre 86.90c) 5" (125 mm) i/d Per Rft. 37.80 Per Metre 123.90d) 6" (150 mm) i/d Per Rft. 41.60 Per Metre 136.45e) 8" (200 mm) i/d Per Rft. 48.85 Per Metre 160.20f) 10" (250 mm) i/d Per Rft. 67.80 Per Metre 222.45g) 12" (300 mm) i/d Per Rft. 79.55 Per Metre 260.85h) 15" (375 mm) i/d Per Rft. 109.60 Per Metre 359.30i) 18" (450 mm) i/d Per Rft. 139.50 Per Metre 457.55

21 Laying, cutting, jointing, testing and disinfecting cast iron Chap. 2 1) Pipes to be supplied bypipe line in trenches with Tyton joints, complete in all Government.respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 11.55 Per Metre 37.90 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 13.15 Per Metre 43.20c) 5" (125 mm) i/d Per Rft. 16.95 Per Metre 55.60d) 6" (150 mm) i/d Per Rft. 19.00 Per Metre 62.35e) 8" (200 mm) i/d Per Rft. 25.90 Per Metre 84.95f) 10" (250 mm) i/d Per Rft. 32.75 Per Metre 107.35g) 12" (300 mm) i/d Per Rft. 38.90 Per Metre 127.65h) 15" (375 mm) i/d Per Rft. 55.80 Per Metre 182.95i) 18" (450 mm) i/d Per Rft. 66.80 Per Metre 219.10

22 Providing, laying, cutting, jointing, testing and disinfecting Chap. Cost of sockets, tees, elbows,G.I. pipeline in trenches, with socket joints, using G.I. 2 bends, valves, crosses, unions andpipes of B.S.S. 1387-1967 complete in all respects, with plugs, etc. is included in the rates.specials and valves.

i) Light Quality

a) ½" i/d (15 mm) 2mm thick Per Rft. 9.60 57.30 Per Metre 31.55 187.90b) ¾" i/d (20 mm) 2.35mm thick Per Rft. 10.45 78.15 Per Metre 34.30 256.35c) 1" i/d (25 mm) 2.65mm thick Per Rft. 11.80 107.65 Per Metre 38.70 353.15d) 1¼" i/d (32 mm) 2.65mm thick Per Rft. 11.90 137.70 Per Metre 39.00 451.70e) 1½" i/d (40 mm) 2.9mm thick Per Rft. 12.00 173.45 Per Metre 39.35 568.90f) 2" i/d (50 mm) 2.9mm thick Per Rft. 13.45 215.95 Per Metre 44.15 708.25g) 2"½ i/d (65 mm) 3.25mm thick Per Rft. 14.05 292.25 Per Metre 46.10 958.55h) 3" i/d (75 mm) 3.25mm thick Per Rft. 16.20 342.30 Per Metre 53.10 1122.70i) 4" i/d (100 mm) 3.65mm thick Per Rft. 17.40 477.60 Per Metre 57.15 1566.55 ii) Medium Quality i. Cost of sockets, tees, elbow,

bends, valves, crosses, unions and a) ½" i/d (15 mm) 2.65mm thick Per Rft. 9.60 67.70 Per Metre 31.55 222.00 plugs etc is included in the rates b) ¾" i/d (20 mm) 2.65mm thick Per Rft. 10.45 85.25 Per Metre 34.30 279.60 except for internal G.I piping (1"dia,

chapter-23(Tubewell) Page 134

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

c) 1" i/d (25 mm) 3.25mm thick Per Rft. 11.8 123.6 Per Metre 38.7 405.35 3/4"dia & 1/2"dia) for Bath rooms/ d) 1¼" i/d (32 mm) 3.25mm thick Per Rft. 11.90 156.80 Per Metre 39.00 514.35 Levorotary.e) 1½" i/d (40 mm) 3.25mm thick Per Rft. 12.20 180.15 Per Metre 40.00 590.85f) 2" i/d (50 mm) 3.65mm thick Per Rft. 13.45 247.15 Per Metre 44.15 810.70 ii. For internal G.I piping (1"dia, 3/4"dia & g) 2"½ i/d (65 mm) 3.65mm thick Per Rft. 14.05 314.10 Per Metre 46.10 1030.30 Bath room(s)/ Levorotary of rate h) 3" i/d (75 mm) 4.05mm thick Per Rft. 16.20 402.60 Per Metre 53.10 1320.55 (composite) shall be reduced by 8%i) 4" i/d (100 mm) 4.5mm thick Per Rft. 17.40 572.35 Per Metre 57.15 1877.30 and specials mentioned above may j) 5" i/d (150 mm) 4.85mm thick Per Rft. 20.20 768.50 Per Metre 66.20 2520.65 be paid at the rates placed onk) 6" i/d (200 mm) 4.85mm thick Per Rft. 20.50 904.40 Per Metre 67.20 2966.50 Website as per actual quantity used.

iii) Heavy Quality

a) ½" i/d (15 mm) 3.25mm thick Per Rft. 9.60 93.55 Per Metre 31.55 306.9b) ¾" i/d (20 mm) 3.25mm thick Per Rft. 10.45 121.10 Per Metre 34.30 397.15c) 1" i/d (25 mm) 4.05mm thick Per Rft. 11.80 178.00 Per Metre 38.70 583.8d) 1¼" i/d (32 mm) 4.05mm thick Per Rft. 11.90 228.45 Per Metre 39.00 749.25e) 1½" i/d (40 mm) 4.05mm thick Per Rft. 12.20 259.05 Per Metre 40.00 849.65f) 2" i/d (50 mm) 4.5mm thick Per Rft. 13.45 354.65 Per Metre 44.15 1163.3g) 2"½ i/d (65 mm) 4.5mm thick Per Rft. 14.05 443.80 Per Metre 46.10 1455.7h) 3" i/d (75 mm) 4.85mm thick Per Rft. 16.20 570.15 Per Metre 53.10 1870.05i) 4" i/d (100 mm) 5.4mm thick Per Rft. 17.40 775.25 Per Metre 57.15 2542.8j) 5" i/d (125 mm) 5.4mm thick Per Rft. 20.20 958.60 Per Metre 66.20 3144.25k) 6" i/d (150 mm) 5.4mm thick Per Rft. 20.50 1131.65 Per Metre 67.20 3711.75

23 Providing, laying, cutting, jointing, testing and disinfectingAsbestos Cement / Fibre Cement pipe line in trenches, with PS 428 & Providing and installing specialscomet joint and rubber ring, complete in all respects:- ISO 160 and valves is not included in the

rate, which is payable separately.B Class Working Pressurea) 3" i/d (75 mm) Per Rft. 12.95 219.90 Per Metre 42.55 721.30b) 4" i/d (100 mm) Per Rft. 13.70 286.80 Per Metre 45.00 940.65c) 6" i/d (150 mm) Per Rft. 18.80 453.50 Per Metre 61.60 1487.40d) 8" i/d (200 mm) Per Rft. 25.90 759.35 Per Metre 84.90 2490.70e) 10" i/d (250 mm) Per Rft. 33.70 1034.10 Per Metre 110.50 3391.80f) 12" i/d (300 mm) Per Rft. 42.90 1366.55 Per Metre 140.75 4482.30g) 14" i/d (350 mm) Per Rft. 49.55 1969.45 Per Metre 162.50 6459.80h) 16" i/d (400 mm) Per Rft. 55.90 2501.05 Per Metre 183.35 8203.50i) 18" i/d (450 mm) Per Rft. 65.90 3116.00 Per Metre 216.20 10220.40j) 20" i/d (500 mm) Per Rft. 77.45 3832.60 Per Metre 254.05 12570.95k) 24" i/d (600 mm) Per Rft. 92.30 5288.25 Per Metre 302.80 17345.45l) 28 i/d (700 mm) Per Rft. 98.25 8404.50 Per Metre 322.30 27566.75m) 32 i/d (800 mm) Per Rft. 107.65 9619.65 Per Metre 353.15 31552.50n) 40 i/d 1000 mm) Per Rft. 121.00 14822.90 Per Metre 396.90 48619.05

24 C Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 12.95 219.90 Per Metre 42.55 721.30 ISO 160b) 4" i/d (100 mm) Per Rft. 13.70 314.95 Per Metre 45.00 1033.00c) 6" i/d (150 mm) Per Rft. 18.80 542.85 Per Metre 61.60 1780.50d) 8" i/d (200 mm) Per Rft. 25.90 857.30 Per Metre 84.90 2811.85e) 10" i/d (250 mm) Per Rft. 33.70 1195.65 Per Metre 110.50 3921.75f) 12" i/d (300 mm) Per Rft. 42.90 1664.00 Per Metre 140.75 5457.90g) 14" i/d (350 mm) Per Rft. 49.55 2869.10 Per Metre 162.50 9410.60

chapter-23(Tubewell) Page 135

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

h) 16" i/d (400 mm) Per Rft. 55.90 3665.10 Per Metre 183.35 12021.50i) 18" i/d (450 mm) Per Rft. 65.90 4496.65 Per Metre 216.20 14749.05j) 20" i/d (500 mm) Per Rft. 77.45 5350.35 Per Metre 254.05 17549.20k) 24" i/d (600 mm) Per Rft. 93.55 7531.85 Per Metre 306.80 24704.40

25 D Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 12.95 219.90 Per Metre 42.55 721.30 ISO 160b) 4" i/d (100 mm) Per Rft. 13.70 357.80 Per Metre 45.00 1173.50c) 6" i/d (150 mm) Per Rft. 18.80 650.55 Per Metre 61.60 2133.80d) 8" i/d (200 mm) Per Rft. 25.90 1148.60 Per Metre 84.90 3767.35e) 10" i/d (250 mm) Per Rft. 33.70 1695.05 Per Metre 110.50 5559.75f) 12" i/d (300 mm) Per Rft. 42.90 2471.85 Per Metre 140.75 8107.60g) 14" i/d (350 mm) Per Rft. 49.55 4135.90 Per Metre 162.50 13565.85h) 16" i/d (400 mm) Per Rft. 55.90 5341.95 Per Metre 183.35 17521.65i) 18" i/d (450 mm) Per Rft. 65.90 6430.55 Per Metre 216.20 21092.30j) 20" i/d (500 mm) Per Rft. 77.45 7847.35 Per Metre 254.05 25739.25

26 Providing, laying, cutting, jointing, testing and disinfecting Chap Providing and installing specialsP.V.C. pipe line of B.S.S. with `B' Class working pressure 2 and valves is not included in thepipe, in trenches, complete in all respects:- rate, which is payable separately.

a) 3" i/d (75 mm) Per Rft. 3.85 105.75 Per Metre 12.65 346.90 b) 4" i/d (100 mm) Per Rft. 4.90 158.70 Per Metre 16.10 520.45 c) 5" i/d (125 mm) Per Rft. 6.00 219.90 Per Metre 19.70 721.30 d) 6" i/d (150 mm) Per Rft. 6.35 305.60 Per Metre 20.75 1002.35e) 8" i/d (200 mm) Per Rft. 9.00 469.80 Per Metre 29.45 1541.00f) 10" i/d (250 mm) Per Rft. 11.85 727.90 Per Metre 38.90 2387.50h) 12" i/d (300 mm) Per Rft. 14.70 1013.45 Per Metre 48.15 3324.15g) 14" i/d (350 mm) Per Rft. 18.90 1214.15 Per Metre 62.05 3982.45

