GE.16-18633(E)
Subsidiary Body for Implementation Forty-fifth session
Marrakech, 7–14 November 2016
Item 4(c) of the provisional agenda
Reporting from Parties not included in Annex I to the Convention
Provision of financial and technical support
Information provided by the Global Environment Facility
on its activities relating to the preparation of national communications
and biennial update reports
Note by the secretariat
1. The Subsidiary Body for Implementation (SBI), at its forty-third session, invited the
Global Environment Facility (GEF) to continue to provide detailed, accurate, timely and
complete information on its activities relating to the preparation of national
communications by Parties not included in Annex I to the Convention (non-Annex I
Parties), including the dates of approvals of funding and disbursement of funds. It also
invited the GEF to continue to provide an approximate date for completion of draft national
communications and an approximate date for submission of final national communications
to the secretariat, for consideration at SBI 45.1
2. SBI 44 invited the GEF to continue to provide detailed information on its activities
relating to the preparation of biennial update reports by non-Annex I Parties, including the
dates of requests for funding, approval of funding and disbursement of funds, for
consideration at SBI 45.2
3. The information referred to in paragraphs 1 and 2 above has been reproduced in
annexes I and II, respectively, as received from the GEF and without formal editing.*
1 FCCC/SBI/2015/22, paragraph 33.
2 FCCC/SBI/2016/8, paragraph 32.
* Received from the Global Environment Facility secretariat on 21 October 2016.
United Nations FCCC/SBI/2016/INF.18
Distr.: General
26 October 2016
English only
FC
CC
/SB
I/201
6/IN
F.1
8
2
Annex I
STATUS OF NATIONAL COMMUNICATIONS FROM PARTIES NOT INCLUDED IN ANNEX I TO THE CONVENTION
N o t e : I n f o r m a t i o n w a s c o m p i l e d b y t h e I m p l e m e n t i n g A g e n c i e s ( U N D P a n d U N E P ) . T h e t a b l e b e l o w w a s s u b m i t t e d
t o t h e G E F b y t h e N a t i o n a l C o m m u n i c a t i o n s S u p p o r t P r o g r a m m e ( N C S P ) . W e k i n d l y r e q u e s t P a r t i e s t o i n f o r m
t h e i r r e s p e c t i v e i m p l e m e n t i n g a g e n c i e s i f t h e r e a r e i n c o n s i s t e n c i e s i n t h e i n f o r m a t i o n b e l o w .
I N C – I n i t i a l N a t i o n a l C o m m u n i c a t i o n , S N C – S e c o n d N a t i o n a l C o m m u n i c a t i o n , T N C – T h i r d N a t i o n a l C o m m u n i c a t i o n ,
F N C – F o u r t h N a t i o n a l C o m m u n i c a t i o n , I A - I m p l e m e n t i n g A g e n c y , E A - E x e c u t i n g A g e n c y
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
1. Afghanistan UNEP 12-Mar-2013
(INC)
19-Aug-2014
(SNC) 500,000 09-Sept-2014 Jun-2017 Aug-2017
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: 50-75% Completed Other Information: >75% Completed Constraints & Gaps: 25-50% Completed
2. Albania UNDP 23-Nov-2009
(SNC)
18-Nov-11
(TNC) 500,000 18-Sep-2012 Mar-2016 Oct-2016 All components completed
3. Algeria UNDP 25-Nov-2010
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated
4. Angola UNEP 06-Feb-2012
(INC)
14-May-2013
(SNC) 500,000 05-Jun-2013 Dec- 2016 Jan-2017
National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: >75% Completed Constraints & Gaps: 50-75% Completed
5. Antigua and Barbuda UNEP
23-Sep-2016
(TNC) - - - - -
Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.
The FSP was approved by the GEF Council on 09-Jun-2016
IA is preparing GEF CEO Endorsement request documents.
6. Argentina World
Bank
09-Dec-2015
(TNC) - - - - -
Process for requesting GEF funding for FNC preparation has not been initiated.
FC
CC
/SB
I/201
6/IN
F.1
8
3
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
7. Armenia UNDP 22-Apr-2015
(TNC)
Agency project
document under
review for IA
clearance
(FNC)
500,000 Not yet
disbursed Dec-2019 Dec-2019
Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC
& BUR 2 (US$ 852,000)
8. Azerbaijan UNDP 25-May-2016
(TNC)
Agency project
document under
review for IA
clearance
(FNC)
500,000 Not yet
disbursed Dec-2019 Dec-2019
Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC
& BUR 2 (US$ 852,000)
9. Bahamas UNDP 20-Nov-2015
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated
10. Bahrain UNEP 15-Mar-2012
(SNC)
04-Mar-2014
(TNC) 500,000 25-Apr-2014 Apr-2019 Dec-2019
PIP preparation completed Internal Cooperation Agreement under approval process
11. Bangladesh UNDP 26-Dec-2012
(SNC)
22-Aug-2013
(TNC) 456,621 06-Aug-2014 Jan-2017 Jun-2017
National Circumstances: >75% Completed GHG Inventories: 50-75% Completed V&A Analysis: >75% Completed Mitigation Analysis: 50-75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed
12. Barbados UNDP 30-Oct-2001
(INC)
22-Nov-2006
(SNC) 420,000 02-Mar-2007 Aug-2015 Dec-2016 All components completed
13. Belize UNDP 27-Apr-2016
(TNC) -- -- -- -- --
Process for requesting GEF funding for FNC preparation has not been initiated
14. Benin UNEP
23-Nov-2011
(SNC)
23-Sep-2014
(TNC) 500,000 03-Oct-2014 Sept-2017 Dec-2017
National Circumstances: 25-50% Completed GHG Inventories: >75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: <25% Completed Other Information: 25-50% Completed Constraints & Gaps: Not yet initiated
15. Bhutan UNEP 28-Nov-2011
(SNC)
01-Sep-2014
(TNC) 500,000 17-Nov-2014 To be determined To be determined TNC PIP under preparation by EA
FC
CC
/SB
I/201
6/IN
F.1
8
4
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
16. Bolivia UNDP 02-Dec-2009
(SNC)
11-Feb-2011
(TNC) 500,000 09-Sep-2011 Sept-2016 Nov-2016
National Circumstances: >75% Completed GHG Inventory: >75% Completed V&A Assessment: 50-75% Completed Mitigation Analysis: 50-75% Completed Other information: 50-75% Completed Constraints & Gaps: >75% Completed
17. Bosnia and Herzegovina UNDP
11-Nov-2013
(SNC)
23-Apr-2014
(TNC) 500,000 03-Jul-2014 Sept-2016 Apr- 2017 All components completed
18. Botswana UNDP 08-Jan-2013
(SNC)
24-Nov-2015
(TNC) 500,000 08-Jun-2016 Aug-2017 Dec-2017
National Circumstances: Not yet initiated GHG Inventories: Not yet initiated V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
19. Brazil UNDP 20-Apr-2016
(TNC)
14-Jul-2016
(FNC) 6,478,500
Not yet
disbursed Aug-2019 May-2020
Project Document under signature US$ 6,475,500 as part of a combined EA proposal for
FNC & BUR 2 (US$ 7,528,500)
20. Burkina Faso UNEP 01-Apr-2015
(SNC)
05-Nov-2013
(TNC) 500,000
15-Jul-2014
May-2019 Aug-2019 TNC project under inception phase
21. Burundi UNEP 28-June-2010
(SNC)
23-Jul-2013
(TNC) 500,000 08-Oct-2013 Aug-2018 Oct-2018
National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: Not initiated Mitigation Analysis: Not initiated Other Information: Not initiated Constraints & Gaps: Not initiated
22. Cambodia UNEP
13-Jan-2016
(SNC)
16-Sept-2013
(TNC) 500,000 27-Oct-2015 Mar-2019 Jun-2019 TNC Project under inception phase
23. Cameroon UNEP 11-Mar-2016
(SNC) - - - - -
Process for requesting GEF funding for TNC preparation has been initiated
24. Cape Verde UNDP 21-Oct-2011
(SNC)
09-Sep-2013
(TNC) 500,000 14-Feb-2014 Nov-2016 Dec-2016
National Circumstances: 25-50% Completed GHG Inventories: Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: <25% Completed
FC
CC
/SB
I/201
6/IN
F.1
8
5
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
25. Central African Republic UNEP
05-Feb-2015
(SNC)
06-Jul-2016
(TNC) 500,000
Not yet
disbursed To be determined To be determined EA awaiting funds for TNC PIP preparation
26. Chad UNEP 04-Jun-2013
(SNC)
02-Oct-2012
(TNC) 500,000 11-Oct-2012 Nov-2017 Feb-2018
National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: <25% Completed Other Information: Not yet initiated Constraints & Gaps: Not yet initiated
27. Chile UNDP 24-Oct-2011
(SNC)
27-Jul-2012
(TNC) 500,000 12-Oct-2012 Dec-2016 Jul-2017
National Circumstances: >75% Completed GHG Inventories: 50-75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: 50-75% Completed Constraints & Gaps: >75% Completed
28. China UNDP 08-Nov-2012
(SNC)
03-Nov-2014
(TNC) 6,387,600 09-Jul-2015 Jun- 2018 Sept-2018
National Circumstances: Not yet initiated GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed US$ 6,387,600 as part of a combined EA proposal for
TNC & BUR 1 (US$ 7,280,000)
29. Colombia UNDP 07-Dec-2010
(SNC)
25-Nov-2013
(TNC) 2,000,000 17-Dec-2013 Jul-2017 Sept-2017
National Circumstances: 50-75% Completed GHG Inventories: 50-75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: 50-75% Completed Constraints & Gaps: 50-75% Completed
30. Comoros UNEP 24-Jun-2013
(SNC)
27-Jul-2014
(TNC) 500,000
Not yet
disbursed To be determined To be determined
Awaiting bank details for transfer of initial cash advance to EA
31. Congo (Republic of) UNEP
27-Nov-2009
(SNC)
01-Sept-2014
(TNC) 500,000 15-Dec-2014 To be determined To be determined TNC PIP awaiting signing by EA
32. Congo Democratic Republic
UNEP 21-Apr-2015
(TNC) - - - - -
Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.
