GE.16-18633(E) Subsidiary Body for Implementation Forty-fifth session Marrakech, 714 November 2016 Item 4(c) of the provisional agenda Reporting from Parties not included in Annex I to the Convention Provision of financial and technical support Information provided by the Global Environment Facility on its activities relating to the preparation of national communications and biennial update reports Note by the secretariat 1. The Subsidiary Body for Implementation (SBI), at its forty-third session, invited the Global Environment Facility (GEF) to continue to provide detailed, accurate, timely and complete information on its activities relating to the preparation of national communications by Parties not included in Annex I to the Convention (non-Annex I Parties), including the dates of approvals of funding and disbursement of funds. It also invited the GEF to continue to provide an approximate date for completion of draft national communications and an approximate date for submission of final national communications to the secretariat, for consideration at SBI 45. 1 2. SBI 44 invited the GEF to continue to provide detailed information on its activities relating to the preparation of biennial update reports by non-Annex I Parties, including the dates of requests for funding, approval of funding and disbursement of funds, for consideration at SBI 45. 2 3. The information referred to in paragraphs 1 and 2 above has been reproduced in annexes I and II, respectively, as received from the GEF and without formal editing. * 1 FCCC/SBI/2015/22, paragraph 33. 2 FCCC/SBI/2016/8, paragraph 32. * Received from the Global Environment Facility secretariat on 21 October 2016. United Nations FCCC/SBI/2016/INF.18 Distr.: General 26 October 2016 English only
Transcript
Page 1: Marrakech, 7 14 November 2016 Provision of financial and ...

GE.16-18633(E)

Subsidiary Body for Implementation Forty-fifth session

Marrakech, 7–14 November 2016

Item 4(c) of the provisional agenda

Reporting from Parties not included in Annex I to the Convention

Provision of financial and technical support

Information provided by the Global Environment Facility

on its activities relating to the preparation of national communications

and biennial update reports

Note by the secretariat

1. The Subsidiary Body for Implementation (SBI), at its forty-third session, invited the

Global Environment Facility (GEF) to continue to provide detailed, accurate, timely and

complete information on its activities relating to the preparation of national

communications by Parties not included in Annex I to the Convention (non-Annex I

Parties), including the dates of approvals of funding and disbursement of funds. It also

invited the GEF to continue to provide an approximate date for completion of draft national

communications and an approximate date for submission of final national communications

to the secretariat, for consideration at SBI 45.1

2. SBI 44 invited the GEF to continue to provide detailed information on its activities

relating to the preparation of biennial update reports by non-Annex I Parties, including the

dates of requests for funding, approval of funding and disbursement of funds, for

consideration at SBI 45.2

3. The information referred to in paragraphs 1 and 2 above has been reproduced in

annexes I and II, respectively, as received from the GEF and without formal editing.*

1 FCCC/SBI/2015/22, paragraph 33.

2 FCCC/SBI/2016/8, paragraph 32.

* Received from the Global Environment Facility secretariat on 21 October 2016.

United Nations FCCC/SBI/2016/INF.18

Distr.: General

26 October 2016

English only

Page 2: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

2

Annex I

STATUS OF NATIONAL COMMUNICATIONS FROM PARTIES NOT INCLUDED IN ANNEX I TO THE CONVENTION

N o t e : I n f o r m a t i o n w a s c o m p i l e d b y t h e I m p l e m e n t i n g A g e n c i e s ( U N D P a n d U N E P ) . T h e t a b l e b e l o w w a s s u b m i t t e d

t o t h e G E F b y t h e N a t i o n a l C o m m u n i c a t i o n s S u p p o r t P r o g r a m m e ( N C S P ) . W e k i n d l y r e q u e s t P a r t i e s t o i n f o r m

t h e i r r e s p e c t i v e i m p l e m e n t i n g a g e n c i e s i f t h e r e a r e i n c o n s i s t e n c i e s i n t h e i n f o r m a t i o n b e l o w .

I N C – I n i t i a l N a t i o n a l C o m m u n i c a t i o n , S N C – S e c o n d N a t i o n a l C o m m u n i c a t i o n , T N C – T h i r d N a t i o n a l C o m m u n i c a t i o n ,

F N C – F o u r t h N a t i o n a l C o m m u n i c a t i o n , I A - I m p l e m e n t i n g A g e n c y , E A - E x e c u t i n g A g e n c y

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

1. Afghanistan UNEP 12-Mar-2013

(INC)

19-Aug-2014

(SNC) 500,000 09-Sept-2014 Jun-2017 Aug-2017

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: 50-75% Completed Other Information: >75% Completed Constraints & Gaps: 25-50% Completed

2. Albania UNDP 23-Nov-2009

(SNC)

18-Nov-11

(TNC) 500,000 18-Sep-2012 Mar-2016 Oct-2016 All components completed

3. Algeria UNDP 25-Nov-2010

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated

4. Angola UNEP 06-Feb-2012

(INC)

14-May-2013

(SNC) 500,000 05-Jun-2013 Dec- 2016 Jan-2017

National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: >75% Completed Constraints & Gaps: 50-75% Completed

5. Antigua and Barbuda UNEP

23-Sep-2016

(TNC) - - - - -

Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.

The FSP was approved by the GEF Council on 09-Jun-2016

IA is preparing GEF CEO Endorsement request documents.

6. Argentina World

Bank

09-Dec-2015

(TNC) - - - - -

Process for requesting GEF funding for FNC preparation has not been initiated.

Page 3: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

3

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

7. Armenia UNDP 22-Apr-2015

(TNC)

Agency project

document under

review for IA

clearance

(FNC)

500,000 Not yet

disbursed Dec-2019 Dec-2019

Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC

& BUR 2 (US$ 852,000)

8. Azerbaijan UNDP 25-May-2016

(TNC)

Agency project

document under

review for IA

clearance

(FNC)

500,000 Not yet

disbursed Dec-2019 Dec-2019

Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC

& BUR 2 (US$ 852,000)

9. Bahamas UNDP 20-Nov-2015

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated

10. Bahrain UNEP 15-Mar-2012

(SNC)

04-Mar-2014

(TNC) 500,000 25-Apr-2014 Apr-2019 Dec-2019

PIP preparation completed Internal Cooperation Agreement under approval process

11. Bangladesh UNDP 26-Dec-2012

(SNC)

22-Aug-2013

(TNC) 456,621 06-Aug-2014 Jan-2017 Jun-2017

National Circumstances: >75% Completed GHG Inventories: 50-75% Completed V&A Analysis: >75% Completed Mitigation Analysis: 50-75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed

12. Barbados UNDP 30-Oct-2001

(INC)

22-Nov-2006

(SNC) 420,000 02-Mar-2007 Aug-2015 Dec-2016 All components completed

13. Belize UNDP 27-Apr-2016

(TNC) -- -- -- -- --

Process for requesting GEF funding for FNC preparation has not been initiated

14. Benin UNEP

23-Nov-2011

(SNC)

23-Sep-2014

(TNC) 500,000 03-Oct-2014 Sept-2017 Dec-2017

National Circumstances: 25-50% Completed GHG Inventories: >75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: <25% Completed Other Information: 25-50% Completed Constraints & Gaps: Not yet initiated

15. Bhutan UNEP 28-Nov-2011

(SNC)

01-Sep-2014

(TNC) 500,000 17-Nov-2014 To be determined To be determined TNC PIP under preparation by EA

Page 4: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

4

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

16. Bolivia UNDP 02-Dec-2009

(SNC)

11-Feb-2011

(TNC) 500,000 09-Sep-2011 Sept-2016 Nov-2016

National Circumstances: >75% Completed GHG Inventory: >75% Completed V&A Assessment: 50-75% Completed Mitigation Analysis: 50-75% Completed Other information: 50-75% Completed Constraints & Gaps: >75% Completed

17. Bosnia and Herzegovina UNDP

11-Nov-2013

(SNC)

23-Apr-2014

(TNC) 500,000 03-Jul-2014 Sept-2016 Apr- 2017 All components completed

18. Botswana UNDP 08-Jan-2013

(SNC)

24-Nov-2015

(TNC) 500,000 08-Jun-2016 Aug-2017 Dec-2017

National Circumstances: Not yet initiated GHG Inventories: Not yet initiated V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

19. Brazil UNDP 20-Apr-2016

(TNC)

14-Jul-2016

(FNC) 6,478,500

Not yet

disbursed Aug-2019 May-2020

Project Document under signature US$ 6,475,500 as part of a combined EA proposal for

FNC & BUR 2 (US$ 7,528,500)

20. Burkina Faso UNEP 01-Apr-2015

(SNC)

05-Nov-2013

(TNC) 500,000

15-Jul-2014

May-2019 Aug-2019 TNC project under inception phase

21. Burundi UNEP 28-June-2010

(SNC)

23-Jul-2013

(TNC) 500,000 08-Oct-2013 Aug-2018 Oct-2018

National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: Not initiated Mitigation Analysis: Not initiated Other Information: Not initiated Constraints & Gaps: Not initiated

22. Cambodia UNEP

13-Jan-2016

(SNC)