27 Providing, laying, cutting, jointing, testing and disinfecting ditto Providing and installing specialspipe line in trenches with P.V.C. pipes of B.S.S. with `D' and valves is not included in theClass working pressure complete in all respects:- rate, which is payable separately.a) 2" i/d (50 mm) Per Rft. 3.15 74.75 Per Metre 10.30 245.15 b) 3" i/d (75 mm) Per Rft. 3.80 161.70 Per Metre 12.50 530.40 c) 4" i/d (100 mm) Per Rft. 4.85 267.40 Per Metre 15.95 877.10 d) 5" i/d (125 mm) Per Rft. 5.95 399.75 Per Metre 19.45 1311.20 e) 6" i/d (150 mm) Per Rft. 6.25 573.55 Per Metre 20.45 1881.30

28 Providing and fixing cast iron special of B.S.S. Class `B' 9.1 i) Labour rates include the cost of(such as bend, tee cross collar, reducer, tail piece, jointing material & labour.flanged spigot, cap, flanged socket, taper, angle branch,plug etc.) for cast iron pipe line , complete:- ii) The internal dia of the pipe, from

which the branch is taken out willa) C.I.S.S. Specials, with spigot. and be considered the internal dia for

socket joint:- the purpose of payments ofi) 3" to 6" (75 to 150 mm) i/d Per Kg. 21.35 119.90 Per Kg 21.35 119.90 specials.ii) 8" to 12" (200 to 300 mm) i/d Per Kg. 11.65 110.20 Per Kg 11.65 110.20iii) 15" to 18" (375 to 450 mm) i/d Per Kg. 8.80 107.35 Per Kg 8.80 107.35

b) C.I. flanged specials, with flanged and

chapter-23(Tubewell) Page 136

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

flanged joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 8.85 107.40 Per Kg 8.85 107.40ii) 8" to 12" (200 to 300 mm) i/d Per Kg 2.35 100.90 Per Kg 2.35 100.90iii) 15" to 18" (375 to 450 mm) i/d Per Kg 3.90 100.90 Per Kg 3.90 100.90

c) C.I. Specials, with tyton joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 11.80 110.35 Per Kg 11.80 110.35ii) 8" to 12" (200 to 300 mm) i/d Per Kg 11.80 110.35 Per Kg 11.80 110.35iii) 15" to 18" (375 to 450 mm) i/d Per Kg 11.80 110.35 Per Kg 11.80 110.35

29 Providing and fixing cast iron specials of B.S.S. Class 'B' 9.1 1) Labour rates include the cost of(such as bend, tee, cross collar, reducer, tail piece, jointing material and labour.flanged socket, flanged spigot, cap, taper, angle branch,plug, etc) for Asbestos cement pipe line, with comet joint 2) The internal dia of the pipe, fromand rubber ring, complete. which the branch is taken out, willi) 3" to 6" (75 to 150 mm) i/d Per Kg 12.15 110.70 Per Kg 12.15 110.70 be considered the internal dia forii) 8" to 18" (200 to 450 mm) i/d Per Kg 6.30 104.85 Per Kg 6.30 104.85 the purpose of payment.iii) 20" to 24" (500 to 600 mm) i/d Per Kg 5.05 103.55 Per Kg 5.05 103.55

30 Providing and fixing sluice valve of B.S.S. quality and 9.1 Labour rates include cost of jointingweight, Class `B', for cast iron pipe line, and Asbestos material and labour.cement pipe line (including cost of jointing material):-a) 3" i/d (75 mm) Each 767.45 6671.45 Each 767.45 6671.45b) 4" i/d (100 mm) Each 835.15 7855.15 Each 835.15 7855.15c) 5" i/d (125 mm) Each 1503.30 9663.30 Each 1503.30 9663.30d) 6" i/d (150 mm) Each 1602.60 13002.60 Each 1602.60 13002.60e) 8" i/d (200 mm) Each 1871.20 22751.20 Each 1871.20 22751.20f) 10" i/d (250 mm) Each 3191.85 29351.85 Each 3191.85 29351.85g) 12" i/d (300 mm) Each 3586.80 37966.80 Each 3586.80 37966.80h) 16" i/d (400 mm) Each 4757.30 58757.30 Each 4757.30 58757.30i) 18" i/d (450 mm) Each 5475.35 119475.35 Each 5475.35 119475.35

31 Providing and fixing, sluice valve of B.S.S. quality and Labour rates include cost of jointingweight, for Asbestos cement pipe line, with comet joint 9.1 material and labour.and rubber ring, complete (including cost of jointingmaterials):-a) 3" i/d (75 mm) Each 425.55 5465.55 Each 425.55 5465.55b) 4" i/d (100 mm) Each 517.30 6277.30 Each 517.30 6277.30c) 6" i/d (150 mm) Each 645.55 10605.55 Each 645.55 10605.55d) 8" i/d (200 mm) Each 1046.65 19046.65 Each 1046.65 19046.65e) 10" i/d (250 mm) Each 1338.80 24018.80 Each 1338.80 24018.80f) 12" i/d (300 mm) Each 1589.30 29789.30 Each 1589.30 29789.30g) 16" i/d (400 mm) Each 1876.10 57076.10 Each 1876.10 57076.10h) 18" i/d (450 mm) Each 2217.70 101817.70 Each 2217.70 101817.70

32 Providing and fixing, fire hydrants B.S.S. quality and Each 58.00 4738.00 Each 58.00 4738.00 9.1 1) Labour rates include cost ofweight of 2½" (65 mm) dia (including cost of jointing jointing material and labour.material).

2) Connecting pipes and specials,if used, will be paid extra.

chapter-23(Tubewell) Page 137

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

33 Providing and fixing, air valve 2½ (65mm) dia of B.S.S. dittoquality and weight (complete with jointing material).

a) single Each 123.25 3363.25 Each 123.25 3363.25

b) double Each 123.25 7623.25 Each 123.25 7623.25

34 Providing and fitting C.I. flanges on pipes, includingturning, threading, facing and fitting, etc. complete in all dittorespects:-

a) 3" to 6" (75 to 150 mm) i/d Per Kg 33.00 110.05 Per Kg 33.00 110.05

b) 8" to 12" (200 to 300 mm) i/d Per Kg 20.75 97.75 Per Kg 20.75 97.75

c) 15" to 18" (375 to 450 mm) i/d Per Kg 17.65 94.65 Per Kg 17.65 94.65

35 Cutting C.I. pipe, and welding spigot or socket, flanged ortyton end, after finishing ends of pipes:

Per Inch Per cm i/d a) 3" to 6" (75 to 150 mm) i/d i/d of pipe 55.00 of pipe 22.00b) 8" to 12" (200 to 300 mm) i/d ditto 68.65 ditto 27.45c) 15" to 18" (375 to 450 mm) i/d ditto 63.25 ditto 25.30

36 Providing, laying, cutting, jointing, testing and disinfecting Cost of sockets, tees, elbows,G.I. pipe line in trenches, with flanged joints, using G.I. bends, valves, crosses, unions andpipe of B.S.S. 1387-1967 complete in all respects, plugs, etc. is included in the rates.including specials and valves:-

i) G.I. flanged joints (Heavy Quality)

a) 1½" i/d (40 mm) Per Rft. 17.25 264.05 Per Metre 56.55 866.05b) 2" i/d (50 mm) Per Rft. 17.25 358.95 Per Metre 56.55 1177.40c) 2½" i/d (65 mm) Per Rft. 18.40 448.25 Per Metre 60.35 1470.25d) 3" i/d (75 mm) Per Rft. 18.50 573.10 Per Metre 60.65 1879.75e) 4" i/d (100 mm) Per Rft. 21.45 779.45 Per Metre 70.40 2556.65f) 6" i/d (150 mm) Per Rft. 24.40 962.75 Per Metre 80.00 3157.80g) 8" i/d (200 mm) Per Rft. 24.40 1135.00 Per Metre 80.15 3722.75

ii) C.I. flanged joints (Medium Quality)

a) 1½" i/d (40 mm) Per Rft. 19.65 205.65 Per Metre 64.45 674.45b) 2" i/d (50 mm) Per Rft. 18.45 277.00 Per Metre 60.55 908.60c) 2½" i/d (65 mm) Per Rft. 20.75 351.90 Per Metre 68.10 1154.20d) 3" i/d (75 mm) Per Rft. 20.80 448.70 Per Metre 68.25 1471.75e) 4" i/d (100 mm) Per Rft. 24.00 637.85 Per Metre 78.70 2092.20f) 6" i/d (150 mm) Per Rft. 27.15 854.20 Per Metre 89.00 2801.75g) 8" i/d (200 mm) Per Rft. 27.30 1004.05 Per Metre 89.50 3293.25

chapter-23(Tubewell) Page 138

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

37 Providing and installing P.V.C. bends, of B.S.S.

i) Class `B' working pressure:-a) 3" i/d (75 mm) Each 91.25 217.25 Each 91.25 217.25b) 4" i/d (100 mm) Each 104.05 374.05 Each 104.05 374.05c) 5" i/d (125 mm) Each 130.10 658.10 Each 130.10 658.10d) 6" i/d (150 mm) Each 134.20 903.40 Each 134.20 903.40

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 60.95 94.55 Each 60.95 94.55b) 1½" i/d (40 mm) Each 65.30 101.30 Each 65.30 101.30c) 2" i/d (50 mm) Each 70.25 142.25 Each 70.25 142.25d) 3" i/d (75 mm) Each 91.25 278.45 Each 91.25 278.45e) 4" i/d (100 mm) Each 104.05 539.65 Each 104.05 539.65f) 5" i/d (125 mm) Each 130.10 1126.10 Each 130.10 1126.10g) 6" i/d (150 mm) Each 134.20 1550.20 Each 134.20 1550.20

38 Providing and installing P.V.C. tees, of B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (80 mm) Each 136.85 616.85 Each 136.85 616.85b) 4" i/d (100 mm) Each 158.00 1094.00 Each 158.00 1094.00c) 5" i/d (125 mm) Each 192.30 2064.30 Each 192.30 2064.30d) 6" i/d (150 mm) Each 201.30 2157.30 Each 201.30 2157.30

ii) Class `D' working pressure:-

a) 1¼" i/d (30 mm) Each 93.00 225.00 Each 93.00 225.00b) 1½" i/d (40 mm) Each 98.25 257.85 Each 98.25 257.85c) 2" i/d (50 mm) Each 104.90 314.90 Each 104.90 314.90d) 3" i/d (75 mm) Each 136.85 598.85 Each 136.85 598.85e) 4" i/d (100 mm) Each 158.00 1094.00 Each 158.00 1094.00f) 5" i/d (125 mm) Each 192.30 2052.30 Each 192.30 2052.30g) 6" i/d (150 mm) Each 201.30 2121.30 Each 201.30 2121.30

39 Providing and installing P.V.C. sockets, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 63.95 147.95 Each 63.95 147.95b) 4" i/d (100 mm) Each 76.75 226.75 Each 76.75 226.75c) 5" i/d (125 mm) Each 95.95 305.95 Each 95.95 305.95d) 6" i/d (150 mm) Each 100.05 388.05 Each 100.05 388.05e) 8" i/d (200 mm) Each 144.40 792.40 Each 144.40 792.40f) 10" i/d (250 mm) Each 169.10 1909.10 Each 169.10 1909.10g) 12" i/d (300 mm) Each 195.90 4275.90 Each 195.90 4275.90h) 14" i/d (350 mm) Each 219.45 3459.45 Each 219.45 3459.45