The FSP was approved by the GEF Council on 09-Jun-2016
IA is preparing GEF CEO endorsement request documents.
FC
CC
/SB
I/201
6/IN
F.1
8
6
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
33. Cook Islands UNEP 12-Apr-2012
(SNC)
06-May-2014
(TNC) 500,000 19-May-2014 Jun-2018 Dec-2018
National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed
34. Costa Rica UNDP 11-Dec-2014
(TNC) -- -- -- -- --
Process for requesting GEF funding for FNC preparation has not been initiated
35. Côte d’Ivoire UNEP 26-Apr-2010
(SNC)
11–May-2012
(TNC) 500,000 12-Feb-2013 Oct-2016 Dec-2016
All TNC components completed Process for requesting GEF funding for FNC preparation
has been initiated
36. Cuba UNDP 01-Oct-2015
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated.
37. Democratic People's Republic of Korea
UNEP 15-Oct-2013
(SNC)
PIP preparation
suspended
(TNC)
500,000
PIP
preparation
suspended
To be determined To be determined TNC PIP preparation suspended
38. Djibouti UNEP 19-Feb-2014
(SNC)
26-Mar-2014
(TNC) 500,000 19-Apr-2014 Nov-2018 Dec-2018 TNC Project under inception phase
39. Dominica UNEP 20-Nov-2012
(SNC)
29-Aug-2014
(TNC) 500,000 11-Sept-2014 Jul-2017 Aug-2017
National Circumstances: <25% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: <25% Completed
40. Dominican Republic UNDP
17-Dec-2009
(SNC)
14-Aug-2013
(TNC) 500,000 10-Oct-2013 Sept-2016 Nov-2016
National Circumstances: Completed GHG Inventories: Completed V & A Analysis: >75% Completed Mitigation Analysis: 25-50% Completed Other Information: Completed Constraints & Gaps: >75% Completed
41. Ecuador UNDP 02-Apr-2012
(SNC)
21-Jan-2014
(TNC) 500,000 25-Feb-2014 Oct-2016 Nov-2016
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: >75% Completed Other Information: 50-75% Completed Constraints & Gaps: >75% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
FC
CC
/SB
I/201
6/IN
F.1
8
7
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
42. Egypt UNDP 07-Jun-2010
(SNC)
27-Apr-2011
(TNC) 500,000 06-Jun-2011 Apr-2016 Dec-2016 All components completed
43. El Salvador UNDP 11-Sep-2013
(SNC)
02-Dec-2014
(TNC) 500,000 24-Mar-2015 Apr-2017 Sept-2017
National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
44. Equatorial Guinea UNEP
INC under
preparation
02-Mar-2009
(INC) 420,000 23-Apr-2009 Oct-2016 Dec-2016 All INC components completed
45. Eritrea* UNEP
10-Aug-2012
(SNC)
02-Jul-2013
(TNC) 500,000 13-Sept-2013 Oct-2017 Dec-2017
National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated *Information based on previous survey. IA did not
receive a response to request for updated information from EA after repeated request
46. Ethiopia UNDP 11-May-2016
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated
47. Fiji UNEP 31-Jul-2014
(SNC)
01-Sep-2014
(TNC) 500,000 11-Sep-2014 Dec-2016 Jul-2017
National Circumstances: 25-50% Completed GHG Inventories: 50-75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 50-75% Completed Other Information: 50-75% Completed Constraints & Gaps: 25-50% Completed
48. Gabon UNDP 08-Dec-2011
(SNC)
06-Mar-2014
(TNC) 480,000 19-Aug-2014 Jul-2018 Dec-2018
National Circumstances: >75% Completed GHG Inventories: Completed V & A Analysis: <25% completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated
FC
CC
/SB
I/201
6/IN
F.1
8
8
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
49. Gambia UNEP 28-Jan-2013
(SNC)
27-Mar-2013
(TNC) 500,000 15-Apr-2013 Dec-2016 Mar-2017
National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: <25% Completed Other Information: Completed Constraints & Gaps: Completed Request for FNC GEF funding included in the UNEP Full
Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-
2016 IA is preparing GEF CEO endorsement request
documents.
50. Georgia UNDP 24-Feb-2016
(TNC) -- -- -- -- --
Process for requesting GEF funding for FNC preparation has been initiated
51. Ghana UNEP 21-Jul-2015
(TNC)
24-Mar-2016
(FNC) 500,000 08-Jul-2016 To be determined To be determined
FNC and BUR 2 PIP under preparation by EA US$ 500,000 as part of a combined EA proposal for FNC
& BUR 2 (US$ 852,000)
52. Grenada UNDP 21-Nov-2000
(INC)
08-Sep-2006
(SNC) 420,000 01-May-2007 Dec-2016 Feb-2017
National Circumstances: >75% Completed GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated Request for TNC GEF funding included in the UNEP Full
Size Project (FSP) for NCs. The FSP was approved by the GEF Council on 07-Jun-
2012
53. Guatemala UNDP 11-Jan-2016
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has been initiated
54. Guinea UNEP 28-Oct-2002
(INC)
24-Sep-2007
(SNC) 420,000 01-Oct-2007 Sept-2016 Dec-2016 All SNC components completed
FC
CC
/SB
I/201
6/IN
F.1
8
9
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
55. Guinea Bissau UNEP 29-Oct-2011
(SNC)
21-Mar-2012
(TNC) 500,000 27-Mar-2012 Sept- 2016 Dec-2016
All TNC components completed Request for FNC GEF funding included in the UNEP Full
Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-
2016 IA is preparing GEF CEO endorsement request
documents
56. Guyana UNEP 24-Sep-2012
(SNC)
02-Aug-2012
(TNC) 500,000 28-Sept-2012
Jul-2019
Nov-2019
National Circumstances: <25% Completed GHG Inventories: Not yet initiated V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated
57. Haiti UNEP 07-Oct-2013
(SNC)
18-Jun-2014
(TNC) 500,000 08-July-2014 Jun-2017 Aug-2017
National Circumstances: Completed GHG Inventories: <25% Completed V&A Assessment: 25-50% Completed Mitigation Analysis: Not yet initiated Other information: <25% Completed Constraints & Gaps: Not yet initiated
58. Honduras UNDP 05-Apr-2012
(SNC)
20-Feb-2015
(TNC) 500,000 09-Mar-2015 Oct-2017 Dec-2017
National Circumstances: Not yet initiated GHG Inventories: <25% Completed V & A Analysis: Not yet initiated Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: <25% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
59. India UNDP 04-May-2012
(SNC)
11-Jun-2013
(TNC) 6,385,604 25-Sep-2013 Mar-2018 Mar-2019
Project under inception phase US$ 6,385,604 as part of a combined EA proposal for
TNC, BUR 1 & BUR 2 (US$ 9,010,604)
60. Indonesia UNDP 14-Jan-2011
(SNC)
22-Nov-2013
(TNC) 4,500,000 06-May-2014 Dec-2016 Mar-2017
National Circumstances: <25% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 50-75% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed US$ 4,080,444 as part of a combined EA proposal for
TNC & BUR 1 (US$ 4,500,000)
FC
CC
/SB
I/201
6/IN
F.1
8
10
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
61. Iran, Islamic Republic of UNDP
23-Nov-2011
(SNC)
20-Dec-2011
(TNC) 500,000 20-Jan-2012 Sept-2016 Dec-2016
National Circumstances: Completed GHG Inventories: Completed V & A Analysis: Completed Mitigation Analysis: Completed Other Information: Completed Constraints & Gaps: 50-75% Completed
62. Iraq
UNEP
05-Dec-2015
(INC) -- -- -- -- --
Request for SNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.