16-Sept-2013

(TNC) 500,000 27-Oct-2015 Mar-2019 Jun-2019 TNC Project under inception phase

23. Cameroon UNEP 11-Mar-2016

(SNC) - - - - -

Process for requesting GEF funding for TNC preparation has been initiated

24. Cape Verde UNDP 21-Oct-2011

(SNC)

09-Sep-2013

(TNC) 500,000 14-Feb-2014 Nov-2016 Dec-2016

National Circumstances: 25-50% Completed GHG Inventories: Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: <25% Completed

Page 5: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

5

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

25. Central African Republic UNEP

05-Feb-2015

(SNC)

06-Jul-2016

(TNC) 500,000

Not yet

disbursed To be determined To be determined EA awaiting funds for TNC PIP preparation

26. Chad UNEP 04-Jun-2013

(SNC)

02-Oct-2012

(TNC) 500,000 11-Oct-2012 Nov-2017 Feb-2018

National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: <25% Completed Other Information: Not yet initiated Constraints & Gaps: Not yet initiated

27. Chile UNDP 24-Oct-2011

(SNC)

27-Jul-2012

(TNC) 500,000 12-Oct-2012 Dec-2016 Jul-2017

National Circumstances: >75% Completed GHG Inventories: 50-75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: 50-75% Completed Constraints & Gaps: >75% Completed

28. China UNDP 08-Nov-2012

(SNC)

03-Nov-2014

(TNC) 6,387,600 09-Jul-2015 Jun- 2018 Sept-2018

National Circumstances: Not yet initiated GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed US$ 6,387,600 as part of a combined EA proposal for

TNC & BUR 1 (US$ 7,280,000)

29. Colombia UNDP 07-Dec-2010

(SNC)

25-Nov-2013

(TNC) 2,000,000 17-Dec-2013 Jul-2017 Sept-2017

National Circumstances: 50-75% Completed GHG Inventories: 50-75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: 50-75% Completed Constraints & Gaps: 50-75% Completed

30. Comoros UNEP 24-Jun-2013

(SNC)

27-Jul-2014

(TNC) 500,000

Not yet

disbursed To be determined To be determined

Awaiting bank details for transfer of initial cash advance to EA

31. Congo (Republic of) UNEP

27-Nov-2009

(SNC)

01-Sept-2014

(TNC) 500,000 15-Dec-2014 To be determined To be determined TNC PIP awaiting signing by EA

32. Congo Democratic Republic

UNEP 21-Apr-2015

(TNC) - - - - -

Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.

The FSP was approved by the GEF Council on 09-Jun-2016

IA is preparing GEF CEO endorsement request documents.

Page 6: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

6

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

33. Cook Islands UNEP 12-Apr-2012

(SNC)

06-May-2014

(TNC) 500,000 19-May-2014 Jun-2018 Dec-2018

National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed

34. Costa Rica UNDP 11-Dec-2014

(TNC) -- -- -- -- --

Process for requesting GEF funding for FNC preparation has not been initiated

35. Côte d’Ivoire UNEP 26-Apr-2010

(SNC)

11–May-2012

(TNC) 500,000 12-Feb-2013 Oct-2016 Dec-2016

All TNC components completed Process for requesting GEF funding for FNC preparation

has been initiated

36. Cuba UNDP 01-Oct-2015

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated.

37. Democratic People's Republic of Korea

UNEP 15-Oct-2013

(SNC)

PIP preparation

suspended

(TNC)

500,000

PIP

preparation

suspended

To be determined To be determined TNC PIP preparation suspended

38. Djibouti UNEP 19-Feb-2014

(SNC)

26-Mar-2014

(TNC) 500,000 19-Apr-2014 Nov-2018 Dec-2018 TNC Project under inception phase

39. Dominica UNEP 20-Nov-2012

(SNC)

29-Aug-2014

(TNC) 500,000 11-Sept-2014 Jul-2017 Aug-2017

National Circumstances: <25% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: <25% Completed

40. Dominican Republic UNDP

17-Dec-2009

(SNC)

14-Aug-2013

(TNC) 500,000 10-Oct-2013 Sept-2016 Nov-2016

National Circumstances: Completed GHG Inventories: Completed V & A Analysis: >75% Completed Mitigation Analysis: 25-50% Completed Other Information: Completed Constraints & Gaps: >75% Completed

41. Ecuador UNDP 02-Apr-2012

(SNC)

21-Jan-2014

(TNC) 500,000 25-Feb-2014 Oct-2016 Nov-2016

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: >75% Completed Other Information: 50-75% Completed Constraints & Gaps: >75% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

Page 7: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

7

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

42. Egypt UNDP 07-Jun-2010

(SNC)

27-Apr-2011

(TNC) 500,000 06-Jun-2011 Apr-2016 Dec-2016 All components completed

43. El Salvador UNDP 11-Sep-2013

(SNC)

02-Dec-2014

(TNC) 500,000 24-Mar-2015 Apr-2017 Sept-2017

National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

44. Equatorial Guinea UNEP

INC under

preparation

02-Mar-2009

(INC) 420,000 23-Apr-2009 Oct-2016 Dec-2016 All INC components completed

45. Eritrea* UNEP

10-Aug-2012

(SNC)

02-Jul-2013

(TNC) 500,000 13-Sept-2013 Oct-2017 Dec-2017

National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated *Information based on previous survey. IA did not

receive a response to request for updated information from EA after repeated request

46. Ethiopia UNDP 11-May-2016

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated

47. Fiji UNEP 31-Jul-2014

(SNC)

01-Sep-2014

(TNC) 500,000 11-Sep-2014 Dec-2016 Jul-2017

National Circumstances: 25-50% Completed GHG Inventories: 50-75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 50-75% Completed Other Information: 50-75% Completed Constraints & Gaps: 25-50% Completed

48. Gabon UNDP 08-Dec-2011

(SNC)

06-Mar-2014

(TNC) 480,000 19-Aug-2014 Jul-2018 Dec-2018

National Circumstances: >75% Completed GHG Inventories: Completed V & A Analysis: <25% completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated

Page 8: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

8

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

49. Gambia UNEP 28-Jan-2013

(SNC)

27-Mar-2013

(TNC) 500,000 15-Apr-2013 Dec-2016 Mar-2017

National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: <25% Completed Other Information: Completed Constraints & Gaps: Completed Request for FNC GEF funding included in the UNEP Full

Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-

2016 IA is preparing GEF CEO endorsement request

documents.

50. Georgia UNDP 24-Feb-2016

(TNC) -- -- -- -- --

Process for requesting GEF funding for FNC preparation has been initiated

51. Ghana UNEP 21-Jul-2015

(TNC)

24-Mar-2016

(FNC) 500,000 08-Jul-2016 To be determined To be determined

FNC and BUR 2 PIP under preparation by EA US$ 500,000 as part of a combined EA proposal for FNC

& BUR 2 (US$ 852,000)

52. Grenada UNDP 21-Nov-2000

(INC)

08-Sep-2006

(SNC) 420,000 01-May-2007 Dec-2016 Feb-2017

National Circumstances: >75% Completed GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated Request for TNC GEF funding included in the UNEP Full

Size Project (FSP) for NCs. The FSP was approved by the GEF Council on 07-Jun-

2012

53. Guatemala UNDP 11-Jan-2016

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has been initiated

54. Guinea UNEP 28-Oct-2002

(INC)

24-Sep-2007

(SNC) 420,000 01-Oct-2007 Sept-2016 Dec-2016 All SNC components completed

Page 9: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

9

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

55. Guinea Bissau UNEP 29-Oct-2011

(SNC)

21-Mar-2012

(TNC) 500,000 27-Mar-2012 Sept- 2016 Dec-2016

All TNC components completed Request for FNC GEF funding included in the UNEP Full

Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-

2016 IA is preparing GEF CEO endorsement request

documents

56. Guyana UNEP 24-Sep-2012

(SNC)

02-Aug-2012

(TNC) 500,000 28-Sept-2012

Jul-2019

Nov-2019

National Circumstances: <25% Completed GHG Inventories: Not yet initiated V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated

57. Haiti UNEP 07-Oct-2013

(SNC)

18-Jun-2014

(TNC) 500,000 08-July-2014 Jun-2017 Aug-2017

National Circumstances: Completed GHG Inventories: <25% Completed V&A Assessment: 25-50% Completed Mitigation Analysis: Not yet initiated Other information: <25% Completed Constraints & Gaps: Not yet initiated

58. Honduras UNDP 05-Apr-2012

(SNC)

20-Feb-2015

(TNC) 500,000 09-Mar-2015 Oct-2017 Dec-2017

National Circumstances: Not yet initiated GHG Inventories: <25% Completed V & A Analysis: Not yet initiated Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: <25% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

59. India UNDP 04-May-2012

(SNC)

11-Jun-2013

(TNC) 6,385,604 25-Sep-2013 Mar-2018 Mar-2019

Project under inception phase US$ 6,385,604 as part of a combined EA proposal for

TNC, BUR 1 & BUR 2 (US$ 9,010,604)

60. Indonesia UNDP 14-Jan-2011

(SNC)

22-Nov-2013

(TNC) 4,500,000 06-May-2014 Dec-2016 Mar-2017

National Circumstances: <25% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 50-75% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed US$ 4,080,444 as part of a combined EA proposal for

TNC & BUR 1 (US$ 4,500,000)

Page 10: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

10

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

61. Iran, Islamic Republic of UNDP

23-Nov-2011

(SNC)

20-Dec-2011

(TNC) 500,000 20-Jan-2012 Sept-2016 Dec-2016

National Circumstances: Completed GHG Inventories: Completed V & A Analysis: Completed Mitigation Analysis: Completed Other Information: Completed Constraints & Gaps: 50-75% Completed

62. Iraq

UNEP

05-Dec-2015

(INC) -- -- -- -- --

Request for SNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.

