UPDATED Form – I For Extension of E.C. validity (E.C. issued vide order No. J-11011 / 1149 / 2007 – IA II (I) dated 2 nd January 2009) Submitted to MoEF, New Delhi for Maruti Ispat & Energy Pvt. Ltd. at Sy. No. 158, 159, 160, 163-168 & 171 at Village Madhavaram and Sy. No. 13 – 19 at Village Rassamani, Mandal Mantralayam, District Kurnool, Andhra Pradesh
Transcript
Page 1: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

UPDATED Form – I For

Extension of E.C. validity (E.C. issued vide order No. J-11011 / 1149 / 2007 – IA II (I) dated 2nd January 2009)

Submitted to MoEF, New Delhi

for

Maruti Ispat & Energy Pvt. Ltd. at

Sy. No. 158, 159, 160, 163-168 & 171 at Village Madhavaram and

Sy. No. 13 – 19 at Village Rassamani, Mandal Mantralayam, District Kurnool,

Andhra Pradesh

Page 2: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

1

APPENDIX I (See paragraph – 6)

FORM - I

(I) BASIC INFORMATION

1. Name of the project Maruti Ispat & Energy Pvt. Ltd.

2. S. No. in the schedule 3 (a)

3. Proposed capacity / area / length / tonnage to be handled / command area / lease area / number of wells to be drilled

Extension of E.C. validity issued vide order No. J-11011 / 1149 / 2007 – IA II (I) dated 2nd January 2009.

Environmental Clearance was issued for the following units

S.No. Units Plant Configuration Production Capacity

1. Palletization plant (Pellets)

1 x 3,000 TPD 9,00,000 TPA

2. Sintering Plant (Sinter)

1 x 2,000 TPD 6,00,000 TPA

3. Sponge Iron Kilns (Sponge Iron)

6 x 100 TPD 1,80,000 TPA

4. Mini Blast Furnace (Hot Metal / Pig Iron)

1 x 380 m3 2,40,000 TPA

5. Induction Furnace (Billets from CCM)

2 x 40 TPH 2,40,000 TPA

6. Billets Casting Machine / Continuous Casting Machine

1 x 1,000 TPD 3,00,000 TPA

7. Rolling Mill 1 x 1,000 TPD 3,00,000 TPA

8. Power Generation Through WHRB 6 x 10 TPH 20 MW

Through FBC 2 x 100 TPH 2 x 18 MW

9. Ladle Furnace 1 x 40 TPH ----

10. Oxygen plant --- 97,92,000 SM3/annum

4. New/Expansion/Modernization Request for Extension of validity of the Environmental Clearance order issued in order to the implement the remaining units.

5. Existing capacity/Area etc. The following table showing Implementation status

S.No. Units Plant Configuration

Production Capacity

Status of Implementation

1. Palletization plant (Pellets)

1 x 3,000 TPD 9,00,000 TPA Not Started

2. Sintering Plant (Sinter)

1 x 2,000 TPD 6,00,000 TPA Not Started

3. Sponge Iron Kilns (Sponge Iron)

6 x 100 TPD 1,80,000 TPA 2 x 100 TPD – is in operation

2 x 100 TPD – Civil work started

Remaining 2 x 100 TPD to be implemented

4. Mini Blast Furnace 1 x 380 m3 2,40,000 TPA Not Started

Page 3: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

2

(Hot Metal / Pig Iron)

5. Induction Furnace (Billets from CCM)

2 x 40 TPH 2,40,000 TPA Not Started

6. Billets Casting Machine / Continuous Casting Machine

1 x 1,000 TPD 3,00,000 TPA Not Started

7. Rolling Mill 1 x 1,000 TPD 3,00,000 TPA Not Started

8. Power Generation

Through WHRB

6 x 10 TPH 20 MW 8 MW WHRB – Civil work started

Through FBC

2 x 100 TPH 2 x 18 MW Not Started

9. Ladle Furnace 1 x 40 TPH ----- Not Started

10. Oxygen plant --- 97,92,000 SM3/annum

Not Started

Note: Non implementation of Units for which Environmental Clearance has been accorded, is due

to sluggish market conditions and non-availability of Funds.