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 38.20 61.00 Each 38.20 61.00

chapter-23(Tubewell) Page 139

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

b) 1½" i/d (40 mm) Each 42.55 73.75 Each 42.55 73.75c) 2" i/d (50 mm) Each 47.50 97.90 Each 47.50 97.90d) 3" i/d (75 mm) Each 63.95 218.75 Each 63.95 218.75e) 4" i/d (100 mm) Each 76.75 362.35 Each 76.75 362.35f) 5" i/d (125 mm) Each 95.95 623.95 Each 95.95 623.95g) 6" i/d (150 mm) Each 100.05 1024.05 Each 100.05 1024.05

40 Providing and installing P.V.C. Tapered core, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 91.25 133.25 Each 91.25 133.25b) 4" i/d (100 mm) Each 104.05 158.05 Each 104.05 158.05c) 5" i/d (125 mm) Each 130.10 198.50 Each 130.10 198.50d) 6" i/d (150 mm) Each 134.20 215.80 Each 134.20 215.80e) 8" i/d (200 mm) Each 189.95 325.55 Each 189.95 325.55f) 10" i/d (250 mm) Each 214.65 388.65 Each 214.65 388.65g) 12" i/d (300 mm) Each 250.50 464.10 Each 250.50 464.10h) 14" i/d (350 mm) Each 274.05 541.65 Each 274.05 541.65

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 60.95 81.35 Each 60.95 81.35b) 1½" i/d (40 mm) Each 65.30 92.90 Each 65.30 92.90c) 2" i/d (50 mm) Each 70.25 105.05 Each 70.25 105.05

41 Making connection for new watersupply lines with the The rate includes the component ofrunning main, including excavation of trench and refilling, bailing out water from the trenchcomplete, but excluding cost of pipe and specials, etc. and cutting of existing pipe line.

Diameter of running main:Per Per

i) upto 6" i/d (150 mm) Connection 1521.30 Connection 1521.30ii) upto 8" i/d (200 mm) ditto 1921.25 ditto 1921.25iii) upto 10" i/d (250 mm) ction 2709.30 ction 2709.30iv) upto 12" i/d (300 mm) ditto 3709.20 ditto 3709.20v) upto 16" i/d (400 mm) ditto 4547.25 ditto 4547.25vi) upto 20" i/d (500 mm) ditto 5897.10 ditto 5897.10vii) upto 24" i/d (600 mm) ditto 7085.10 ditto 7085.10

chapter-24(Electric Installation) Page 140

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Supply and erection of G.I. pipes for wiring purposes, includingpull boxes, inspection boxes, bends, tees, etc. complete withall specials.

a) on surface, including clamps, etc. 38.4

i) 15 mm i/d Per Rft. 18.35 65.15 Per Metre 60.20 213.65 ii) 20 mm i/d Per Rft. 18.35 79.35 Per Metre 60.20 260.20 iii) 25 mm i/d Per Rft. 18.35 102.05 Per Metre 60.20 334.75 iv) 32 mm i/d Per Rft. 22.95 131.55 Per Metre 75.25 431.50 v) 40 mm i/d Per Rft. 22.95 158.60 Per Metre 75.25 520.20 vi) 50 mm i/d Per Rft. 27.30 196.25 Per Metre 89.55 643.65 vii) 80 mm i/d Per Rft. 34.75 305.15 Per Metre 114.00 1,000.95

b) recessed in walls, including hooks, cutting jharries andrepairing surface: 38.3

i) 15 mm i/d Per Rft. 27.55 71.55 Per Metre 90.30 234.70 ii) 20 mm i/d Per Rft. 27.55 87.15 Per Metre 90.30 285.85 iii) 25 mm i/d Per Rft. 28.65 111.50 Per Metre 94.05 365.80 iv) 32 mm i/d Per Rft. 28.65 136.55 Per Metre 94.05 447.95 v) 40 mm i/d Per Rft. 31.30 165.50 Per Metre 102.60 542.90 vi) 50 mm i/d Per Rft. 43.00 211.15 Per Metre 141.10 692.55 vii) 80 mm i/d Per Rft. 68.80 339.30 Per Metre 225.70 1,112.95

2 Supply and erection of M.S. conduit pipes for wiring, including 38.4 & 38.6pull boxes, inspection boxes, bends, tees, etc. complete with all specials.

a) on surface, including clamps, etc.

i) 16 mm i/d Per Rft. 12.75 33.90 Per Metre 41.80 111.15 ii) 20 mm i/d Per Rft. 12.75 39.40 Per Metre 41.80 129.25 iii) 25 mm i/d Per Rft. 12.75 44.80 Per Metre 41.80 147.00 iv) 32 mm i/d Per Rft. 12.75 49.40 Per Metre 41.80 162.05 v) 40 mm i/d Per Rft. 14.35 62.35 Per Metre 47.05 204.45 vi) 50 mm i/d Per Rft. 17.65 76.15 Per Metre 57.90 249.75

b) recessed in walls, including cutting jharries, cost of 38.3 &hooks and repairing surface etc. 38.7

i) 16 mm i/d Per Rft. 24.60 46.80 Per Metre 80.60 153.50 ii) 20 mm i/d Per Rft. 24.60 51.80 Per Metre 80.60 169.85 iii) 25 mm i/d Per Rft. 27.55 59.30 Per Metre 90.30 194.50

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

24. ELECTRIC INSTALLATION

chapter-24(Electric Installation) Page 141

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

iv) 32 mm i/d Per Rft. 28.65 65.35 Per Metre 94.05 214.30 v) 40 mm i/d Per Rft. 29.90 76.90 Per Metre 98.15 252.20 vi) 50 mm i/d Per Rft. 31.30 90.40 Per Metre 102.60 296.50

3 Supply and erection of PVC pipe for wiring recessed in walls, 38.3 &including inspection boxes, pull boxes, hooks, cutting jharries, 38.5and repairing surface, etc., complete with all specials.

i) 12 mm i/d Per Rft. 22.20 32.85 Per Metre 72.80 107.70 ii) 20 mm i/d Per Rft. 22.95 36.10 Per Metre 75.25 118.45 iii) 25 mm i/d Per Rft. 25.50 42.85 Per Metre 83.60 140.50 iv) 32 mm i/d Per Rft. 27.55 51.10 Per Metre 90.30 167.60 v) 40 mm i/d Per Rft. 28.65 60.85 Per Metre 94.05 199.55 vi) 50 mm i/d Per Rft. 29.90 73.95 Per Metre 98.15 242.50

4 Supply and erection of PVC pipe for wiring on surfaceincluding clamps inspection boxes, pull boxes, bends, tees, repairing surface, etc., complete with all specials:-

i) 12 mm i/d Per Rft. 5.75 17.05 Per Metre 18.80 56.00 ii) 20 mm i/d Per Rft. 5.75 19.50 Per Metre 18.80 64.00 iii) 25 mm i/d Per Rft. 5.75 24.90 Per Metre 18.80 81.70 iv) 32 mm i/d Per Rft. 6.55 33.10 Per Metre 21.50 108.60 v) 40 mm i/d Per Rft. 6.55 43.15 Per Metre 21.50 141.55 vi) 50 mm i/d Per Rft. 7.90 60.05 Per Metre 25.95 197.05

5 Supply and erection of G.I. flexible pipe for wiring, including 38.4welding of sockets, nipples and check nuts, etc. complete:-

i) 12 mm i/d Per Rft. 15.00 60.15 Per Metre 49.25 197.25 ii) 20 mm i/d Per Rft. 16.00 76.95 Per Metre 52.50 252.45 iii) 25 mm i/d Per Rft. 16.55 102.00 Per Metre 54.35 334.60 iv) 32 mm i/d Per Rft. 20.00 124.70 Per Metre 65.65 408.95 v) 40 mm i/d Per Rft. 21.85 140.80 Per Metre 71.60 461.85 vi) 50 mm i/d Per Rft. 24.00 182.55 Per Metre 78.80 598.80 vii) 80 mm i/d Per Rft. 32.05 349.75 Per Metre 105.05 1,147.10

6 Supply and erection PVC pipe for recessed wiring (main and 38.2 &sub-main) purpose, including bends, specials, etc. in floor, 38.3wall or trenches:-

i) 50 mm i/d Per Rft. 29.90 75.65 Per Metre 98.15 248.05 ii) 80 mm i/d Per Rft. 34.40 96.85 Per Metre 112.85 317.70 iii) 100 mm i/d Per Rft. 34.40 122.55 Per Metre 112.85 401.90

7 Supply and erection of PVC pipe for surface wiring (main andsub-main) including clamps, inspection boxes, pull boxesbends etc., complete with all specials:-

chapter-24(Electric Installation) Page 142

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

i) 50 mm i/d Per Rft. 7.90 54.80 Per Metre 25.95 179.80 ii) 80 mm i/d Per Rft. 11.45 90.65 Per Metre 37.60 297.30 iii) 100 mm i/d Per Rft. 13.10 114.50 Per Metre 43.00 375.50

8 Supply and erection of wooden strip batten for wiring Per Rft. 2.30 4.60 Per Metre 7.50 15.10 38.8 Additional width required to

purposes, including clips, insulation cleats, etc. accommodate wires will be providedby erection of additional strips.

9 Supply and erection of Sahl wood casing and capping for Per Rft. 2.30 13.85 Per Metre 7.50 45.45 38.8wiring purposes, including insulation cleats, screws, etc. complete.

10 Supply and erection of single core PVC insulated copper 38.1conductor cables, in prelaid PVC pipe/M.S. conduit/G.Ipipe/wooden strip batten/wooden casing an capping/G.I.wire/trenches (rate for cables only):-

a) 250/440 volts, PVC insulated:

i) 3/0.74 mm (3/0.029") Per Rft. 4.60 11.00 Per Metre 15.05 36.10 ii) 3/0.91 mm (3/0.036") Per Rft. 4.60 11.45 Per Metre 15.05 37.50 iii) 7/0.74 mm (7/0.029") Per Rft. 4.60 15.30 Per Metre 15.05 50.15 iv) 7/0.91 mm (7/0.036") Per Rft. 5.10 22.20 Per Metre 16.70 72.85 v) 7/1.12 mm (7/0.044") Per Rft. 5.75 31.40 Per Metre 18.80 103.00 vi) 7/1.63 mm (7/0.064") Per Rft. 7.05 74.65 Per Metre 23.15 244.90 vii) 19/1.32 mm (19/0.052") Per Rft. 16.40 121.90 Per Metre 53.75 399.85 viii) 19/1.63 mm (19/0.064") Per Rft. 19.10 166.15 Per Metre 62.70 545.00

b) 250/440 volts, PVC insulated cotton braided andcompounded cables:-

i) 3/0.74 mm (3/0.029") Per Rft. 5.10 11.50 Per Metre 16.70 37.75 ii) 3/0.91 mm (3/0.036") Per Rft. 5.10 11.95 Per Metre 16.70 39.20 iii) 7/0.74 mm (7/0.029") Per Rft. 5.10 15.80 Per Metre 16.70 51.80 iv) 7/0.91 mm (7/0.036") Per Rft. 5.40 22.50 Per Metre 17.70 73.85 v) 7/1.12 mm (7/0.044") Per Rft. 6.05 31.70 Per Metre 19.80 104.00 vi) 7/1.63 mm (7/0.064") Per Rft. 6.95 74.55 Per Metre 22.80 244.55