The FSP was approved by the GEF Council on 09-Jun-2016

IA is preparing GEF CEO endorsement request documents

63. Jamaica UNDP 02-Dec-2011

(SNC)

16-Jul-2014

(TNC) 500,000 09-Oct-2014 Jun-2017 Nov-2017

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: <25% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

64. Jordan UNDP 02-Dec-14

(TNC) -- -- -- -- --

Process for requesting GEF funding for FNC preparation has not been initiated

65. Kazakhstan UNDP 24-Dec-2013

(NC 3, 4, 5 & 6) 17-Jul-2014 500,000 23-Sep-2014 May 2017 Dec-2017

National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for NC &

BUR 1 (US$ 852,000)

66. Kenya UNEP 11-Dec-2015

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated

67. Kiribati UNEP 27-Jun-2013

(SNC)

09-May-2014

(TNC) 500,000 08-Jul-2014 To be determined To be determined TNC PIP under preparation

68. Kuwait UNEP 30-Nov-2012

(INC)

03-Sep-2014

(SNC) 500,000 22-Sep-2014 Sept-2018 Mar-2019

National Circumstances: <25% Completed GHG Inventories: <25% Completed V&A Assessment: <25% Completed Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated

Page 11: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

1

1

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

69. Kyrgyzstan UNEP 01-Dec-2008

(SNC)

11–May-2012

(TNC) 500,000 17-Sep-2012 Sept-2016 Dec-2016

All TNC components completed Request for FNC GEF funding included in the UNEP Full

Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-

2016 IA is preparing GEF CEO endorsement request

documents

70. Lao People's Democratic Republic

UNEP 24-Jun-2013

(SNC)

29-Oct-2013

(TNC) 500,000 19-Nov-2013 Mar-2018 Dec-2018

National Circumstances: <25% Completed GHG Inventories: Not yet initiated V & A Analysis: Not yet initiated Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated

71. Lebanon UNDP 01-Mar-2011

(SNC)

01-Dec-2011

(TNC) 500,000 02-Mar-2012 Sept-2016 Dec-2016

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed

72. Lesotho UNEP 20-Nov-2013

(SNC)

23-Jan-2014

(TNC) 500,000 25-Feb-2014

Feb-2018

Jun-2018

National Circumstances: 25-50% Completed GHG Inventories: 50-75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: Not yet initiated

73. Liberia* UNEP 28-Jun-2013

(INC)

05-Apr-2013

(SNC) 500,000 21- May-2013 Mar-2016 Dec-2016

National Circumstances: Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated *Information based on previous survey. IA did not

receive a response to request for updated information from EA after repeated request

74. Libyan Arab Jamahiriya * UNEP

INC under

preparation

31-Jan-2002

(SNC) 275,000 20-Feb-2002 -- --

National Circumstances 50-75% Completed GHG Inventories: 50% Completed *Project Implementation stalled due to political

instability

Page 12: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

12

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

75. Madagascar UNEP 07-Dec-2010

(SNC)

17-Oct-2011

(TNC) 500,000 02-Nov-2011 Nov-2016 Dec-2016

All TNC components completed Request for FNC GEF funding included in the UNEP Full

Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-

2016 IA is preparing GEF CEO endorsement request

documents

76. Malawi UNEP 09-May-2012

(SNC)

26-July-2013

(TNC) 500,000 18-Sep-2013 Jun-2017 Dec-2017

National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed

77. Malaysia UNDP 14-Apr-2011

(SNC)

18-Mar-2014

(TNC) 500,000 06-May-2014 Jun-2017 Dec-2017

National Circumstances: 50-75% Completed GHG Inventories: 50-75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

78. Maldives UNEP 13-Oct-2016

(SNC) -- -- -- -- --

Request for TNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.

The FSP was approved by the GEF Council on 09-Jun-2016

IA is preparing GEF CEO endorsement request documents.

79. Mali UNDP 04-May-2012

(SNC)

18-Mar-2014

(TNC) 500,000 05-Jun-2014 Sept- 2017 Nov-2017

National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: Not reported Constraints & Gaps: Not reported

80. Marshall Islands UNDP

11-Dec-2015

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated

81. Mauritania UNEP 27-Oct-2014

(TNC)

02-Mar-2016

(FNC) 500,000 03-Jul-2016 Apr-2019 Jun-2019 FNC project under inception phase

Page 13: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

1

3

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

82. Mauritius UNEP 09-Nov-2011

(SNC)

30-Apr-2014

(TNC) 500,000 16-Jul-2014 Sept-2016 Dec-2016

National Circumstances: > 75% Completed GHG Inventories: 50-75% Completed V & A Analysis: > 75% Completed Mitigation Analysis: > 75% Completed Other Information: > 75% Completed Constraints & Gaps: 25-50% Completed

83. Mexico UNDP 06-Dec-2012

(NC 6)

30-Jun-2015

(NC) 3,636,364 26-Aug-2015 Sept-2017 Mar-2018

National Circumstances: 50-75% Completed GHG Inventories: <25% Completed V & A Analysis: <25% completed Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: <25% Completed The project will also support the preparation of Mexico’s

BUR 2.

84. Micronesia (Federated States of)

UNDP 12-Nov-2015

(SNC) -- 500,000 -- -- --

Request for TNC and BUR 1 project funding was approved by the GEF Secretariat on 15-Sep-2016

US$ 500,000 as part of a combined EA proposal for FNC & BUR 1 (US$ 852,000)

85. Mongolia UNEP 10-Dec-2010

(SNC)

06-May-2014

(TNC) 500,000 23-May-2014 Apr-2017 Dec-2017

National Circumstances: 50-75% Completed GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed

86. Montenegro UNDP 28-May-2015

(SNC)

11-May-2016

(TNC) 500,000 08-Jun-2016 Jun-2019 Jan-2020

National Circumstances: Not yet initiated GHG Inventories: Not yet initiated V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: Not yet initiated

87. Morocco UNDP 07-May-2016

(TNC)

Agency project

document under

review for IA

clearance

(FNC)

500,000 Not yet

disbursed 2020 2020

Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC

& BUR 2 (US$ 852,000)

88. Mozambique UNEP 02-Jun-2006

(INC)

11-Oct-2006

(SNC) 420,000 25-Oct-2006

Nov-2015

Dec-2016

All SNC project components completed Project Cooperation Agreement (PCA) for TNC between

Mozambique and UNEP sent to Country

Page 14: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

14

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

89. Myanmar UNEP 26-Dec-2012

(INC)

09-May-2014

(SNC) 500,000 15-Aug-2014 Nov-2018 Dec-2018 TNC Project under inception phase

90. Namibia UNDP 02-Dec-2015

(TNC)

11-Aug-2016

(FNC) 500,000

Not yet

disbursed 2019 2019

Project Document under signature Project under inception phase

91. Nauru UNEP 01-Apr-2015

(SNC)

05-Aug-2014

(TNC) 500,000 08-Sep-2014 Jan-2019 Apr-2019 SNC Project under inception phase

92. Nepal UNEP 04-Dec-2015

(SNC)

02-Jul-2013

(TNC) 500,000 13-Sep-2013 Dec-2018 Feb-2019

National Circumstances: Not yet initiated GHG Inventories: <25% Completed V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated

93. Nicaragua* UNDP 22-Jun-2011

(SNC)

31-Aug-2014

(TNC) 500,000 31-Dec-2014 Dec-2017 Jun-2018

National Circumstances: Not yet initiated GHG Inventories: <25% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: Not yet initiated *Information based on previous survey. UNDP project

suspended following the decision of the Government of Nicaragua to implement directly all international cooperation.