The FSP was approved by the GEF Council on 09-Jun-2016
IA is preparing GEF CEO endorsement request documents
63. Jamaica UNDP 02-Dec-2011
(SNC)
16-Jul-2014
(TNC) 500,000 09-Oct-2014 Jun-2017 Nov-2017
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: <25% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
64. Jordan UNDP 02-Dec-14
(TNC) -- -- -- -- --
Process for requesting GEF funding for FNC preparation has not been initiated
65. Kazakhstan UNDP 24-Dec-2013
(NC 3, 4, 5 & 6) 17-Jul-2014 500,000 23-Sep-2014 May 2017 Dec-2017
National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for NC &
BUR 1 (US$ 852,000)
66. Kenya UNEP 11-Dec-2015
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated
67. Kiribati UNEP 27-Jun-2013
(SNC)
09-May-2014
(TNC) 500,000 08-Jul-2014 To be determined To be determined TNC PIP under preparation
68. Kuwait UNEP 30-Nov-2012
(INC)
03-Sep-2014
(SNC) 500,000 22-Sep-2014 Sept-2018 Mar-2019
National Circumstances: <25% Completed GHG Inventories: <25% Completed V&A Assessment: <25% Completed Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated
FC
CC
/SB
I/201
6/IN
F.1
8
1
1
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
69. Kyrgyzstan UNEP 01-Dec-2008
(SNC)
11–May-2012
(TNC) 500,000 17-Sep-2012 Sept-2016 Dec-2016
All TNC components completed Request for FNC GEF funding included in the UNEP Full
Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-
2016 IA is preparing GEF CEO endorsement request
documents
70. Lao People's Democratic Republic
UNEP 24-Jun-2013
(SNC)
29-Oct-2013
(TNC) 500,000 19-Nov-2013 Mar-2018 Dec-2018
National Circumstances: <25% Completed GHG Inventories: Not yet initiated V & A Analysis: Not yet initiated Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated
71. Lebanon UNDP 01-Mar-2011
(SNC)
01-Dec-2011
(TNC) 500,000 02-Mar-2012 Sept-2016 Dec-2016
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed
72. Lesotho UNEP 20-Nov-2013
(SNC)
23-Jan-2014
(TNC) 500,000 25-Feb-2014
Feb-2018
Jun-2018
National Circumstances: 25-50% Completed GHG Inventories: 50-75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: Not yet initiated
73. Liberia* UNEP 28-Jun-2013
(INC)
05-Apr-2013
(SNC) 500,000 21- May-2013 Mar-2016 Dec-2016
National Circumstances: Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated *Information based on previous survey. IA did not
receive a response to request for updated information from EA after repeated request
74. Libyan Arab Jamahiriya * UNEP
INC under
preparation
31-Jan-2002
(SNC) 275,000 20-Feb-2002 -- --
National Circumstances 50-75% Completed GHG Inventories: 50% Completed *Project Implementation stalled due to political
instability
FC
CC
/SB
I/201
6/IN
F.1
8
12
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
75. Madagascar UNEP 07-Dec-2010
(SNC)
17-Oct-2011
(TNC) 500,000 02-Nov-2011 Nov-2016 Dec-2016
All TNC components completed Request for FNC GEF funding included in the UNEP Full
Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-
2016 IA is preparing GEF CEO endorsement request
documents
76. Malawi UNEP 09-May-2012
(SNC)
26-July-2013
(TNC) 500,000 18-Sep-2013 Jun-2017 Dec-2017
National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed
77. Malaysia UNDP 14-Apr-2011
(SNC)
18-Mar-2014
(TNC) 500,000 06-May-2014 Jun-2017 Dec-2017
National Circumstances: 50-75% Completed GHG Inventories: 50-75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
78. Maldives UNEP 13-Oct-2016
(SNC) -- -- -- -- --
Request for TNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.
The FSP was approved by the GEF Council on 09-Jun-2016
IA is preparing GEF CEO endorsement request documents.
79. Mali UNDP 04-May-2012
(SNC)
18-Mar-2014
(TNC) 500,000 05-Jun-2014 Sept- 2017 Nov-2017
National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: Not reported Constraints & Gaps: Not reported
80. Marshall Islands UNDP
11-Dec-2015
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated
81. Mauritania UNEP 27-Oct-2014
(TNC)
02-Mar-2016
(FNC) 500,000 03-Jul-2016 Apr-2019 Jun-2019 FNC project under inception phase
FC
CC
/SB
I/201
6/IN
F.1
8
1
3
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
82. Mauritius UNEP 09-Nov-2011
(SNC)
30-Apr-2014
(TNC) 500,000 16-Jul-2014 Sept-2016 Dec-2016
National Circumstances: > 75% Completed GHG Inventories: 50-75% Completed V & A Analysis: > 75% Completed Mitigation Analysis: > 75% Completed Other Information: > 75% Completed Constraints & Gaps: 25-50% Completed
83. Mexico UNDP 06-Dec-2012
(NC 6)
30-Jun-2015
(NC) 3,636,364 26-Aug-2015 Sept-2017 Mar-2018
National Circumstances: 50-75% Completed GHG Inventories: <25% Completed V & A Analysis: <25% completed Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: <25% Completed The project will also support the preparation of Mexico’s
BUR 2.
84. Micronesia (Federated States of)
UNDP 12-Nov-2015
(SNC) -- 500,000 -- -- --
Request for TNC and BUR 1 project funding was approved by the GEF Secretariat on 15-Sep-2016
US$ 500,000 as part of a combined EA proposal for FNC & BUR 1 (US$ 852,000)
85. Mongolia UNEP 10-Dec-2010
(SNC)
06-May-2014
(TNC) 500,000 23-May-2014 Apr-2017 Dec-2017
National Circumstances: 50-75% Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed
86. Montenegro UNDP 28-May-2015
(SNC)
11-May-2016
(TNC) 500,000 08-Jun-2016 Jun-2019 Jan-2020
National Circumstances: Not yet initiated GHG Inventories: Not yet initiated V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: Not yet initiated
87. Morocco UNDP 07-May-2016
(TNC)
Agency project
document under
review for IA
clearance
(FNC)
500,000 Not yet
disbursed 2020 2020
Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC
& BUR 2 (US$ 852,000)
88. Mozambique UNEP 02-Jun-2006
(INC)
11-Oct-2006
(SNC) 420,000 25-Oct-2006
Nov-2015
Dec-2016
All SNC project components completed Project Cooperation Agreement (PCA) for TNC between
Mozambique and UNEP sent to Country
FC
CC
/SB
I/201
6/IN
F.1
8
14
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
89. Myanmar UNEP 26-Dec-2012
(INC)
09-May-2014
(SNC) 500,000 15-Aug-2014 Nov-2018 Dec-2018 TNC Project under inception phase
90. Namibia UNDP 02-Dec-2015
(TNC)
11-Aug-2016
(FNC) 500,000
Not yet
disbursed 2019 2019
Project Document under signature Project under inception phase
91. Nauru UNEP 01-Apr-2015
(SNC)
05-Aug-2014
(TNC) 500,000 08-Sep-2014 Jan-2019 Apr-2019 SNC Project under inception phase
92. Nepal UNEP 04-Dec-2015
(SNC)
02-Jul-2013
(TNC) 500,000 13-Sep-2013 Dec-2018 Feb-2019
National Circumstances: Not yet initiated GHG Inventories: <25% Completed V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated
93. Nicaragua* UNDP 22-Jun-2011
(SNC)
31-Aug-2014
(TNC) 500,000 31-Dec-2014 Dec-2017 Jun-2018
National Circumstances: Not yet initiated GHG Inventories: <25% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated *Information based on previous survey. UNDP project
suspended following the decision of the Government of Nicaragua to implement directly all international cooperation.