11 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 250/440 volts grade cable(BSS-2004), in prelaid PVC pipes/M.S. conduit/G.I.pipe/wooden strip batten/wooden casing andcapping/trenches, etc. (rate for cable only):-

i) 3/0.74 mm (3/0.029") Per Rft. 4.60 10.60 Per Metre 15.05 34.70 ii) 3/0.91 mm (3/0.036") Per Rft. 4.60 13.55 Per Metre 15.05 44.50 iii) 7/0.74 mm (7/0.029") Per Rft. 4.60 17.85 Per Metre 15.05 58.55 iv) 7/0.91 mm (7/0.036") Per Rft. 5.10 25.20 Per Metre 16.70 82.70 v) 7/1.12 mm (7/0.044") Per Rft. 5.75 35.25 Per Metre 18.80 115.65

chapter-24(Electric Installation) Page 143

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

vi) 7/1.63 mm (7/0.064") Per Rft. 7.05 68.25 Per Metre 23.15 223.85

12 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 660/1100 volts grade cable, in 38.1 toprelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches, 38.7etc (rate for cable only):-

i) 7/1.63 mm (7/0.064") Per Rft. 6.95 76.85 Per Metre 22.80 252.15 ii) 19/1.32 mm (19/0.052") Per Rft. 7.65 128.40 Per Metre 25.10 421.20 iii) 19/1.63 mm (19/0.064") Per Rft. 8.35 173.20 Per Metre 27.35 568.05 iv) 19/2.11 mm (19/0.083") Per Rft. 9.20 329.10 Per Metre 30.10 1,079.50 v) 37//1.83 mm (37/0.072") Per Rft. 15.80 457.80 Per Metre 51.90 1,501.60 vi) 37/2.11 mm (37/0.083") Per Rft. 19.10 574.25 Per Metre 62.70 1,883.55 vii) 37/2.62 mm (37/0.103") Per Rft. 27.00 880.45 Per Metre 88.50 2,887.85

13 Supply and erection of copper conductor cables for service dittoconnection, in prelaid pipe/G.I. wire/trenches, etc. (rate forcable only):-

a) PVC insulated, PVC sheathed twin core, 250/440 volts.

i) 3/0.74 mm (3/0.029") Per Rft. 5.10 18.35 Per Metre 16.70 60.25 ii) 3/0.91 mm (3/0.036") Per Rft. 5.10 25.20 Per Metre 16.70 82.70 iii) 7/0.74 mm (7/0.029") Per Rft. 5.10 33.75 Per Metre 16.70 110.75 iv) 7/0.91 mm (7/0.036") Per Rft. 5.40 48.60 Per Metre 17.70 159.45 v) 7/1.12 mm (7/0.044") Per Rft. 6.05 68.50 Per Metre 19.80 224.70 vi) 7/1.63 mm (7/0.064") Per Rft. 6.95 134.95 Per Metre 22.80 442.55

b) PVC insulated, PVC sheathed 3 core,660/1100 volt cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 5.40 26.80 Per Metre 17.70 87.90 ii) 3/0.91 mm (3/0.036") Per Rft. 5.40 37.50 Per Metre 17.70 122.95 iii) 7/0.74 mm (7/0.029") Per Rft. 5.40 50.35 Per Metre 17.70 165.10 iv) 7/0.91 mm (7/0.036") Per Rft. 6.05 73.00 Per Metre 19.80 239.40 v) 7/1.12 mm (7/0.044") Per Rft. 6.35 103.40 Per Metre 20.90 339.20 vi) 7/1.63 mm (7/0.064") Per Rft. 7.30 207.70 Per Metre 23.90 681.35

c) PVC insulated, PVC sheathed 4 core,660/1100 volt non armoured cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 5.75 34.00 Per Metre 18.80 111.45 ii) 3/0.91 mm (3/0.036") Per Rft. 5.75 46.80 Per Metre 18.80 153.55 iii) 7/0.74 mm (7/0.029") Per Rft. 6.05 63.65 Per Metre 19.80 208.85 iv) 7/0.91 mm (7/0.036") Per Rft. 6.05 93.35 Per Metre 19.80 306.15 v) 7/1.12 mm (7/0.044") Per Rft. 6.35 133.50 Per Metre 20.90 437.90 vi) 7/1.63 mm (7/0.064") Per Rft. 7.30 270.00 Per Metre 23.90 885.65 vii) 19/1.32 mm (19/0.052") Per Rft. 10.20 503.05 Per Metre 33.45 1,649.95

d) PVC insulated, PVC sheathed 4 core 660/1100 volt grade cable, Cost of trenches where necessary

chapter-24(Electric Installation) Page 144

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

armoured with G.I. wire 16 SWG. is included in the rates.i) 19/1.32 mm (19/0.052") Per Rft. 10.20 560.65 Per Metre 33.45 1,839.00 ii) 19/1.63 mm (19/0.064") Per Rft. 10.90 748.70 Per Metre 35.85 2,455.70 iii) 19/1.83 mm (19/0.072") Per Rft. 11.45 1,013.25 Per Metre 37.60 3,323.45 iv) 19/2.11 mm (19/0.083") Per Rft. 12.40 1,417.20 Per Metre 40.65 4,648.35 v) 37//1.83 mm (37/0.072") Per Rft. 12.75 1,929.45 Per Metre 41.80 6,328.50 vi) 37/2.11 mm (37/0.083") Per Rft. 15.30 2,438.80 Per Metre 50.15 7,999.25 vii) 37/2.36 mm (37/0.093") Per Rft. 18.35 2,972.40 Per Metre 60.20 9,749.50 viii) 37/2.62 mm (37/0.103") Per Rft. 22.95 3,699.50 Per Metre 75.25 12,134.40

14 Supply and erection of M.S. sheet box of 16 SWG, 10 cm (4") 38.1deep, with 4.75 mm thick (3/16") bakelite sheet top, for torecessed wiring, including making holes for regulators, 38.7switches, plugs, etc.

i) 10 x 10 cm (4"x4") Each 75.25 145.50 Each 75.25 145.50 ii) 17.5 x 10 cm (7"x4") Each 94.05 192.35 Each 94.05 192.35 iii) 22.5 x 10 cm (9"x4") Each 125.40 246.00 Each 125.40 246.00 iv) 20 x 25 cm (8"x10") Each 150.50 354.90 Each 150.50 354.90 v) 25 x 30 cm (10"x12") Each 188.10 467.70 Each 188.10 467.70 vi) 30 x 35 cm (12"x14") Each 250.80 608.10 Each 250.80 608.10

15 Supply and erection of round block of Sahl wood, 10x4 cm Each 21.50 34.80 Each 21.50 34.80 38.1(4"x1½") thick.

16 Supply and erection of teak wood board, 4.5 cm (1¾") thick. 38.1

i) 17.5 x 10 cm (7"x4") Each 30.10 87.15 Each 30.10 87.15 ii) 22.5 x 10 cm (9"x4") Each 30.10 99.50 Each 30.10 99.50 iii) 20 x 25 cm (8"x10") Each 33.45 116.45 Each 33.45 116.45 iv) 25 x 30 cm (10"x12") Each 37.60 157.90 Each 37.60 157.90 v) 30 x 35 cm (12"x14") Each 43.00 213.95 Each 43.00 213.95

17 Supply and erection of Sahl wood board, 4.5 cm (1¾") thick.

i) 17.5 x 10 cm (7"x4") Each 30.10 66.75 Each 30.10 66.75 ii) 22.5 x 10 cm (9"x4") Each 30.10 85.30 Each 30.10 85.30 iii) 20 x 25 cm (8"x10") Each 33.45 100.40 Each 33.45 100.40 iv) 25 x 30 cm (10"x12") Each 37.60 120.65 Each 37.60 120.65 v) 30 x 35 cm (12"x14") Each 43.00 142.70 Each 43.00 142.70

18 Supply and erection of iron/aluminum clad, 500 volts main 38.1 When the base frame is alreadyswitches with kitkat fuses, on angle iron board with 3 mm installed, the labour and composite(1/8") thick M.S. sheet covering, including bonding to earth rates will be reduced as follows:- For with necessary flexible pipe and thimbles, etc. 15 to 35 Amps. by Rs. 21.20 and Rs.

145.50. For 60 to 65 Amps. by Rs.a) double pole: 38.80 and Rs. 252.60. For 100 Amps.

by Rs. 38.80 and Rs. 350.80.i) 15/20 Amp. Each 501.60 1,555.40 Each 501.60 1,555.40

chapter-24(Electric Installation) Page 145

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

ii) 30/35 Amp. Each 501.60 1,845.85 Each 501.60 1,845.85 iii) 60/65 Amp. Each 752.40 2,416.15 Each 752.40 2,416.15 iv) 100 Amp. Each 752.40 2,972.35 Each 752.40 2,972.35

b) triple pole:i) 15/20 Amp. Each 752.40 2,133.75 Each 752.40 2,133.75 ii) 30/35 Amp. Each 501.60 2,315.55 Each 501.60 2,315.55

c) triple pole with neutral link:

i) 30/35 Amp. Each 501.60 2,488.60 Each 501.60 2,488.60 ii) 60/65 Amp. Each 752.40 3,160.85 Each 752.40 3,160.85 iii) 100 Amp. Each 985.65 3,907.05 Each 985.65 3,907.05

19 Supply and erection of iron/aluminum clad, 500 volts main When the base frame is alreadyswitches with triple pole and neutral link and HRC fuses, on 38.1 installed, the labour & compositeangle iron board with 3 mm (1/8") thick M.S. sheet covering, rates will be reduced as follows:-including bonding to earth with necessary flexible pipe andthimbles. i) For 60/65 Amp. by Rs. 21.20 and

Rs. 145.50.60/65 Amp Each 752.40 3,205.25 Each 752.40 3,205.25 ii) For 100 to 300 Amp. by Rs. 21.20100 Amp Each 985.65 4,476.75 Each 985.65 4,476.75 and Rs. 350.80150 Amp Each 985.65 6,041.50 Each 985.65 6,041.50 iii) For 400 to 500 Amp. by Rs. 42.20200 Amp Each 2,257.20 9,871.60 Each 2,257.20 9,871.60 and Rs. 526.20300 Amp Each 2,257.20 11,280.60 Each 2,257.20 11,280.60 400 Amp Each 3,197.70 15,225.20 Each 3,197.70 15,225.20 500 Amp Each 3,385.80 19,220.85 Each 3,385.80 19,220.85

20 Supply and erection of iron/aluminum clad, branch ditto When the base frame is alreadydistribution board, 250 volt, on angle iron frame of suitable installed the labour and compositesize with 3 mm (1/8") M.S. sheet covering: rates will be reduced by Rs. 19.50 &