94. Niger UNDP 09-Dec-2009

(SNC)

19-Jan-2012

(TNC) 500,000 13-Jun-2012 Sept-2016 Nov-2016

National Circumstances: Completed GHG Inventories: Completed V & A Analysis: Completed Mitigation Analysis: Completed Other Information: >75% Completed Constraints & Gaps: Not yet initiated

95. Nigeria UNDP 27-Feb-2014

(SNC)

13-Jul-2015

(TNC) 1,850,000 28-Jan-2016 Oct-2017 Dec-2017

National Circumstances: 25-50% Completed GHG Inventories: Not yet initiated V & A Analysis: Not yet initiated Mitigation Analysis: Not yet initiated Other Information: <25% Completed Constraints & Gaps: <25% Completed

96. Niue UNEP 02-Oct-2001

(INC)

11-Nov-2004

(SNC) 420,000 20-Dec-2004 Nov-2015 Dec-2016 All SNC components completed

Page 15: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

1

5

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

97. Oman UNEP 30-Oct-2013

(INC)

05-Jun-2014

(SNC) 500,000 12-Sep-2014 Dec-2017 Jun-2018

National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V&A Assessment: >75% Completed Mitigation Analysis: Not yet initiated Other information: < 25% Completed Constraints & Gaps: 25-50% Completed

98. Pakistan UNEP 15-Nov-2003

(INC)

03-Sep-2015

(SNC) 405,000 28-Oct-2015 Feb-2018 Jun-2018

National Circumstances: <25% Completed GHG Inventories: <25% Completed V&A Assessment: <25% Completed Mitigation Analysis: <25% Completed Other information: <25% Completed Constraints & Gaps: <25% Completed

99. Palau UNEP 18-Jun-2003

(INC)

09-Dec-2005

(SNC) 420,000 13-Dec-2005 Aug-2016 Dec-2016 All SNC project components completed

100. Panama UNDP 02-Mar-2012

(SNC)

22-Jun-2015

(TNC) 500,000 03-Aug-2015 Jul-2017 Oct-2017

National Circumstances: Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

101. Papua New Guinea

UNEP

(TNC)

15-Dec-2015

(SNC)

02-Mar-2015

(TNC) 500, 000 24-Mar-2015 Aug-2018 Sept-2018

TNC Project under inception phase US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

102. Paraguay UNDP 08-Dec-2011

(SNC)

11-Mar-2014

(TNC) 500,000 25-Apr-2014 Oct-2016 Nov-2016

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

103. Peru UNDP 23-Apr-2016

(TNC) -- -- -- -- --

Process for requesting GEF funding for FNC preparation has not been initiated

104. Philippines UNDP 29-Dec-2014

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated

Page 16: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

16

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

105. Republic of Moldova UNEP

20-Jan-2014

(TNC)

30-Apr-2014

(FNC) 500,000 19-May-2015 Jun-2017 Nov-2017

National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: 25-50% Completed Other Information: 25-50% Completed Constraints & Gaps: 25-50% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

106. Rwanda UNEP 05-Jun-2012

(SNC)

01- Sep-2014

(TNC) 500,000 10-Sep-2014 Jul-2017 Sept-2017

National Circumstances: 25-50% Completed GHG Inventories: 25-50% Completed V&A Assessment: <25% Completed Mitigation Analysis: <25% Completed Other information: 25-50% Completed Constraints & Gaps: 25-50% Completed

107. Saint Kitts and Nevis UNEP

11-Mar-2016

(SNC) -- -- -- -- --

TNC Project Cooperation Agreement (PCA) sent to country for signing

108. Saint Lucia UNEP 19-Apr-2012

(SNC)

19-Jul-2013

(TNC) 500,000 02-Aug-2013 Nov-2016 Dec-2016

National Circumstances: Completed GHG Inventories: Completed V&A Assessment: Completed Mitigation Analysis: Completed Other information: Not Yet initiated Constraints & Gaps: Not Yet initiated

109. Saint Vincent and The Grenadines

UNEP 29-Apr-2016

(SNC) -- -- -- -- --

TNC Project Cooperation Agreement (PCA) sent to country for signing

110. Samoa -- 14-Jun-2010

(SNC) -- -- -- -- --

Process for requesting GEF funding for TNC preparation has not been initiated

111. Sao Tome and Principe UNEP

03-Oct-2012

(SNC)

26-Feb-2014

(TNC) 500,000 16-Apr-2014 Mar-2018 Sept-2018

National Circumstances: >75% Completed GHG Inventories: >75% Completed V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated

112. Saudi Arabia UNEP 25-Oct-2011

(SNC)

11–Feb-2013

(TNC) 500,000 22-Feb-2013 Sept-2016 Dec-2016 All TNC components completed

113. Senegal UNEP 08-Jan-2016

(TNC) - - - - -

Process for requesting GEF funding for FNC preparation has not been initiated

114. Serbia UNDP 29-Nov-2010

(INC)

22-May-2012

(SNC) 500,000 17-Aug-2012 Dec-2015 October 2016 All SNC components completed

Page 17: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

1

7

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

115. Seychelles UNEP 14-Apr-2013

(SNC)

05-Aug-2014

(TNC) 500,000 16-Apr-2014 To be determined To be determined TNC PIP under preparation

116. Sierra Leone UNEP 02-Dec-2012

(SNC)

16-Sep-2013

(TNC) 500,000 25-Oct-2013 October 2017 December 2017

National Circumstances: Completed GHG Inventories: >75% Completed V & A Analysis: <25% Completed Mitigation Analysis: >75% Completed Other Information: 25-50% Completed Constraints & Gaps: <25% Completed

117. Solomon Islands

UNDP

(SNC)

UNEP

(TNC)

29-Sep-2004

(INC)

30-Jan-2007

(SNC) 420,000 16-Aug-2007 November 2015 December 2016

All SNC components completed TNC Project Cooperation Agreement (PCA) sent to

country for signing

118. Somalia UNEP INC under

preparation

05-Aug-2014

(INC) 500,000 23-Sep-2014 January 2018 April 2018

National Circumstances: >75% Completed GHG Inventories: Not yet initiated V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated

119. South Africa UNEP 16-Nov-2011

(SNC)

23-Sep-2014

(TNC) 3,654,650 06-Oct-2014 September 2016 December 2016

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed US$ 3,654,650 as part of a combined EA proposal for

TNC & BUR 2 (US$ 4,006,650)

120. Southern Sudan UNEP

INC under

preparation

03-Apr-2015

(SNC) 500,000 21-Apr-2015 May 2018 June 2018

National Circumstances: <25% Completed GHG Inventories: Not yet initiated V&A Assessment: Not yet initiated Mitigation Analysis: Not yet initiated Other information: Not yet initiated Constraints & Gaps: Not yet initiated

121. Sri Lanka UNDP 16-Mar-2012

(SNC)

09-Mar-2016

(TNC) 500,000 04-Apr-2016 December 2018 July 2019 Project under inception phase

122. Sudan UNDP 14-Nov-2013

(SNC)

21-Apr-2016

(TNC) 500,000

Not yet

disbursed June 2020 September 2020

Project document under signature US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

123. Suriname UNDP 15-Mar-2016

(SNC) -- -- -- -- --

TNC Project Cooperation Agreement (PCA) with UNEP sent to country for signing

Page 18: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

18

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

124. Swaziland UNEP

06–Oct–2016

(TNC) -- -- -- -- --

Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.

The FSP was approved by the GEF Council on 09-Jun-2016

125. Syrian Arab Republic UNDP

29-Dec-2010

(INC) -- -- -- -- -- Project suspended due to current unrest.

126. Tajikistan UNDP 29-Dec-2014

(TNC)

Agency project

document under

review for IA

clearance

(FNC)

500,000 Not yet

disbursed To be determined To be determined

Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for FNC

& BUR 1 (US$ 852,000)

127. Tanzania United Republic of

UNEP 04-Jul-2003

(INC)

21-Jul-2006

(SNC) 420,000 15-Aug-2006 September 2015 December 2016

All SNC components completed TNC Project Cooperation Agreement (PCA) signing

process initiated

128. Thailand UNDP 24-Mar-2011

(SNC)

23-Apr-2014

(TNC) 500,000 06-Jun-2014 October 2017 December 2017

National Circumstances: Not yet initiated GHG Inventories: >75% Completed V & A Analysis: 50-75% Completed Mitigation Analysis: 50-75% Completed Other Information: <25% Completed Constraints & Gaps: Not yet initiated US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

129. The Former Yugoslav Republic of Macedonia

UNDP 03-Mar-2014

(TNC) -- -- -- -- --

Process for requesting GEF funding for FNC preparation has not been initiated

130. Timor Leste UNDP 11-Oct-2014

(INC)

21-Oct-2014

(SNC) 1,000,000 23-Feb-2015 December 2018 April 2019

National Circumstances: <25% Completed GHG Inventories: Not yet initiated V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: <25% Completed

131. Togo UNDP 07-Nov-2015

(TNC) -- -- -- -- --

Process for requesting GEF funding for FNC preparation has not been initiated

Page 19: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

1

9

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

132. Tonga UNDP 02-May-2012

(SNC)

11-Oct-2012

(TNC) 500,000 08-Feb-2013 May 2017 July 2017

National Circumstances: >75% Completed GHG Inventories: Completed V & A Analysis: >75% Completed Mitigation Analysis: 50-75% Completed Other Information: 50-75% Completed Constraints & Gaps: 25-50% Completed

133. Trinidad and Tobago UNDP

07-Nov-2013

(SNC)

Agency project

document under

review for IA

clearance

(TNC)

500,000 Not yet

disbursed June 2018 January 2019

Project document under review for IA clearance US$ 500,000 as part of a combined EA proposal for TNC,

BUR 1, and iNDC (US$ 952,000)

134. Tunisia UNDP 14-Feb-2014

(SNC)

13-May-2014

(TNC) 500,000 11-Aug-2014 June 2017 July 2017

National Circumstances: Not yet initiated GHG Inventories: Completed V & A Analysis: Not yet initiated Mitigation Analysis: <25% Completed Other Information: Not yet initiated Constraints & Gaps: Not yet initiated

135. Turkmenistan UNEP 05-Jan-2016

(TNC) - - - - -

Request for FNC GEF funding included in the UNEP Full Size Project (FSP) for NCs and BURs.