94. Niger UNDP 09-Dec-2009
(SNC)
19-Jan-2012
(TNC) 500,000 13-Jun-2012 Sept-2016 Nov-2016
National Circumstances: Completed GHG Inventories: Completed V & A Analysis: Completed Mitigation Analysis: Completed Other Information: >75% Completed Constraints & Gaps: Not yet initiated
95. Nigeria UNDP 27-Feb-2014
(SNC)
13-Jul-2015
(TNC) 1,850,000 28-Jan-2016 Oct-2017 Dec-2017
National Circumstances: 25-50% Completed GHG Inventories: Not yet initiated V & A Analysis: Not yet initiated Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: <25% Completed
96. Niue UNEP 02-Oct-2001
(INC)
11-Nov-2004
(SNC) 420,000 20-Dec-2004 Nov-2015 Dec-2016 All SNC components completed
FC
CC
/SB
I/201
6/IN
F.1
8
1
5
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
97. Oman UNEP 30-Oct-2013
(INC)
05-Jun-2014
(SNC) 500,000 12-Sep-2014 Dec-2017 Jun-2018
National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V&A Assessment: >75% Completed Mitigation Analysis: Not yet initiated Other information: < 25% Completed Constraints & Gaps: 25-50% Completed
98. Pakistan UNEP 15-Nov-2003
(INC)
03-Sep-2015
(SNC) 405,000 28-Oct-2015 Feb-2018 Jun-2018
National Circumstances: <25% Completed GHG Inventories: <25% Completed V&A Assessment: <25% Completed Mitigation Analysis: <25% Completed Other information: <25% Completed Constraints & Gaps: <25% Completed
99. Palau UNEP 18-Jun-2003
(INC)
09-Dec-2005
(SNC) 420,000 13-Dec-2005 Aug-2016 Dec-2016 All SNC project components completed
100. Panama UNDP 02-Mar-2012
(SNC)
22-Jun-2015
(TNC) 500,000 03-Aug-2015 Jul-2017 Oct-2017
National Circumstances: Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
101. Papua New Guinea
UNEP
(TNC)
15-Dec-2015
(SNC)
02-Mar-2015
(TNC) 500, 000 24-Mar-2015 Aug-2018 Sept-2018
TNC Project under inception phase US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
102. Paraguay UNDP 08-Dec-2011
(SNC)
11-Mar-2014
(TNC) 500,000 25-Apr-2014 Oct-2016 Nov-2016
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
103. Peru UNDP 23-Apr-2016
(TNC) -- -- -- -- --
Process for requesting GEF funding for FNC preparation has not been initiated
104. Philippines UNDP 29-Dec-2014
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated
FC
CC
/SB
I/201
6/IN
F.1
8
16
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
105. Republic of Moldova UNEP
20-Jan-2014
(TNC)
30-Apr-2014
(FNC) 500,000 19-May-2015 Jun-2017 Nov-2017
National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
106. Rwanda UNEP 05-Jun-2012
(SNC)
01- Sep-2014
(TNC) 500,000 10-Sep-2014 Jul-2017 Sept-2017
National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V&A Assessment: <25% Completed Mitigation Analysis: <25% Completed Other information: 25-50% Completed Constraints & Gaps: 25-50% Completed
107. Saint Kitts and Nevis UNEP
11-Mar-2016
(SNC) -- -- -- -- --
TNC Project Cooperation Agreement (PCA) sent to country for signing
108. Saint Lucia UNEP 19-Apr-2012
(SNC)
19-Jul-2013
(TNC) 500,000 02-Aug-2013 Nov-2016 Dec-2016
National Circumstances: Completed GHG Inventories: Completed V&A Assessment: Completed Mitigation Analysis: Completed Other information: Not Yet initiated Constraints & Gaps: Not Yet initiated
109. Saint Vincent and The Grenadines
UNEP 29-Apr-2016
(SNC) -- -- -- -- --
TNC Project Cooperation Agreement (PCA) sent to country for signing
110. Samoa -- 14-Jun-2010
(SNC) -- -- -- -- --
Process for requesting GEF funding for TNC preparation has not been initiated
111. Sao Tome and Principe UNEP
03-Oct-2012
(SNC)
26-Feb-2014
(TNC) 500,000 16-Apr-2014 Mar-2018 Sept-2018
National Circumstances: >75% Completed GHG Inventories: >75% Completed V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated
112. Saudi Arabia UNEP 25-Oct-2011
(SNC)
11–Feb-2013
(TNC) 500,000 22-Feb-2013 Sept-2016 Dec-2016 All TNC components completed
113. Senegal UNEP 08-Jan-2016
(TNC) - - - - -
Process for requesting GEF funding for FNC preparation has not been initiated
114. Serbia UNDP 29-Nov-2010
(INC)
22-May-2012
(SNC) 500,000 17-Aug-2012 Dec-2015 October 2016 All SNC components completed
FC
CC
/SB
I/201
6/IN
F.1
8
1
7
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
115. Seychelles UNEP 14-Apr-2013
(SNC)
05-Aug-2014
(TNC) 500,000 16-Apr-2014 To be determined To be determined TNC PIP under preparation
116. Sierra Leone UNEP 02-Dec-2012
(SNC)
16-Sep-2013
(TNC) 500,000 25-Oct-2013 October 2017 December 2017
National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: <25% Completed Mitigation Analysis: >75% Completed Other Information: 25-50% Completed Constraints & Gaps: <25% Completed
117. Solomon Islands
UNDP
(SNC)
UNEP
(TNC)
29-Sep-2004
(INC)
30-Jan-2007
(SNC) 420,000 16-Aug-2007 November 2015 December 2016
All SNC components completed TNC Project Cooperation Agreement (PCA) sent to
country for signing
118. Somalia UNEP INC under
preparation
05-Aug-2014
(INC) 500,000 23-Sep-2014 January 2018 April 2018
National Circumstances: >75% Completed GHG Inventories: Not yet initiated V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated
119. South Africa UNEP 16-Nov-2011
(SNC)
23-Sep-2014
(TNC) 3,654,650 06-Oct-2014 September 2016 December 2016
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed US$ 3,654,650 as part of a combined EA proposal for
TNC & BUR 2 (US$ 4,006,650)
120. Southern Sudan UNEP
INC under
preparation
03-Apr-2015
(SNC) 500,000 21-Apr-2015 May 2018 June 2018
National Circumstances: <25% Completed GHG Inventories: Not yet initiated V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated
121. Sri Lanka UNDP 16-Mar-2012
(SNC)
09-Mar-2016
(TNC) 500,000 04-Apr-2016 December 2018 July 2019 Project under inception phase
122. Sudan UNDP 14-Nov-2013
(SNC)
21-Apr-2016
(TNC) 500,000
Not yet
disbursed June 2020 September 2020
Project document under signature US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
123. Suriname UNDP 15-Mar-2016
(SNC) -- -- -- -- --
TNC Project Cooperation Agreement (PCA) with UNEP sent to country for signing
FC
CC
/SB
I/201
6/IN
F.1
8
18
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
124. Swaziland UNEP
06–Oct–2016
(TNC) -- -- -- -- --
Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.
The FSP was approved by the GEF Council on 09-Jun-2016
125. Syrian Arab Republic UNDP
29-Dec-2010
(INC) -- -- -- -- -- Project suspended due to current unrest.
126. Tajikistan UNDP 29-Dec-2014
(TNC)
Agency project
document under
review for IA
clearance
(FNC)
500,000 Not yet
disbursed To be determined To be determined
Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC
& BUR 1 (US$ 852,000)
127. Tanzania United Republic of
UNEP 04-Jul-2003
(INC)
21-Jul-2006
(SNC) 420,000 15-Aug-2006 September 2015 December 2016
All SNC components completed TNC Project Cooperation Agreement (PCA) signing
process initiated
128. Thailand UNDP 24-Mar-2011
(SNC)
23-Apr-2014
(TNC) 500,000 06-Jun-2014 October 2017 December 2017
National Circumstances: Not yet initiated GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: <25% Completed Constraints & Gaps: Not yet initiated US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
129. The Former Yugoslav Republic of Macedonia
UNDP 03-Mar-2014
(TNC) -- -- -- -- --
Process for requesting GEF funding for FNC preparation has not been initiated
130. Timor Leste UNDP 11-Oct-2014
(INC)
21-Oct-2014
(SNC) 1,000,000 23-Feb-2015 December 2018 April 2019
National Circumstances: <25% Completed GHG Inventories: Not yet initiated V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed
131. Togo UNDP 07-Nov-2015
(TNC) -- -- -- -- --
Process for requesting GEF funding for FNC preparation has not been initiated
FC
CC
/SB
I/201
6/IN
F.1
8
1
9
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
132. Tonga UNDP 02-May-2012
(SNC)
11-Oct-2012
(TNC) 500,000 08-Feb-2013 May 2017 July 2017
National Circumstances: >75% Completed GHG Inventories: Completed V & A Analysis: >75% Completed Mitigation Analysis: 50-75% Completed Other Information: 50-75% Completed Constraints & Gaps: 25-50% Completed
133. Trinidad and Tobago UNDP
07-Nov-2013
(SNC)
Agency project
document under
review for IA
clearance
(TNC)
500,000 Not yet
disbursed June 2018 January 2019
Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for TNC,
BUR 1, and iNDC (US$ 952,000)
134. Tunisia UNDP 14-Feb-2014
(SNC)
13-May-2014
(TNC) 500,000 11-Aug-2014 June 2017 July 2017
National Circumstances: Not yet initiated GHG Inventories: Completed V & A Analysis: Not yet initiated Mitigation Analysis: <25% Completed Other Information: Not yet initiated Constraints & Gaps: Not yet initiated
135. Turkmenistan UNEP 05-Jan-2016
(TNC) - - - - -
Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.