Rs. 152.20 respectively.i) 2 way, 15 Amp per way Each 250.80 658.40 Each 250.80 658.40 ii) 3 way, 15 Amp per way Each 250.80 658.40 Each 250.80 658.40 iii) 4 way, 15 Amp per way Each 250.80 732.55 Each 250.80 732.55 iv) 5 way, 15 Amp per way Each 250.80 794.35 Each 250.80 794.35 v) 6 way, 15 Amp per way Each 250.80 837.60 Each 250.80 837.60 vi) 7 way, 15 Amp per way Each 250.80 893.25 Each 250.80 893.25 vii) 8 way, 15 Amp per way Each 250.80 942.65 Each 250.80 942.65 viii) 9 way, 15 Amp per way Each 250.80 998.30 Each 250.80 998.30 ix) 10 way, 15 Amp per way Each 250.80 1,078.65 Each 250.80 1,078.65 x) 11 way, 15 Amp per way Each 250.80 1,140.45 Each 250.80 1,140.45 xi) 12 way, 15 Amp per way Each 250.80 1,196.05 Each 250.80 1,196.05 xii) 2 way, 30 Amp per way Each 376.20 783.80 Each 376.20 783.80 xiii) 3 way, 30 Amp per way Each 376.20 789.95 Each 376.20 789.95 xiv) 4 way, 30 Amp per way Each 376.20 851.75 Each 376.20 851.75 xv) 5 way, 30 Amp per way Each 376.20 919.75 Each 376.20 919.75 xvi) 6 way, 30 Amp per way Each 376.20 963.00 Each 376.20 963.00 xvii) 7 way, 30 Amp per way Each 376.20 1,031.00 Each 376.20 1,031.00

chapter-24(Electric Installation) Page 146

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

xviii 8 way, 30 Amp per way Each 376.20 1,086.60 Each 376.20 1,086.60 xix) 9 way, 30 Amp per way Each 376.20 1,136.05 Each 376.20 1,136.05 xx) 10 way, 30 Amp per way Each 376.20 1,222.55 Each 376.20 1,222.55

21 Supply and erection of bus bars, for 500 volts 3 phase A.C. When the base frame is alreadysupply with four copper bars, including glazed porcelain 38.1 installed the labour and compositebridges, on angle iron board, fixed with rag bolts and M.S. rates will be reduced by Rs. 21.20 andsheet box 1.5 mm thick, etc. complete:- Rs. 145.50 respectively.

i) 60 Amp. with 4 copper bars Each 897.60 3,004.80 Each 897.60 3,004.80 size 1½"x1/8" (40 x 3 mm)

ii) 100 Amp. with 4 copper bars Each 897.60 3,004.80 Each 897.60 3,004.80 size 1½"x1/8" (40 x 3 mm)

iii) 200 Amp with 4 copper bars Each 1,419.00 3,625.10 Each 1,419.00 3,625.10 size 2"x1/8" (50x 3 mm)

iv) 300 Amp with 4 copper bars Each 1,692.90 3,899.00 Each 1,692.90 3,899.00 size 2"x3/16" (50x 5 mm)

v) 500 Amp with 4 copper Each 1,085.70 3,899.45 Each 1,085.70 3,899.45 size 2"x1/4" (50x 6 mm)

22 i) Supply and erection of plain pendent lamp holder, Each 15.70 107.80 Each 15.70 107.80 38.1complete with bakelite lamp holder and flexible twin wire23/0.0076" upto 2 metre length (without bulb and shade).

ii) Extra for additional length of flexible wire, beyond Per Rft. -- 1.65 Per Metre -- 5.45 2 metres.

23 Supply and erection of counter weight pedent with porcelain Each 31.35 240.60 Each 31.35 240.60 38.1

counter weight, and fitting on bakelite lamp holder, withflexible twin wire 23/0.0076" complete (without bulb andshade).

24 Supply and erection of stiff pedent with brass/metal pipe 6.3 Each 47.30 390.25 Each 47.30 390.25 dittocm (2.5") long, and 15 mm (½") dia brass oxidised or painted,along with brass lamp holder with VIR/PVC cable 3/0.74 mm(3/0.029").

25 Supply and erection of 22.5 cm (9") long swan neck plain Each 48.95 112.60 Each 48.95 112.60 dittobrass/steel brass oxidised bracket lamp holder, complete.

26 Supply and erection of wall type/pole type bracket, with double Each 67.55 428.30 Each 67.55 428.30 dittocover water tight reflector, flexible wire and brass bolder.

27 Supply and erection of bakelite button holder shade, large Each 10.85 50.25 Each 10.85 50.25 dittosize.

28 Supply and erection of call bell 220/250 volts, fixed on teak Each 47.30 232.65 Each 47.30 232.65 38.1wood board 17.5x10 cm (7"x4").

chapter-24(Electric Installation) Page 147

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

29 Supply and erection of bell push or bed switch, with 5 metres Each 9.40 211.90 Each 9.40 211.90 38.1twin flexible wire 23/0.0076".

30 Supply and erection of ceiling rose, bakelite. Each 15.70 35.70 Each 15.70 35.70 ditto

31 Supply and erection of switches 5 Amp.

i) open type Each 15.05 32.60 Each 15.05 32.60 dittoii) piano type Each 15.05 32.60 Each 15.05 32.60 iii) ring type, recessed Each 15.05 27.40 Each 15.05 27.40 iv) plate type, recessed Each 15.05 49.90 Each 15.05 49.90 v) double control, open type Each 20.90 50.10 Each 20.90 50.10 vi) double control, ring type recessed Each 20.90 43.90 Each 20.90 43.90 vii) double control, piano type Each 20.90 45.15 Each 20.90 45.15

32 Supply and erection of switches 10/15 Amp. ditto

i) open type Each 15.05 41.75 Each 15.05 41.75 ii) recessed type Each 15.05 51.65 Each 15.05 51.65

33 Supply and erection of wall socket with 3 pin 5 Amp, shoe. Each 15.05 78.85 Each 15.05 78.85 ditto

34 Supply and erection of 3 pin. 5 Amp wall socket. Each 15.05 54.15 Each 15.05 54.15 ditto

35 Supply and erection of 3 pin, 10/15 Amp. wall socket. ditto

i) open type Each 15.05 47.95 Each 15.05 47.95 ii) recessed type Each 15.05 85.05 Each 15.05 85.05

36 Supply and erection of 3 pin switch and plug combined, dittorecessed type.

i) 5 Amp Each 15.05 68.50 Each 15.05 68.50 ii) 10/15 Amp Each 15.05 94.20 Each 15.05 94.20

37 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe, Each 15.05 146.85 Each 15.05 146.85 dittoopen type.

38 Supply and erection of cut out, bakelite. ditto

i) open type Each 8.35 35.10 Each 8.35 35.10 ii) recessed type Each 8.35 41.25 Each 8.35 41.25

39 Supply and erection of button holder. 38.1

i) bakelite large size Each 9.40 28.70 Each 9.40 28.70 ii) brass Each 9.40 41.05 Each 9.40 41.05

40 Supply and erection of brass bracket with holder. Each 12.55 44.20 Each 12.55 44.20 ditto

chapter-24(Electric Installation) Page 148

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

41 Supply and erection of bell push open/recessed type Each 8.35 28.90 Each 8.35 28.90 ditto(without flexible wire).

42 Supply and erection of kitkat, 500 volt: ditto

i) 15/20 Amp Each 15.30 47.75 Each 15.30 47.75 ii) 30/35 Amp Each 16.70 49.15 Each 16.70 49.15 iii) 60/65 Amp Each 25.55 71.90 Each 25.55 71.90 iv) 100 Amp Each 28.70 118.35 Each 28.70 118.35 v) 200 Amp Each 32.80 159.50 Each 32.80 159.50 vi) 300 Amp Each 32.80 320.20 Each 32.80 320.20 vii) 400 Amp Each 43.45 398.80 Each 43.45 398.80 viii) 500 Amp Each 43.45 574.90 Each 43.45 574.90

43 Supply and erection of tube light, including rod, choke, starter 38.1with frame, flexible wire, including connection from ceilingrose, etc., complete.

i) double rod (80 watts) with two chokes and 2 starters. Per set 271.45 1,229.60 Per set 271.45 1,229.60

ii) single rod (40 watts) with one choke and one starter. ditto 217.15 656.20 ditto 217.15 656.20

iii) round tube, 32 watt, with one choke and one starter, Each 217.15 714.30 Each 217.15 714.30 without cover.

iv) round tube, 32 watt with one chock and one starter, with ditto 180.95 801.70 ditto 180.95 801.70 cover.

44 Providing and fixing M.S. iron box for housing main switches, dittomade of 1.5 mm (1/16") thick M.S. sheet, with lockingarrangement, including painting:-i) 60x35x15 cm (24"x14"x6") Each 566.35 2,030.45 Each 566.35 2,030.45 ii) 95x40x20 cm (38"x16"x8") Each 817.85 2,526.15 Each 817.85 2,526.15 iii) 105x52.5x22.5 cm (42"x21"x9") Each 1,243.70 3,504.10 Each 1,243.70 3,504.10 iv) 135x70x27.5 cm (54"x28"x11") Each 1,367.85 4,863.05 Each 1,367.85 4,863.05

45 Supply and erection of girder clamp hook, 16 mm (5/8") with Each 36.20 151.15 Each 36.20 151.15 38.1M.S. plate 25x6 mm (1"x¼"), with bolts and nuts for hanging &ceiling fans. 38.10

46 Supply and erection of girder strut, of M.S. tee section Each 47.30 899.20 Each 47.30 899.20 ditto40x40x6 mm (1½"1½"x ¼"), complete with clamp, bolts andnuts, etc., including fixing with cement concrete 1:3:6.

47 Supply and erection of roof suspension hook, 16 mm (5/8") Each 50.70 1,231.40 Each 50.70 1,231.40 38.1dia rod with 75x40x3 mm (3"x1½"x1/8") M.S. steel channel, with clamp, bolts and nuts, etc., including fixing with cementconcrete 1:3:6.

chapter-24(Electric Installation) Page 149

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

48 Supply and erection of roof suspension hook of M.S plate Each 67.55 513.70 Each 67.55 513.70 75x40x12.7mm (3"x1½"x½") with 16 mm (5/8") hook completewith bolts, nuts and fixing with cement concrete 1:3:6

49 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook, Each 19.30 36.60 Each 19.30 36.60 dittoplaced at the time of casting of slab.

50 Erection of circular L.T. pole in cement concrete 1:3:6 one Each 613.15 2,586.55 Each 613.15 2,586.55 38.12metre below ground level (excluding the cost of pole),including cement concrete collar (1:2:4) excavation offoundation, and finishing surface.

51 Supply and erection of bracket of M.S. channel 75x40x6 mm (3"x1½"x¼") section:-i) 0.60 metre (2') long for 2 lines. Each 134.35 581.00 Each 134.35 581.00 ii) 1.200 metre (4') long for 4 lines. Each 156.75 1,272.45 Each 156.75 1,272.45

52 Supply and erection of anchor rod Henley type for pole, Per Rft. 9.10 22.90 Per Metre 29.80 75.20 38.14including necessary clamps and 7/12" stay wire, strainingscrews, etc., erected in cement concrete 1:3:6 and collar ofcement concrete.

53 Supply and erection of stay for house service pipe, erected Per Rft. 13.10 35.75 Per Metre 43.00 117.20 dittowith straining screws and 7/14" stay wire, complete.

54 Supply and erection of house service pipe Henley (G.I. pipe Per Rft. 57.35 260.40 Per Metre 188.10 854.20 water quality) or pole type, 50 mm (2") dia, erected to instalinsulated overhead line,include shackle insulator for holdinginsulated wire and straining devices for bearer wire and otheraccessories etc., complete.