The FSP was approved by the GEF Council on 09-Jun-2016

136. Tuvalu

UNDP

(SNC)

UNEP

(TNC)

30-Oct-1999

(INC)

17-Jan-2007

(SNC) 420,000 01-May-2007 September 2016 November 2016

All SNC components completed TNC Project Cooperation Agreement (PCA) with UNEP

sent to country for signing

137. Uganda UNEP 02-Dec-2014

(SNC) - - - - -

Process for requesting GEF funding for TNC preparation has been initiated

138. Uruguay UNDP 18-Nov-2010

(TNC)

27-Apr-2011

(FNC) 500,000 02-Aug-2011 September 2016 October 2016

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: >75% Completed Mitigation Analysis: >75% Completed Other Information: >75% Completed Constraints & Gaps: >75% Completed

Page 20: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

20

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

139. Uzbekistan UNEP 03-Dec-2008

(SNC)

30-Jan-2012

(TNC) 500,000 01-Feb-2012 November 2016 December 2016

National Circumstances: Completed GHG Inventories: Completed V & A Analysis: Completed Mitigation Analysis: Completed Other Information: > 75% Completed Constraints & Gaps: >75% Completed Request for FNC GEF funding included in the UNEP Full

Size Project (FSP) for NCs and BURs. The FSP was approved by the GEF Council on 09-Jun-

2016 IA is preparing GEF CEO endorsement request

documents

140. Vanuatu UNDP 15-Oct-2016

(SNC) - - - - -

Request for TNC and BUR 1 project funding submitted to GEF Secretariat for approval.

Project cleared for approval on 17-Oct-2016.

141. Venezuela (Bolivarian Republic of)

UNDP 13-Oct-2005

(INC)

21-Sep-2012

(SNC) 420,000 14-Dec-2012 July 2017 October 2017

National Circumstances: <25% Completed GHG Inventories: <25% Completed V & A Analysis: <25% Completed Mitigation Analysis: Not yet initiated Other Information: Not yet initiated Constraints & Gaps: <25% Completed

142. Vietnam UNEP 07-Dec-2010

(SNC)

22-Jul-2014

(TNC) 500,000 25-Feb-2014 March 2018 November 2018

National Circumstances: 50-75% Completed GHG Inventories: 25-50% Completed V & A Analysis: <25% Completed Mitigation Analysis: <25% Completed Other Information: <25% Completed Constraints & Gaps: Not yet initiated

143. Yemen UNDP 06-Jun-2013

(SNC)

04-Apr-2014

(TNC) 500,000 04-Jun-2014 March 2017 June 2017

National Circumstances: >75% Completed GHG Inventories: >75% Completed V & A Analysis: 25-50% Completed Mitigation Analysis: >75% Completed Other Information: 50-75% Completed Constraints & Gaps: 50-75% Completed US$ 500,000 as part of a combined EA proposal for TNC

& BUR 1 (US$ 852,000)

144. Zambia UNEP

16-Nov-2014

(SNC)

21-Jul-2014

(TNC) 500,000 11-Aug-2014 January 2019 April 2019 TNC Project under inception phase

Page 21: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

2

1

Party

Agency

Submission

date of the last

report to COP

Date of approval

by

Implementing

Agency (IA) of

most recent NC

project

Total

Amount

Approved

US$

Date of initial

disbursement

of funds by IA

Approximate date

of completion of

draft NC Report

Approximate date

of NC submission

to the COP

Status of project activities

145. Zimbabwe UNEP 31-Jan-2013

(SNC)

02-Jul-2013

(TNC) 500,000 21-Aug-2013 August 2016 December 2016

All TNC components completed Request for FNC GEF funding included in the UNEP Full

Size Project (FSP) for NCs and BURs The FSP was approved by the GEF Council on 09-Jun-

2016 IA is preparing GEF CEO endorsement request

documents

Page 22: Marrakech, 7 14 November 2016 Provision of financial and ...

22

FC

CC

/SB

I/201

6/IN

F.1

8

Annex II

STATUS OF RESOURCES APPROVED BY THE GEF SECRETARIAT FOR THE PREPARATION OF BIENNIAL UPDATE REPORTS FROM PARTIES

NOT INCLUDED IN ANNEX 1 TO THE CONVENTION

N o t e : I n f o r m a t i o n w a s c o m p i l e d b y t h e I m p l e m e n t i n g A g e n c i e s ( U N D P a n d U N E P ) .

I A - I m p l e m e n t i n g A g e n c y , E A - E x e c u t i n g A g e n c y

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

1. Afghanistan UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 05-Feb-2016 352,000

09-Feb-

2016 10,000

Not yet

determined

Not yet

determined

Project Implementation Plan (PIP) under preparation for BUR 1

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendmentiii

2. Angola UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014

Project

Cooperation

Agreement

sent for

signing

352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Project Cooperation Agreement was sent to EA for signing in August 2015 for BUR 1 and subsequent reminders, last one on 20-Jun-2016

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

3. Antigua and Barbuda UNEP

BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 05-Feb-2016 352,000

18-Feb-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

4. Argentina UNDP 09-Dec-2015

(BUR 1)

13-Dec-2013

(BUR 2) 29-Jan-2014

Not

applicableiv

31-Jul-2015 300,854 01-Sep-

2015 262,154

November

2016

December

2016

BUR 2 under preparation National Circumstances: Completed GHG Inventories: >75% Completed Mitigation Actions and their effects:

50-75% Completed Domestic measurement reporting

and verification (MRV): 50-75% Completed

Other Information: <25% Completed

Constraints & Gaps: Not yet initiated

Project transferred from WB to UNDP on 11-Sep-2014

Page 23: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

2

3

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

5. Armenia UNDP 29-Apr-2016

(BUR 1)

14-Apr-

2016

(BUR 2)

29-Apr-2016

Not

applicable4

Agency Project

Document

under IA

clearance

352,000 as

part of the

EA proposal

(852,000)

for the FNC

and BUR 2

Not yet

disburse

d

Not yet

disbursed

December

2017

December

2017

Agency Project Document under IA clearance for BUR 2

6. Azerbaijan UNDP 31-Mar-2015

(BUR 1)

13-Jan-

2016

(BUR 2)

13-Jul-2016

Not

applicable4

Agency Project

Document

under

preparation

for IA

clearance

352,000 as

part of the

EA proposal

(852,000)

for the FNC

and BUR 2

Not yet

disburse

d

Not yet

disbursed

December

2017

December

2017

Agency Project Document under preparation for IA clearance for BUR 2

Note: BUR 2 included in the EA Proposal for 4NC and BUR 2

7. Bahrain UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 22-Aug-2016 352,000

06-Sep-

2016 30,000 April 2018 June 2018

BUR 1 project under inception phase

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

8. Benin UNEP BUR 1 under

preparation

16-Apr-

2014

(BUR 1)

19-May-

2014

Not

applicable4

23-Sep-2014 352,000 28-Nov-

2014 95,000 June 2017

September

2017

BUR 1 project under inception phase

9. Bhutan UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014

Agency Project

Document

under

preparation

for IA

clearance

352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Project Cooperation Agreement sent to IA for signing for BUR 1

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

10. Bosnia and Herzegovina UNDP

12-Mar-2015

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

Page 24: Marrakech, 7 14 November 2016 Provision of financial and ...

24

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

11. Botswana UNDP BUR 1 under

preparation

05-Aug-

2014

(BUR 1)

25-Nov-2014

Not

applicable4

23-Nov-2015

352,000 as

part of the

EA proposal

(952,000)

for the TNC,

BUR 1 and

iNDC

08-Jun-

2016 604,9105

October

2016

December

2016

BUR 1 under preparation National Circumstances: >75%

Completed GHG Inventories: Completed Mitigation Actions and their effects:

Completed Domestic measurement reporting

and verification (MRV): Completed Constraints & Gaps: >75%

Completed Other Information: >75%

Completed Note: BUR included in the EA

Proposal for TNC, BUR 1 and iNDC

12. Brazil UNDP 31-Dec-2014

(BUR 1)

05-Apr-

2013

(BUR 2)

02-May-

2013

20-Jun-

2013 16-Jul-2016

1,050,000 as

part of the

full project

proposal

(7,528,500)

for the FNC

and BUR 2

18-Aug-

2016 883,3165

December

2016 February 2017

BUR 2 under preparation National Circumstances: <25%

Completed GHG Inventories: Not yet initiated Mitigation Actions and their effects:

Not yet initiated Domestic measurement reporting

and verification (MRV): Not yet initiated

Constraints & Gaps: <25% Completed

Other Information: Not yet initiated

13. Burkina Faso UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 16-Nov-2015 352,000

14-Jun-

2016 10,000

Not yet

determined

Not yet

determined

PIP of BUR 1 sent to EA for signing Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

14. Burundi UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016

Page 25: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

2

5

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

15. Cambodia UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 12-Jan-2016 352,000

16-Mar-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

16. Cameroon UNEP -- -- -- -- -- -- -- -- -- --

Process for requesting GEF funding for BUR 1 preparation has been initiated

17. Chad UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016

18. Chile AGCI 10-Dec-2014

(BUR 1)

31-Jul-

2013

(BUR 2)

30-Jul-2014

Not

applicable4

22-Sep-2014 352,000 19-Mar-

2015 140,800

December

2016

December

2016

BUR 2 under preparation National Circumstances: 90%

Completed GHG Inventories: 90% Completed Mitigation Actions and their effects:

90% Completed Domestic measurement reporting

and verification (MRV): 90% Completed

Constraints & Gaps: 70% Completed Other Information: 70% Completed This project is being executed

through direct access by the Chilean Agency for International Cooperation (AGCI for its acronym in Spanish)

Note: Since Chile was already in process of preparing its BUR 1, the project was amended to support the preparation of its BUR 2.