6. Category of project i.e. ‘A’ or ‘B’. A

7. Does it attract the general condition? If yes, please specify.

No

8. Does it attract the specific condition? If yes, please specify.

No

9. Location

Plot/Survey/Khasra No. Sy. No. 158, 159, 160, 163-168 & 171 at Village Madhavaram and Sy. No. 13 – 19 at Village Rassamani,

Village Madhavaram & Rassamani

Mandal Mantralayam

District Kurnool

State Andhra Pradesh

10. Nearest railway station/airport along with distance in kms.

Nearest Railway Station – Kurnool (73 Kms) Nearest Airport – Hyderabad Airport (185 Kms)

11. Nearest Town, City, District Headquarters along with distance in kms.

Nearest Town – Mantralayam (6.0 Kms) Nearest City – Kurnool (73 Kms)

12. Village Panchayats, Zilla Parishad, Municipal corporation, Local body (complete postal addresses with telephone no.s to be given)

Village – Madhavaram & Rassamani Mandal – Mantralayam District - Kurnool State – Andhra Pradesh

13. Name of the applicant Maruti Ispat & Energy Pvt. Ltd.

14. Registered Address 5-4-83, 2nd Floor, Rama Towers, M.G. Road, Secunderbad -500003

15. Address for correspondence: 5-4-83, 2nd Floor, Rama Towers, M.G. Road, Secunderbad -500003

Name Mr. Pramod Agarwal

Designation(owner/partner/CEO) Managing Director

Address 5-4-83, 2nd Floor, Rama Towers, M.G. Road, Secunderbad -

Page 4: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

3

500003

Pin code 700013

E-Mail [email protected]

Telephone No. 040-23447321-22

Fax No. ---

16.

Details of Alternative sites examined, if any. Location these sites should be shown on a topo sheet

Not applicable

17. Interlinked Projects No

18. Whether separate application of interlinked project has been submitted?

No

19. If yes, date of submission Not applicable

20. If no, reason Not applicable

21. Whether the proposal involves approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation) Act,1980 (b) The Wildlife (protection) Act,1972 (c) The C.R.Z Notification, 1991?

Not applicable

22.

Whether there is any a government order/policy relevant/relating to the site?

No

23. Forest land involved(hectares) Not applicable

24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a)Name of the court (b)Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project.

Not applicable

Page 5: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

4

(II) ACTIVITY

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

Yes Present use of land is Industrial and total land (60.7 ha. earmarked for project is converted for Industrial Purpose. Some of the units are already in operation/ implemented and some are under implementation. The status of implementation has been specified in Page # 1 of Form-1. There are certainly some topographical changes in the site due to implementation of the remaining units.

1.2 Clearance of existing land, vegetation and buildings?

Yes Existing land is more or less flat without many undulations. Not much of plantation in the area earmarked for unimplemented units. Hence no clearance of vegetation required during construction of the unimplemented units. However, as a part of greenbelt development, vegetation is being developed in the Plant premises.

1.3 Creation of new land uses?

No Present use of land is already converted for the industrial purpose. Moreover, extensive greenbelt will be developed within the plant premises.

1.4 Pre-construction investigations e.g. bore houses, soil testing?

Yes Investigations have been carried out for soil for already implemented units in the area earmarked for project activity along with water analysis.

1.5 Construction works? Yes Construction work has been taken up for some of the units for which E.C. already accorded by honorable Ministry and the construction for the remaining units will be taken up after obtaining the extension of validity of Environmental Clearance from MoEF and CFE from APPCB.

1.6 Demolition works? No No demolition has been involved for

Page 6: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

5

units already implemented/under implementation. Similarly, no demolition work will be involved for unimplemented units.

1.7 Temporary sites used for construction works or housing of construction workers?

No Construction workers are being taken from local areas only for implementation of units. Hence no housing is proposed for construction workers.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes Most of the structures in the proposed project which have been implemented/under implementation are above the ground. Structures in the proposed project which are not implemented will also be above the ground. However, excavations are involved for foundations pertaining to units. Excess cut will be used for landfill.