55 Supply and erection of house service pipe 50 mm (2") dia G.I. Per Rft. 53.00 254.00 Per Metre 173.80 833.10 pipe Henley or pole type for bare copper wire overhead line,including shackle insulator, straining devices and otheraccessories etc.

56 Supply and erection of lightning arrestor horn type, complete. Each 283.80 2,508.60 Each 283.80 2,508.60

57 Supply and erection of shackle insulator, medium size. Each 35.45 202.35 Each 35.45 202.35 38.12

58 Supply and erection of pin insulator, green medium size. Each 35.45 84.90 Each 35.45 84.90 ditto

59 Supply and erection of bare copper conductor wire No. 2 to Per Kg 18.45 1,072.75 Per Kg 18.45 1,072.75 38.1No. 10 SWG, including binding wire No. 16 SWG.

60 Supply and erection of G.I. wire of all sizes, including binding Per Kg 18.45 133.40 Per Kg 18.45 133.40 dittowire No. 16 SWG for support of rubber wire or earthing wire,pole to pole etc.

chapter-24(Electric Installation) Page 150

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

61 Wiring overhead line in 2 single core, PVC/weather proof 38.12cable, on G.I. wire No. 8 SWG bearer wire and in house service pipe, including connection through joint box.

i) 3/0.74 mm (3/0.029") Per Rft. 4.80 12.80 Per Metre 15.75 42.00 ii) 7/0.74 mm (7/0.029") ditto 4.80 21.15 ditto 15.75 69.45 iii) 7/0.91 mm (7/0.036") ditto 4.80 27.80 ditto 15.75 91.25 iv) 7/1.12 mm (7/0.044") ditto 4.80 36.95 ditto 15.75 121.25

62 Supply and erection of all aluminum stranded hard drawn bare Per Rft. 8.80 22.10 Per Metre 28.95 72.55 38.1conductor, of size 7/3.099 mm (7/0.122").

63 Supply and erection of street light pole bracket 30 mm (1¼") Each 236.50 995.30 Each 236.50 995.30 G.I. pipe 2 metre long, complete with 2 No. pole clamp.

64 Supply and erection of pole mounted street light, holders, shade and glass, etc., for fitting 125/250 watts mercury vapourlamp (excluding cost of lamps):

i) G.E.C. design Each 473.00 2,895.55 Each 473.00 2,895.55 ii) Philips design ditto 473.00 3,278.70 ditto 473.00 3,278.70

65 Supply and fitting of mercury vapour lamp, complete with

choke set.i) 125 watt lamp Each 180.95 1,107.95 Each 180.95 1,107.95 ii) 250 watt lamp ditto 217.15 2,009.35 ditto 217.15 2,009.35

66 Manufacture and erection of angle iron lattice steel structure Each 7,947.30 22,760.25 Each 7,947.30 22,760.25 38.13 The composite rate will be reducedpole (36.0') 10,923 mm long 9348 mm (30.5') above ground or increased by Rs. 36.50 for eachlevel) 355 mm (14") square at base and 204 mm (8") square at (100 mm) of reduction or addition intop for electric distribution line, using 1¼"x1¼"x3/16" (30x30x5 the height of the pole above groundmm) angle iron legs and ¾"x¾"1/8" (20x20x3 mm) angle iron level.bracing 420 mm (17") long fixed between legs on all the foursides in diagonal position, and 1¾"x1¾"x3/16"(45x45x5 mm)angle iron on top and 4 bands of M.S. flat iron 2"x¼" (50x6 mm)305 mm (12") centre to centre, as per standard drawingincluding silver painting of pole 3 coats, excavation and refillingof foundation cement concrete 1:2:4. 6'-0"x1'-8"x1'-8"(1807x500x500 mm) for foundation, etc, complete in allrespects.

67 Manufacture and erection of galvanized angle iron lattice steel Each 7,699.45 33,822.65 Each 7,699.45 33,822.65 38.13 The composite rate will be reducedstructure pole 37 ft. (11.25 m) long 30 ft. (9 m) above ground or increased by Rs. 237.00 for eachlevel), 34" square (850 mm) at base, 13.75" (35 mm) square at foot (300 mm) of reduction ortop, for electric distribution line, using 2"x2"x5/32" addition in the height of the pole(50x50x4mm) high tensile steel angle iron legs, and 1-3/8"x above ground level.1-3/8"x1/8" (35x35x3 mm) M.S. angle iron bracings fixedbetween legs on all the four sides in diagonal position as perstandard drawing including silver painting of pole, excavationand refilling of foundation, one ft. (300 mm) thick cementconcrete 1:3:6 foundation of outer size 8'x3½'x3½'

chapter-24(Electric Installation) Page 151

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

(2400x1050x1050 mm), etc. complete in all respects.

68 Earthing of iron clad/aluminum switches, etc. with G.I. wire No. Job 1,042.80 4,154.05 Job 1,042.80 4,154.05 8 SWG in G.I. pipe 15 mm (½") dia, recessed or on surface ofwall and floor, complete with 1.5 metre long G.I. pipe, 50 mm(2") dia with reducing socket 4 to 5 metre below ground level,and 2 metre away from building plinth.

69 Earthing of Metallic cases, etc. with G.I. wire No. 8 SWG, in 38.1115 mm (½") dia G.I. pipe, best quality:-i) on surface, including clamps, etc. Per Rft. 10.80 56.30 Per Metre 35.50 184.70 ii) recessed in wall, including hooks, ditto 25.45 72.05 ditto 83.40 236.30

jharries and making good surface.

70 Bonding to earth with wire on surface, including cost of wire, dittoclamps, thimbles, etc.

a) G.I. wire:i) 8 SWG Per Rft. 4.60 11.25 Per Metre 15.05 36.85 ii) 16 SWG ditto 4.60 6.35 ditto 15.05 20.85

b) Copper wire:

i) 16 SWG Per Rft. 4.60 11.90 Per Metre 15.05 39.05 ii) 20 SWG ditto 4.60 7.40 ditto 15.05 24.35

71 Erection only, of lightning conductor of copper tape, including Per Rft. 17.30 21.95 Per Metre 56.75 72.00 38.11 Rate includes all materials requiredsupply of copper staple and copper nails and cement, sand in erection (excluding copper tapemortar. lightning conductor).

72 Supply and erection of 600x600x3 mm (2'x2'x1/8") copper Each 695.20 4,558.40 Each 695.20 4,558.40 dittoplate, including revitting to copper tape and placing in mixtureof salt and charcoal, etc.

73 Supply and erection of copper tape, including copper staple copper nails, cement, sand, etc.

i) tape 40x3 mm (1½"x1/8") Per Rft. 25.45 266.90 Per Metre 83.40 875.50 ii) tape 50x3 mm (2"x1/8") ditto 25.45 317.25 ditto 83.40 1,040.60

74 Supply and erection of 25 mm (1") dia and one metre long Job 473.00 2,809.05 Job 473.00 2,809.05 lightning conductor copper rod with 5 spikes on ball and base,etc. complete.

75 Supply and erection of electric energy meter, including meter 38.1testing fee, etc.

a) single phase:

i) 1x10 Amp, 250 volts Each 188.10 2,324.10 Each 188.10 2,324.10

chapter-24(Electric Installation) Page 152

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

ii) 1x30 Amp, 250 volts ditto 188.10 2,324.10 ditto 188.10 2,324.10

b) three phase, 4 wires:

i) 3x15 Amp, 400 volts Each 376.20 6,131.40 Each 376.20 6,131.40 ii) 3x50 Amp, 400 volts ditto 542.85 6,298.05 ditto 542.85 6,298.05 iii) 3x80 Amp, 400 volts ditto 542.85 6,298.05 ditto 542.85 6,298.05

76 Rewinding of A.C. ceiling fan, capacitor type, including cost of The credit of out turn of dismantledwire, leatheride paper cotton tape, soldering, etc. material has been accounted for in

the rate.i) 1200 mm (48") sweep, 275-300 RPM. Each 365.50 983.10 Each 365.50 983.10 ii) 1400 mm (56") sweep, 250-275 RPM. ditto 407.15 1,130.40 ditto 407.15 1,130.40

77 Rewinding of A.C. exhaust fan, including cost of wire, The credit of out turn of dismantledleatheride paper, cotton tape, soldering, etc. material has been accounted for in

the rate.i) 375 mm (15") sweep, and 1300-1500 RPM Each 250.80 679.30 Each 250.80 679.30 ii) 450 mm (18") sweep, and 1300-1500 RPM ditto 250.80 760.25 ditto 250.80 760.25

78 Rewinding of pedestal fan 600 mm (24") sweep, and 900-950 Each 300.95 882.70 Each 300.95 882.70 The credit of out turn of dismantledRPM, including wire, leatheride paper, cotton, tape, etc. material has been accounted for in

the rate.79 Supply and fitting of regulator knob with shaft Each 47.05 108.85 Each 47.05 108.85 38.1

and plate of electric fan regulator.

80 Supply and fitting of capacitor 2.2 uF, for ceiling fans. Each 37.60 62.35 Each 37.60 62.35 ditto

81 Supply and fitting of ball bearing of size Each 47.05 170.65 Each 47.05 170.65 ditto6201, 6202 or 6203 for ceiling fans.

82 Rewinding regulator of ceiling fan 48"/56" (1200/1400 mm) Each 94.05 207.35 Each 94.05 207.35 The credit out turn of dismantledsweep, to control 3/4 speeds. material has been accounted for in

the rate.83 Erection of ceiling fan alongwith regulator (all sizes), including Each 182.50 220.65 Each 182.50 220.65

carriage from local Railway Station/Store to site of work,electric wire/cable for suspension rod and board connection,and cutting, threading on the rod, where necessary.

chapter-25(Iron work) Page 153

The Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Railway Track, etc.

1 Laying, linking and packing tramway line. 100Lft. 1766.55 Metre 57.95

2 Dismantling tramway track. 100Lft. 584.50 Metre 19.15

3 Laying, linking of B.G. track, including packing, 100Lft. 4596.90 Metre 150.80straightening and leveling.

4 Linking points and crossings, complete with fastenings. Each 4424.65 Each 4424.65

5 Bending or strainghtening B.G. rail with Jim Each 483.80 Each 483.80Crow. Point Point

6 Fixing street lamp posts. Each 566.60 Each 566.60

7 Binding ends of sleepers and timber of all sizes and kinds, 100 Nos 5343.70 100 Nos 5343.70including spreading and restacking.

8 Opening stacks of sleepers and timber of all kinds and 100 Nos 673.10 100 Nos 673.10sizes, including spreading for inspection and restackingwithin one chain lead.

IRON WORK

9 Small iron work, such as gusset plates, knees, bends, Per Cwt 2795.10 7674.40 100 Kg 5502.15 15107.05stirrups, straps, rings, etc. including cutting, drilling,riveting, handling, assembling and fixing; but excludingerection in position.

10 Fabrication of heavy steel work, with angle, tees, flat iron Per Cwt 999.90 5637.30 100 Kg 1968.30 11097.00round iron and sheet iron for making trusses, girders,tanks, etc., including cutting, drilling, revitting, handling,assembling and fixing, but excluding erection in position.

11 Erection and fitting in position iron trusses, staging of Per Cwt 315.35 100 Kg 620.75water tanks, etc.

12 Fixing corrugated iron sheet, including revitting, etc. 100 Sft. 1135.20 sq.m 122.15

13 Erecting corrugated iron sheet tanks, upto 20' Per Cwt 550.00 100 Kg 1082.70(6 m) height.

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

25. IRON WORK

chapter-25(Iron work) Page 154

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

14 Erecting rolled steel beams or old rails, in roofs, etc., Per Cwt 334.75 100 Kg 658.90erection and fixing in position.