Page 26: Marrakech, 7 14 November 2016 Provision of financial and ...

26

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

19. China UNDP BUR 1 under

preparation

16-Mar-

2012

(BUR 1)

01-Oct-2012 15-Nov-

2012 03-Nov-2014

892,400 as

part of the

full project

proposal

(7,280,000)

for the TNC

and BUR 1

09-Jul-

2015 4,038,360v

August

2016

December

2016

All components for BUR 1 complete Note: CEO Endorsement request

and Project Document approved by GEF Secretariat 18-Jul-2014

20. Colombia UNDP 11-Dec-2015

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

21. Comoros UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 19-Feb-2016 352,000

13-Apr-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

22. Congo Republic UNEP

BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.

23. Costa Rica UNDP 09-Dec-2015

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

24. Cote D’Ivoire UNEP BUR 1 under

preparation

09-Oct-

2013

(BUR 2)

18-Nov-2013

Not

applicable4

18-Apr-2014 352,000 30–Sep-

2014 182,140

September

2016

December

2016

BUR 2 under preparation National Circumstances: Completed GHG Inventories: >75% Completed Domestic measurement reporting

and verification (MRV): 50-75% Completed

Mitigation Actions and their effects: 50-75% Completed

Other Information: 50-75% Completed

Constraints & Gaps: >75% Completed

Process for requesting GEF funding for BUR 2 preparation has been initiated

Page 27: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

2

7

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

25. Democratic Republic of Congo

UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 18-Sep-2015 352,000

11-Feb-

2016 10,000

Not yet

determined

Not yet

determined

PIP under review by EA for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

26. Djibouti UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016

27. Dominica UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 07-Jan-2016 352,000

16-Mar-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

28. Ecuador UNDP 21-Sep-2016

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

29. Egypt UNDP BUR 1 under

preparation

11-Jun-

2014

(BUR 1)

03-Nov-2014

Not

applicable4

22-Apr-2015 352,000 06-Nov-

2015 352,000 April 2017 May 2017

BUR 1 under preparation National Circumstances: < 25%

Completed GHG Inventories: < 25% Completed Domestic Measurement, Reporting

and Verification (MRV): < 25% Completed

Mitigation Actions and their effects: Not yet initiated

Other Information: Not yet initiated Constraints & Gaps: Not yet

initiated

Page 28: Marrakech, 7 14 November 2016 Provision of financial and ...

28

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

30. El Salvador UNDP BUR 1 under

preparation

13-Aug-

2013

(BUR 1)

12-Sep-2013 07-Nov-

2013 02-Dec-2014

352,000 as

part of the

EA proposal

(852,000)

for the TNC

and BUR 1

24-Mar-

2015 523,0005

January

2017

April

2017

BUR 1 under preparation National Circumstances: <25%

Completed GHG Inventory: <25% Completed Mitigation Actions and their effects:

<25% Completed Domestic Measurement Reporting

and Verification (MRV): Not yet initiated

Constraints & Gaps: <25% Completed

Other Information: Not yet initiated Note: BUR included in the EA

Proposal for TNC and BUR 1 approved by the GEF Council in the November 2013 Work Program. Due to internal approval process within the government, the final approval took much longer than originally planned

31. Equatorial Guinea UNEP

BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 18-Jul-2016 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

BUR 1 under preparation Initial funds for PIP preparation to

be disbursed based on confirmation of BUR bank account details received from EA on 18-Aug-2016

Note: Revised umbrella program was CEO endorsed on 24-Jun-20153

32. Eritrea UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 05-Jan-2016 352,000

02-Mar-

2016 10,000

Not yet

determined

Not yet

determined

BUR 1 under preparation PIP under preparation Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

33. Fiji UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014

Project

Cooperation

Agreement

sent for

signing

352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Project Cooperation Agreement sent to EA for signing in August 2015 for BUR 1

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

Page 29: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

2

9

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

34. Gabon UNEP BUR 1 under

preparation

31-Mar-

2015

(BUR 1)

12-May-

2015

Not

applicable4

01-Sep-2015 352,000 11-Apr-

2016 10,000

Not yet

determined

Not yet

determined PIP under preparation for BUR 1

35. Gambia UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 12-Nov-2015 352,000

06-Jun-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

36. Georgia UNDP 18-Jul-2016

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

37. Ghana UNEP 21-Jul-2015

(BUR 1)

14-Aug-

2015

(BUR 2)

15-Jan-2016

Not

applicable4

24-Mar-2016

352,000 as

part of the

EA proposal

(852,000)

for the FNC

and BUR 2

08-Jul-

2016 20,0005

Not yet

determined

Not yet

determined PIP under preparation for BUR 2

38. Guinea UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 22-Oct-2015 352,000

15-Jul-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

39. Guinea Bissau UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 24-Mar-2016 352,000

11-May-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

40. Guyana UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 21-Apr-2016 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Awaiting bank account details for transfer of initial cash advance to EA for BUR 1

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

41. Haiti UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 01-Sep-2015 352,000

16-Feb-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

Page 30: Marrakech, 7 14 November 2016 Provision of financial and ...

30

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

42. Honduras UNDP BUR 1 under

preparation

26-Feb-

2014

(BUR 1)

02-May-

2014

Not

applicable4

20-Feb-2015

352,000 as

part of the

EA proposal

(852,000)

for the TNC

and BUR 1

09-Mar-

2015 469,2175 October 2017

December

2017

BUR 1 under preparation National Circumstances: Not yet

initiated GHG Inventory: <25% Completed Mitigation Actions and their effects:

Not yet initiated Domestic Measurement Reporting

and Verification (MRV): Not yet initiated

Constraints & Gaps: <25% Completed

Other Information: Not yet initiated Note: BUR included in the EA

Proposal for TNC and BUR 1

43. India UNDP 22-Jan-2016

(BUR 1)

14-Sep-

2011

(BUR 2)

26-Jan-2012 29-Feb-

2012 10-Jun-2013

2,625,000 as

part of the

full project

proposal

(9,010,604)

for the TNC,

BUR 1 and 2

25-Sep-

2013 3,486,4125

November

2016

December

2016

BUR 2 under preparation National Circumstances: Not yet

initiated GHG Inventories: <25% Completed Mitigation Actions and their effects:

Not yet initiated Domestic measurement reporting

and verification (MRV): Not yet initiated

Constraints & Gaps: Not yet initiated

Other Information: Not yet initiated

44. Indonesia UNDP 18-Mar-2016

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

45. Iraq UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs.

The Full Size Project was approved by the GEF Council on 09-Jun-2016

IA is preparing GEF CEO endorsement request documents

Page 31: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

3

1

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

46. Jamaica UNDP BUR 1 under

preparation

29-May-

2013

(BUR 1)

18-Jul-2013 05-Sep-

2013 16-Jul-2014

352,000 as

part of the

EA proposal

(852,000)

for the TNC

and BUR 1

09-Oct-

2014 554,2855

April

2016

November

2016

All BUR 1 components completed Note: BUR included in the EA

Proposal for TNC and BUR 1, approved by the GEF Council in the August 2013 Special Intersessional Work Program

47. Jordan UNDP BUR 1 under

preparation

31-Jul-

2014

(BUR 1)

03-Nov-2014

Not

applicable4

06-Jan-2015 352,000 03-Jun-

2015 145,000 May 2017 July 2017

BUR 1 under preparation National Circumstances: >75%

Completed GHG Inventories: 25-50%

Completed Mitigation Actions and their effects:

25-50% Completed Domestic measurement reporting

and verification (MRV): 25-50% Completed

Constraints & Gaps: 50-75% Completed

Other Information: Not yet initiated

48. Kazakhstan UNDP 16-Feb-2016

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

49. Kiribati UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 26-Jan-2016 352,000

14-Mar-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

50. Kyrgyzstan UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016

Page 32: Marrakech, 7 14 November 2016 Provision of financial and ...