The FSP was approved by the GEF Council on 09-Jun-2016
136. Tuvalu
UNDP
(SNC)
UNEP
(TNC)
30-Oct-1999
(INC)
17-Jan-2007
(SNC) 420,000 01-May-2007 September 2016 November 2016
All SNC components completed TNC Project Cooperation Agreement (PCA) with UNEP
sent to country for signing
137. Uganda UNEP 02-Dec-2014
(SNC) - - - - -
Process for requesting GEF funding for TNC preparation has been initiated
138. Uruguay UNDP 18-Nov-2010
(TNC)
27-Apr-2011
(FNC) 500,000 02-Aug-2011 September 2016 October 2016
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed
FC
CC
/SB
I/201
6/IN
F.1
8
20
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
139. Uzbekistan UNEP 03-Dec-2008
(SNC)
30-Jan-2012
(TNC) 500,000 01-Feb-2012 November 2016 December 2016
National Circumstances: Completed GHG Inventories: Completed V & A Analysis: Completed Mitigation Analysis: Completed Other Information: > 75% Completed Constraints & Gaps: >75% Completed Request for FNC GEF funding included in the UNEP Full
Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-
2016 IA is preparing GEF CEO endorsement request
documents
140. Vanuatu UNDP 15-Oct-2016
(SNC) - - - - -
Request for TNC and BUR 1 project funding submitted to GEF Secretariat for approval.
Project cleared for approval on 17-Oct-2016.
141. Venezuela (Bolivarian Republic of)
UNDP 13-Oct-2005
(INC)
21-Sep-2012
(SNC) 420,000 14-Dec-2012 July 2017 October 2017
National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: <25% Completed
142. Vietnam UNEP 07-Dec-2010
(SNC)
22-Jul-2014
(TNC) 500,000 25-Feb-2014 March 2018 November 2018
National Circumstances: 50-75% Completed GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: Not yet initiated
143. Yemen UNDP 06-Jun-2013
(SNC)
04-Apr-2014
(TNC) 500,000 04-Jun-2014 March 2017 June 2017
National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: >75% Completed Other Information: 50-75% Completed Constraints & Gaps: 50-75% Completed US$ 500,000 as part of a combined EA proposal for TNC
& BUR 1 (US$ 852,000)
144. Zambia UNEP
16-Nov-2014
(SNC)
21-Jul-2014
(TNC) 500,000 11-Aug-2014 January 2019 April 2019 TNC Project under inception phase
FC
CC
/SB
I/201
6/IN
F.1
8
2
1
Party
Agency
Submission
date of the last
report to COP
Date of approval
by
Implementing
Agency (IA) of
most recent NC
project
Total
Amount
Approved
US$
Date of initial
disbursement
of funds by IA
Approximate date
of completion of
draft NC Report
Approximate date
of NC submission
to the COP
Status of project activities
145. Zimbabwe UNEP 31-Jan-2013
(SNC)
02-Jul-2013
(TNC) 500,000 21-Aug-2013 August 2016 December 2016
All TNC components completed Request for FNC GEF funding included in the UNEP Full
Size Project (FSP) for NCs and BURs The FSP was approved by the GEF Council on 09-Jun-
2016 IA is preparing GEF CEO endorsement request
documents
22
FC
CC
/SB
I/201
6/IN
F.1
8
Annex II
STATUS OF RESOURCES APPROVED BY THE GEF SECRETARIAT FOR THE PREPARATION OF BIENNIAL UPDATE REPORTS FROM PARTIES
NOT INCLUDED IN ANNEX 1 TO THE CONVENTION
N o t e : I n f o r m a t i o n w a s c o m p i l e d b y t h e I m p l e m e n t i n g A g e n c i e s ( U N D P a n d U N E P ) .
I A - I m p l e m e n t i n g A g e n c y , E A - E x e c u t i n g A g e n c y
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
1. Afghanistan UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 05-Feb-2016 352,000
09-Feb-
2016 10,000
Not yet
determined
Not yet
determined
Project Implementation Plan (PIP) under preparation for BUR 1
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendmentiii
2. Angola UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014
Project
Cooperation
Agreement
sent for
signing
352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Project Cooperation Agreement was sent to EA for signing in August 2015 for BUR 1 and subsequent reminders, last one on 20-Jun-2016
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
3. Antigua and Barbuda UNEP
BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 05-Feb-2016 352,000
18-Feb-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
4. Argentina UNDP 09-Dec-2015
(BUR 1)
13-Dec-2013
(BUR 2) 29-Jan-2014
Not
applicableiv
31-Jul-2015 300,854 01-Sep-
2015 262,154
November
2016
December
2016
BUR 2 under preparation National Circumstances: Completed GHG Inventories: >75% Completed Mitigation Actions and their effects:
50-75% Completed Domestic measurement reporting
and verification (MRV): 50-75% Completed
Other Information: <25% Completed
Constraints & Gaps: Not yet initiated
Project transferred from WB to UNDP on 11-Sep-2014
FC
CC
/SB
I/201
6/IN
F.1
8
2
3
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
5. Armenia UNDP 29-Apr-2016
(BUR 1)
14-Apr-
2016
(BUR 2)
29-Apr-2016
Not
applicable4
Agency Project
Document
under IA
clearance
352,000 as
part of the
EA proposal
(852,000)
for the FNC
and BUR 2
Not yet
disburse
d
Not yet
disbursed
December
2017
December
2017
Agency Project Document under IA clearance for BUR 2
6. Azerbaijan UNDP 31-Mar-2015
(BUR 1)
13-Jan-
2016
(BUR 2)
13-Jul-2016
Not
applicable4
Agency Project
Document
under
preparation
for IA
clearance
352,000 as
part of the
EA proposal
(852,000)
for the FNC
and BUR 2
Not yet
disburse
d
Not yet
disbursed
December
2017
December
2017
Agency Project Document under preparation for IA clearance for BUR 2
Note: BUR 2 included in the EA Proposal for 4NC and BUR 2
7. Bahrain UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 22-Aug-2016 352,000
06-Sep-
2016 30,000 April 2018 June 2018
BUR 1 project under inception phase
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
8. Benin UNEP BUR 1 under
preparation
16-Apr-
2014
(BUR 1)
19-May-
2014
Not
applicable4
23-Sep-2014 352,000 28-Nov-
2014 95,000 June 2017
September
2017
BUR 1 project under inception phase
9. Bhutan UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014
Agency Project
Document
under
preparation
for IA
clearance
352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Project Cooperation Agreement sent to IA for signing for BUR 1
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
10. Bosnia and Herzegovina UNDP
12-Mar-2015
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
24
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
11. Botswana UNDP BUR 1 under
preparation
05-Aug-
2014
(BUR 1)
25-Nov-2014
Not
applicable4
23-Nov-2015
352,000 as
part of the
EA proposal
(952,000)
for the TNC,
BUR 1 and
iNDC
08-Jun-
2016 604,9105
October
2016
December
2016
BUR 1 under preparation National Circumstances: >75%
Completed GHG Inventories: Completed Mitigation Actions and their effects:
Completed Domestic measurement reporting
and verification (MRV): Completed Constraints & Gaps: >75%
Completed Other Information: >75%
Completed Note: BUR included in the EA
Proposal for TNC, BUR 1 and iNDC
12. Brazil UNDP 31-Dec-2014
(BUR 1)
05-Apr-
2013
(BUR 2)
02-May-
2013
20-Jun-
2013 16-Jul-2016
1,050,000 as
part of the
full project
proposal
(7,528,500)
for the FNC
and BUR 2
18-Aug-
2016 883,3165
December
2016 February 2017
BUR 2 under preparation National Circumstances: <25%
Completed GHG Inventories: Not yet initiated Mitigation Actions and their effects:
Not yet initiated Domestic measurement reporting
and verification (MRV): Not yet initiated
Constraints & Gaps: <25% Completed
Other Information: Not yet initiated
13. Burkina Faso UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 16-Nov-2015 352,000
14-Jun-
2016 10,000
Not yet
determined
Not yet
determined
PIP of BUR 1 sent to EA for signing Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
14. Burundi UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016
FC
CC
/SB
I/201
6/IN
F.1
8
2
5
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
15. Cambodia UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 12-Jan-2016 352,000
16-Mar-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
16. Cameroon UNEP -- -- -- -- -- -- -- -- -- --
Process for requesting GEF funding for BUR 1 preparation has been initiated
17. Chad UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016
18. Chile AGCI 10-Dec-2014
(BUR 1)
31-Jul-
2013
(BUR 2)
30-Jul-2014
Not
applicable4
22-Sep-2014 352,000 19-Mar-
2015 140,800
December
2016
December
2016
BUR 2 under preparation National Circumstances: 90%
Completed GHG Inventories: 90% Completed Mitigation Actions and their effects:
90% Completed Domestic measurement reporting
and verification (MRV): 90% Completed
Constraints & Gaps: 70% Completed Other Information: 70% Completed This project is being executed
through direct access by the Chilean Agency for International Cooperation (AGCI for its acronym in Spanish)
Note: Since Chile was already in process of preparing its BUR 1, the project was amended to support the preparation of its BUR 2.