15 Erecting rolled steel beams or rails, erection for posts etc. Per Cwt 162.55 100 Kg 319.95(other than in roofs).

16 Making bolts and nuts of iron rods. Per Cwt 2148.30 7649.25 100 Kg 4228.95 15057.60

17 Cutting rails, rolled steel joists and beams, with hacksaw:-

a) upto 6" size (150 mm) Per Cut 212.85 Per Cut 212.85b) above 6" size (150 mm) Per Cut 313.90 Per Cut 313.90

18 Cutting rails or rolled steel beams of size below 6" Per 101.35 Per Cwt 101.35(150 mm), with jim. Cut Cut

19 Bending rolled steel beams or rails. Per 108.40 360.30 Per 108.40 360.30Bend Bend

20 Drilling holes, in plates upto ½" (13 mm) thick, per inch Per 42.75 Per 42.75dia, (25mm) or part thereof. Hole Hole

21 Extra for drilling holes in plates over ½" (13 mm) thick, per Per 23.80 Per 23.80inch dia, (25 mm) or part thereof. Hole Hole

22 Rivetting 1/8" dia (3 mm). 100 Nos 569.80 100 Nos 569.80

23 Cutting out Rivets, all sizes. 100 Nos 1806.75 100 Nos 1806.75

24 Fitting and erection of gutters of sheet iron. Per Lft. 71.05 Metre 233.05

25 Cutting and fixing iron bars, for barred windows. Per bar 40.55 Per bar 40.55

26 Cutting G.I. sheets. Each 22.25 Each 22.25Cut Cut

27 Notching web or foot of rail posts, for housing rail beams. Per 481.80 649.80 Per 481.80 649.80Notch Notch

28 Hoop iron netted trellis work fixed with nails. Per Sft. 28.40 sq.m 305.35

29 Fixing zinc iron or G.I. sheet on table tops. Per Sft. 16.70 sq.m 179.65

30 Making and fixing steel grated doors, complete with Per Sft. 176.15 680.35 sq.m 1895.60 7320.35locking arrangement, angle iron frame 2"x2"x3/8"(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre.

31 Making and fixing steel grated door with 1/16" thick Per Sft. 182.90 779.95 sq.m 1967.90 8392.30(1.5mm) sheeting, including angle iron frame 2"x2"x3/8"(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)

chapter-25(Iron work) Page 155

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

centre to centre, with locking arrangement.

32 Making and fixing grating in opening, including fixing at Per Sft. 70.45 327.60 sq.m 758.20 3525.00site with flat iron 2"x3/8" (50x10 mm) and ¾" (19 mm)square bars, at 4" (100 mm) centre to centre.

33 Providing and fixing stair railing (all types and designs) of Per Rft. 340.50 788.70 Metre 1117.10 2587.65 The composite rate shall behard wood, including bends and corners, screwed to reduced or increased by Rs. 31.905/8"x5/8" (16x16 mm) M.S. square bars 2.75 ft. (838 mm) for each foot of reduction orhigh, at 5.5 inch (137 mm) inch centre to centre, fixed in addition in the height of the squaresteps of stairs, M.S. flat 1"x1/8" (25x3 mm) welded to bars.bars, painting/polishing 3 coats, etc. complete.

34 Providing/fixing stair railing consisting of M.S. Box section Per Rft. 175.20 512.35 Metre 574.85 1680.95size 1-1/2"x3" of 16 SWG welded with M.S. flat 1"x1/8"continuously and welded over M.S. square bars 5/8"x5/8"punched in M.S. flat 2 ¾' high @ 5½" c/c fixed in steps ofstair I/C painting 3 coats complete.

35 Providing and fixing terrace railing of 2" (50 mm) i/d Per Rft. 126.60 546.20 Metre 415.35 1791.99 -do-conduit pipe 16 SWG, welded with 5/8"x5/8" (16x16 mm)square bar 2.75 ft. (838 mm) high fixed at 5" (125 mm)centre to centre, in reinforced cement concrete slab withsuitable arrangement, complete in all respects, as perdesign and drawing.

36 Providing and fixing collapsible gate made of 2"x2"x"¼" Per Sft. 255.55 654.25 sq.m 2749.85 7039.90(50x50x6 mm) tee iron at top and bottom, channel ironverticals ¾"x¼"x¼"x1/8" (20x6x6x3 mm) at 3" (75 mm) to5" (125 mm) centre to centre (approximate) and flat ironcrosses 3"x3/16" (75x5 mm), and best quality rollers atbottom of 3" (75 mm) diameter including holdfasts,handles 12" (300 mm) long of ¾"x¼"x¼"x1/8" (20x6x6x3mm) channel iron, locking arrangement inside andoutside, painting 3 coats of black Japan enameled,complete in working order.

37 Providing and fixing 24 SWG G.I. sheet rolling shutter, Per Sft. 56.30 215.70 sq.m 605.60 2320.75consisting of steel frame of M.S. channel 2"x1¼"x1/8"(50x30x3 mm), angle iron 1½"x1½"x1/8" (40x40x3 mm),M.S. plate 1'x1'x1/8" (300x300x3 mm), G.I. pipe 1½" (37mm) dia, springs 2' (600 mm) centre to centre, rollers, 24SWG G.I. covering 1 ft. x 1 ft. (300x300 mm), handles,holdfast, and painting three coats, complete in allrespects.

38 Providing and fixing M.S. angle iron 1½"x1½"x¼" Per Rft. 26.55 133.55 Metre 87.10 438.15(40x40x6 mm) edge protector nozing of steps of stairs,having holdfast or 3/8" (10 mm) dia M.S. bars 8" (200 mm)long welded at 2' (600 mm) centre to centre andembedded in cement concrete on steps, complete in allrespects.

chapter-25(Iron work) Page 156

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

39 Providing and fixing stair railing of 2½" (63 mm) i/d G.I. Per Rft. 150.00 648.80 Metre 492.20 2128.65 The composite rate shall bepipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars reduced or increased by Rs. 31.902'-9" (838 mm) high, fixed in each step, complete in all for each foot of reduction orrespects, including painting, polishing three coats. addition in the height of the square

bars.40 Providing and fixing G.I. wire gauze 24 SWG, 12x12 Per Sft. 25.10 63.60 sq.m 269.85 684.55

meshes per square inch, fixed to steel windows or doors,etc., complete in all respects.

41 Providing and fixing steel windows with openable glazedpanels, using beam section for frame 1½"x1"x5/8"x1/8" For fixed pannels, the composite(40x25x16x3 mm), Z-section for leaves ¾"x1"x¾"x1/8" rate will be reduced by Rs.30.00(20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3 per Sft. or Rs. 305.00 per Sq. mm), glass panes, wooden screed for glazing embedded metre.over a thin layer of putty duly screwed with leaves, brassfittings, holdfast, duly painted, complete in all respects,including all cost of material and labour, etc. as perapproved design and as directed by theEngineer-in-charge:-

a) without wire gauze:

i) glass pane 2 mm thick Per Sft. 64.80 304.90 sq.m 697.40 3280.95ii) glass pane 2.5 mm thick ditto 64.80 307.40 ditto 697.40 3307.55iii) glass pane 3 mm thick ditto 64.80 311.10 ditto 697.40 3347.45iv) glass pane 4 mm thick ditto 64.80 317.30 ditto 697.40 3413.95v) glass pane 5 mm thick ditto 64.80 329.65 ditto 697.40 3546.95

b) fixed with wire gauze, 22 SWG

i) glass pane 2 mm thick Per Sft. 91.05 369.40 sq.m 979.85 3974.55ii) glass pane 2.5 mm thick ditto 91.05 371.85 ditto 979.85 4001.15iii) glass pane 3 mm thick ditto 91.05 375.55 ditto 979.85 4041.05iv) glass pane 4 mm thick ditto 91.05 381.75 ditto 979.85 4107.55v) glass pane 5 mm thick ditto 91.05 394.10 ditto 979.85 4240.50

42 Providing and fixing steel windows using M.S. sheet (16SWG) moulded tubular pipe 1½"x1½" (40x40mm) forframe and 1¼"x1¼" (30x30mm) for leaves including M.S.square bars ¼"x¼" (6x6 mm) welded around each panelof frame, 5 mm thick glass panes fixed with double M.S.square tubular pipe 3/8"x3/8" (10x10mm) (22 SWG)beading with U' shaped rubber lining, brass fitting,holdfast, including painting three coats complete in allrespects.a) For openable panels fixed with wire Per Sft. 59.45 317.65 Sq.m 639.45 3418.05

gauze 24 SWG, 12x12 mesh and glasspanes ¼" (6 mm) thick.

b) For fixed panels without wire gauze. ditto 57.55 197.80 ditto 619.20 2128.50

chapter-25(Iron work) Page 157

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

43 Providing and fixing windows consisting of M.S. box Per Sft. 67.20 395.70 Sq.m 723.05 4257.60section frame 2"x1½" (50x40mm), leaves frame 1-½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews I/C all C.P. fitting and painting 3 coats complete inall respect.

44 Providing and fixing windows consisting of M.S. box Per Sft. 84.35 461.60 Per Sft. 907.75 4966.85section frame 2"x1½", (50x40mm) leaves frame 1½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews including grill of M.S. flat ½"x1/8" (13x3mm) or¼"x¼" (6x6mm) square bar with independent frame of½"x½" (13x13mm) box section of 16 SWG i/c all C.P.fitting and painting 3 coats complete in all respect.

45 Flapping G.I. pipes for bath room drains. Each 564.30 603.85 Each 564.30 603.85

46 Supply and fixing iron grating for fire place. Per Sft. 108.55 213.65 sq.m 1168.20 2298.65

47 Fixing copper flashing, including cutting of sheets, Per Lft. 47.30 Metre 155.15grooving and rivetting.

48 Providing and fixing angle iron railing, using 2½"x2½"x3/8" Per Rft. 79.55 726.40 Metre 261.00 2383.30(63x63x10 mm) angle iron post 4½" (113 mm) long, 5' to6' (1500 to 1800 mm) apart, with 2½"x2½"x3/8" (63x63x10mm) angle iron top rail, and two rows of M.S. flat 2½"x¼"(63x6 mm) including fixing to side of Bridge/structure withU.bolt 1½' (450 mm) long ¾" (20 mm) dia, painting posts,etc. complete in all respects.

49 Providing and fixing barbed wire fencing on compound 100Rft. 1743.70 9658.10 Metre 57.20 316.85wall, consisting of 1½"x1½"x3/16" (40x40x5 mm), angleiron post 3¼ ft. (990 mm) long, 5 to 6 ft. (1500 to 1800mm) centre to centre, embedded in cement concrete1:4:8, base of size 9"x9"x12" (225x225x300 mm), andthree rows of barbed wire, painting posts, etc. complete inall respects.

50 Providing and fixing barbed wire fencing on compound 100Rft. 2862.25 12284.10 Metre 93.90 403.00

chapter-25(Iron work) Page 158

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

wall, consisting of 1½"x1½"x3/16" (40x40x5mm) angleiron post 3' (900 mm) long, 4' (1200 mm) apart embeddedin cement concrete 1:4:8 base of size 6"x6"x9"(150x150x225 mm) and 4 rows of barbed wire, includingbinding wire, painting posts, etc. complete in all respects.