32

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

51. Kuwait UNEP BUR 1 under

preparation

17-Sep-

2013

(BUR 1)

10-Mar-

2014

Not

applicable4

03-Sep-2014

352,000 as

part of the

EA proposal

(852,000)

for the SNC

and BUR 1

23-Oct-

2014 15,000

December

2017 March 2018

BUR 1 under preparation National Circumstances: Not yet

initiated GHG Inventories: <25% Completed Domestic measurement reporting

and verification (MRV): Not yet initiated

Mitigation Actions and their effects: Not yet initiated

Other Information: Not yet initiated Constraints & Gaps: Not yet

initiated

52. Lao People's Democratic Republic

UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 22-Oct-2015 352,000

26-Feb-

2016 10,000

Not yet

determined

Not yet

determined

PIP under review by IA for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

53. Lebanon UNDP 13-Oct-2015

(BUR 1)

15-Jan-

2015

(BUR 2)

16-Feb-2016

Not

applicable4

07-May-2016 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Agency Project Document for BUR 2 under signature

54. Lesotho UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 18-Sep-2015 352,000

14-Mar-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

55. Liberia UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 07-Jan-2016 352,000

16-Mar-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

56. Macedonia UNDP 26-Feb-2015

(BUR 1)

22-Dec-

2015

(BUR 2)

23-Feb-2016

Not

applicable4

16-Jun-2016 352,000 28-Jun-

2016 237,000 February 2017

April

2017

BUR 2 under preparation National Circumstances: Not yet

initiated GHG Inventories: < 25% Completed Domestic Measurement, Reporting

and Verification (MRV): < 25% Completed

Mitigation Actions and their effects: Not yet initiated

Other Information: Not yet initiated Constraints & Gaps: Not yet

initiated

Page 33: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

3

3

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

57. Madagascar UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 24-Apr-2016 352,000

05-May-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

58. Malawi UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 29-Oct-2015 352,000

26-Feb-

2016 10,000

Not yet

determined

Not yet

determined

PIP under review by IA for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

59. Malaysia UNDP 03-Mar-2016

(BUR 1)

04-Aug-

2016

(BUR 2)

Pending

approval

Not

applicable4

Pending

approval 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

BUR 2 funding request cleared for approval by the GEF Secretariat on 16-Sep-2016

60. Maldives UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 25-Jan-2016 352,000

09-May-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

61. Mali UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 01-Sep-2015 352,000

11-Feb-

2016 10,000

Not yet

determined

Not yet

determined

PIP sent to EA for signing for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

62. Mauritania UNEP 14-Mar-2016

(BUR 1)

16-Mar-

2016

(BUR 2)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.

63. Mauritius UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 24-Dec-2015 352,000

09-Mar-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

Page 34: Marrakech, 7 14 November 2016 Provision of financial and ...

34

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

64. Mexico UNDP 23-Oct-2015

(BUR 1)

13-Sep-

2012

(BUR 2)

01-Oct-2012 15-Nov-

2012 30-Jun-2015

Part of the

full project

proposal

(3,636,364)

for the NC 6

and BUR 2

26-Aug-

2016 2,221,3005

December

2016

March

2018

BUR 2 under preparation National Circumstances: <25%

Completed GHG Inventories: 25-50%

Completed Domestic measurement reporting

and verification (MRV): <25% Completed

Mitigation Actions and their effects: <25% Completed

Other Information: <25% Completed

Constraints & Gaps: <25% Completed

65. Micronesia (Federated States of)

UNDP BUR 1 under

preparation

02-Jun-

2016

(BUR 1)

15-Sep-2016

Not

applicable4

Under

preparation

352,000 as

part of the

EA proposal

(852,000)

for the TNC

and BUR 1

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Request for TNC and BUR 1 project funding approved by the GEF Secretariat on 15-Sep-2016

66. Mongolia UNEP BUR 1 under

preparation

16-Apr-

2014

(BUR 1)

11-Jun-2014

Not

applicable4

21-Jul-2014 352,000 20-Nov-

2014 118,707

January

2017

June

2017

BUR 1 under preparation National Circumstances: 50-75%

Completed GHG Inventories: >75% Completed Domestic measurement reporting

and verification (MRV): <25% Completed

Mitigation Actions and their effects: < 25% Completed

Other Information: 50-75% Completed

Constraints & Gaps: 50-75% Completed

67. Montenegro UNDP 13-Jan-2016

(BUR 1)

05-Apr-

2016

(BUR 2)

12-Jul-2016

Not

applicable4

Agency Project

Document

under

preparation

for IA

clearance

352,000

Not yet

disburse

d

Not yet

disbursed

March

2019

March

2019

Agency Project Document under preparation for IA clearance for BUR 2

Page 35: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

3

5

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

68. Morocco UNDP 07-May-2016

(BUR 1)

26-Apr-

2016

(BUR 2)

02-Jun-2016

Not

applicable4

Agency Project

Document

under review

for IA

clearance

352,000 as

part of the

EA proposal

(852,000)

for the FNC

and BUR 2

Not yet

disburse

d

Not yet

disbursed

December

2018

December

2018

Agency Project Document under review for IA clearance for BUR 2

69. Mozambique UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 19-May-2016 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

70. Myanmar UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014

Project

Cooperation

Agreement

sent for

signing

352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Project Cooperation Agreement awaiting EA Cabinet Committee’s approval for BUR 1

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

71. Namibia UNDP 02-Dec-2014

(BUR 1)

20-Feb-

2015

(BUR 2)

12-May-

2015

Not

applicable4

03-Jul-2015 352,000 03-Sep-

2015 338,000

November

2016

December

2016

BUR 2 under preparation National Circumstances: <25%

Completed GHG Inventories: >75% Completed Domestic measurement reporting

and verification (MRV): 25-50% Completed

Mitigation Actions and their effects: 25-50% Completed

Other Information: <25% Completed

Constraints & Gaps: <25% Completed

72. Nauru UNEP -- -- -- -- -- -- -- -- -- --

Process for requesting GEF funding for BUR 1 preparation has been initiated

73. Nepal UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.

Page 36: Marrakech, 7 14 November 2016 Provision of financial and ...

36

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

74. Nigeria UNDP BUR 1 under

preparation

11-Sep-

2014

(BUR 1)

03-Nov-2014

Not

applicable4

14-May-2015 352,000 10-Mar-

2016 92,900

October

2016

December

2016

BUR 1 under preparation National Circumstances: 25-50%

Completed GHG Inventories: <25% Completed Domestic measurement reporting

and verification (MRV): <25% Completed

Mitigation Actions and their effects: <25% Completed

Other Information: 25-50% Completed

Constraints & Gaps: Completed

75. Oman UNEP BUR 1 under

preparation

14-Jan-

2014

(BUR 1)

02-May-

2014

Not

applicable4

05-Jun-2014 352,000 03-Sep-

2014 166,700

December

2017

April

2018

BUR 1 under preparation National Circumstances: <25%

Completed GHG Inventories: 25-50%

Completed Domestic measurement reporting

and verification (MRV): <25% Completed

Mitigation Actions and their effects: Not yet initiated

Other Information: <25% Completed

Constraints & Gaps: Not yet initiated

76. Panama UNDP BUR 1 under

preparation

02-Feb-

2015

(BUR 1)

10-Mar-

2015

Not

applicable4

22-Jun-2015

352,000 as

part of the

EA proposal

(852,000)

for the TNC

and BUR 1

03-Aug-

2015 736,6805

July

2017 October 2017

BUR 1 under preparation National Circumstances: 25-50%

Completed GHG Inventories: 25-50%

Completed Mitigation Actions and their effects:

Not yet initiated Domestic measurement reporting

and verification (MRV): Not yet initiated

Constraints & Gaps: <25% Completed

Other Information: Not yet initiated

Page 37: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

3

7

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

77. Papua New Guinea UNEP

BUR 1 under

preparation

25-Aug-

2014

(BUR 1)

04-Dec-2014

Not

applicable4

02-Mar-2015

352,000 as

part of the

EA proposal

(852,000)

for the TNC

and BUR 1

24-Mar-

2015 100,000

August

2018

September

2018

BUR 1 project under inception phase

78. Paraguay UNDP 30-Dec-2015

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

79. Peru UNDP 30-Dec-2014

(BUR 1)

26-Aug-

2015

(BUR 2)

08-Sep-2015

Not

applicable4

21-Jan-2016 352,000 18-Mar-

2016 247,000

December

2016

December

2016

BUR 2 under preparation National Circumstances: <25%

Completed GHG Inventories: 25-50%

Completed Domestic measurement reporting

and verification (MRV): <25% Completed

Mitigation Actions and their effects: Not yet initiated

Other Information: Not yet initiated Constraints & Gaps: Not yet

initiated

80. Republic of Moldova UNEP

05-Apr-2016

(BUR 1)

15-Apr-

2016

(BUR 2)

02-May-

2016

Not

applicable4

19-Jul-2016 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined PIP under preparation for BUR 2

81. Rwanda UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 05-Feb-2016 352,000

06-Apr-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

Page 38: Marrakech, 7 14 November 2016 Provision of financial and ...