1.9 Underground works including mining or tunneling?

No No mining and tunneling are involved for units pertaining to proposed project which have been implemented/under implementation. Similarly, no mining or tunneling will be involved in the unimplemented units.

1.10 Reclamation works?

No No reclamation works are involved for units pertaining to proposed project which have been implemented/under implementation. Similarly, no reclamation works will be involved in the unimplemented units.

1.11 Dredging?

No No dredging works are involved for units pertaining to proposed project which have been implemented/under implementation. Similarly, no dredging works will be involved in the unimplemented units.

1.12 Offshore structures? No No offshore structures are involved for units pertaining to proposed project which have been implemented / under implementation / unimplemented units.

1.13 Production and manufacturing processes?

Yes Sinter will be produced using Iron ore fines, limestone fines, flux, coke breeze etc. as raw material in the Sinter plant. Pig Iron will be produced using Iron

Page 7: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

6

ore lump, BF coke, Quartzite, Sinter, Mn ore as raw material in Blast Furnace. Pellets will be produced using Iron ore fines, Limestone Dolomite as raw material in Pelletisation plant. The Sponge iron produced is melted in Induction furnaces with concast to produce Billets and these Billets will be taken to a reheating furnace to produce TMT bars/structural steels. Power will be generated by utilization of hot waste flue gases from the kilns. The dolochar from sponge iron will be utilized in the FBC Boiler as fuels to generate power. By air separation process based on low pressure cryogenic cycle and double column rectification system for purity of various gases in order to meet the requirement of Oxygen, Nitrogen and Argon.

1.14 Facilities for storage of goods or materials?

Yes Sheds have been constructed for storage of some of the raw materials. Other raw materials will be stored in storage yards and products.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes There is no effluent generation from the process & cooling of Sponge iron units which have been implemented and in operation in the proposed project. In the remaining unimplemented units of Pellet plant, Sinter plant, DRI kilns, Induction furnaces, & Rolled products also closed circuit cooling system will be adopted in the proposed project. Effluent from power plant such as boiler blow down, DM Plant regeneration will have pH between 9.5 and 10.5. Hence a neutralization tank will be constructed for neutralizing the boiler blow down & DM plant regeneration water After neutralization these two effluent streams will be mixed in a Central Monitoring Basin (CMB). The treated effluent will be used for dust

Page 8: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

7

suppression and Green belt development within the premises. No effluent will be let out of the plant premises. Hence Zero discharge concept will be implemented in the proposed project. Sanitary waste water will be treated in Septic tank followed by sub surface dispersion trench. All the solid wastes generated from the proposed project will be reused/disposed as per CPCB norms only. Slag generated during the manufacturing of the Billets will be crushed and after recovery of iron the inert material will be used as landfill. Fly ash generated from the power plant will be utilized in accordance with the provisions of MoEF notification on fly ash utilization.

1.16 Facilities for long term housing of operational workers?

No No housing colony or township is proposed.

1.17 New road, rail or sea traffic during construction or operation?

No There has been a marginal increase in traffic volume during construction of the proposed units for transportation of construction materials. During operation of the plant the raw materials will be brought by rail upto the nearest railway facility and from there it will be brought upto the site by road in covered trucks. The existing roads can handle this additional increase in vehicular traffic. Hence there will not be any adverse impact on road traffic/rail traffic due to the proposed project.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

No No new road / rail transport infrastructure is proposed project.

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No No closure or diversion of existing transport routes is envisaged in the proposed projects for units implemented / under implementation / yet to be implemented.

Page 9: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

8

1.20 New or diverted transmission lines or pipelines?

Yes Water required for the project (for which E.C. accorded) will be met from Tungabhadra river. A dedicated pipeline has been laid from Tungabhadra river. G.O. no. 109 vide no. 06-10-2010 has been issued by Irrigation & CAD (PW:Reforms) Department.

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No No damming, culverting, realignments are envisaged. There will not be any changes to the hydrology of water courses or aquifers due to the units implemented / under implementation / yet to be implemented units.