51 Providing and fixing all types of partly fixed and partly (1) Increase rate by Rs. 40.00 per openable glazed anodised bronze colour aluminium Sft or Rs.430.50 per Sq-metre ifdoors, using delux section of M/s Al-Cop or Pakistan sections thickness is 2 mm.Cables, having chowkat frame of size 40 x 100 mm (1½" x (2) Reduce rate by Rs.20.00 per Sft4") and leaf frame of 60x40mm (2½"x1½") wide sections or Rs.215.20 per Sq-metre ifincluding the cost of ¼" (5 mm) thick imported tinted sections are of dull aluminimumglass with aluminium triangular gola and rubber gasket to Per Sft 92.90 530.20 sq. m 999.60 5704.95 shade.support the glass and leaf edging, using approved (3) Reduce rate by Rs.20.00 perstandard fittings, locks, 3" (75 mm) wide long handles Sft or Rs.215.20 per Sq-metre ifetc., and hardware any required as approved by the local glass is used.engineer in-charge.

52 Providing and fitting all types of glazed aluminium Per Sft 133.75 426.45 sq. m 1439.15 4588.60 (1) Reduce rate by Rs.20.00 per Sftwindows of anodised bronze colour partly fixed and partly or Rs.215.20 per Sq-metre ifsliding using delux sections of approved manufacturer section thickness is 1.2 mm.having frame size of 100 x 20 mm (4"x¾") andleaf frame sections of 50 x 20 mm (2"x¾"), all of 1.6mm (2) Reduce rate by Rs.20.00 per Sftthickness including 5 mm thick imported tinted glass with or Rs.215.20 per Sq-metre ifrubber gasket using approved standard latches, hardware sections are of dull aluminiumetc., as approved by the Engineer in-charge. shade.

(3) Reduce rate by Rs.20.00 per Sftor Rs.215.20 per sq-metre if localglass is used.

53

a) 1.6 mm thick Per Sft 90.65 659.50 Sqm 975.40 7096.20b) 2 mm thick Per Sft 90.65 745.90 Sqm 975.40 8025.90

Providing and fixing all types of glazed aluminium windows ofanodized champagne colour partly fixed and party sliding usingdeluxe section of approved manufacturer having Frame of size100mm x 30mm using frame at bottom, at top and side leaf leafframe sections of 60mm x 23mm at top & bottom and size 45mm x25mm at center and size 45mm x 25mm at sides, Jali leaf frame size43mm x 13mm i/c fine quality aluminum jali, 5mm thick importedtinted glass with rubber gasket using approved standard latches,wheel, stopper, brush chennel angle joint and hardware etc.complete in all respect.

chapter-26( Misc) Page 159

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Notice board made of cement, sand mortar 1:3. Per Sft. 61.55 72.00 Per 662.20 774.95 The board is to be of cementsq.m plaster ½" (13 mm) thick, with 2"

(50 mm) wide and 1" (25 mm) thick beading.

2 Fixing handles to iron hammers. Each 78.40 - Each 78.40 -

3 Providing and fixing barbed wire fencing, with 4 horizontal 100Lft. 6,470.45 23,990.90 L.m. 212.30 787.10 Vertical bars in straining andand 2 number cross wires fixed with posts of R.C.C., 1:2:4 stiffening posts to be 4 No. each by(straining posts 7'x9"x9" (2.13 mx225x225 mm) at 100' ½" (13 mm) dia and for(30 m) centre to centre, stiffening posts 7'x6"x6" (2.13 intermediate posts to be 4 No. ofmx150x150 mm) at 50 ft. (15 m) interval and intermediate 3/8" (10 mm) dia Stirrups for allpost 7'x5"x5" (2.13 mx125x125 mm) at 8 ft.(2.4 m) centre posts to be ¼" (6 mm) dia. at 12"to centre), including cost of steel, its fabrication and (300 mm) centre to centre.placing of steel reinforcement, eye bolts, washers, etc.complete.

Surveying

4 Supplying Bamboo Jhandies 10' to 12' (3.00 to 3.65 m) with Each 39.35 169.10 Each 39.35 169.10 iron shoes, and flags 15" (375mm) square.

5 Supplying wooden pegs for levelling, 1½" (40 mm) dia, 6" 100Nos. 125.40 143.10 100Nos. 125.40 143.10 (150mm) long.

6 Supplying wooden pegs for alignment, 2" to 3" dia (50 to 100Nos. 300.95 504.90 100Nos. 300.95 504.90 75 mm), 9" (225 mm) long.

7 Fixing enamalled iron gauges flush with masonry, including Per Lft. 70.95 79.85 Per 232.80 261.95 cost of hooks. L.M.

8 Placing boundary pillars in position, including digging pits. Each 47.30 - Each 47.30 -

9 Fixing main line type distance mark in position, including Each 208.55 385.55 Each 208.55 385.55 Composite rate does not includemaking 1:3:6 cement concrete base block, size cost of iron distance marks.14"x10"x15" (350x250x375 mm).

Hand Pumps & Pressure Pipes

10 Cutting pipes, upto 2" (50 mm) dia. Per cut 47.30 - Per cut 47.30 -

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

26. MISCELLANEOUS

chapter-26( Misc) Page 160

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

11 Cutting pipe, above 2" (50 mm) dia. Per cut 86 0 Per cut 86 0

12 Threading pipe ends, 1½" (40 mm) to 4" (100 mm) dia. Each 59.85 - Each 59.85 - End End

13 Assembling 1½" (40 mm) dia pressure pipe. 100Lft. 219.05 - Per Metre 7.20 -

14 Boring and fixing 1½" (40 mm) dia pressure pipe:

a) in ordinary soil Per Lft. 77.15 - Per Metre 253.10 - b) in clay Per Lft. 152.15 - Per Metre 499.10 - c) in shingle Per Lft. 227.12 - Per Metre 745.15 -

15 Repairs to hand pump, pulling out and refitting. Per Lft. 34.20 - Per Metre 112.15 -

16 Fixing hand pump (Machine only) Each 150.50 - Each 150.50 -

Rest House Furniture & Fuel, etc.

17 Washing Niwar of bed. Per bed 499.95 531.10 Per bed 499.95 531.10

18 Washing Durries. 100Sft. 666.60 740.75 sq.m 71.75 79.75

19 Recaning chairs:

i) office chairs, single caning seat only. Each 263.35 299.05 Each 263.35 299.05 ii) office chairs, double canning seat only. Each 338.60 389.00 Each 338.60 389.00 iii) office chairs, single caning back only. Each 188.10 190.35 Each 188.10 190.35 iv) office chairs, double caning back only. Each 300.95 320.30 Each 300.95 320.30 v) easy chairs, single caning seat only. Each 188.10 236.00 Each 188.10 236.00 vi) easy chairs, double caning seat only. Each 526.70 598.10 Each 526.70 598.10 vii) easy chairs, single caning only, back and seat in one Each 752.40 1,046.55 Each 752.40 1,046.55

piece.viii) easy chairs, double caning back & seat in one piece Each 1,128.60 1,843.00 Each 1,128.60 1,843.00

or couches with caned area about 16 Sft (1.5 Sqm).

20 Making and fixing Hat pegs ordinary. Each 135.45 498.80 Each 135.45 498.80

21 Weaving charpoy. Each 489.05 - Each 489.05 -

22 Sweeping chimney. Each 111.10 112.40 Each 111.10 112.40

23 Picture railing, including making, fixing and painting. Per Lft. 38.75 124.70 Per LM 127.15 409.10

24 Cutting fuel wood, from plantation. 100Kg 148.80 - 100Kg 148.80 -

25 Splitting fuel wood. 100Kg 311.65 - 100Kg 311.65 -

chapter-26( Misc) Page 161

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

26 Burning charcoal, including loading, unloading and 100Kg of 502.95 - 100Kg of 502.95 - repairing kilns. Char- Char-

coal coal

27 Filling cement bags with coal and sewing (including cost 100Cft. 1,366.55 1,369.65 cu.m 482.65 483.75 of strings).

28 Supplying manure. Cart 166.65 302.60 Cart 166.65 302.60 Capacity of cart, 20 Cft. (0.57Load Load cu.m).

29 Washing punkha frills. Each 150.50 - Each 150.50 -

30 Washing:-

a) table cloth Each 37.60 - Each 37.60 - b) napkins, dusters, etc. Each 25.10 - Each 25.10 -

31 Hoisting and placing sleepers for centring, including Each 59.40 - Each 59.40 - carriage within one chain. No. No.

32 Dismantling sleepers from centring, including stacking Each 67.75 - Each 67.75 - within one chain. No. No.

33 Dredging Sumps. Per 2,499.75 - Per 2,499.75 - Not less than five gangmen to beShift Shift employed for each shift to ensure

effective dredging.

34 Fixing `U' bolt in masonry or concrete, including levelling Each 180.95 - Each 180.95 - and tying for fixing angle iron post.

35 Bailing out water:-

a) by hand 1000 Cft. 1,999.80 - cu.m 70.65 - Rate includes cost of providingb) by pump 1000 Cft. 221.70 394.30 ditto 7.85 13.95 pump, POL and operation charges,

etc.

36 Drilling holes in R.C. Trough. Per Nos. 118.25 - Per Nos. 118.25 -

37 Supplying and laying polythene sheet over D.P.C. under The rate includes overlaps.floors and on roofs, etc.

i) 300 gauge (.003" thick) Per Sft. 1.15 2.70 sq.m 12.15 29.30 ii) 500 gauge (.005" thick) Per Sft. 2.25 3.60 sq.m 24.30 38.65

38 Laying 2" (50 mm) thick sand and bitumen carpet, on top 100Sft. 1,313.30 5,042.50 sq.m 141.30 542.55 of foundation of oil tank.

39 Cutting hole 4"x6" (100x150 mm) in stone masonry or Per 202.70 - Per 202.70 - Same rate to be paid for other typebrick wall with chisel, repairing masonry and removing Hole Hole of masonry and R.C.C. work.debris within one chain lead.

chapter-26( Misc) Page 162

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE

40 Making 1½"x1½" (40x40 mm) groove in wall of stone or Per 177.40 - Per 177.40 - brick masonry in cement for fixing planks upto 9" (225 Plank Plankmm) deep.

41 Drilling holes in stone or brick masonry upto 2" (50 mm) Per hole 66.65 Per hole 26.65 dia, per inch (25 mm) depth. per inch per c.m

depth depth

42 Spraying anti-termite liquid mixed with water in the ratio of 100Sft. of 75.25 213.60 sq.m of 8.10 23.00 1:40. each each

spray spray

43 Providing and fixing barbed wire fencing, with 4 horizontaland two cross wires, with R.C.C. 1:2:4 posts, 5.5'x6"x9"(1.68mx150mmx225 mm) at 8 ft. (2.45 m) centre tocentre, reinforced with 4 No. 3/8" (10 mm) dia vertical barsand 1/8" (3 mm) dia stirrups 12" (300 mm) centre tocentre, complete in all respects.

i) without cement concrete base. 100Rft. 7,684.05 24,600.50 Per Metre 252.05 806.90 ii) in cement concrete 1:4:8 base of size 12"x12"x21" 100Rft. 8,453.55 27,060.30 Per Metre 277.30 887.60

(300x300x525 mm).


Recommended