38

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

82. Saint Lucia UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014

Project

Cooperation

Agreement

sent for

signing

352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Review of the Project Cooperation Agreement sent to the EA has been completed

The amended Project Cooperation Agreement sent to EA for signing for BUR 1

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

83. Sao Tome and Principe UNEP

BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 29-Oct-2015 352,000

16-May-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

84. Saudi Arabia UNEP BUR 1 under

preparation

11-Jun-

2014

(BUR 1)

13-Jun-2014

Not

applicable4

21-Jul-2014 352,000 12-Nov-

2014 155,000

September

2017

November

2017

BUR 1 under preparation National Circumstances: 50-75%

Completed GHG Inventories: 50-75%

Completed Domestic measurement reporting

and verification (MRV): 25-50% Completed

Mitigation Actions and their effects: 50-75% Completed

Other Information: 50-75% Completed

Constraints & Gaps: 50-75% Completed

85. Senegal UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 24-Mar-2016 352,000

10-May-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

86. Serbia UNDP 28-Mar-2016

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

87. Seychelles UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 19-May-2016 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

Page 39: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

3

9

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

88. Sierra Leone UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 24-Jun-2016 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

89. Somalia UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 05-Jan-2016 352,000

23-Mar-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

90. South Africa UNEP 17-Dec 2014

(BUR 1)

07-Jan-

2013

(BUR 2)

20-Feb-2013 31-Jul-

2014 12-Sep-2014

352,000 as

part of the

EA proposal

(4,006,650)

for the TNC

and BUR 2

30-Oct-

2014 400,0005

September

2016

December

2016

BUR 2 under preparation National Circumstances: >75%

Completed GHG Inventories: >75% Completed Domestic measurement reporting

and verification (MRV): >75% Completed

Mitigation Actions and their effects: >75% Completed

Other Information: >75% Completed

Constraints & Gaps: >75% Completed

Note: This is a GEF full-size TNC project which includes $352,000 support towards BUR 2.

91. South Sudan UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 12-Jan-2016 352,000

26-Jan-

2016 10,000 January 2018 April 2018

BUR 1 project under inception phase

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

92. Sudan UNDP BUR 1 under

preparation

27-Mar-

2015

(BUR 1)

19-May-

2015

Not

applicable4

21-Apr-2016 352,000

Not yet

disburse

d

Not yet

disbursed June 2020

September

2020

Agency Project Document for BUR 1 sent to EA for signature

93. Swaziland UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016

Page 40: Marrakech, 7 14 November 2016 Provision of financial and ...

40

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

94. Tajikistan UNDP BUR 1 under

preparation

28-Oct-

2015

(BUR 1)

03-Feb-2016

Not

applicable4

Agency Project

Document

under

preparation

for IA

clearance

352,000 as

part of the

EA proposal

(852,000)

for the FNC

and BUR 1

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Project Document under preparation for IA clearance for BUR 1

Note: BUR included in the EA Proposal for FNC and BUR 1 combined project

95. Thailand UNDP 29-Dec-2015

(BUR 1)

04-Jul-

2016

(BUR 2)

13-Jul-2016

Not

applicable4

Agency Project

Document

under

preparation

for IA

clearance

352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

Agency Project Document under preparation for IA clearance for BUR 2

96. Togo UNDP BUR 1 under

preparation

12-May-

2014

(BUR 1)

02-Jun-2014

Not

applicable4

26-Sep-2014 352,000 20-Feb-

2015 10,000 May 2017 June 2017

BUR 1 under preparation National Circumstances: 25-50%

Completed GHG Inventories: <25% Completed Mitigation Actions and their effects:

Not yet initiated Domestic measurement reporting

and verification (MRV): <25% Completed

Constraints & Gaps: Not yet initiated

Other Information: <25% Completed

97. Trinidad and Tobago UNDP

BUR 1 under

preparation

07-Aug-

2014

(BUR 1)

26-Nov-2014

Not

applicable4

Agency Project

Document

under review

for IA

clearance

352,000 as

part of the

EA proposal

(952,000)

for the TNC,

BUR 1 and

iNDC

Not yet

disburse

d

Not yet

disbursed

August

2018

September

2018

Project Document under review for IA clearance for BUR 1

Note: BUR included in the EA Proposal for TNC, BUR 1 and iNDC combined project

98. Tunisia UNDP 11-Dec-2014

(BUR 1) -- -- -- -- -- -- -- -- --

Process of requesting GEF funding for BUR 2 preparation has not been initiated

Page 41: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

4

1

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

99. Turkmenistan UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.

100. Uganda UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014 24-Mar-2016 352,000

03-May-

2016 10,000

Not yet

determined

Not yet

determined

PIP under preparation for BUR 1 Note: Revised umbrella program

was CEO endorsed on 24-Jun-2015 following an amendment3

101. Uruguay UNDP 7-Dec-2015

(BUR 1)

24-Feb-

2016

(BUR 2)

10-Mar-

2016

Not

applicable4

09-May-2016 352,000 03-Jun-

2016 43,236 October 2017

December

2017

BUR 2 under preparation National Circumstances: <25%

Completed GHG Inventories: <25% Completed Mitigation Actions and their effects:

<25% Completed Domestic measurement reporting

and verification (MRV): Not yet initiated

Constraints & Gaps: Not yet initiated

Other Information: Not yet initiated

102. Uzbekistan UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016

103. Vanuatu UNDP BUR 1 under

preparation

10-Mar-

2016

(BUR 1)

Pending

approval -- -- -- -- -- -- --

Request for funding TNC and BUR 1 submitted to GEF Secretariat for approval. Project approval pending submission of SNC to UNFCCC.

SNC was submitted on 15-Oct-2016. Project cleared for approval on 17-

Oct-2016.

Page 42: Marrakech, 7 14 November 2016 Provision of financial and ...

42

FC

CC

/SB

I/201

6/IN

F.1

8

Party

Agency

Submission

date of the

last report to

COP

Date of

request

for

fundingi

Date of

project

clearance by

GEF

Secretariat

Date of

approval

by GEF

Council

Date of

approval by

Implementing

Agency (IA) of

BUR

project

Total

amount

approved

US$

Date of

initial

disburse

ment of

funds

by IA

Amount of

funding

disbursed

for BUR

preparation

(USD)ii

Approximate

date of

completion of

draft BUR

report

Approximate

date of BUR

submission to

the COP

Status of project activities

104. Vietnam UNEP 08-Dec-2014

(BUR 1)

07-Jan-

2014

(BUR 2)

29-Jan-2014

Not

applicable4

02-Mar-2016 352,000 11-Apr-

2016 10,000

Not yet

determined

Not yet

determined PIP for BUR 2 awaiting signing by IA

105. Yemen UNDP BUR 1 under

preparation

05-Jul-

2013

(BUR 1)

18-Jul-2013 05-Sep-

2013 04-Apr-2014

352,000 as

part of the

EA proposal

(852,000)

for the TNC

and BUR 1

04-Jun-

2014 472,1805 March 2017 June 2017

BUR 1 under preparation National Circumstances: 50-75%

Completed GHG Inventories: 50-75%

Completed Mitigation Actions and their effects:

50-75% Completed Domestic measurement reporting

and verification (MRV): 25-50% Completed

Constraints & Gaps: 25-50% Completed

Other Information: 50-75% Completed

106. Zambia UNEP BUR 1 under

preparation

27-Aug-

2014

(BUR 1)

03-Sep-2014 30-Oct-

2014

Project

Cooperation

Agreement

awaiting

approval

352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA awaiting for bank details for disbursement of initial cash for BUR 1

Note: Revised umbrella program was CEO endorsed on 24-Jun-2015 following an amendment3

107. Zimbabwe UNEP BUR 1 under

preparation

16-Mar-

2016

(BUR 1)

04-May-

2016

09-Jun-

2016

Under

preparation 352,000

Not yet

disburse

d

Not yet

disbursed

Not yet

determined

Not yet

determined

IA is preparing GEF CEO endorsement request documents

Note: Request for BUR 1 GEF funding included in the UNEP Umbrella Programme for Preparation of NCs and BURs. The Full Size Project was approved by the GEF Council on 09-Jun-2016.

Page 43: Marrakech, 7 14 November 2016 Provision of financial and ...

FC

CC

/SB

I/201

6/IN

F.1

8

4

3

i The first submission date of enabling activity proposal to the GEF Secretariat ii For UNEP-supported countries, this is the amount of funding disbursed to countries as at September 2016. For UNDP-supported countries, this is the sum of

cumulative expenditures as of December 2015 and the budget approved for the year 2016. iii The UNEP Umbrella Programme to support thirty-nine (39) Least Developed Countries (LDCs) and Small Islands Developing States (SIDS) prepare and submit

good quality initial biennial update reports to the UNFCCC was CEO endorsed on 24-June-2015, following a request for a major amendment submitted by the

IA after council approval. iv Enabling activity projects below US$1 million do not require GEF Council approval. v Includes the amount of funding disbursed for BUR and NC. In combined projects, it is not possible to separate the amount of funds that have been disbursed for

BUR only.


Recommended