1.22 Stream crossings? No No stream crossing is involved

1.23 Abstraction or transfers of water form ground or surface waters?

Yes Water required for the project (for which E.C. accorded) will be met from Tungabhadra river. A dedicated pipeline has been laid from Tungabhadra river. G.O. no. 109 vide no. 06-10-2010 has been issued by Irrigation & CAD (PW:Reforms) Department.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No No changes in water bodies, drainage and land surface are anticipated as the site is more or less flat.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes Few vehicles are being provided for transport of personnel during construction & operation of the plant. Construction materials are being transported in covered trucks. Raw materials are being / will be transported by rail & road. Hence there is no significant impact on environment due to transportation pertaining to proposed project.

1.26 Long-term dismantling or decommissioning or restoration works?

No No such works are envisaged

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No No such works are envisaged

1.28 Influx of people to the area either temporarily or permanently?

Yes Influx of people will be temporary.

1.29 Introduction of alien species? No No such activity is envisaged

1.30 Loss of native species or genetic diversity?

No As a part of greenbelt development plan native species that are suitable to that soil condition have been planted in consultation with DFO as

Page 10: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

9

per CPCB guidelines.

1.31 Any other actions? No Nil

2. Use of Natural resources for construction or operation of the Project (such as land, water,

materials or energy, especially any resources which are non-renewable or in short supply)

S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

No Present use of land is Industrial. Total 60.7 Ha. of land was available with the management and proposed project is / will be carried in the existing plant premises only. Out of total land 1/3rd of land is earmarked for greenbelt.

2.2

Water (expected source & competing users) unit: KLD

Yes Water required for the project (for which E.C. accorded) will be met from Tungabhadra river. A dedicated pipeline has been laid from Tungabhadra river. G.O. no. 109 vide no. 06-10-2010 has been issued by Irrigation & CAD (PW:Reforms) Department.

2.3 Minerals (MT) Yes Iron ore fines : 13,50,000 TPA Coal (DRI) : 7,20,000 TPA Coal (Power) : 2,52,000 TPA

2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

Yes All construction materials such as stone, sand, soil are available locally.

2.5 Forests and timber (source – MT) No Nil

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes As now Electricity required for the existing plant is being taken from nearby grid. Once the power plant is established, power will be sourced from captive power plant.

2.7 Any other natural resources (use appropriate standard units)

No Nil

Page 11: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

10

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health

S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

Yes LDO/HFO will be stored in Storage tanks with Dyke wall arrangement as per OISD norms. All the HWM rules and regulations will be followed. Hence there will not be any adverse impact on human health & environment due to the proposed project.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No Closed circuit cooling system has been adopted in DRI units implemented as part of proposed project. In other units like induction furnaces, DRI kilns, Pellet plant, Sinter plant which are yet to be implemented/under implementation also closed circuit cooling system will be adopted. In power plant effluent generated will be treated to comply with APPCB norms and will be partly utilized for dust suppression partly for ash conditioning and the remaining for green belt development. High efficiency ESPs will be installed to the waste heat recovery boilers to bring down the PM to within the norms. Fume extraction system with bagfilters will be provided to the Induction furnaces to bring down the particulate matter to within the norms. High efficiency ESP will be installed to the FBC Boiler of the power plant to bring down the particulate matter in the exhaust gas to within the norms. Ash disposal will be in accordance

Page 12: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

11

with MoEF notification on Fly ash utilization. All required Emission control systems will be installed and operated to comply with the norms. Hence no water borne diseases are anticipated due to the proposed project.

3.3 Affect the welfare of people e.g. by changing living conditions?

Yes Proposed project has already created employment in the implemented units and further it will create employment opportunities in the area after implementing remaining units and thereby a substantial improvement in the socio-economic status of people in the area.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No High efficiency Electro Static Precipitator (ESP) will be installed to WHRBs & FBC Boiler to bring down the particulate matter in the exhaust gas to within the standards. Fume extraction system with bag filters will be provided to control the fugitive emissions from induction furnaces will be collected through hoods then treated in bagfilters to bring down the particulate matter in the exhaust gases to within the standards and then discharged into the atmosphere through stacks whose heights are in accordance with CPCB norms. There are no hospitals and schools in the vicinity of the plant. Hence there is/will not be any adverse impact on vulnerable groups due to the proposed project.