26
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
19. China UNDP BUR 1 under
preparation
16-Mar-
2012
(BUR 1)
01-Oct-2012 15-Nov-
2012 03-Nov-2014
892,400 as
part of the
full project
proposal
(7,280,000)
for the TNC
and BUR 1
09-Jul-
2015 4,038,360v
August
2016
December
2016
All components for BUR 1 complete Note: CEO Endorsement request
and Project Document approved by GEF Secretariat 18-Jul-2014
20. Colombia UNDP 11-Dec-2015
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
21. Comoros UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 19-Feb-2016 352,000
13-Apr-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
22. Congo Republic UNEP
BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.
23. Costa Rica UNDP 09-Dec-2015
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
24. Cote D’Ivoire UNEP BUR 1 under
preparation
09-Oct-
2013
(BUR 2)
18-Nov-2013
Not
applicable4
18-Apr-2014 352,000 30–Sep-
2014 182,140
September
2016
December
2016
BUR 2 under preparation National Circumstances: Completed GHG Inventories: >75% Completed Domestic measurement reporting
and verification (MRV): 50-75% Completed
Mitigation Actions and their effects: 50-75% Completed
Other Information: 50-75% Completed
Constraints & Gaps: >75% Completed
Process for requesting GEF funding for BUR 2 preparation has been initiated
FC
CC
/SB
I/201
6/IN
F.1
8
2
7
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
25. Democratic Republic of Congo
UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 18-Sep-2015 352,000
11-Feb-
2016 10,000
Not yet
determined
Not yet
determined
PIP under review by EA for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
26. Djibouti UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016
27. Dominica UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 07-Jan-2016 352,000
16-Mar-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
28. Ecuador UNDP 21-Sep-2016
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
29. Egypt UNDP BUR 1 under
preparation
11-Jun-
2014
(BUR 1)
03-Nov-2014
Not
applicable4
22-Apr-2015 352,000 06-Nov-
2015 352,000 April 2017 May 2017
BUR 1 under preparation National Circumstances: < 25%
Completed GHG Inventories: < 25% Completed Domestic Measurement, Reporting
and Verification (MRV): < 25% Completed
Mitigation Actions and their effects: Not yet initiated
Other Information: Not yet initiated Constraints & Gaps: Not yet
initiated
28
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
30. El Salvador UNDP BUR 1 under
preparation
13-Aug-
2013
(BUR 1)
12-Sep-2013 07-Nov-
2013 02-Dec-2014
352,000 as
part of the
EA proposal
(852,000)
for the TNC
and BUR 1
24-Mar-
2015 523,0005
January
2017
April
2017
BUR 1 under preparation National Circumstances: <25%
Completed GHG Inventory: <25% Completed Mitigation Actions and their effects:
<25% Completed Domestic Measurement Reporting
and Verification (MRV): Not yet initiated
Constraints & Gaps: <25% Completed
Other Information: Not yet initiated Note: BUR included in the EA
Proposal for TNC and BUR 1 approved by the GEF Council in the November 2013 Work Program. Due to internal approval process within the government, the final approval took much longer than originally planned
31. Equatorial Guinea UNEP
BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 18-Jul-2016 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
BUR 1 under preparation Initial funds for PIP preparation to
be disbursed based on confirmation of BUR bank account details received from EA on 18-Aug-2016
Note: Revised umbrella program was CEO endorsed on 24-Jun-20153
32. Eritrea UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 05-Jan-2016 352,000
02-Mar-
2016 10,000
Not yet
determined
Not yet
determined
BUR 1 under preparation PIP under preparation Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
33. Fiji UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014
Project
Cooperation
Agreement
sent for
signing
352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Project Cooperation Agreement sent to EA for signing in August 2015 for BUR 1
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
FC
CC
/SB
I/201
6/IN
F.1
8
2
9
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
34. Gabon UNEP BUR 1 under
preparation
31-Mar-
2015
(BUR 1)
12-May-
2015
Not
applicable4
01-Sep-2015 352,000 11-Apr-
2016 10,000
Not yet
determined
Not yet
determined PIP under preparation for BUR 1
35. Gambia UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 12-Nov-2015 352,000
06-Jun-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
36. Georgia UNDP 18-Jul-2016
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
37. Ghana UNEP 21-Jul-2015
(BUR 1)
14-Aug-
2015
(BUR 2)
15-Jan-2016
Not
applicable4
24-Mar-2016
352,000 as
part of the
EA proposal
(852,000)
for the FNC
and BUR 2
08-Jul-
2016 20,0005
Not yet
determined
Not yet
determined PIP under preparation for BUR 2
38. Guinea UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 22-Oct-2015 352,000
15-Jul-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
39. Guinea Bissau UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 24-Mar-2016 352,000
11-May-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
40. Guyana UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 21-Apr-2016 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Awaiting bank account details for transfer of initial cash advance to EA for BUR 1
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
41. Haiti UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 01-Sep-2015 352,000
16-Feb-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
30
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
42. Honduras UNDP BUR 1 under
preparation
26-Feb-
2014
(BUR 1)
02-May-
2014
Not
applicable4
20-Feb-2015
352,000 as
part of the
EA proposal
(852,000)
for the TNC
and BUR 1
09-Mar-
2015 469,2175 October 2017
December
2017
BUR 1 under preparation National Circumstances: Not yet
initiated GHG Inventory: <25% Completed Mitigation Actions and their effects:
Not yet initiated Domestic Measurement Reporting
and Verification (MRV): Not yet initiated
Constraints & Gaps: <25% Completed
Other Information: Not yet initiated Note: BUR included in the EA
Proposal for TNC and BUR 1
43. India UNDP 22-Jan-2016
(BUR 1)
14-Sep-
2011
(BUR 2)
26-Jan-2012 29-Feb-
2012 10-Jun-2013
2,625,000 as
part of the
full project
proposal
(9,010,604)
for the TNC,
BUR 1 and 2
25-Sep-
2013 3,486,4125
November
2016
December
2016
BUR 2 under preparation National Circumstances: Not yet
initiated GHG Inventories: <25% Completed Mitigation Actions and their effects:
Not yet initiated Domestic measurement reporting
and verification (MRV): Not yet initiated
Constraints & Gaps: Not yet initiated
Other Information: Not yet initiated
44. Indonesia UNDP 18-Mar-2016
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
45. Iraq UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs.
The Full Size Project was approved by the GEF Council on 09-Jun-2016
IA is preparing GEF CEO endorsement request documents
FC
CC
/SB
I/201
6/IN
F.1
8
3
1
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
46. Jamaica UNDP BUR 1 under
preparation
29-May-
2013
(BUR 1)
18-Jul-2013 05-Sep-
2013 16-Jul-2014
352,000 as
part of the
EA proposal
(852,000)
for the TNC
and BUR 1
09-Oct-
2014 554,2855
April
2016
November
2016
All BUR 1 components completed Note: BUR included in the EA
Proposal for TNC and BUR 1, approved by the GEF Council in the August 2013 Special Intersessional Work Program
47. Jordan UNDP BUR 1 under
preparation
31-Jul-
2014
(BUR 1)
03-Nov-2014
Not
applicable4
06-Jan-2015 352,000 03-Jun-
2015 145,000 May 2017 July 2017
BUR 1 under preparation National Circumstances: >75%
Completed GHG Inventories: 25-50%
Completed Mitigation Actions and their effects:
25-50% Completed Domestic measurement reporting
and verification (MRV): 25-50% Completed
Constraints & Gaps: 50-75% Completed
Other Information: Not yet initiated
48. Kazakhstan UNDP 16-Feb-2016
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
49. Kiribati UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 26-Jan-2016 352,000
14-Mar-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
50. Kyrgyzstan UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016
32
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
51. Kuwait UNEP BUR 1 under
preparation
17-Sep-
2013
(BUR 1)
10-Mar-
2014
Not
applicable4
03-Sep-2014
352,000 as
part of the
EA proposal
(852,000)
for the SNC
and BUR 1
23-Oct-
2014 15,000
December
2017 March 2018
BUR 1 under preparation National Circumstances: Not yet
initiated GHG Inventories: <25% Completed Domestic measurement reporting
and verification (MRV): Not yet initiated
Mitigation Actions and their effects: Not yet initiated
Other Information: Not yet initiated Constraints & Gaps: Not yet
initiated
52. Lao People's Democratic Republic
UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 22-Oct-2015 352,000
26-Feb-
2016 10,000
Not yet
determined
Not yet
determined
PIP under review by IA for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
53. Lebanon UNDP 13-Oct-2015
(BUR 1)
15-Jan-
2015
(BUR 2)
16-Feb-2016
Not
applicable4
07-May-2016 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Agency Project Document for BUR 2 under signature
54. Lesotho UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 18-Sep-2015 352,000
14-Mar-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
55. Liberia UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 07-Jan-2016 352,000
16-Mar-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
56. Macedonia UNDP 26-Feb-2015
(BUR 1)
22-Dec-
2015
(BUR 2)
23-Feb-2016
Not
applicable4
16-Jun-2016 352,000 28-Jun-
2016 237,000 February 2017
April
2017
BUR 2 under preparation National Circumstances: Not yet
initiated GHG Inventories: < 25% Completed Domestic Measurement, Reporting
and Verification (MRV): < 25% Completed
Mitigation Actions and their effects: Not yet initiated
Other Information: Not yet initiated Constraints & Gaps: Not yet
initiated
FC
CC
/SB
I/201
6/IN
F.1
8
3
3
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
57. Madagascar UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 24-Apr-2016 352,000
05-May-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
58. Malawi UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 29-Oct-2015 352,000
26-Feb-
2016 10,000
Not yet
determined
Not yet
determined
PIP under review by IA for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
59. Malaysia UNDP 03-Mar-2016
(BUR 1)
04-Aug-
2016
(BUR 2)
Pending
approval
Not
applicable4
Pending
approval 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
BUR 2 funding request cleared for approval by the GEF Secretariat on 16-Sep-2016
60. Maldives UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 25-Jan-2016 352,000
09-May-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
61. Mali UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 01-Sep-2015 352,000
11-Feb-
2016 10,000
Not yet
determined
Not yet
determined
PIP sent to EA for signing for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
62. Mauritania UNEP 14-Mar-2016
(BUR 1)
16-Mar-
2016
(BUR 2)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.
63. Mauritius UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 24-Dec-2015 352,000
09-Mar-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
34
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
64. Mexico UNDP 23-Oct-2015
(BUR 1)
13-Sep-
2012
(BUR 2)
01-Oct-2012 15-Nov-
2012 30-Jun-2015
Part of the
full project
proposal
(3,636,364)
for the NC 6
and BUR 2
26-Aug-
2016 2,221,3005
December
2016
March
2018
BUR 2 under preparation National Circumstances: <25%
Completed GHG Inventories: 25-50%
Completed Domestic measurement reporting
and verification (MRV): <25% Completed
Mitigation Actions and their effects: <25% Completed
Other Information: <25% Completed
Constraints & Gaps: <25% Completed
65. Micronesia (Federated States of)
UNDP BUR 1 under
preparation
02-Jun-
2016
(BUR 1)
15-Sep-2016
Not
applicable4
Under
preparation
352,000 as
part of the
EA proposal
(852,000)
for the TNC
and BUR 1
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Request for TNC and BUR 1 project funding approved by the GEF Secretariat on 15-Sep-2016
66. Mongolia UNEP BUR 1 under
preparation
16-Apr-
2014
(BUR 1)
11-Jun-2014
Not
applicable4
21-Jul-2014 352,000 20-Nov-
2014 118,707
January
2017
June
2017
BUR 1 under preparation National Circumstances: 50-75%
Completed GHG Inventories: >75% Completed Domestic measurement reporting
and verification (MRV): <25% Completed
Mitigation Actions and their effects: < 25% Completed
Other Information: 50-75% Completed
Constraints & Gaps: 50-75% Completed
67. Montenegro UNDP 13-Jan-2016
(BUR 1)
05-Apr-
2016
(BUR 2)
12-Jul-2016
Not
applicable4
Agency Project
Document
under
preparation
for IA
clearance
352,000
Not yet
disburse
d
Not yet
disbursed
March
2019
March
2019
Agency Project Document under preparation for IA clearance for BUR 2
FC
CC
/SB
I/201
6/IN
F.1
8
3
5
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
68. Morocco UNDP 07-May-2016
(BUR 1)
26-Apr-
2016
(BUR 2)
02-Jun-2016
Not
applicable4
Agency Project
Document
under review
for IA
clearance
352,000 as
part of the
EA proposal
(852,000)
for the FNC
and BUR 2
Not yet
disburse
d
Not yet
disbursed
December
2018
December
2018
Agency Project Document under review for IA clearance for BUR 2
69. Mozambique UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 19-May-2016 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
70. Myanmar UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014
Project
Cooperation
Agreement
sent for
signing
352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Project Cooperation Agreement awaiting EA Cabinet Committee’s approval for BUR 1
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
71. Namibia UNDP 02-Dec-2014
(BUR 1)
20-Feb-
2015
(BUR 2)
12-May-
2015
Not
applicable4
03-Jul-2015 352,000 03-Sep-
2015 338,000
November
2016
December
2016
BUR 2 under preparation National Circumstances: <25%
Completed GHG Inventories: >75% Completed Domestic measurement reporting
and verification (MRV): 25-50% Completed
Mitigation Actions and their effects: 25-50% Completed
Other Information: <25% Completed
Constraints & Gaps: <25% Completed
72. Nauru UNEP -- -- -- -- -- -- -- -- -- --
Process for requesting GEF funding for BUR 1 preparation has been initiated
73. Nepal UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.
36
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
74. Nigeria UNDP BUR 1 under
preparation
11-Sep-
2014
(BUR 1)
03-Nov-2014
Not
applicable4
14-May-2015 352,000 10-Mar-
2016 92,900
October
2016
December
2016
BUR 1 under preparation National Circumstances: 25-50%
Completed GHG Inventories: <25% Completed Domestic measurement reporting
and verification (MRV): <25% Completed
Mitigation Actions and their effects: <25% Completed
Other Information: 25-50% Completed
Constraints & Gaps: Completed
75. Oman UNEP BUR 1 under
preparation
14-Jan-
2014
(BUR 1)
02-May-
2014
Not
applicable4
05-Jun-2014 352,000 03-Sep-
2014 166,700
December
2017
April
2018
BUR 1 under preparation National Circumstances: <25%
Completed GHG Inventories: 25-50%
Completed Domestic measurement reporting
and verification (MRV): <25% Completed
Mitigation Actions and their effects: Not yet initiated
Other Information: <25% Completed
Constraints & Gaps: Not yet initiated
76. Panama UNDP BUR 1 under
preparation
02-Feb-
2015
(BUR 1)
10-Mar-
2015
Not
applicable4
22-Jun-2015
352,000 as
part of the
EA proposal
(852,000)
for the TNC
and BUR 1
03-Aug-
2015 736,6805
July
2017 October 2017
BUR 1 under preparation National Circumstances: 25-50%
Completed GHG Inventories: 25-50%
Completed Mitigation Actions and their effects:
Not yet initiated Domestic measurement reporting
and verification (MRV): Not yet initiated
Constraints & Gaps: <25% Completed
Other Information: Not yet initiated
FC
CC
/SB
I/201
6/IN
F.1
8
3
7
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
77. Papua New Guinea UNEP
BUR 1 under
preparation
25-Aug-
2014
(BUR 1)
04-Dec-2014
Not
applicable4
02-Mar-2015
352,000 as
part of the
EA proposal
(852,000)
for the TNC
and BUR 1
24-Mar-
2015 100,000
August
2018
September
2018
BUR 1 project under inception phase
78. Paraguay UNDP 30-Dec-2015
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
79. Peru UNDP 30-Dec-2014
(BUR 1)
26-Aug-
2015
(BUR 2)
08-Sep-2015
Not
applicable4
21-Jan-2016 352,000 18-Mar-
2016 247,000
December
2016
December
2016
BUR 2 under preparation National Circumstances: <25%
Completed GHG Inventories: 25-50%
Completed Domestic measurement reporting
and verification (MRV): <25% Completed
Mitigation Actions and their effects: Not yet initiated
Other Information: Not yet initiated Constraints & Gaps: Not yet
initiated
80. Republic of Moldova UNEP
05-Apr-2016
(BUR 1)
15-Apr-
2016
(BUR 2)
02-May-
2016
Not
applicable4
19-Jul-2016 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined PIP under preparation for BUR 2
81. Rwanda UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 05-Feb-2016 352,000
06-Apr-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
38
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
82. Saint Lucia UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014
Project
Cooperation
Agreement
sent for
signing
352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Review of the Project Cooperation Agreement sent to the EA has been completed
The amended Project Cooperation Agreement sent to EA for signing for BUR 1
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
83. Sao Tome and Principe UNEP
BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 29-Oct-2015 352,000
16-May-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
84. Saudi Arabia UNEP BUR 1 under
preparation
11-Jun-
2014
(BUR 1)
13-Jun-2014
Not
applicable4
21-Jul-2014 352,000 12-Nov-
2014 155,000
September
2017
November
2017
BUR 1 under preparation National Circumstances: 50-75%
Completed GHG Inventories: 50-75%
Completed Domestic measurement reporting
and verification (MRV): 25-50% Completed
Mitigation Actions and their effects: 50-75% Completed
Other Information: 50-75% Completed
Constraints & Gaps: 50-75% Completed
85. Senegal UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 24-Mar-2016 352,000
10-May-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
86. Serbia UNDP 28-Mar-2016
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
87. Seychelles UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 19-May-2016 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
FC
CC
/SB
I/201
6/IN
F.1
8
3
9
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
88. Sierra Leone UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 24-Jun-2016 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
89. Somalia UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 05-Jan-2016 352,000
23-Mar-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
90. South Africa UNEP 17-Dec 2014
(BUR 1)
07-Jan-
2013
(BUR 2)
20-Feb-2013 31-Jul-
2014 12-Sep-2014
352,000 as
part of the
EA proposal
(4,006,650)
for the TNC
and BUR 2
30-Oct-
2014 400,0005
September
2016
December
2016
BUR 2 under preparation National Circumstances: >75%
Completed GHG Inventories: >75% Completed Domestic measurement reporting
and verification (MRV): >75% Completed
Mitigation Actions and their effects: >75% Completed
Other Information: >75% Completed
Constraints & Gaps: >75% Completed
Note: This is a GEF full-size TNC project which includes $352,000 support towards BUR 2.
