Airborne’s Thermoplastic Composite Pipe™ conc
One plastic compound in liner, composite and coating Glass fibres provide strength and stiffness
Benefits:
Lightweight
No corrosion
Spoolable
Superior fatigue
Liner
Com
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 3/21
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 4/21
Airborne Thermoplastic Composite Pipe™ Conce
Fully bonded flexible pipe (melt-fused): one solid wall
Smooth bore
High collapse
Vacuum capability
No Rapid Gas
Decompression issues
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 5/21
TCP Downline: THE solution to maximize produc
High flow: one 3” ID coil = 20+BPM
Multiple operations per year,
for years, with one downline:
superior fatigue performance
Easy and safe to operate: light-
weight, no spring effect, no
heavy weight requirements
Fast running: 2,5 hrs to 2100
meters water depth
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 6/21
TCP Downline: THE solution to maximize produc
Reducing cost perintervention:
• No logistics
• Fastest running
Increased oil recovery
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 7/21
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 8/21
6. Overboarding chute7. Tensioner
8. Deck arch
System overview
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 9/21
Preparation for deployment Deployment – running the downline
System overview
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 10/21
Challenge: Dynamic stability
Lightweight pipe is more susceptible to currents
• System must allow all current directions; vessel cannot alway
turned
Vessel motions can result in large hang-off angles
• Low terminal velocity, issues on the overboarding chute to b
avoided Fluid versus gas operation
• When gas-filled the downline is buoyant
• Avoid downline jumping on the chute – risk of overbending
Fast deployment benefit not to be lost
10
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 11/21
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 12/21
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 13/21
Challenge: Fatigue loading in operation
Reeling / unreeling
Vessel motions
Downline used for
injection of large volumes,
long duration overboard
Both bending fatigue,tension fatigue &
combination
13
Vessel
Low cycle bending
(reeling / unreeling)
High cycle bending +
tension (dynamics)
High cycle tension
(dynamics)
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 14/21
Solution: Fatigue mitigation in operation
Reeler barrel diameter to
cover all reeling / unreeling
cycles
• E.g. 15 years x 14 deployments x
4 cycles = 840 cycles
Overboarding chute to coverall high cycle loading from
dynamics
• E.g. 15 years x 14 deployments x
3 days per deployment x wave
frequency = 1+ million cycles
14
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 15/21
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 16/21
Operation – damages during use
16
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 17/21
Operation – other damages
Tensioner pads missing Protruding bolts
17
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 18/21
Operation – other damages
Blister due to tensioner malfunction – repaired offshore
18
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 19/21
Conclusions
Composite Downline proven in 2140 meter water dept
• 33 deployments completed successfully to date
• 100 days fully deployed
Dynamic stability addressed as key issue
Pipe system rugged – can cope with offshore handling
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 20/21
The Future is Here
8/13/2019 Martin Von Onna
http://slidepdf.com/reader/full/martin-von-onna 21/21
Sales & Business DevelopmentRogier Cornelisse [email protected]