3.5 Any other causes

No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes Yes The dug soil during excavation is being/will be used for filling of low lying areas in the already

Page 13: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

12

implemented/yet to be implemented units.

4.2 Municipal waste (domestic and or commercial wastes)

Yes MSW will be disposed off as per norms.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

Yes Waste Oil: 10 KL/annum. This waste oil will be stored in HDPE drums and will be given to APPCB approved vendors. All HWM rules will be followed.

4.4 Other industrial process wastes

Yes The solid waste from sponge iron will be Dolochar, accretion slag, bagfilter dust, wet scraper sludge. Dolochar will be used in the FBC power plant and others will be given to brick manufacturers/ used in road construction Granulated slag generated from Blast furnace will be given to Cement plant. Dust generated from Pellet plant will be reused in the plant. Slag from SMS will be crushed and after recovery of iron, the inert material is used for landfill and similar practice will be followed for other units. Flyash generated from the power plant will be in accordance with MoEF Notification on fly ash utilization.

4.5 Surplus product No Not Applicable

4.6 Sewage sludge or other sludge from effluent treatment

No Not Applicable

4.7 Construction or demolition wastes Yes Construction wastes are being/ will be disposed off as per guidelines.

4.8 Redundant machinery or equipment No No redundant machinery will be kept in the premises.

4.9 Contaminated soils or other materials No No contamination of soils or no contaminated materials will be kept in the plant.

4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes No Not applicable.

Page 14: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

13

5.Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes The emissions of concern from the project will be are PM, SO2 & NOx. High efficiency ESPs will be provided to the FBC Boiler to bring down the particulate emission in the exhaust gas to within the norms.

Adequate stack height as per CPCB norms will be provided for effective dispersion of SO2 emissions into the atmosphere. Low NOx burners will be provided to FBC Boilers to control NOx emissions. Hence there will not be any adverse impact on environment due to the proposed project.

5.2 Emissions from production processes Yes The emissions of concern from the project will be are PM, SO2 & NOx. High efficiency ESPs will be provided to the WHRB & FBCs to bring down the particulate emission in the exhaust gas to within the norms. Fume extraction system with bagfilters will be provided to treat the flue gases from SMS and discharged through stack of adequate height. Adequate stack height as per CPCB norms will be provided for effective dispersion of SO2 emissions into the atmosphere. Hence there will not be any adverse impact on environment due to the proposed project.

5.3 Emissions from materials handling including storage or transport

Yes Dust suppression system is provided at raw material unloading areas in already implemented units / will be provided for unimplemented units. Dust extraction system with bag filters will be provided at all the dust emanating areas. All conveyors will

Page 15: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

14

be covered with GI sheets to prevent the fugitive dust. Junction hoppers and other areas where fugitive dust is likely to be generated will be provided with dust extraction system with bag filters.

5.4 Emissions from construction activities including plant and equipment

Yes Some dust emissions will be generated during construction. Dust curtains will be provided all round the area to prevent the dust emissions.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

No Not applicable

5.6 Emissions from incineration of waste No Not applicable

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

No All such wastes will be disposed along with municipal solid waste.

5.8 Emissions from any other sources No Nil

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

No All machinery used will be as per OSHA/MOEF guidelines. Earplugs will be provided to workers working in the noise prone areas. Ambient noise levels will be in accordance with MOEF notification dated 14-02-2000 i.e. noise levels will be < 75 dBA during daytime and < 70 dBA during night time.

6.2 From industrial or similar processes Yes Acoustic enclosures will be provided to STG. The ambient noise levels will be in accordance with MOEF notification dated 14-02-2000 i.e. noise levels will be < 75 dBA during daytime and < 70 dBA during night time.

6.3 From construction or demolition Yes Construction equipment will cause some noise. Ear plugs will be provided to construction workers who work near the noise generating equipment.

Page 16: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

15

6.4 From blasting or piling No No such operations are involved.

6.5 From construction or operational traffic

Yes Vehicles used by construction staff are minimal. The noise levels will be in accordance with MoEF notification dated 14-02-2000.

