+ All Categories
Home > Education > Mass, Volume and Density Labs Day 2

Mass, Volume and Density Labs Day 2

Date post: 28-May-2015
Category:
Upload: jmori1
View: 206 times
Download: 3 times
Share this document with a friend
Popular Tags:
8
Today you will need : 1. Pencil 2. Volume & Mass Labs Worksheets – Picked Up Yesterday 3. Progress Notice – Due Tomorrow Signed
Transcript
Page 1: Mass, Volume and Density Labs Day 2

Today you will need:1. Pencil2. Volume & Mass Labs

Worksheets – Picked Up Yesterday

3. Progress Notice – Due Tomorrow Signed

Page 2: Mass, Volume and Density Labs Day 2

Friday, June 1st1. On-line Component2. ½ page of notes – What to Know

for the Chemistry Final3. Binder Check #4

1. Due at the beginning of class

Monday, June 4th1. Test #2 Part 2 Written

Page 3: Mass, Volume and Density Labs Day 2

-10 points will be taken for unclean labs

1. Sinks clean 2. Counters & Table Tops Clean &

Dry3. Supply Tubs should be

complete and “ready” for next group.

4. Testing Equipment should be organized into appropriate bags.

5.Tubs and Scales at end of tables to be checked.

Let Me KnowLet Me Know if supplies need to if supplies need to be added/changedbe added/changed

Page 4: Mass, Volume and Density Labs Day 2

Mass Lab Mass Lab

Table #

Tub Supply Check

12

x2

Page 5: Mass, Volume and Density Labs Day 2

1. Part 1 – Count your Drops!

2. Part 2 – Volume by Formula

3. Part 3 – Water Displacement

4. Part 4 – Color Change

5. Part 5 – Mass Lab 1

6. Part 6 – Your Age on Other Worlds

7. Part 7 – Using an Electronic Scale

8. Part 8 – Density Check

9. Part 9 – Bohr Model and Lewis Dot

10. Part 10 – Balancing Equations

11. Extra Credit

Page 6: Mass, Volume and Density Labs Day 2

Mass Lab Mass Lab

Table #

Tub Supply Check

12

x2

Page 7: Mass, Volume and Density Labs Day 2

-10 points will be taken for unclean labs

1. Sinks clean 2. Counters & Table Tops Clean &

Dry3. Supply Tubs should be

complete and “ready” for next group.

4. Testing Equipment should be organized into appropriate bags.

5.Tubs and Scales at end of tables to be checked.

Let Me KnowLet Me Know if supplies need to if supplies need to be added/changedbe added/changed

Page 8: Mass, Volume and Density Labs Day 2

1. Signed Progress Notices – Due Tomorrow

2. Volume and Mass Lab – Due Friday May 18th at the end of the period

3. Final Exam –Part 1 & Binder Check #4 – June 1st


Recommended