91. South Sudan UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 12-Jan-2016 352,000
26-Jan-
2016 10,000 January 2018 April 2018
BUR 1 project under inception phase
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
92. Sudan UNDP BUR 1 under
preparation
27-Mar-
2015
(BUR 1)
19-May-
2015
Not
applicable4
21-Apr-2016 352,000
Not yet
disburse
d
Not yet
disbursed June 2020
September
2020
Agency Project Document for BUR 1 sent to EA for signature
93. Swaziland UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016
40
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
94. Tajikistan UNDP BUR 1 under
preparation
28-Oct-
2015
(BUR 1)
03-Feb-2016
Not
applicable4
Agency Project
Document
under
preparation
for IA
clearance
352,000 as
part of the
EA proposal
(852,000)
for the FNC
and BUR 1
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Project Document under preparation for IA clearance for BUR 1
Note: BUR included in the EA Proposal for FNC and BUR 1 combined project
95. Thailand UNDP 29-Dec-2015
(BUR 1)
04-Jul-
2016
(BUR 2)
13-Jul-2016
Not
applicable4
Agency Project
Document
under
preparation
for IA
clearance
352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
Agency Project Document under preparation for IA clearance for BUR 2
96. Togo UNDP BUR 1 under
preparation
12-May-
2014
(BUR 1)
02-Jun-2014
Not
applicable4
26-Sep-2014 352,000 20-Feb-
2015 10,000 May 2017 June 2017
BUR 1 under preparation National Circumstances: 25-50%
Completed GHG Inventories: <25% Completed Mitigation Actions and their effects:
Not yet initiated Domestic measurement reporting
and verification (MRV): <25% Completed
Constraints & Gaps: Not yet initiated
Other Information: <25% Completed
97. Trinidad and Tobago UNDP
BUR 1 under
preparation
07-Aug-
2014
(BUR 1)
26-Nov-2014
Not
applicable4
Agency Project
Document
under review
for IA
clearance
352,000 as
part of the
EA proposal
(952,000)
for the TNC,
BUR 1 and
iNDC
Not yet
disburse
d
Not yet
disbursed
August
2018
September
2018
Project Document under review for IA clearance for BUR 1
Note: BUR included in the EA Proposal for TNC, BUR 1 and iNDC combined project
98. Tunisia UNDP 11-Dec-2014
(BUR 1) -- -- -- -- -- -- -- -- --
Process of requesting GEF funding for BUR 2 preparation has not been initiated
FC
CC
/SB
I/201
6/IN
F.1
8
4
1
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
99. Turkmenistan UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.
100. Uganda UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014 24-Mar-2016 352,000
03-May-
2016 10,000
Not yet
determined
Not yet
determined
PIP under preparation for BUR 1 Note: Revised umbrella program
was CEO endorsed on 24-Jun-2015 following an amendment3
101. Uruguay UNDP 7-Dec-2015
(BUR 1)
24-Feb-
2016
(BUR 2)
10-Mar-
2016
Not
applicable4
09-May-2016 352,000 03-Jun-
2016 43,236 October 2017
December
2017
BUR 2 under preparation National Circumstances: <25%
Completed GHG Inventories: <25% Completed Mitigation Actions and their effects:
<25% Completed Domestic measurement reporting
and verification (MRV): Not yet initiated
Constraints & Gaps: Not yet initiated
Other Information: Not yet initiated
102. Uzbekistan UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016
103. Vanuatu UNDP BUR 1 under
preparation
10-Mar-
2016
(BUR 1)
Pending
approval -- -- -- -- -- -- --
Request for funding TNC and BUR 1 submitted to GEF Secretariat for approval. Project approval pending submission of SNC to UNFCCC.
SNC was submitted on 15-Oct-2016. Project cleared for approval on 17-
Oct-2016.
42
FC
CC
/SB
I/201
6/IN
F.1
8
Party
Agency
Submission
date of the
last report to
COP
Date of
request
for
fundingi
Date of
project
clearance by
GEF
Secretariat
Date of
approval
by GEF
Council
Date of
approval by
Implementing
Agency (IA) of
BUR
project
Total
amount
approved
US$
Date of
initial
disburse
ment of
funds
by IA
Amount of
funding
disbursed
for BUR
preparation
(USD)ii
Approximate
date of
completion of
draft BUR
report
Approximate
date of BUR
submission to
the COP
Status of project activities
104. Vietnam UNEP 08-Dec-2014
(BUR 1)
07-Jan-
2014
(BUR 2)
29-Jan-2014
Not
applicable4
02-Mar-2016 352,000 11-Apr-
2016 10,000
Not yet
determined
Not yet
determined PIP for BUR 2 awaiting signing by IA
105. Yemen UNDP BUR 1 under
preparation
05-Jul-
2013
(BUR 1)
18-Jul-2013 05-Sep-
2013 04-Apr-2014
352,000 as
part of the
EA proposal
(852,000)
for the TNC
and BUR 1
04-Jun-
2014 472,1805 March 2017 June 2017
BUR 1 under preparation National Circumstances: 50-75%
Completed GHG Inventories: 50-75%
Completed Mitigation Actions and their effects:
50-75% Completed Domestic measurement reporting
and verification (MRV): 25-50% Completed
Constraints & Gaps: 25-50% Completed
Other Information: 50-75% Completed
106. Zambia UNEP BUR 1 under
preparation
27-Aug-
2014
(BUR 1)
03-Sep-2014 30-Oct-
2014
Project
Cooperation
Agreement
awaiting
approval
352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA awaiting for bank details for disbursement of initial cash for BUR 1
Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3
107. Zimbabwe UNEP BUR 1 under
preparation
16-Mar-
2016
(BUR 1)
04-May-
2016
09-Jun-
2016
Under
preparation 352,000
Not yet
disburse
d
Not yet
disbursed
Not yet
determined
Not yet
determined
IA is preparing GEF CEO endorsement request documents
Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.
FC
CC
/SB
I/201
6/IN
F.1
8
4
3
i The first submission date of enabling activity proposal to the GEF Secretariat ii For UNEP-supported countries, this is the amount of funding disbursed to countries as at September 2016. For UNDP-supported countries, this is the sum of
cumulative expenditures as of December 2015 and the budget approved for the year 2016. iii The UNEP Umbrella Programme to support thirty-nine (39) Least Developed Countries (LDCs) and Small Islands Developing States (SIDS) prepare and submit
good quality initial biennial update reports to the UNFCCC was CEO endorsed on 24-June-2015, following a request for a major amendment submitted by the
IA after council approval. iv Enabling activity projects below US$1 million do not require GEF Council approval. v Includes the amount of funding disbursed for BUR and NC. In combined projects, it is not possible to separate the amount of funds that have been disbursed for
BUR only.