6.6 From lighting or cooling systems No Not applicable

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

7.1 From handling, storage, use or spillage of hazardous materials

No HFO/LDO will be stored in designated storage area with dyke arrangement as per OISD norms. Good housing practices will be adopted to prevent any spillages. Hence there will not be any adverse impact on the environment due to the proposed project.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No There will be no effluent generation from the process & cooling of Pellet plant, Sinter plant, Sponge iron, Billets & Rolled products as closed circuit cooling system is proposed to be adopted in the proposed project. Hence no waste water generation from the proposed project. Effluent from power plant such as boiler blow down, DM Plant regeneration will have pH between 9.5 and 10.5. Hence a neutralization tank will be constructed for neutralizing the boiler blow down & DM plant regeneration water After neutralization these two effluent streams will be mixed in a Central Monitoring Basin (CMB). The treated effluent will be used for dust suppression and Green belt development within the premises. No effluent will be let out of the plant premises. Hence Zero discharge concept will be implemented in the proposed project. Sanitary waste water will be treated in Septic tank followed by sub-surface dispersion

Page 17: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

16

trench.

7.3 By deposition of pollutants emitted to air into the land or into water

No High efficiency ESPs are being / will be installed to WHRB & FBC boiler stacks to bring down the PM to within the norms. Fume extraction system with bag filters will be provided to treat the gases and the secondary fugitive emissions from the SMS. Unloading areas will be provided with water sprinklers to prevent the fugitive dust. All conveyors will be completely covered with GI sheets. Ash will be stored in silo and entire ash will be given to Cement plants / brick manufacturers. Hence there will not be any major deposition of pollutants into the air/land/water.

7.4 From any other sources No Not applicable

7.5 Is there a risk of long term build up of pollutants in the environment from these sources?

No Not applicable

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances.

No LDO/HFO will be stored in storage tanks with dyke wall arrangement as per OISD guidelines. Waste oil will be stored in covered HDPE drums in designated area and will be given to APPCB approved vendors. Good housekeeping practices will be adopted. Hence there will not be any adverse impact on environment

8.2 From any other causes No Not applicable

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

No Not applicable

Page 18: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

17

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

Housing development

Extractive industries

Supply industries

Other

No

No such activities are envisaged

9.2 Lead to after-use of the site, which could have an impact on the environment

No Not applicable

9.3 Set a precedent for later developments Yes With the improvement in the socio-economic status of the people in the area, later developments are expected.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

Yes The emissions from other industries in the area will also be considered while evaluating the incremental concentrations.

Page 19: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

18

(III) ENVIRONMENTAL SENSITIVITY

S.No. Areas Name / Identity

Aerial distance (within 15 km.)

Proposed project location boundary

1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value

Not Applicable ….

2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

Tungabhadra RF Tungabhadra River Sugur Vanka Rajalabanda Diversion Scheme Canal

5.2 Kms. 2.5 Kms. 0.8 Kms. 5.3 Kms.

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

--- ---

4 Inland, coastal, marine or underground waters

Under ground water Available at the site

5 State, National boundaries --- Not applicable

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

State Highway National Highway

Mantralayam (Pilgrim place)

5.8 Kms. 2.6 Kms. 6.5 Kms.

7 Defence installations Nil Not applicable

8 Densely populated or built-up area Mantralayam 6.2 Kms.

9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

Rassamani Village

1.4 Kms

10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

---

Not applicable

11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

--- Not applicable

12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

--- Based on the historical data, the site is not likely to prone to earthquakes, floods, etc.

Page 20: Maruti Ispat & Energy Pvt. Ltd.environmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity 1 APPENDIX

Maruti Ispat & Energy Pvt. Ltd. Form I for extension of EC validity

19

(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

NOT APPLICABLE

We request the Honorable Ministry to kindly extend the validity of the Environmental

Clearance order issued earlier vide order No. J-11011 / 1149/ 2007 – IA II (I) dated 2nd January

2009 in order to complete the remaining unimplemented portion of the proposed project for

which Environmental Clearance has been accorded.

“I hereby given undertaking that the data and information given in the application and

enclosures are true to the best of my knowledge and belief and I am aware that if any part of the

data and information submitted is found to be false or misleading at any stage, the project will be

rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 29-12-2015

Place: Hyderabad


Recommended